Sie sind auf Seite 1von 54

Ministry of Energy and Mineral Resources

Republic of Indonesia

Renewable Energy for Sustainable Development


Responsible Energy Consumption and Production for Sustainable Cities
and Communities'

Ignasius Jonan
Minister of Energy and Mineral Resources

Bali, September 12th, 2018

1
#Equitable Energy

#EquitableEnergy
Emphasize Social Welfare, Conducive Business Climate dan Economic Growth

Electrification Sustainability Investment & Bureaucracy


Fair Distribution
Ratio & Affordability Growth Reform
 Increasing Power  Targeted Subsidies  Renewable Energy  Mineral Added Value  Simplification of
Generation Capacity  Single Retail Fuel Utilization  PI 10% from oil & gas Permits
(35,000 MW) Price contract
 PPA Reform  Online System
 Rural Electrification  City Gas  Private Refinery
 Mine Mouth Power  Good Governance
 Electrifying 2,519  LPG’s Converter Kit Plant  Industrial Gas Price
Villages for fishery  PSC Gross Split  Beneficial Ownership
 1 Gas Refueling  Wellhead Power Plant
 Electricity Tariff of  Sunk Cost Refund -
Station Nozzle at PSC
NRE Each gas station

= Sovereignty and Energy Resilient =


2
Renewable Energy Development
Semester I - 2018 Installed Geothermal Power Plant Capacity (MW)

140 MW Geothermal Power Plant


additional capacity from Karaha#1
(30 MW) & Sarulla# (110 MW)

Target

Semester I A
chievement

Installed Bioenergy Power Plant Capacity (MW)


Installed Solar, Minihydro/Microhydro & Wind
Power Plant Capacity (MW) Bioenergy Power Plant consisted of Biomass, biogas, Municipal Wa
ste, and Biofuel. Mostly are off-grid power plant)
Target 2018 Semester I Achievement

Semester I A
chievement
Target
3
More Power Purchase Agreement from Renewable Energy have been signed
[CATEGORY
NAME] 5 Unit
[VALUE]MW
[[PERCENTAGE]]
[CATEGORY
NAME] 5 Unit Financial Close
Construction
70 [VALUE]MW
[[PERCENTAGE]]
[CATEGORY
COD Preparation
Contracts
4 23 43
NAME] 6 Unit
[VALUE]MW
[[PERCENTAGE]]
1.214,16 MW [CATEGORY
NAME] 1 Unit
[CATEGORY [VALUE]MW
[[PERCENTAGE]]
NAME] 4 Unit [CATEGORY
[VALUE] NAME] 49 Unit
[VALUE]MW
MW [[PERCENTAGE]] As of August 2018
[[PERCENTAGE]]
Signing of 70 contracts The Progress of NRE-based Power Plant
RE Power Generation FY 2017 Contracts (2014-2017)
70
23 Contracts
2 2 46 11 9 Contracts 14
Contracts 14

1.214,2MW
Contracts

1.251MW

1.829MW
Source:
January the article
May 11, Government September
Regulation No. 79 November
year 2014 concerning National Energy Policy.

116MW
August
13,5 MW 11 MW 257,6 MW 291,4 MW 640,6 MW
Minihydro : 10 MW Minihydro : 9 MW Minihydro : 175,8 MW Minihydro : 52,4 MW Minihydro : 39,6 MW
Biomass : 3,5MW Biogas : 2 MW Biomass : 29 MW Hydro : 239 MW Hydro : 515 MW
Biogas : 7,8 MW Geothermal : 86 MW 2014 2015 2016 2017
Solar : 45 MW

4
Big Wind Energy Projects
Wind Power Plant Sidrap Located at
Sidereng Rappang (SIDRAP) Regency
Existing Renewable Energy
(30x2.5 MW) COD April 2018 Projects
South Sulawesi
Electricity Production
247 GWh/year PLTB Jeneponto
Capacity 60 MW
PPA Price :
US$ 11.41 cent/kWh PLTB Sidrap II
Capacity 50 MW
Investment
US$ 150 Million PLTB Tanah Laut
Capacity 70 MW
Avarage Wind Speed
(85 m) 7+ m/s (25+ KPH)

PLTS Floating Cirata


Capacity 200 MW

5
Indonesia is A Home for Geothermal
Sarulla: The biggest Geothermal Power Plant in Sumatera
PLTP SARULLA

Current Installed Capacity 2018: 1.948,5 MW Sarulla operation Ltd. 3 x 110 MW


Additional installed capacity:
1. PLTP Sorik Marapi (50 MW) (Desember 2018)
2. PLTP Lumut Balai Unit 1 (55 MW) (Desember 2018)
TARGET KAPASITAS
3. PLTP Sokoria Unit 1 (5 MW) (Desember 2018)
8000 3000

Additional Capacity (MW)


