Introduction
Asda East & West Contracting Est. Is a Contracting company, started by a group of professionals
who has acquired a vast experience in Engineering, Civil Construction, industrial Maintenance
operations and services, Power, Electrical, Instrumentation, Mechanical and Telecom Project
management equipment services of large petrochemical complex in JUBAIL Kingdom of Saudi
Arabia. The Company is dedicated in the following the highest level of safety Standards and
quality control in all its contracts activities. With a satisfied clientele in public and private sector,
that includes Saudi Electrical Company, Saudi Telecom Company Royal Commission of Jubail
and scores of other organization in private sectors. The Company has complete professional
management, highly qualified, motivated and experienced staffs to cope with the fast development
of country and it is a testimony to the integrity and dedication of its management and workers to
provide quality work and services. In brief our capabilities include Civil, Mechanical, Electrical
Planning, Insulation, Industrial Services, Rental Equipment’s and Manpower Services.
Our Company Asda East & West Est. Established in 2005 and registered as Electrical Maintenance
Est. and later on Registered as contracting Est. at Jubail, Committed to Overall success by serving
manpower supports to all projects. We have grown significantly since our inspection with strong
fundamentals and achieved our goals within a stipulated time through our Continuous
uncompromising integrity, dedication and honesty. Now we are one of leading eves for
Contracting, Rental Equipment’s and effectively participating for project works which includes
Civil, Mechanical and specially Electrical. The Company is a 100 % Saudi ownership. The
company has based its Office in Jubail. We Trust that this brief information find interesting and if
any further details needed, please let us know for immediate response. We look forward to being
of sincere to one and all forever.
Our Commitment
The commitment of is to assure you that our services can do wonder in terms of satisfying your
business needs and assist our clients to keep powerful competitive advantages. In order to
complete the commitment, we are required to elaborately collect; estimate and pay close attention
to various information, and to make scientific decisions in accordance with the changes of client’s
needs, to improve technologies and designs to improving various service measures, to meet and
surpass client’s expectations, namely to guarantee quality, techniques and services to pursue the
basic conceptions of time and effectiveness.
Our Aim
Endlessly and ceaselessly make improvements and continuously meet client’s requirements, with
Constant efforts to achieve excellence.
Our Vision
To be the First Choice for the customers in Plant Maintenance and construction committed to total
customer satisfaction by building on our strengths of innovative designs, superlative quality of
material, cutting-edge technology, timely completion and demonstrating the highest standards of
workmanship.
Our Mission
To strengthen our position as a market leader in plant maintenance and construction Projects, by
creating sustainable growth that uphold the highest standards of business ethics and lead the way
in fulfilling social responsibilities by implementing the best practices of quality and EHSS.
DIVISION
The company Asda East & West Est. is a focused organization operating in many different
businesses or trades. One of these is Construction Division, engaged mainly in civil works. It is our
pleasure to introduce our company, specifically the construction division with the brochure for a
more comprehensive knowledge and understanding. Our business line is to undertake civil works.
Our experienced staff and workforce of various trades are dedicated people ready to meet the
challenges of the industry. We are committed to complete and deliver our projects to the full
satisfaction of our esteemed clients. Whatever job/work within our scope, we are ready to extend
our services and cooperation. We are looking forward to serve you.

Civil Works in Industries: Including:

Temporary Facilities Lay down areas


Maintenance Works Tanks Farms
Storm water ponds Water proofing
Utilities Open channels
Warehouses Buildings
Final Civil Works Stockyards
HDPE Liner
Residential Building Including Construction of:

Hotels Motels
Apartments Mosques
Housing Compounds Villas
Portable unit Labor camps
Horse stable Recreation Camp Construction

Site Development: Including Installation

Site preparation Potable water lines


Storm water lines Waster water lines
Telecom Electrical works
Roads Landscaping
Gravel & Asphalt paving Floating berths
Demolition and repair Foundation
Concrete dikes Dewatering
Excavation Back Filling Site Filling
Plant Maintenance Activities:

Annual Maintenance Contracts Preventive & predictive Maintenance


Structural and pipe Fabrication Maintenance & Buildings Renovation.
Fire Fighting Excavation & Underground services
Pipeline replacements Equipment overhauling
Instrument Calibration Equipment Modification

