Sie sind auf Seite 1von 1

Defence Institute of Advanced Technology

Girinagar, Pune – 25
Department of Electronics Engineering

11th NEMP Course Structure [11-22 Feb. 2019]


Day Session – I (0900-1100 Hrs) Session – II (1130-1300Hrs) Session – III (1400-1530Hrs) Session – IV (1600-1730Hrs)
Basics of EM , Introd., to EMI/EMC ,
11/2/19 Registration and Inaugural Overview of E3 ,
DIAT LRDE
Monday Function DIAT
Shielding, Filtering, Grounding and Bonding, EMI/EMC Specifications,
12/2/19
DIAT LRDE LRDE LRDE
Tuesday
E3 in Radars, E3 in Comm., Systems, E3 in Combat Vehicles, E3 in Military Aircraft,
13/2/19
DIAT DEAL CVRDE ADA
Wednesday
L
T U T Hazards of EM Radiation on
14/2/19 EMP SIMULATUS, UWB Systems, Lightening,
E N E Personals (HERP),
Thursday RCI RCI IISc
A C A IITM
E3 in Missile systems, H Spectrum Management &
15/2/19 E3 in Navy Systems, Spectrum Management in
M/s Pro-Tech, USA B Spectrum Supportability, B
Friday NEMCC India, ACE
R B WMO R
E R E
16/2/19
 Lab Visit – demonstration on A E3 for Vehicle/Automobile E testing A By VRDE 
Saturday K A
17/2/19 K
 Sunday Sunday Sunday Sunday 
Sunday
Generation & Characteristics of NEMP Venerability &
18/2/19 NEMP Coupling, NEMP Mitigation,
NEMP, Susceptibility,
Monday BARC NEU - Jamnagar
M/s Free Lancer Consultant INS Kattabomman,
19/2/19 NEMP Shielding, NEMP Coupling Analysis, NEMP Hardness Assurance, Nuclear and TREE Effects,
Tuesday DIAT SPIC SPIC DLJ
Shielding Facilities for Service,
202/19 Non-Nuclear EMP, UWB Systems,
HPMW Systems, CCE
Wednesday TBRL RCI
MTRDC
Pulse Power Systems (PPSs) in Indigenous Gaskets and Shielding EMI/EMC/EMP/TEMPEST EMC & EMP Protection,
21/2/19
India, Materials, Indigenous Filters, M/s ETS Lingren
Thursday
M/s Zeonics Sys., Pvt., Ltd., M/s SSD Polymers M/s EMI Solutions
EMP Generations, E3 Policy for Services,
22/2/19 Examination and
DCP JCES /HQ IDS DIAT LAB Visit
Friday Valedictory Function

Das könnte Ihnen auch gefallen