Installed Capacity (MW)

2500
6000 2632 2000
4000 880 1500
585 1000
2000 205 165 250 160 266 355 305 280 210
0 37 110 7.5 60 35 65 500
0 0

installed capacity additional capacity

6
Mandatory of Biodiesel Blending
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

B2,5 – B7,5 B10 B15 B20

 B20 Implementation Enforcement of B20 to


Regulation on licensin Mandatory Biodiesel Blendin Establishment of CPO Fund as an
 Prior the implementation of B20 the government hav all related sectors by
g biodiesel for commer g in the transportation, indus incentive for biodiesel blended wit e conducted a series of performance and road test i
cial. trial and power generation se h PSO diesel fuel (B15). n cooperation with related stakeholder for up to 40,0 expanding the CPO
ctors. 00 km. Fund Incentives to boost
 Performance test also conducted to heavy vehicles, domestic consumption
marine engine, and military vehicles and reduce diesel fuel
import

Installed Capacity of Biodiesel


Producers
Capacity Investment (USD)
Region
(kL)
Sumatera 7.337.299 721.909.824
Java 2.983.852 353.818.187
Kalimantan 1.262.356 91.987.951
Sulawesi 475.862 32.620.407
Incentives Total 12.059.369 1.200.336.369
Period of State budget subsidy from CPO Fund

7
Renewables for Remote Areas
48 Units of LTSHE for Aou Village, Pulau Tiga District,
LTSHE, Lanny Jaya District, Papua
Asmat Regency, ENERGY ACCESS
Solar Panel • Electrification ratio (mid 2018) is 97.13%
• Target in 2019: 99.99%
• Efforts for increasing the electrification
ratio:
• Grid extension
• Mini grid renewable energy
• Efficient solar power lighting program

EFFICIENT SOLAR POWERED LIGHTING PROGRAM


• To provide pre electrification to the area that the
Off-Grid Solar Panel 50 KWp, Maybrat Micro Hydro Toba Samosir (130 kW) grid extention will not be available within 3 years
• Solar Panel with 4 LED Lamps and USB Port, provides
an extensive benefit in remote area
• The target is to illuminate 2519 villages
Micro Hydro Warabiyai (2x800 kW),
• 2017: Illuminated 79,556 houses in 5 Provinces
Jokte Village, Tembrauw Regency, Papua • 2018: Illuminating 175,782 houses in 15 Provinces
• 2019: Illuminating 150.000 houses

8
Indonesia’s Commitment
 The GOI committed to participate on global sustainable action as
pledged by President Joko Widodo, at the 21st COP 2015 in Paris;
 The GOI ratified Paris Agreement, trough the Law No.16 year 2016;
 29% of greenhouse gas (GHG) emission reductions in 2030 to with own
efforts and 41% GHG emissions reduction with International support

“Mitigation actions will be conducted through:


 Shift fuel subsidy budget to productive activities (infrastructure);
 23% renewable energy of the total national primary energy mix
by 2025;
 Waste to Energy (WtE).

GHG target for energy sector: 341 million ton CO2 eq in 2030.
Realization in 2017 was 40 million ton, realization in August 2018 is 36 million ton

9
Thank You
&
Follow Us

10
Fossil Energy Reserves
Oil Gas Coal

• Proven Reserves: 3,6 Billion Barrel • Proven Reserves: 98 TSCF • Proven Reserves: 32,4 Billion Ton
• Production: 288 Million Barrel Per Year • Production: 3,0 TSCF Per Year • Production: 393 Million Ton Per Year
• Est. productivity: 12 Years*) • Est. productivity: 33 Years*) • Est. productivity: 82 Years*)

Notes: *) assumption if no new reserves found

11
National Energy Policies

1 Maximizing renewable energy utilization;

2 Minimizing oil utilization;

3 Optimizing natural gas and new energy utilization;

4 Utilizing coal as a reliable national energy supply;

5 Utilizing nuclear as the last option.

Source: the article 11, Government Regulation No. 79 year 2014 concerning National Energy Policy.

12
Renewable Energy Targets
1. Geothermal PP 7,2 GW
2. Large Hydro PP 17,9GW
3. Mini Hydro PP 3 GW
4. Biomass/gas PP 5,5GW
5. Solar PV PP 6,5GW
PRIMARY ENERGY MIX BY 2025
6. Wind Power PP 1,8GW
7. Others 3,1GW
NRE
Gas

Direct Use

Coal Oil

Source: the Government Regulation No. 79/2014 concerning National Energy Policy and the Presidential Regulation
No. 22/2017 on RUEN (General Plan on National Energy)

13
Renewable Energy Potentials
Geothermal • Resource: 11,0 GW
• Reserve: 17,5 GW
• Utilization for PLTP 1,949 GW (0,44%)

Hydro • Resource: 75 GW (19,3 GW)