Finishing Works

Tile Works Gypsum Board


Painting Work Block Work
Plaster Work Pavement Tiles
Ceiling Curb Stone/Interlock Tile
Epoxy Paint
Projects
Sr.
Client Project
#
1 PETRO KEMYA SABIC-Petrokemya Civil Work Mod-07 4801200314-Quench Imprnt
Demolition of Existing Concrete, Manual Excavation, Construction of RCC Foundation
SABIC/ SISCO Including Supply & Fixing of Re-Bar, Supply & Fixing of Shuttering, Supply &
Pouring of 30 MPa, 17 MPa Concrete, Construction of RCC Ramp, Construction of
RCC Drain Channel & Grade Slab.
2 PETRO KEMYA SABIC-Petrokemya Mod-03 4801200314-Quench Imprnt
Manual Excavation & Backfilling Work for laying of Cables, Bedding of Sweet Sand,
SABIC/ SISCO Laying of Red Tiles & Warning Tape, Construction of Duck Bank and Cable Trench,
Construction of RCC Pads Foundation.
3 Al-Bayroni SABIC/ Renovation of Assets Engineering & Inspection Offices.
Demolition of Existing Tiles, Ceiling, Blocks, Ventilation Ducts, Diffusers, smoke
IOCON Detectors &Toilets. Supply & Installation of Gypsum board Wall partition, Ceiling, 3D
Decor Walls, Painting, Tiles, Skirting, Toilets Fitting & fixtures, Counter top with
Wash Basin, Kitchen Cabinets, Aluminum Doors, Aluminum Partition Wall, LED
Ceiling Lights, HVAC Diffusers & AC installation. Supply, Fabrication & Installation
of Pressure Air Pipe line.
4 SHARQ SABIC/ Renovation of ITB ISD Building at SHARQ Plant, Project Number: AF-161200024
Demolition of Existing Tiles, Ceiling, Blocks, Ventilation Ducts, Diffusers, smoke
DAR PETRO Detectors &Toilets. Supply & Installation of Gypsum board Wall partition, Ceiling, 3D
Decor Walls, Fire Retardant Paint, Tiles, Stair Case Marbles, Interlock Tiles, Skirting,
Toilets Fitting & fixtures, Water Proofing, Marble Counter top with Wash Basin, SS
Kitchen Cabinets, SS Doors, SS Sliding Doors, SS stair Hand rail & Aluminum
Windows.
5 PETRO KEMYA Up gradation of 02 Analyzers in Butadiene Unit Foundation –
SABIC/ NUQBAH Olefins-3 AF-1320062
Demolition of Existing Concrete, Manual Excavation, Construction of RCC Shelter
Integrated Co. Foundation Including Supply & Fixing of Re-Bar, Supply & Fixing of Shuttering,
Supply & Pouring of 30 MPa, 17 MPa Concrete & Grade Slab.
6 IBN ZAHR SABIC/ Ultrasonic Flow meter on Flare Header of MTBE- 1, 2 and LP & HP Flare Lines of PP-
NUQBAH Integrated 1, Project Number: BS-173300033.
Demolition of Existing Asphalt, Manual Excavation, Construction of RCC Flow Meter
Co. Foundation Including Supply & Fixing of Re-Bar, Form Work, Anchor Bolts. Supply &
Pouring of 35 MPa, 17 MPa Concrete & Grade Slab. Dewatering & Shoring.

