LOCATION: GRAND CANAL MALL , MCKINLEY HILL TAGUIG CITY DATE: APRIL 15, 2019
GENERAL ACTIVITY % COMPLETED TARGET DATE REMARKS
Hauling of Debris/Equipment ONGOING Until end of Project On-going Assembly of Pool Equipment and Play Sets* 90% April 20, 2019 Awaiting materials HVAC Installation* 0% May 30, 2019 Awaiting materials Sprinkler system done Fire Protection 60% May 30, awaiting for FDAS Electrical Roughing-ins 50% June 2019 On-going Plumbing complete, Awaiting Sanitary Works 50% May 06, 2019 concrete works Masonry Works (CHB Laying & Plastering) 80% April 27, 2019 On-going Drywall Partitions 100% Done Done Painting Works 60% June 2019 Top coat On-going Plumbing Works + Testing 50% April 30, 2019 Installation works at pool area Standby for plumbing Concreting Works 10% May 06, 2019 completion and testing Framing complete, Standby Ceiling Works 60% May 30, 2019 for ducting works Tile Works 0% May 24, 2019 Tiles for purchasing Continuous Fabrication Off- Interior Accents Fabrication/Installation 20% June 2019 site Temporary Board -up 100% Done Done Awaiting materials for Kitchen Cabinetries 0% June 10, 2019 Fabrication Materials on site awaiting Glass Works 30% June 2019 installation Waterproofing (1st Layer) 90% April 30, 2019 Flood test 95% Complete Awaiting Concrete works Waterproofing (2nd Layer) 0% May 25, 2019 inside pool area Boat Café and PVC board wall Off-Site Preparation/Fabrication 40% June 2019 accents fabrication on-going Doors and Jambs for Doors & Jambs Installation 0% May 25, 2019 purchasing Finishing & Retouching 0% June 2019
*Awaiting additional parts and materials sourced from China, thus causing delays on assembly installation.