• Utilization for: PLTA 5,124 GW
PLTMH 0,225 GW (1,21%)
• Resource: 32,6 GW Micro hydro Potential: 19,3 GWp
Bioenergy • Resource BBN: 200 Thou Bph
• Utilization for: PLTBio 1,857 GW (0,42%)
BBN 3 million kL per year
Wind • Resource: 60,6 GW
• Utilization PLTB: 0,076 GW (0,02%) Solar Potential: 207,8 GWp

Solar • Potential PLTS: 207,8 GWp


• Utilization for: PLTS 0,090 GWp (0,02%) Wind Potential: 60,6 GWp

Sea Total Total 9,32 GW


• Potential: 17,9 GW 442 GW Installed
Potential (2%)
• Utilization: -

14
Renewable Energy Achievement
10000
Geothermal Bioenergy Hydro Microhydro Solar PV Wind
8000

6000

4000

2000

0
2012 2013 2014 2015 2016 2017 2nd Q 2018
Type Power Installed Capacity
No. Unit
Plant 2012 2013 2014 2015 2016 2017 2nd Quarter 2018
1. Geothermal MW 1.336,00 1.343,50 1.403,50 1.438,50 1.643,50 1.808,50 1.948,5
2. Bioenergy MW 26,00 126,00 898,50 1.767,10 1.787,90 1.839,50 1.857,5
3. Hydro MW 4.078,24 5.058,87 5.059,06 5.079,06 5.124,06 5.124,06 5.124,06
4. Micro Hydro MW 37,88 67,22 105,58 137,57 162,36 206,13 225,2
5. Solar PV MW 8,92 14,34 16,99 22,81 85,00 90,12 90,12
6. Wind MW 0,93 0,93 1,12 1,12 1,12 1,12 76,12
TOTAL 5.487,97 6.610,86 7.484,75 8.446,16 8.804,48 9.069,4 9.321,5
Production per Annum
No. Type of Energy Unit
2012 2013 2014 2015 2016 2017 2nd Quarter 2018
Biodiesel
1. kL 669,00 1.048,00 1.845,00 915,00 3.030,00 3.410,00 2.350,00
Domestic

15
Biodiesel B20 (Mandatory)
• The Government of Indonesia has mandated B20 (blending 20% biofuel with oil fuel) since 2016 in
order to reduce importing oil fuel (the government expenditures savings for almost 1.02 billion
USD)
• The challenge is the fluctuating price of crude oil in the market that creates the difference of
subsidy for biodiesel;
• Therefore, the GOI regulates incentives through BPDPKS (Indonesia Agency Fund of Palm Oil).

16
RE Policy Instrument and Regulations
• The Law No. 30/2007 concerning Energy;
• The Law No. 30/2009 concerning Electricity;
• The Law No. 21/2014 concerning Geothermal;
• Government Regulation No. 70/2009 concerning Energy Conservation;
• Government Regulation No. 79/2014 concerning National Energy Policy (KEN):
• Presidential Decree No. 22/2017 concerning General Energy Plan (RUEN);
• Presidential Decree No. 47/2017 concerning Solar Efficient Lamp (LTSHE);
• Presidential Decree No. 35/2018 concerning Municipal Solid Waste Power Plant 12
Cities;
• Ministerial of Energy and Mineral Resources Decree No. 41/2018 concerning
Biodiesel Fund from BPDPKS;

17
RE Development based on RUPTL PLN 2018-2027
No. NRE - Generation Capacity 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Total
Geothermal Power
1. MW 210 150 221 235 405 445 355 2.537 20 5 4.583
Plant
2. Hydro Power Plant MW 66 287 193 755 315 196 635 4.461 - 564 7.472
Micro Hydro Power
3. MW 108 202 366 103 31 - - - - - 811
Plant
4. Solar Power Plant MWp 5 22 214 281 - 200 - 325 - - 1.047

5. Wind Power Plant MW 70 60 5 45 10 30 309 - - 60 589

6. Biomass Power Plant MW 53 53 41 19 235 - - - - 10 411

7. Sea Power Plant MW - - - - - - - - - - 0


Thousand
8. Bio-Fuel Power Plant 607 598 375 217 146 150 154 157 165 176 2.745
Kilo Liter
Total MW 512 774 1.040 1.438 996 871 1.299 7.323 20 639 14.913

Source: Minister of Energy and Mineral Resources Decree No. 1567K/21/MEM/2018 on Ratification of Electricity Supply
Business Plan (RUPTL) PT. PLN Persero 2018 - 2027

18
4 PPA: COD Status
Capacity Price Year
No. Power Plant Developer Location Levelized (ABCD Component)
(MW) COD
(IDR/kWh) ȼUS$/kWh