7 PETRO KEMYA Boiler Opacity Analyzers Foundation Work Olefins-3 SP-152000009


Demolition of Existing Concrete, Manual Excavation, Construction of RCC Boiler
SABIC/ Foundation Including Supply & Fixing of Re-Bar, Supply & Fixing of Shuttering,
NAZAIK(Abdul Supply & Pouring of 30 MPa, 17 MPa Concrete & Grade Slab.
Kareem Holding)
8 IBN ZAHR SABIC/ Construction of RCC Pad Foundations, Cable Laying & Coring Works.
Demolition of Existing Slab & Asphalt, Manual Excavation, Supply & Construction of
MARCO RCC Pad Foundation, Coring in Roof Slab, Cable Laying.
9 PETRO KEMYA Construction of X-Ray Building Including Demolition of Existing Concrete, Manual
Excavation, Supply & Pouring of Concreting for X-Ray Room Including Supply &
SABIC/ SAUDI DAZ Fixing of Re-Bar, Supply & Fixing of Shuttering, Concrete Pouring, Construction of
Ramp Foundation, Construction of Foundation, Supply & Fixing of Block & Plaster
Work, Supply & Fixing of Ceiling, Supply & Fixing of Gypsum Board, Supply &
Application of Painting Work, Supply & Fixing of Tile Work, Water Proofing Work,
Excavation work for laying of Cables, Construction of Duck Bank and Cable Trench,
Construction of Pads Foundation.
10 ARECLOR RCC Foundation for Fire Fighting Pumps, Ref # 3000003657
Demolition, Chipping of Existing Slab. Manual Excavation, Supply & Installation of
MITTAL Plant. Rebar, Form Work, Anchors Bolts, Grouting, Joint Sealant for RCC Foundations.
11 ARECLOR Painting Work on Visitor Walkway in the Hot mill Area, Ref # 200007652
Repair of Cracks, Surface Preparation and Green Color with Yellow Border & Zebra
MITTAL Plant. Crossing Epoxy Paint for Visitors in Hot Mill Area
12 SABTANK/ SABIC HDPE Liner Installation of Saudi Kayan & SADAF BZ Tanks at SAB Tank
Supply & Installation of Geo Textile Non-Woven 300 GSM, single layer 1.5 mm Thick
SAUDI DAZ HDPE liner both side smooth Black including Wedge welding, Extrusion Welding, Hot
air Welding and testing with S.S Strips & Screws.
13 PETRO KEMYA Manual Excavation & Backfilling Work for laying of Cables, Bending of Sweet Sand,
Laying of Red Tiles & Warning Tapes, Construction of Duck Bank and Cable Trench,
SABIC/ Industrial Construction of RCC Pads Foundation.
Instrumentation &
Control System
Limited
14 PETRO KEMYA Evaporation Pond Cleaning Work at PETROKEMYA OLEFIN-II.
SABIC/ SAUDI DAZ Supply and provide 10000 PSI Hydro Jetting Machine with all accessories ,
Supply and apply high performance elastomeric expansion joint sealant gun
grade acid resistance master seal GG 470, Repair the existing pond wall and
floor crack repair using high speed, high efficiency HM-120L crack injection
adhesive included the surface cleaning re-proofing as per SABIC Standard.
Excavation for external side pond wall. Excavate up to 2 Meters deep to expose
the existing crack and repair , Supply and lay the base course for excavated
area to bring the original condition
15 PETRO KEMYA Demolishing the Oil separator, Oil Coolers Foundation, Motor & Bare-Shaft
foundation as Basis of the New Foundation Work, Demolishing the Existing RCC Slab
SABIC/ Johnson for the New Foundation, Anchors and Roughing the old concrete to engage the New
Controls Foundation Work, Design & Construction of the New Foundation, Surface Preparation
and Under Ground Bitumen Painting Work.

16 Al-Bayroni Plant / Manual Excavation & Backfilling Work for laying of Cables, Bedding of Sweet Sand,
Laying of Red Tiles & Warning Tape, Construction of Cable Trench & Grade Slab.
Industrial Supply & Installation of Core Test for Existing Concrete Transformer Foundation,
Instrumentation & Grouting work, Concrete Work & Asphalt work.
Control System
Limited
17 ARECLOR Piping Work for the Fire Fighting Pumps, Ref. # 3000003690
MITTAL Plant. Supply, Fabrication & Installation of 12,8,6 & 2 inches Pipe line for the Jockey,
Electrical & Diesel Driven Fire Fighting Pumps includes Flanges, Blind Flanges,
Pressure reducers Back Flow line & Butter Fly Valves.

