Republic of the Philippines

TECHNOLOGICAL UNIVERSITY OF THE PHILIPPIN


1000 Ayala Blvd. cor. San Marcelino St.Ermita, Ma

College of Engineering
Department of Civil Engineering

Name of Project: PROPOSED FIVE-STOREY RESIDENT


CONCRETE WORKS

ITEM TO BE ESTIMATED CALCULATIONS

BEAMS
VOLUME (m ) 3
11.882
% OF WASTAGES 5
TOTAL VOLUME (m3) 12.4761
STRENGTH OF CONCRETE (psi) 3000
CLASS A

FOOTING TIE BEAMS CEMENT: (TOTAL VOLUME) (FACTOR)=


12.4761 9
SAND: (TOTAL VOLUME) (FACTOR)=
12.4761 0.41
GRAVEL: (TOTAL VOLUME) (FACTOR)=
12.4761 0.82
WATER: (TOTAL VOLUME) (FACTOR)=
12.4761 53

ITEM TO BE ESTIMATED CALCULATIONS

BEAMS
VOLUME (m ) 3
11.245
% OF WASTAGES 5
TOTAL VOLUME (m3) 11.80725
STRENGTH OF CONCRETE (psi) 3000
CLASS A

GROUND FLOOR CEMENT: (TOTAL VOLUME) (FACTOR)=


11.80725 9
SAND: (TOTAL VOLUME) (FACTOR)=
11.80725 0.41
GRAVEL: (TOTAL VOLUME) (FACTOR)=
11.80725 0.82
WATER: (TOTAL VOLUME) (FACTOR)=
11.80725 53

ITEM TO BE ESTIMATED CALCULATIONS

BEAMS
VOLUME (m ) 3
11.245
% OF WASTAGES 5
TOTAL VOLUME (m3) 11.80725
STRENGTH OF CONCRETE (psi) 3000
CLASS A

SECOND FLOOR CEMENT: (TOTAL VOLUME) (FACTOR)=


11.80725 9
SAND: (TOTAL VOLUME) (FACTOR)=
Prepared by: Checked by:IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
CASTRO, RHENDEL ENGR. ARNOLFO ARCIBALIIIIIIIIIIIIIIIIIIII
CURAYAG, JOHN PAULA INSTRUCTORIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
BSCE-3A
Republic of the Philippines
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPIN
1000 Ayala Blvd. cor. San Marcelino St.Ermita, Ma

College of Engineering
Department of Civil Engineering

Name of Project: PROPOSED FIVE-STOREY RESIDENT


SECOND FLOOR
CONCRETE WORKS

11.80725 0.41
GRAVEL: (TOTAL VOLUME) (FACTOR)=
11.80725 0.82
WATER: (TOTAL VOLUME) (FACTOR)=
11.80725 53

ITEM TO BE ESTIMATED CALCULATIONS

BEAMS
VOLUME (m ) 3
6.0025
% OF WASTAGES 5
TOTAL VOLUME (m3) 6.302625
STRENGTH OF CONCRETE (psi) 3000
CLASS A

THIRD FLOOR CEMENT: (TOTAL VOLUME) (FACTOR)=


6.302625 9
SAND: (TOTAL VOLUME) (FACTOR)=
6.302625 0.41
GRAVEL: (TOTAL VOLUME) (FACTOR)=
6.302625 0.82
WATER: (TOTAL VOLUME) (FACTOR)=
6.302625 53

Prepared by: Checked by:IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII


CASTRO, RHENDEL ENGR. ARNOLFO ARCIBALIIIIIIIIIIIIIIIIIIII
CURAYAG, JOHN PAULA INSTRUCTORIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
BSCE-3A
Republic of the Philippines
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPIN
1000 Ayala Blvd. cor. San Marcelino St.Ermita, Ma

College of Engineering
Department of Civil Engineering

Name of Project: PROPOSED FIVE-STOREY RESIDENT


CONCRETE WORKS

ITEM TO BE ESTIMATED CALCULATIONS

BEAMS
VOLUME (m ) 3
6.0025
% OF WASTAGES 5
TOTAL VOLUME (m3) 6.302625
STRENGTH OF CONCRETE (psi) 3000
CLASS A

FORTH FLOOR CEMENT: (TOTAL VOLUME) (FACTOR)=


6.302625 9
SAND: (TOTAL VOLUME) (FACTOR)=
6.302625 0.41
GRAVEL: (TOTAL VOLUME) (FACTOR)=
6.302625 0.82
WATER: (TOTAL VOLUME) (FACTOR)=
6.302625 53