1. PLTBg Mitra Puding Mas (Excess Power) PT Mitra Puding Mas Sumatera Selatan 2 889,1 6,59 2017

2. PLTM Nengar (Excess Power) PT Gayo Lues Mentalu Aceh 1 1244,7 9,351 2018

3. PLTA Pakkat PT Energy Sakti Sentosa Sumatera Utara 18 - 8,6 2018

4. PLTBm Tempilang PT Energi Karya Persada Bangka Belitung 6 1544,45 11,611 2018

19
23 PPA: Construction Status
Capacity Price Year
No. Power Plant Developer Location Levelized (ABCD Component) Investment (IDR)
(MW) COD
(IDR/kWh) ȼUS$/kWh
PT Bangun Tirta
1. PLTA Air Putih Bengkulu 21 - 8,45 2019 916.346.120.712
Lestari
PLTA Poso
2. PT Poso Energy Sulawesi Tengah 515 1117,87 8,4 2021 11.621.400.000.000
Peaker
PT Brantas
3. PLTM Sako 1 Kab. Pesisir Selatan 6 912,9 6,86 2018 171.638.200.000
Cakrawala Energi
PLTM Tanjung
4. PT Maji Biru Pusaka Jawa Tengah 8 868 6,52 2018 201.600.000.000
Tirta

5. PLTM Kincang 1 KPRI Koperca Jawa Tengah 0,35 868 6,52 2018 9.140.000.000

6. PLTM Kandibata 1 PT Karo Bumi Energi Kab. Karo 10 1049,75 7,89 2019 245.646.985.091

PT Prasetya Bajra Desa Singapure, Kec. Kota


7. PLTM Endikat 8,01 889,1 6,68 2019 239.901.887.000
Prima Agung, Kab.
Sungai Kali Rejo, Desa Taman
8. PLTM Taman Asri PT Akasa Eko Energi 1,17 870 6,84 2019 17.523.695.000
Asri kec
PT Kunci Hidro
9. PLTM Kunci Putih Jawa Tengah 0,9 868 6,52 2019 29.277.315.383
Energi
PT Zhong Min Hydro
10. PLTM Cikaso 3 Jawa Barat 9,9 866 6,51 2019 182.210.000.000
Indonesia

20
23 PPA: Construction Status
Capacity Price Year
No. Power Plant Developer Location Levelized (ABCD Component) Investment (IDR)
(MW) COD
(IDR/kWh) ȼUS$/kWh
Desa Mungkur, Dusun Anggoci,
11. PLTM Anggoci PT Alabama Energy Kec.Tarabintang, Kab. Humbang 9 1049,75 7,89 2018 239.415.046.000
Hasundutan, Sumut
PLTM Bone
12. PT Bone Bolango Energi Gorontalo 9,9 1400 10,52 2020 416.470.000.000
Bolango
PKS Pagar Merbau Desa Pagar
PLTBg Pagar PT Perkebunan Nusantara
13. Merbau II Kec. Pagar Merbau, 0,827 1049,75 7,888 2019 29.184.725.000
Merbau II (Persero)
Kab. Deli Serdang Prov. Sumut
PKS Kwala Sawit Desa Namo
PT Perkebunan Nusantara
14. PLTBg Kwala Sawit Sialang Kec. Batang Serangan 1 1049,75 7,888 2019 29.184.725.000
II (Persero)
Kab. Langkat Prov. Sumut
15. PLTBm Merauke PT Merauke Narada Energi Papua 3,5 1840 13,63 2019 102.200.000.000
PLTP Rantau PT Supreme Energy Kab. Muara Enim, Kab. Lahat,
16. 86 1587,6 11,76 2020 4.600.000.000.000
Dedap Rantau Dedap Kab. Pagar Alam, Provinsi Sumsel
Sungai Enim,Desa Pulau
17. PLTM Semendo PT Dwi Jaya Makmur Panggung,Kec.Semende Darat 9 889,1 6,59 2019 231.552.718.623
Laut, Kab. Muara Enim, Sumsel
PLTS Likupang, PT Infrastruktur Terbarukan
18. Minahasa 15 - 10 2018 293.366.250.000
Minahasa Lestari
PLTS Selong, PT Infrastruktur Terbarukan
19. Lombok 5 - 10 2018 95.986.500.000
Lombok Buana

21
23 PPA: Construction Status
Capacity Price Year
No. Power Plant Developer Location Levelized (ABCD Component) Investment (IDR)
(MW) COD
(IDR/kWh) ȼUS$/kWh
PLTS
PT Infrastruktur
20. Pringgabaya, Lombok 5 - 10 2018 96.120.000.000
Terbarukan Adhiguna
Lombok
PT Infrastruktur
PLTS Sengkol,
21. Terbarukan Lombok 5 - 10 2018 103.596.000.000
Lombok
Cemerlang
Desa Manalu Dolok, Kec.
PLTM PT Bina Gondang
22. Parmonangan, Kab. Tapanuli 10 1049,75 7,89 2020 238.366.373.596
Parmonangan 2 Energy
Utara
Ds Pulosari, Kec Pangalengan,
23. PLTM Cileunca PT Indonesia Power 1 866 6,51 2019 34.187.305.490
Kab Bandung