18 Ibn-Al-Baytar Plant Demolishing the Existing RCC Slab for the New Foundation, Anchors and Roughing
the old concrete to engage the New Foundation Work, Manual Excavation, Construction
(IBB) SABIC / of RCC Foundation for HVAC Including Supply & Fixing of Re-Bar, Supply & Fixing
Johnson Controls of Shuttering, Supply & Pouring of 30 MPa, 17 MPa Concrete & Waterproofing Work.
19 Saudi Kayan Plant / Demolishing the Existing RCC Slab for the New Foundation.
East Prestige
20 SIPCHEM Plant / Manual Excavation & Backfilling for Co Supply from SIPCHEM to SAMAC,
Construction of Skid Foundation, RCC Protection Slab & Ditch, Installation of Fence,
AL-Muzain Demolition of Existing Asphalt & Under Ground Utilities, Asphalt Work, Supply &
Fixing of Inter Lock Tile, Supply & Fixing of Curb Stone,
21 Expertise Industrial Site development, Ware House, Guard House. Light pool foundation, Sliding Gate
Foundation, Car Washing Area, Generator Room, Including Finishing work, Supply &
Services Fixing of Gypsum Board, Supply & Fixing of Ceiling Work, Supply & Fixing of
Marble, Supply & Fixing of Tiles, Supply & Application of Painting Work, Supply &
Installation of Waterproofing, Supply & Fixing of Block Work, Plaster Work, Supply &
Fixing of Marble, Supply & Fixing of Inter Lock Tile, Supply & Fixing of Curb Stone,
Asphalting Works, Car Parking Sheds, Wheel Stopper,
22 JANA Plant Civil & Maintenance Work, Construction of Pump Foundation, Manholes, Acid Tanks,
Pipe Rack Foundation, Trench, RCC Ramp, Construction of RCC Grade Slab, RCC
Slab for Cables Trench, Installation of Anchor Bolts & Epoxy Grouting Work, Drains,
Supply & Fixing of Ceiling, Gypsum & Tiles. Painting Work. Demolition Work,
Manual Excavation Work for Fire Water Line, Repair work of Roof Slab,
23 SODA Plant Civil & Maintenance Work, Construction of Pump Foundation, Manholes, Pipe Rack
Foundation, RCC Slab, Installation of Anchor Bolts & Epoxy Grouting, Manual
Excavation & Backfilling Work for Fire Water Line.
24 Arcelor Mittal Plant Civil Work, Supply & Fixing of Gypsum Board, Supply & Fixing of Ceiling, Fixing of
Tile in Admin Building, Mess hall, truck driver house, guard house and Mosque area.
Water proofing work for the roofs and toilets area in Admin Building, Mess hall, Truck
driver house, Guard house and Mosque area. Fixing of Curb Stone, leveling and laying
of gravels. Fixing of Doors and Windows in Buildings. Fixing of Counter top.
25 PCC Plant Construction of RCC Grade Slab, Ramp, Pads Foundation, Door Step, Supply & Fixing
of Gypsum Board, Supply & Fixing of Ceiling, Supply & Fixing of Tile, Supply &
Application of Painting Work, Supply & Fixing of Door, Supply & Fixing of Curb
Stone, Leveling and Lying of Gravel.
26 International Construction of Commercial Villas Works, Supply & Fixing of Gypsum Board, Supply
& Fixing of Ceiling, Supply & Fixing of Tiles, Supply & Application of Paint Work,
Building System Co SNTV Project Jubail
27 Beijing Construction Construction of Building Including Finishing work, Supply & Fixing of Gypsum Board,
Supply & Fixing of Ceiling, Supply & Fixing of Tiles, Paint Work, Fixing of Inter lock
Engineering Group tile Royal Commission, Jubail, Jalmudah Village
28 Bilfal Heavy Construction Of R.C.C Concrete Blocks for RT Bunkers.
Industries
29 Bilfal Heavy Site development, Concrete works, Dike walls and Asphalt works, at Bilfal facility.
Industries
30 Al-Jabr Talke Ltd Site development, Tanks Foundation, Pipe Rack, Light Pole Foundation, Transformer
Foundation, works at Jubail Commercial port area.
31 SMH Site development, Asphalting works and concrete works, Installation of Fence Work at
Jubail Industrial Port.
32 Abdullah Saeed Al- Site Development, Asphalting works, Car Parking Sheds, Electrical Works, Guard
house and Concrete Works.
Ghamdi Est.
33 ACIC / Lay down Site Development and Civil works, Construction of Office Building, Wear House,
Workshop, Strom Room, Septic Tank and RCC Grade Slab. Fixing of Inter Lock Tile,
Area Fixing of Curb Stone, Block Work and Concrete Works, Construction of Car Parking
Including RCC Ramp & Wheel Stopper, Marking of Road & Car Parking, Fabrication
of ladder and Platforms.
34 United Slub Plant/ Construction of Security Guard House Including RCC Concrete, Re-bar and Shuttering
for Footings, Columns, Grade Beams, Grade Slab, Roof Beams and Roof Slab, Supply
DAHCON & Fixing of Block Work , Plaster Work. Tile Work, Ceiling Work, Gypsum Board,
Painting Work and Water Proofing Work.
35 ACC Plant Maintenance Work, Supply & Fixing of Tiles, Supply & Fixing of Kitchen Cabinet,
Laying of Cable

Heavy Equipment Rental

Providing services on rental basis for following equipment:


 Cranes
 Loaders
 Dump trucks
 Trailers
 Compressors, Generators, and welding machines.
 Dewatering Pumps
 Bobcat
 Waste Water Tanker ( 16000 ltr, 32000 ltr)
 Lifter Container Garbage Truck
 Excavators & Backhoes
 Buses of 55-Seater, 25-Seater and 15-Seater
 Pick-up single cabin and double cabin
 Core Drilling Heads.

