BILL OF MATERIALS

PROJECT : PROPOSED 2 STOREY RESIDENTIAL BUILDING


LOCATION : BLOCK 14, LOT 13, E. STEPHANO ST., GREENFIELDS 3 SUBD.,
BRGY. SAN AGUSTINE, NOVALICHES, Q.C
OWNER : MR & MRS PETE SUMAOANG PAQUETE

A. MATERIAL COST P 1,646,440


Soil Works 10,000
Concreting Works 367,650
Masonry Works 350,000
Carpentry Works 158,900
Doors & Windows 79,500
Hardwares 61,240
Finishes 150,000
Plumbing Works 169,150
Electrical Works 150,000
Painting Works 100,000
Roofing Works 50,000
B. LABOR COST 40%- material cost 658,576
C. TECHNICAL SUPERVISION/
PROFESSIONAL SERVICES 10%-material cos 164,644
D. TOTAL COST P 2,469,660
LL OF MATERIALS

OT 13, E. STEPHANO ST., GREENFIELDS 3 SUBD.,


QTY UNIT UNIT COST TOTAL
I EARTH WORKS 10,000
1 Gravel Fill 15 m3 500 7,500
2 Lentrex T.C. 1 gals 2500 2,500

II CONCRETING WORKS 367,650


1 Cement 650 bags 168 109,200
2 Sand 90 m 3
600 54,000
3 Gravel 35 m 3
800 28,000
4 Rebar
10mm dia. X 6.0m 450 pcs 120 54,000
12mm dia. X 6.0m 325 pcs 156 50,700
16mm dia. X 6.0m 250 pcs 285 71,250
5 Tie Wire 10 kilos 50 500

III MASONRY WORKS 350,000


1 4" CHB 4500 pcs 8 36,000
2 6" CHB 2800 pcs 8.5 23,800
3 Cement 650 bags 168 109,200
4 Sand 210 m3 600 126,000
5 Rebar
10mm dia. X 6.0 m 450 pcs 120 54,000
6 Tie Wire 20 kilos 50 1,000

IV CARPENTRY WORKS 158,900


1 Formworks
Form Plywood 28 pcs 450 12,600
Form Lumber 1400 Bd. Ft. 42 58,800
2 Ceiling Works 150 sq. m. 250 37,500
3 Kitchen & Toilet Cabinet 1 lot 50,000 50,000

V DOORS & WINDOWS 79,500


1 Solid Wooden Panel Door 2 set 5,000 10,000
2 Solid WoodenPanel Door 6 set 4,500 27,000
3 PVC Door with 3/4 Louvers 2 sets 2500 5,000
4 Steel Casement Window 15 sets 2500 37,500

VI HARDWARES 61,240
1 CWN Nails 2 kegs 1500 3,000
2 Concreting Nails 2 kegs 2500 5,000
3 Locksets 18 sets 180 3,240
4 Miscellaneous 1 lot 50000 50,000

VII FINISHES 1 lot 150,000


VIII PLUMBING WORKS 169,150
1 Roughing Ins. Sanitary & Water Lines 1 lot 50,000 50,000
2 Water Closet 12 sets 3500 42,000
3 Lavatory 12 sets 850 10,200
4 Kitchen Sink 12 set 1,200 14,400
5 Septic Tank 1 lot 50,000 50,000
6 Catch Basin 3 sets 850 2,550

IX ELECTRICAL WORKS 1 lot 150,000 150,000

X PAINTING WORKS 1 lot 100,000 100,000

XI WATER PROOFING WORKS 1 lot 50,000 50,000