740,557 20.144.313.846.895

22
43 PPA: Financial Close Status
Capacity Price Year
No. Power Plant Developer Location Levelized (ABCD Component) Investment (IDR)
(MW) COD
(IDR/kWh) ȼUS$/kWh
PT Simalem Bumi
1. PLTM Kineppen Kab. Karo 10 1049,75 7,89 2020 206.095.056.179
Energi
PLTM Padang PT Brantas Hidro Desa Bungin Tambun III, Kec. Padang
2. 7 889,1 6,68 2019 205.758.747.128
Guci 2 Energi Guci Hulu, Kab. Kaur, Bengkulu
Desa Kandibata Kecamatan
PLTM Kandibata PT Senina Hidro Kabanjahe Dan Desa Kineppen
3. 10 1049,75 7,89 2019 197.273.629.196
2 Energi Kecamatan Munte Kabupaten Karo,
Sumut
PLTM Bakal PT Semarak Kita
4. Sumatera Utara 5 1049,75 7,89 2020 125.640.000.000
Semarak Bersama
PT Sumatera Energi Desa Hariara Pintu, Kec. Harian, Kab.
5. PLTM Ordi Hulu 10 1049,75 7,89 2019 304.392.054.000
Lestari Samosir
PT Amera Terrasys
6. PLTA Buttu Batu Sulawesi Selatan 200 - 7,63 2022 8.198.698.560.877
Energi
PT Pandu Lembang
7. PLTM Bukit Sileh Kab. Solok 0,7 912,9 6,86 2021 19.413.191.715
Jaya
PLTM Rabi PT Mega Energi Desa Muara Sitabu, Kec. Gunung
8. 4,5 1049,75 7,89 2018 105.973.180.000
Jonggor Karyatama Tuleh, Kab. Pasaman Barat
PLTM Batu PT Thong Langkat
9. Desa Simpang Pulo, Kec. Bahorok 10 1049,75 7,89 2018 238.357.617.445
Gajah Energi

23
43 PPA: Financial Close Status
Capacity Price Year
No. Power Plant Developer Location Levelized (ABCD Component) Investment (IDR)
(MW) COD
(IDR/kWh) ȼUS$/kWh
PLTM Sungai PT Landasan Tata
10. Kab. Deli Serdang 3 1049,75 7,89 2019 65.450.607.653
Buaya Laksana Energi
PLTM Aek PT Raisan Energi
11. Kab Hambang 2 1049,75 7,89 2019 50.407.687.348
Pungga Indonesia
PT Klaai Dendan Desa Bandung Marga, Kec. Bermani
12. PLTM Klaai 2,6 889,1 6,68 2019 41.364.000.000
Lestari Ulu Raya, Kab. Rejang Lebong
Desa Sion Selatan, Kec. Parlilitan,
13. PLTM Sion PT Citra Multi Energi 10 1049,75 7,89 2019 218.088.945.695
Sumatera Utara
PT Mega Hydro
14. PLTM Tunggang Kec. Kabawetan, Bengkulu 10 889,1 6,68 2020 355.186.246.275
Energi
Desa Seguring, Kec. Curup Utara,
15. PLTM Simpang PT Pat Petulai energi 3,1 889,1 6,68 2019 49.729.000.000
Kab. Rejang Lebong, Bengkulu
Sungai Pareang, Desa Sindang
PT Akasu Energi
16. PLTM Pareang Resmi, Kec. Jampang Tengah, Kab. 2,8 866 6,51 2019 53.514.000.000
Utama
Sukabumi, Prov. Jawa Barat
PLTM Cimandiri PT Megah Energi Desa Wangunreja, Kec. Nyalindung,
17. 4,4 779,4 5,86 2019 117.424.472.000
(bendung PU) Utama Kab. Sukabumi, Prov Jawa Barat
PLTM Aek PT Aek Sibundong
18. Sumatera Utara 8 1049,75 7,89 2019 153.471.497.794
Sibundong Energy