Resources of Manpower

 Project and Site Management (Mechanical, Electrical, Civil & Instrumentation)


 QA/QC Engineers
 QA/QC Inspector
  Mechanical Engineers
  Electrical Engineers
  Civil Engineers
  Safety Engineers and Inspector
  Electrical Engineers
  Instrumentation Engineers
  Certified Welding inspectors
  Site supervisor (Mechanical, Electrical, Piping, Civil)
  Work Permit Receiver
  Certified Electrician
 Expert Manpower (Fabricator, Erector, Fitter, Qualified Welder, Rigger, Scaffold and Driver)

Equipment’s
Cranes 50-100 Tons 01 No’s

Excavators 01 No’s

Front-end Loaders 01 No’s

Vibratory Roller - 10 Tons 01 No

Vibratory Roller - 01 Ton 05 No’s

Boom Trucks 01 No’s

Bobcat 01 No’s

Fork lifters 01 No’s

Water Tankers 02 No’s

Air Compressors 200CFM to 900CFM 02 No’s

Welding Plants (Diesel/Electric) 02 No’s


Power Generators (5-500KVA) 
  10 No’s

Project Functions
ASDA has a fully developed project department to manage and implement our projects and is involved in
effective execution of various projects of the company. The Asda project management uses sophisticated
methods in technology and management, systems engineering, statistical methods and software and
computers to build tools to cope with meeting constraints and challenges faced while execution of
projects and continuously strive to manage people, processes and time,
Allocate and efficiently apply the resources to achieve milestones and successful completion of projects.
For any developmental activities, effective execution and successful completion of projects is key and
our projects department keeps its focus towards completion of projects on time, within cost and of
uncompromising quality. At the same time, Asda believes that no project however big or significant is
worthy of its achievement unless safety of every single personnel involved is safeguarded and kept
absolutely uncompromised from start to finish. Asda projects keep health, safety and environment (HSE)
as our paramount uncompromising aspects. HSE is our first priority and is strictly adhered to in execution
of projects.
Projects Engineering
The key to success in any project is the accurate definition of its three main criteria (Performance, Time
& Budget). In order to deliver successful projects, Asda has a dedicated Project Engineering team which
focuses its effort from project conceptualization up to the start of implementation. The team delivers
accurate project scope, designs, budget estimates and time schedules, key for contract award.

Stages and Challenges


Stages and challenges in a Project and Project Management
A project is an endeavor to meet unique goals and objectives, usually to bring about beneficial change or
added value. The nature of projects being unique and different from other operations, the management of
projects requires the development of distinct technical skills and the adoption of separate management
techniques. Project management is an effort carefully and meticulously planned and organized used for
accomplishing a specific one-time objective, always involving multiple resources to be allocated and
coordinated, and innumerable challenges and constrains to be faced and resolved in time.

An effective project management invariably involves a project plan to be developed, which includes
formulating and defining the project goals and objectives, identifying tasks and how goals will be
achieved, estimating and quantifying the resources needed, and determining budgets and timeline for
completion. It also includes managing the implementation of the project plan, along with operating
regular controls to ensure that there is accurate and objective information on performance relative to the
plan, and the mechanisms to implement recovery actions where necessary. Thus, the project management
typically comprises

Planning, organizing, and managing resources to bring about the successful completion of specific
project goals and objectives. Projects usually follow major phases or stages including feasibility,
definition, estimation, project planning, tendering and contract award, implementation (EPC),
commissioning and acceptance. All projects face three constrains i.e. time (how long is the period
available), cost (how much money or resources are possible) and performance (what is to be
accomplished). How these are successfully balanced is a constant challenge of the project management
functions.
Clients:
Policies

Quality Policy
We are committed to providing service that ensures a quality program is delivered in accordance
with customer’s requirements. We ensure the satisfaction of our valued customers and a
continuous improvement program that provides results for our customers. Determined, we’re
always putting our best foot forward to accomplish our quality Objectives and Systems for its
continuing suitability and for continual improvement of the Quality Management System, with
the aim of enhancing customer satisfaction.
We aim to develop leaders and to train, encourage and motivate employees throughout the
organization of the quality management system, communication and understanding of the quality
policy at all levels is exceeded and achieved, to further enhance the quality of our product and
service.
The key is consistency of quality service; with that key in mind, we designed a system to ensure
that both our company and customers can be confident that we can meet customer’s requirements
on every occasion. Extensive quality tests are conducted from the very initial stage of
procurement
Before dispatching any product to the market. The responsibility of meeting this commitment to
quality is shared by every employee.
We exert the max efforts, for obtaining related ISO certification for our line of business by close
monitoring and reporting all activities.