ITEM TO BE ESTIMATED CALCULATIONS

FOOTING
VOLUME (m ) 3
38.592
% OF WASTAGES 5
TOTAL VOLUME (m3) 40.5216
STRENGTH OF CONCRETE (psi) 3000
CLASS A

COLUMN FOOTING CEMENT: (TOTAL VOLUME) (FACTOR)=


40.5216 9
SAND: (TOTAL VOLUME) (FACTOR)=
40.5216 0.41
GRAVEL: (TOTAL VOLUME) (FACTOR)=
40.5216 0.82
WATER: (TOTAL VOLUME) (FACTOR)=
40.5216 53

ITEM TO BE ESTIMATED CALCULATIONS

FOOTING
VOLUME (m ) 3
42.848
% OF WASTAGES 5
TOTAL VOLUME (m3) 44.9904
STRENGTH OF CONCRETE (psi) 3000
CLASS A

WALL FOOTING CEMENT: (TOTAL VOLUME) (FACTOR)=


44.9904 9
SAND: (TOTAL VOLUME) (FACTOR)=
Prepared by: Checked by:IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
CASTRO, RHENDEL ENGR. ARNOLFO ARCIBALIIIIIIIIIIIIIIIIIIII
CURAYAG, JOHN PAULA INSTRUCTORIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
BSCE-3A
Republic of the Philippines
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPIN
1000 Ayala Blvd. cor. San Marcelino St.Ermita, Ma

College of Engineering
Department of Civil Engineering

Name of Project: PROPOSED FIVE-STOREY RESIDENT


WALL FOOTING
CONCRETE WORKS

44.9904 0.41
GRAVEL: (TOTAL VOLUME) (FACTOR)=
44.9904 0.82
WATER: (TOTAL VOLUME) (FACTOR)=
44.9904 53

ITEM TO BE ESTIMATED CALCULATIONS

COLUMN
VOLUME (m ) 3
5.67
% OF WASTAGES 5
TOTAL VOLUME (m3) 5.9535
STRENGTH OF CONCRETE (psi) 3000
CLASS A

GROUND FLOOR CEMENT: (TOTAL VOLUME) (FACTOR)=


5.9535 9
SAND: (TOTAL VOLUME) (FACTOR)=
5.9535 0.41
GRAVEL: (TOTAL VOLUME) (FACTOR)=
5.9535 0.82
WATER: (TOTAL VOLUME) (FACTOR)=
5.9535 53

Prepared by: Checked by:IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII


CASTRO, RHENDEL ENGR. ARNOLFO ARCIBALIIIIIIIIIIIIIIIIIIII
CURAYAG, JOHN PAULA INSTRUCTORIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
BSCE-3A
Republic of the Philippines
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPIN
1000 Ayala Blvd. cor. San Marcelino St.Ermita, Ma

College of Engineering
Department of Civil Engineering

Name of Project: PROPOSED FIVE-STOREY RESIDENT


CONCRETE WORKS

ITEM TO BE ESTIMATED CALCULATIONS

COLUMN
VOLUME (m ) 3
5.67
% OF WASTAGES 5
TOTAL VOLUME (m3) 5.9535
STRENGTH OF CONCRETE (psi) 3000
CLASS A

SECOND FLOOR CEMENT: (TOTAL VOLUME) (FACTOR)=


5.9535 9
SAND: (TOTAL VOLUME) (FACTOR)=
5.9535 0.41
GRAVEL: (TOTAL VOLUME) (FACTOR)=
5.9535 0.82
WATER: (TOTAL VOLUME) (FACTOR)=
5.9535 53

ITEM TO BE ESTIMATED CALCULATIONS

COLUMN
VOLUME (m ) 3
4.05
% OF WASTAGES 5
TOTAL VOLUME (m3) 4.2525
STRENGTH OF CONCRETE (psi) 3000
CLASS A

THIRD FLOOR CEMENT: (TOTAL VOLUME) (FACTOR)=


4.2525 9
SAND: (TOTAL VOLUME) (FACTOR)=
4.2525 0.41
GRAVEL: (TOTAL VOLUME) (FACTOR)=
4.2525 0.82
WATER: (TOTAL VOLUME) (FACTOR)=
4.2525 53