24
43 PPA: Financial Close Status
Capacity Price Year
No. Power Plant Developer Location Levelized (ABCD Component) Investment (IDR)
(MW) COD
(IDR/kWh) ȼUS$/kWh
PT Bukit Cahaya
19. PLTM Aek Situmandi Sumatera Utara 7 1049,75 7,89 2019 175.813.484.357
Powerindo
PT Gading Energi
20. PLTM Sigeaon Sumatera Utara 3 1049,75 7,89 2019 98.197.946.000
Prima
PT Energy Alam
21. PLTM Sisira Sumatera Utara 9,8 1049,75 7,89 2019 159.959.247.000
Sentosa
PT Indah Alam
22. PLTM Batang Toru 4 Sumatera Utara 10 1049,75 7,89 2019 232.083.386.000
Lestari Energi
PT Bayang Nyalo
23. PLTM Bayang Nyalo Sumatera Barat 6 912,9 6,86 2019 153.471.497.794
Hydro
PT Tiga Oregon
24. PLTM Batu Brak Lampung 7,7 878,9 6,6 2019 239.919.793.469
Putra
PLTM Aek
25. PT Partogi Provinsi Sumatera Utara 10 1210 8,96 2020 228.703.407.000
Sibundong
PT Sumber Daya
26. PLTM Koko Babak Lombok 2,3 1384,65 10,4 2019 86.790.000.000
Investasi
PT Hensan Andalas Desa Anduring, Kec. Kayutanam,
27. PLTM Tras 1,6 912,9 6,86 2020 39.230.920.000
Putra Kab. Padang Pariaman
PT Daya Gravita Ds Jayamukti, Kec Cihurip, Kab
28. PLTM Jayamukti 2,3 8,66 6,51 2020 54.912.590.000
Energi Garut

25
43 PPA: Financial Close Status
Capacity Price Year
No. Power Plant Developer Location Levelized (ABCD Component) Investment (IDR)
(MW) COD
(IDR/kWh) ȼUS$/kWh
PT Rawadasya Inti
29. PLTM Cisomang Jawa Barat 4 866 6,51 2020 80.910.000.000
Energi
PT Mega Energi Kec. Semende Darat Laut, Kab.
30. PLTM Babatan 4,9 889,1 6,68 2021 167.202.000.000
Karyatama Muara Enim, Sumsel
PT Mega Energi Kec. Semende Darat Laut, Kab.
31. PLTM Karyanyata 4 889,1 6,68 2022 163.900.230.000
Karyatama Muara Enim, Sumsel
PT Syailendra Utama
32. PLTM Simonggo Kab Humbang Hasundutan 8 1049,75 7,89 2019 172.655.190.249
Energi
PT Optima Tirta
33. PLTM Tongar Kab. Pasaman Barat 6 912,9 6,86 2020 185.730.124.025
Energy
PLTS Isimu, PT Quantum Solar
34. Gorontalo 10 - 10,4 2018 199.449.000.000
Gorontalo Gorontalo
PT Delapan Menit
35. PLTS Kuta, Lombok Lombok 5 - 10 2019 102.661.500.000
Energi

36. PLTM Cibanteng PT Prima Trya Energi Jawa Barat 4,2 866 6,51 2019 71.400.000.000

PT Nusantara Hidro
37. PLTM Batang toru 5 Kab Tapanuli Utara 7,5 1049,75 7,89 2018 260.750.222.108
Utama
PLTBg Aceh Tamiang PT Green Energy
38. Langsa 3 1175,55 8,8315 2020 65.783.609.462
(Geso) Spesialist One

26
43 PPA: Financial Close Status
Capacity Price Year
No. Power Plant Developer Location Levelized (ABCD Component) Investment (IDR)
(MW) COD
(IDR/kWh) ȼUS$/kWh
PLTBg Ujung PT Pasadena
39. Ujung Batu, Rokan Hulu 3 1146,65 8,619 2020
Batu Biofuels Mandiri
PLTBm Aceh
PT Biomas Energy
40. Tamiang / Aceh Tamiang 10 1175,55 8,8315 2020
Abadi
Langsa
PT Karya Energi Desa Simpang Rantau Gedang,
41. PLTBm Mersam 3 889,1 6,681 2020
Jambi Kec. Mersam, Kab. Batang Hari
PLTBm Sentosa PT Sentosa Jaya
42. Sadai, Kab. Bangka Selatan 10 1544,45 11,611 2020
Jaya Purnama Purnama
PLTM Curug PT Megaraja Setya
43. Way kanan, Lampung 1,2 878,9 6,6 2019 31.442.980.800
Gangsa Energi

446,6 13.677.205.621.569

27
MEMR Regulation 50/2017
Power Purchase Implementation
Price Approval : by Minister of EMR
LAW
In accordance with laws and
regulations PLTP and PLTSa : PT. PLN (Persero) formulate and publish procu
PPA Standard
Through direct selection mecha rement documents, PPA standards, and technic
nism based on capacity PLTS, and PLTB al direction for Direct Selection.
19.36 20.00
Through direct selection PLTA, PLTBm, PLTBg and PLTA Laut
mechanism 15.52 15.53
14.49
Cooperation Pattern : Build, Own, Operate and Transfer (BOOT) 12.94
12.64 16.46 17.00
10.98 11.07 11.14
9.77 13.19 13.20
6.99 7.18 7.26
7.66 8.33 8.59 12.32
6.81 6.81 6.81 6.81 6.81 6.83 10.74 11.00
9.33 9.41 9.47
8.30
7.08 7.30