The Quality Goals are:


 To continuously improve our efficiency and sustainable Quality System.
 To ensure availability of high quality resources of manpower, equipment's and Tooling and
facilities.
 Constantly developing a formal Quality Program to meet the company’s changing
requirements.
 Auditing the Quality Program and the departments involved.
 Implementing Quality Management Systems.
 Statistical Process Control.
 Qualitative and Quantitative Analyses.
 Testing, Inspecting, Evaluating.
 Auditing and prequalification of sub-contractors, suppliers and manufacturers.
 Developing Standards, Specifications, and Test Methods.

Safety Policy
We are committed to SAFETY, which we conceived with knowledge that potential may hazards
confront the safety of personnel; equipment and environment. Necessary safety and preventive
measure are to be practiced and implemented for planning, managing and conducting work. Asda
Management is committed to the protection of our employees, contractors, subcontractors and client
personnel’s, products, equipment, and even the general public at our work locations.
Every employee of the Est. is being trained and shall make to understand the potential hazardous of
the job and the requirement, precaution and procedure of controlling hazards. They are all trained in
the use of respiratory protective system and equipment, protective clothing, use of the first aid in all
equipment, emergency lifesaving exercises, firefighting equipment etc. We are conducting safety
audit program annually, by selected members appointed directly by General Manager. The audit
team will review the documentation to ensure that all the areas of the standard are covered and then
provide the result of the review.
Moreover, Asda realized that SAFETY is the number one priority in a construction site. It is
committed to operate in a safe environment, capable of protecting human resources and properties
through the implementation of this plan.

Asda strategy to achieve safety operation is guided by the following:

 Develop safety awareness


 Minimize Safety hazards
 Quick and adequate response in case of accidents.
 Proper documentation and reporting
 Housekeeping and clean the area
HE Policy
Asda East & West Est. is committed to an effective Health and Environmental Management System
designed in a manner which protects the environment as well as the health of our associates,
customers, suppliers, and neighbors.
It is our mission to ensure the ultimate safety of our employees and the general public by
identifying hazards, controlling risks, educating and motivating all employees to work safely from
top management right through to general labourer. We also promote the benefits of a healthy
lifestyle amongst our employees and provide a comprehensive health cover plan and facilities. We
support our employees by providing training and development of a robust Safety and Health
culture.

Our Health and Environmental Policy adheres

 We will comply with all applicable environmental laws, regulations, and permits, and will
employ more restrictive internal standards.
 We will use our best efforts to identify environmental issues.
 We are applying appropriate considerations to protect the health and safety of our associates
and the communities in which we operate.
 We will communicate and engage with employees, regulators, the communities in which we
operate.
 We are committed to energy efficiency, minimizing waste from operations, and preventing
pollution.
 We continually evaluate, improve and update our Safety, Health and Environment systems in
accordance with local regulatory requirements and international standards.
 This is reflected in our excellent overall safety records on many projects throughout the
region.
 We consistently seek new ways to enhance the environmental performance of our operations
and to protect the air, water and soil surrounding us.
 We engineer our work with modern designs and equipment to minimize their environmental
impact.

Company Details

Commercial Registration
Chamber Membership
Location Map
Contact Details:

Engineer Saleh Ahmed Al-Haddad


Chief Executive Officer
salehahmed@asdasharq.sa.com

Establishment Name:
Asda East & West Contracting Est.
Commercial Registration:
C.R:2055015611

Contact Person:
Company Address Mr. Kashif Imran
Business Development Manager
P.O. Box: 8342-35513 Mobile: +966 597732879
Abu Bakar Street-Al-Jubail City, kashif@asdasharq.sa.com
Kingdom of Saudi Arabia
Tel: +966 13 3449629 Mr. Ali Hussain
Operation Manager
Mobile: +966 590590817
alihussain@asdasharq.sa.com
Our Specialties
Are
Your Success.
Thank You