ITEM TO BE ESTIMATED CALCULATIONS

COLUMN
VOLUME (m ) 3
4.05
% OF WASTAGES 5
TOTAL VOLUME (m3) 4.2525
STRENGTH OF CONCRETE (psi) 3000
CLASS A

FORTH FLOOR CEMENT: (TOTAL VOLUME) (FACTOR)=


4.2525 9
SAND: (TOTAL VOLUME) (FACTOR)=
Prepared by: Checked by:IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
CASTRO, RHENDEL ENGR. ARNOLFO ARCIBALIIIIIIIIIIIIIIIIIIII
CURAYAG, JOHN PAULA INSTRUCTORIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
BSCE-3A
Republic of the Philippines
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPIN
1000 Ayala Blvd. cor. San Marcelino St.Ermita, Ma

College of Engineering
Department of Civil Engineering

Name of Project: PROPOSED FIVE-STOREY RESIDENT


FORTH FLOOR
CONCRETE WORKS

4.2525 0.41
GRAVEL: (TOTAL VOLUME) (FACTOR)=
4.2525 0.82
WATER: (TOTAL VOLUME) (FACTOR)=
4.2525 53

Prepared by: Checked by:IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII


CASTRO, RHENDEL ENGR. ARNOLFO ARCIBALIIIIIIIIIIIIIIIIIIII
CURAYAG, JOHN PAULA INSTRUCTORIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
BSCE-3A
Republic of the Philippines
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPIN
1000 Ayala Blvd. cor. San Marcelino St.Ermita, Ma

College of Engineering
Department of Civil Engineering

Name of Project: PROPOSED FIVE-STOREY RESIDENT


CONCRETE WORKS

Beams
Footing Tie Beam
Mark Length (m) Width (m) Thickness (m)
FTB-1 5.75 0.25 0.4
FTB-2 3.7 0.25 0.4
FTB-3 2.8 0.25 0.4
FTB-3a 3.8 0.25 0.4
FTB-4 3.66 0.25 0.4
FTB-5 5.55 0.25 0.4
FTB-6 3.2 0.25 0.4
FTB-7 2 0.25 0.4
Total Volume :
Ground Floor
Mark Length (m) Width (m) Thickness (m)
B1-a 5.75 0.25 0.4
B1-b 3.7 0.25 0.4
B1-c 2.8 0.25 0.4
B1-d 3.65 0.25 0.4
B1-e 5.5 0.25 0.4
B1-f 3.2 0.25 0.4
B1-g 2 0.25 0.4
Total Volume :
Second Floor
Mark Length (m) Width (m) Thickness (m)
B1-a 5.75 0.25 0.4
B1-b 3.7 0.25 0.4
B1-c 2.8 0.25 0.4
B1-d 3.65 0.25 0.4
B1-e 5.5 0.25 0.4
B1-f 3.2 0.25 0.4
B1-g 2 0.25 0.4
Total Volume :
Third Floor
Mark Length (m) Width (m) Thickness (m)
B2-a 5.75 0.2 0.35
B2-b 4.7 0.2 0.35
B2-c 2.8 0.2 0.35
B2-d 3.65 0.2 0.35
B2-e 5.5 0.2 0.35
Total Volume :
Fourth Floor
Mark Length (m) Width (m) Thickness (m)
B2-a 5.75 0.2 0.35
B2-b 4.7 0.2 0.35
B2-c 2.8 0.2 0.35
B2-d 3.65 0.2 0.35
B2-e 5.5 0.2 0.35
Total Volume :
Footings
Prepared by: Checked by:IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
CASTRO, RHENDEL ENGR. ARNOLFO ARCIBALIIIIIIIIIIIIIIIIIIII
CURAYAG, JOHN PAULA INSTRUCTORIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
BSCE-3A
Republic of the Philippines
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPIN
1000 Ayala Blvd. cor. San Marcelino St.Ermita, Ma

College of Engineering
Department of Civil Engineering

Name of Project: PROPOSED FIVE-STOREY RESIDENT


CONCRETE WORKS

Mark Length (m) Width (m) Thickness (m)


CF-1 2 2 0.6
CF-2 1.2 1.2 0.3

Total Volume :
Wall Footing
Mark Length (m) Width (m) Thickness (m)
WF-1 5.75 1.6 0.25
WF-2 3.7 1.6 0.25
WF-3 2.8 1.6 0.25
WF-3a 3.8 0.4 0.25
WF-4 3.66 1.6 0.25
WF-5 5.55 1.6 0.25
WF-6 3.2 1.6 0.25
WF-7 2 0.4 0.25
Total Volume :

Columns
Ground Floor
Mark Length (m) Width (m) Thickness (m)
C1 0.3 0.3 3
C2 0.3 0.3 3