Power Purchase Price


 PLTS If electricity generation cost in local system: PLTSa
If electricity generation cost in local system >
 PLTB Average National Electricity Generation: Average National Electricity Generation
PLTP


PLTBm
PLTBg
> maximum purchase price 85% of local
electricity generation cost
PLTA maximum purchase price 100%
of local electricity generation cost
 PLTALaut Average National Electricity Generation: Based on agreement, if National Electricity Generation
≤ electricity generation cost based on agreement
(B to B)
in Sumatra, Java, Bali or local regions ≤ Average
National Electricity Generation
28
186 Regulations/Permints were revoked Revoke Period
90 Regulations
96 Permits (Licences, Recomendations,etc)
JAN
11 Regulations
2018
Oil & Gas Mineral & Coal Electricity NRE & EC 30 Regulations
Feb-I
MEMR
18 Regulations 32 Regulations 20 Regulations
2018 2 Permits
9 Regulations
23 Permits 64 Permits 5 Permits Feb-II 45 Regulations
SKK Migas
12 Regulations 2018 72 Permits
BPH Migas
3 Regulations Mar 4 Regulations
22 Permits

2018
According to the President’s Directive,
MEMR has revamp permits & bureaucracy to create Friendly Impact of Deregulation are simplified & revamp
Investment Climate, to encourage Economic Growth & Create Jobs” process business
Ignasius Jonan Arcandra Tahar
Minister of Energy and Mineral Resources Vice Minister of Energy and Mineral Resources

29
Licensing Simplification and NRE Incentives
License and non-license simplification
License Non-License Simplified Licenses and Non-Licenses:
1. Permit for Geothermal Explosive Warehouse Utilization;
2. Recommendation on Geothermal Explosive Purchase and Utilization;
6 - 1 = 5 - 4 - 4 =
10 Reg.
3. Recommendation on Geothermal Explosive Destruction;
Head of Indonesian National
Police (POLRI) Reg. need a c of
2 4.
5.
Recommendation on Foreign Employment Utilization Plan (RPTKA);
Recommendation on Foreign Employment Utilization Permit (IMTA);
License oordination/ agreement wit After the simplif
Non Dir. Gen. 2 POLRI Reg. After simplification 6. Issuance of Feasibility Certificate for Geothermal Equipment Utilization;
h POLRI ication
License of 2 Permenaker
7. Issuance of Feasibility Certificate for Geothermal Installation Utilization;
1. Geothermal Preliminary Survey Assignment (PSP) NREEC 8. Approval on Welding Procedure Specification and Procedure
Qualification Record (WPS/PQR) as well as Welder Qualification;
License
1. Recommendation on Import Plan for Geotherm 9. Approval on Certificate of Registration for Geothermal Service/
2. Geothermal Preliminary Survey and Exploration Supporting Companies.
al Goods
Assignment (PSPE) License
2. Recommendation on Biofuel Export and Import
3. Geothermal License
(BBN)
4. Minimum Energy Performance Standard (SKEM)
Implementation License and energy saving
labelling for energy appliances NRE Incentives and Facilities
5. Biofuel Business License

TAX ALLOWANCE IMPORT DUTY FACILITY TAX HOLIDAY

30 Business Segment
% of the investment Import duty on machine and equip
ment, goods, and raw material for p
Import Duty of Capita
5-20years tax exemption
145 roduction
Exemption of import duty on machi
ne and equipment:
l Goods for the Devel
opment and Expansio
n of Power Generatio 100 % Entity’s Tax Holiday
Under Certain Requirements • 2 years of import duty exemptio n Industry for General

Such as: investment value or export oriented,


n on raw material
• Additional 2 years of import dut
Purpose of Import IDR
500 Billion
Minimal investment plan
y exemption on raw material if t
employment opportunity, local contents. he company utilize local machin (USD 40 million).
e and production equipment (mi
n 30%)

30
Realization and Target of NREEC Investment
2.5

Total NREEC Investment per Year


2 2.01

1.57
1.5
Billion USD

1.34

1 1.03

0.75 37%
0.64
0.5

0
2014 2015 2016 2017 2018 Triwulan II
Realization Target Achievement

Bioenergy Various NRE Energy Conservation Geothermal

31
Government Enforce EV Market in Indonesia
World EV Population

Draft of Presidential Decree


 Encourage EV National Manufacture
 Tax Incentives (No Luxury Sales Tax, Import Duty Incentives)
 Accelerate Electric Vehicle Charging (SPLU)

There are
875 PLN’s SPLU, (Jakarta 542,
Target on 2017 1.000 SPLU)

32
“Several Areas Still Shortage of Electricity Infrastructure”
Aceh
1st semester 2018
Kaltim
98,56% Gorontalo
Jambi Kaltara 99,9%
89,62 87,84% NATIONAL
Sumut 95,87%

97.13%
99,9%
Kepri Kalbar Sulut
Riau Malut
83,57% 91,66% Sulteng 96,45%
97,75% 98,71%
81,57%
Papua Barat
Babel 99,90%
99,9% Papua
Sulbar 72,04%
98,47%

Sumbar DKI Jateng


90,72% 99,9% 97,59% Kalteng
83,11% Kalsel Maluku
Bengkulu 93,86% 89,51%
Sulsel 99,9% Sultra
98,68%
84,37%
Sumsel
90,22%
Jabar 95,35 97,50 99,90
Legend: Lampung 99, 9% Jatim 84.35 88.3 91.16

DIY NTB NTT 76.56 80.51


93,84% 93,24% 67.15
72.95
60,82%
65.61
99,9% Bali 61.32 62.76 64.44
> 70 87,14%
50 - 70
Banten 99,5%
99,9%
< 50

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

33
Efficient Solar Powered Lighting Program

2,519 Villages in 2019


Realization in 2017 Target in 2018 2018 Target in 2019
Illuminating 175,782 houses in Illuminating 150,000
Illuminating 79,556 houses in 5 Provinces
15 Provinces houses

Spesifikasi LTSHE

2017 2018

Has Been Installed in 5 Provinces Will be Instaled in 15 provinces


operate for 6, 12, and up to
60 hrs in a single charge “ Solar Panel with 4 LED Lamps and USB Port, provides
an extensive benefit in remote area

34
Renewable Energy Share in Power Generation 2017

Geothermal
Hydro
NRE
and Others 12.67%
7.39%
RE
5.28%
Oil
6.00%

[CATEGORY Coal
NAME] 58.41%
22.92%

35
Increase Business Certainty in Power Purchase Agreement (PPA)
Improved business certainty:
PPA Reform – Ministerial Regulation 49/2017 • The risk of government force majeure is removed
• Fair balance / risk sharing

30 Years
Since Commercial Operational Date (COD)

Almost at the technical period of the power plant

36
#Local Wisdom Wind Power Plant (PLT Bayu)
Sidrap (30x2,5 MW) Expected to COD by early 2018

37
#Kincir Angin Sidrap

PLTB SIDRAP I
Inaugurated by the President of the Republic of Indonesia in
Watangpulu Sub District, Sidenreng Rappang (Sidrap) District,
South Sulawesi Province on July 2nd, 2018

Specifications
30 Wind turbines
57 Propeller length

80
Meter
Tower height 2,5
Mega Watt
Each turbine
capacity

Built since August Commercial Operation


2015 Early 2018

Wind speed estimation


Investment
USD 150 Million
Electrify
7 m/s
70
Capacity
75 Megawatt (MW)
ha Land needs ±50 ha thousand
Projection of Annual Electricity
Houses in So
Production 247 GWh Emission Reductio
n 0,27 Million Ton
uth Sulawesi
900 VA
CO2 /year
38
#Local Wisdom
Ulubelu Geothermal Power Plant

39
#Local Wisdom

Sarulla Geothermal Power Plant

40
#Local Wisdom
Lahendong Geothermal Power Plant

41
#Local Wisdom

Micro Hydro Toba Samosir, Officialy Inaugurated


on December 4, 2017 (130 kW)
186 MW Microhydro
@10 kW spreadout all
over Indonesia

“Piece mill effort will


make significant
contribution when
massive deploy in
any place”

42
#Local Wisdom
Micro Hydro Warabiyai (2x800 kW),
Jokte Village, Sausapor District, Tembrauw Regency, Papua

43
#Local Wisdom
Off-Grid Solar Panel 50 KWp, Maybrat

44
#Local Wisdom
Solar Panel 1 MWp, Karangasem, Bali

45
Aou Village, Pulau Tiga District,
Asmat Regency, 100% Electrified

46
Solar Panel

48 Units of LTSHE for Aou Village, Pulau Tiga District,


Asmat Regency, 100% Electrified
LTSHE = Efficient Solar Powered Lighting

47
33 Units of LTSHE, Munak Village, Jayawijaya,
22 Desember 2017

48
20.851 units of LTSHE installed, Lanny Jaya District (15 Districts)

49
Lanny Jaya at night, illuminated by LTSHE

50
110 Units of LTHSE, Sori Tatanga Village, Dompu Regency, NTB, 18 November 2017

51
529 units of LTSHE, Tambrauw Regency,
13 Februari 2018

52
Off Grid-Centralized PV (30 kWp) Inauguration, Amdui Village,
Raja Ampat Regency, West Papua, 21 Agustus 2017

“electrify 130 households (103 houses)


~ each houses got 600 watt/hour/Day approximately”

53
Thank You
&
Follow Us

54