Total Volume :
Second Floor
Mark Length (m) Width (m) Thickness (m)
C1 0.3 0.3 3
C2 0.3 0.3 3

Total Volume :
Third Floor
Mark Length (m) Width (m) Thickness (m)
C1 0.3 0.3 3

Total Volume :
Fourth Floor
Mark Length (m) Width (m) Thickness (m)
C1 0.3 0.3 3

Total Volume :

Prepared by: Checked by:IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII


CASTRO, RHENDEL ENGR. ARNOLFO ARCIBALIIIIIIIIIIIIIIIIIIII
CURAYAG, JOHN PAULA INSTRUCTORIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
BSCE-3A
ic of the Philippines
UNIVERSITY OF THE PHILIPPINES
. San Marcelino St.Ermita, Manila

ge of Engineering
ent of Civil Engineering

POSED FIVE-STOREY RESIDENTIAL BUILDING


CONCRETE WORKS

MATERIAL AND ESTIMATE


IONS
CEMENT (bags) SAND (m3) GRAVEL 1 WATER (gal)
BEAMS

112.2849 SAYS 113

5.115201 SAYS 6

10.230402 SAYS 11

661.2333 SAYS 662

MATERIAL AND ESTIMATE


IONS
CEMENT (BAGS) SAND (m3) GRAVEL 1 WATER (gal)
BEAMS

106.26525 SAYS 107

4.8409725 SAYS 5

9.681945 SAYS 10

625.78425 SAYS 626

MATERIAL AND ESTIMATE


IONS
CEMENT (BAGS) SAND (m3) GRAVEL 1 WATER (gal)
BEAMS

106.26525 SAYS 107

4.8409725 SAYS 5
Prepared by: Checked by:IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
CASTRO, RHENDEL ENGR. ARNOLFO ARCIBALIIIIIIIIIIIIIIIIIIII
CURAYAG, JOHN PAULA INSTRUCTORIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
BSCE-3A
ic of the Philippines
UNIVERSITY OF THE PHILIPPINES
. San Marcelino St.Ermita, Manila

ge of Engineering
ent of Civil Engineering

POSED FIVE-STOREY RESIDENTIAL BUILDING


CONCRETE WORKS

9.681945 SAYS 10

625.78425 SAYS 626

MATERIAL AND ESTIMATE


IONS
CEMENT (BAGS) SAND (m3) GRAVEL 1 WATER (gal)
BEAMS

56.723625 SAYS 57

2.58407625 SAYS 3

5.1681525 SAYS 6

334.039125 SAYS 334

Prepared by: Checked by:IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII


CASTRO, RHENDEL ENGR. ARNOLFO ARCIBALIIIIIIIIIIIIIIIIIIII
CURAYAG, JOHN PAULA INSTRUCTORIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
BSCE-3A
ic of the Philippines
UNIVERSITY OF THE PHILIPPINES
. San Marcelino St.Ermita, Manila

ge of Engineering
ent of Civil Engineering

POSED FIVE-STOREY RESIDENTIAL BUILDING


CONCRETE WORKS

MATERIAL AND ESTIMATE


IONS
CEMENT (BAGS) SAND (m3) GRAVEL 1 WATER (gal)
BEAMS

56.723625 SAYS 57

2.58407625 SAYS 3

5.1681525 SAYS 6

334.039125 SAYS 334

MATERIAL AND ESTIMATE


IONS
CEMENT (BAGS) SAND (m3) GRAVEL 1 WATER (gal)
FOOTING

364.6944 SAYS 365

16.613856 SAYS 17

33.227712 SAYS 34

2147.6448 SAYS 2150

MATERIAL AND ESTIMATE


IONS
CEMENT (BAGS) SAND (m3) GRAVEL 1 WATER (gal)
FOOTING

404.9136 SAYS 405

18.446064 SAYS 19
Prepared by: Checked by:IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
CASTRO, RHENDEL ENGR. ARNOLFO ARCIBALIIIIIIIIIIIIIIIIIIII
CURAYAG, JOHN PAULA INSTRUCTORIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
BSCE-3A
ic of the Philippines
UNIVERSITY OF THE PHILIPPINES
. San Marcelino St.Ermita, Manila

ge of Engineering
ent of Civil Engineering

POSED FIVE-STOREY RESIDENTIAL BUILDING


CONCRETE WORKS

36.892128 SAYS 37

2384.4912 SAYS 2385

MATERIAL AND ESTIMATE


IONS
CEMENT (BAGS) SAND (m3) GRAVEL 1 WATER (gal)
COLUMN

53.5815 SAYS 54

2.440935 SAYS 3

4.88187 SAYS 5

315.5355 SAYS 316

Prepared by: Checked by:IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII


CASTRO, RHENDEL ENGR. ARNOLFO ARCIBALIIIIIIIIIIIIIIIIIIII
CURAYAG, JOHN PAULA INSTRUCTORIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
BSCE-3A
ic of the Philippines
UNIVERSITY OF THE PHILIPPINES
. San Marcelino St.Ermita, Manila

ge of Engineering
ent of Civil Engineering

POSED FIVE-STOREY RESIDENTIAL BUILDING


CONCRETE WORKS

MATERIAL AND ESTIMATE


IONS
CEMENT (BAGS) SAND (m3) GRAVEL 1 WATER (gal)
COLUMN

53.5815 SAYS 54

2.440935 SAYS 3

4.88187 SAYS 5

315.5355 SAYS 316

MATERIAL AND ESTIMATE


IONS
CEMENT (BAGS) SAND (m3) GRAVEL 1 WATER (gal)
COLUMN

38.2725 SAYS 39

1.743525 SAYS 2

3.48705 SAYS 4

225.3825 SAYS 226

MATERIAL AND ESTIMATE


IONS
CEMENT (BAGS) SAND (m3) GRAVEL 1 WATER (gal)
COLUMN

38.2725 SAYS 39

1.743525 SAYS 2
Prepared by: Checked by:IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
CASTRO, RHENDEL ENGR. ARNOLFO ARCIBALIIIIIIIIIIIIIIIIIIII
CURAYAG, JOHN PAULA INSTRUCTORIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
BSCE-3A
ic of the Philippines
UNIVERSITY OF THE PHILIPPINES
. San Marcelino St.Ermita, Manila

ge of Engineering
ent of Civil Engineering

POSED FIVE-STOREY RESIDENTIAL BUILDING


CONCRETE WORKS

3.48705 SAYS 4

225.3825 SAYS 226

Prepared by: Checked by:IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII


CASTRO, RHENDEL ENGR. ARNOLFO ARCIBALIIIIIIIIIIIIIIIIIIII
CURAYAG, JOHN PAULA INSTRUCTORIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
BSCE-3A
ic of the Philippines
UNIVERSITY OF THE PHILIPPINES
. San Marcelino St.Ermita, Manila

ge of Engineering
ent of Civil Engineering

POSED FIVE-STOREY RESIDENTIAL BUILDING


CONCRETE WORKS

No. of Beam/s Volume (m³)


5 2.875
5 1.85
8 2.24
2 0.76
2 0.732
3 1.665
3 0.96
4 0.8
11.882

No. of Beam/s Volume (m³)


6 3.45
5 1.85
8 2.24
3 1.095
3 1.65
3 0.96
4 0.8
11.245

No. of Beam/s Volume (m³)


6 3.45
5 1.85
8 2.24
3 1.095
3 1.65
3 0.96
4 0.8
11.245

No. of Beam/s Volume (m³)


6 2.415
5 1.645
6 1.176
3 0.7665
3 1.155
6.0025

No. of Beam/s Volume (m³)


6 2.415
5 1.645
6 1.176
3 0.7665
3 1.155
6.0025

Prepared by: Checked by:IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII


CASTRO, RHENDEL ENGR. ARNOLFO ARCIBALIIIIIIIIIIIIIIIIIIII
CURAYAG, JOHN PAULA INSTRUCTORIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
BSCE-3A
ic of the Philippines
UNIVERSITY OF THE PHILIPPINES
. San Marcelino St.Ermita, Manila

ge of Engineering
ent of Civil Engineering

POSED FIVE-STOREY RESIDENTIAL BUILDING


CONCRETE WORKS

No. of Column Footing/s Volume (m³)


15 36
6 2.592
0
0
38.592

No. of Column Footing/s Volume (m³)


5 11.5
5 7.4
8 8.96
2 0.76
2 2.928
3 6.66
3 3.84
4 0.8
42.848

No. of Column/s Volume (m³)


15 4.05
6 1.62
0
0
5.67

No. of Column/s Volume (m³)


15 4.05
6 1.62
0
0
5.67

No. of Column/s Volume (m³)


15 4.05
0 0
0
0
4.05

No. of Column/s Volume (m³)


15 4.05
0 0
0
0
4.05

Prepared by: Checked by:IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII


CASTRO, RHENDEL ENGR. ARNOLFO ARCIBALIIIIIIIIIIIIIIIIIIII
CURAYAG, JOHN PAULA INSTRUCTORIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII