DPR DATED: 20.01.2019


FROM: HEAD OPERATIONS - I, SAIJ BASE

TO: I/C TSG, WSS, CHANDKHEDA

JOB PLAN
- Mont Cumula
SERVICE JOBS DONE ON 19.01.2019
20.01.201 hly tive
S 9
Well No JOB DETAILS
MF NDN#174 COMPLETE NIL 7 124

Well type: Oil Producer (inclined)


PI: 1834-36.5 m {MS-IID}
Res Temp: 93 Deg C

A. DCT (with KCL water) Rate-4.8


bpm, vol. 10 bbls,
ISIP- 2381 psi
grad- 0.86 psi/ft

B. Step Rate Test (KCL water)


Max Rate- 15 bpm
Max Line Pr- 7915 psi
ISIP: 2475 psi
HF NDN#174 BH ISIP Grad. - 0.88 psi/ft 7 120

C. Main Frac
Pad-330 bbls ( with silica flour 500
kg)
With Sand-420 bbls
Flush- 36 bbls
Avg Treating pr- 4845 psi
Max Treating pr- 8350 psi
Avg. Ann. Pr.- 2000 psi initially
maintained.
Max conc.- 4.0 ppg
Avg conc.- 2.5 ppg
Avg. Rate- 14.5 bpm_ 15.5 max
Job size- 20 MT LSP

Profile modification job:


Acid KL#658 PM: 10m3:250 Lpm @ 1200 psi 21 358
Main Job: polymer volume 80m3
pump.Rate: 250 Lpm @
1200-1500 psi
AF: 8m3: Rate: 300@ 1500 psi

,
T/S:1793, mts,
PI:1814-1817 mts, (1)AMD#184
sobh#312 Back press 100 kg , (WR)
105 to 135 kg water, max press (2)KLL#763(
135kg(1700 mts) D/R)
70 1141
Packer 1628.29 mts, NDN#174
pi: 1666.5- 1629.29 mts, CTU+FOAM
LIN#155 , CTU lower at 1600 mts, N2 Press
2500 psi, & N2 cut at 1450 mts,
Return water & N2
LN2
T.Shoe 1756mtd
PI - 1792 - 1797mts
0 - 40ksc No Return
SKD#122 40 - 60ksc Oil flowing
60 - 70ksc Oil With Water flowing
70 - 120ksc water Flowing
K/O 1400mts

Oil CTU HOC NDN GGS CM


Solanki - 9428518851,
C/S @ 1555m
F/C @ 1530m
Perf: 1494-95.5m
H/P @ 1452.7m
KS-XIIIB Sand
Csg 5-1/2 Tbg 2-7/8 WH-5k

NDN#62 NDN#164 63 1041


Rih 1 1/4" CT with circulation of
hot oil @ 85 c @ 2500 psi up to
CTU 1231 m. Felt hard obstruction at
1231 m. Not cleared with
circulation & reciprocation.
Observed oil & gas in return. Then
after p/O CT up to surface. Total
14 m3 hot oil circulated.

N2 Actuvation
LNC#155
Oil post HF
LNC EPS S Pal 9426613450,
Perf: 1666.5-1668.5m
LU-I Sand
H/P @ 1628.29m
F/C @ 1773.2m
csg 5-1/2 Tbg 2-7/8 WH-5k
RIH 1.25" CT upto 1628m with
circulation of N2@max pr 2800 psi
and return observed was Dirty
water, N2. No obstruction felt upto
lowerered depth. N2 cut at
1450m. CT P/O upto top
.

HOC 7 181

Solvent 6 48

GP@
(7" csg, BP 962 m, PI 953-958 m)
Tagged bottom 962 m. Kept bull
BEC#218 nose at 960.4 m. Injectivity 400
GP lpm/ 700 psi. Pumped 2.1 MT of
- 4 99
20/40 mesh ISP & squeezed upto
2600 psi. Rev 10 kgs
PPF: 115 lb/ft

CTC: (5-1/2" csg, 1025.5-27,


CTC NK#30
27-29CP 1034.5) completed
5 93
TGP:

Loss. Squeezed 7m3 thermogel


followed by 1 m3 pill max
TGP NK#30 pressure reached up to 200psi.
7 101

Surging NIL NIL NIL 0 2

Surfactant NIL NIL NIL 0 0

Others KLL#658
(WSO
Polymer
Mixing) NIL NIL NIL 9 102

Total
(Actual / (10/10) 207 3415
Plan)

STOCKS
LN2 24 KL KCl 119.75 MT

HCl 31.78 KL ACI 18.16 MT

NE (K) 53110 KG ACETIC ACID 6080 KG

NE (SBN) 15020 KG FHGG 34950 KG

NE (WASNA) 13.04 Kg GA – II 20499 KG

SURFACTAN
LSP 271.85 MT 61.5 MT
T

ISP 150 MT ABF 16850 Kg

7” OTP 34 5 1/2” OTP 51

Ammo.
IPA 1100Kg 3200Kg
Chloride

Details of Deviation / Job not done on 19.01.2019

SERVICES WELL NO. REMARKS

PLA ACTU
N AL

MF/HF 1/1 1/1

ACID 3 3

LN2 7 5

CTU 4 3

SOLVENT 0 0

HOC 1 1

CTC/TGP 1/1 1/1

GP 0 0
OTHERS 0 0

Capacity / Capability of Services for the Date 20.01.2019

Service Capa No. of Indents Actual Remar


bilit Received for Jobs ks
y 20.01.2019 Done
per on
day 19.01.2
019

HF/ MF 1/0 0/0 0/0

ACID/Ot
hers/GS 2/0/0 1/0/0 1/0/0
O

LN2 5 4 3

CTU 5 4 4

HOC/SO
1/1 1/0 1/0
LVENT

GP/CTC/
2/0/0 0/0/1 0/0/0
TGP

Percentage of Units available for job:

Total No. of Units Units Percentage of


No. under available for Units
of Maintenance the job as available
Units on
20.01.2019
Upcoming Wells:

S. Wells
Servic
N Asset
es Wells not
o Wells ready
ready
AMD#109/NGM#293

Ahmedabad

NDN#174
1 HF 20.01.2019
Mehsana

Cambay NIL

Ankhleshwar NIL

Ahmedabad NIL NIL

2 CTU Mehsana NIL NIL

Cambay NIL NIL

Ahmedabad NIL NIL


3 LN2
Mehsana NIL NIL

Ahmedabad NIL NIL


4 Acid
Mehsana NIL NIL

Ahmedabad NIL NIL


5 GP
Mehsana NIL NIL

Ahmedabad NIL NIL


6 HOC
Mehsana NIL NIL

MAINTENANCE DPR
S. Unit Reg.
N
No Jobs carried out 20.01.2019
o

1 6824 - Hyd oil leakage rectified test run ok.

2 9014 - Radiator water circulation and flushing job carried out


several times for flushing out oil contamination in coolant
circuit. Test run .ok. Unit handed over

3 6016 - Diesel both tank inter connection fitted. Also air lock
rectified. Test run ok.

4 1540 - PT pump assembly removed from 5983 and fitted in1540


. Coolant hose connecting compressor head replaced.
Test run ok.

5 9282 - Rear rear left side wheel hub studs arranged from local
market fitted. As brake shoes are found worn out, replaced
them with new brake shoes. Test run to be carried out
after installing Tyre.

6 8513 Monthly maintenance carried out.


Ap8513. Installing repaired augur drive shaft flanges is in
progress.

INSTRUMENTATION MAINTENANCE

S.
Unit
N Jobs carried out on 19.01.2019
Reg. No
o

ELECTRICAL MAINTENANCE
S
Unit Reg.
N Jobs carried out on 19.01.2019
No
o

1 8907 8907 HOC starting trouble attended.


6283 SD battery maintenance done.
2 6283

7734 SB battery maintenance done.


3 7734

Associated with HF job

PREVENTIVE MAINTENANCE

S. Unit
N Reg. Jobs carried out on 19.01.2019
o No

OPERATIONAL MAINTENANCE

S.
N Services Jobs carried out on 19.01.2019
o

1 CTU

HF
2

3 ACID

4 GP

5 LN2

CHEMISTRY
S/N Jobs carried out Status
Development of mettalic X-Linker for Lab study &Data
development of HT frac, fluid compilation is in progress

Received 05 no. of core from


SADRA# 17(K-X), SADRA 18(K-IX)
2 & SADRA #19(K-IX) from IRS , for lab study is in progress
evaluation & Design for Acid
stimulation strategy .
Sampling & bonding of 12/20 gravel
3 Completed
sand- "completed"

Three no. Of Ditch samples of well


4 lab study is in progress
Linch#156 for Detailed analysis

Short term Permeability &


5 Conductivity of 20/40 LSP Using lab study is in progress
Proppant conductivity tester- ""

HSE

S/N JOBS CARRIED OUT STATUS

1 Nil

On Job Safety Field Visit (JAN 2019)

Details of visit Remarks


In-charge
Date Well No Job
Head Operations

Head Lab

LM-CTU KLL#673 CTU


03.01.2019

LM-HF HF

09.01.19 LNW#131 GP
LM-Sand Control 09.01.19 SNL#307 CTC

LM-Acid 02.01.2019 Acid


SAN#95
Stimulation 08.01.2019 PM

I/c Chemistry

I/c Maintenance 11.01.2019 SBN#312 HF

16.1.2019
LMD#218 HOC
16.1.2019
I/C HSE 8.1.2019
LMD#160 ACID
SNL#95 ACID

I/c Nitrogen

Total 05

Near Miss/Accident Reported In 2018-19

Section A Ju Au O De Fe To T
p n g c c b t a
r - - t - - a r
- J S - J M l g
M u e N a a e
a l p o n r t
y v
Chemistry 2 2 2 1 03

Maint. 1 1 2 01
CTU 1 4 4 02

N2 1 4 1

HF 1 3 5 3 07

Acid/HOC 0 3 3 3 08

GP 0 2 2 0

Total 6 9 4 8 19

MLY/QLY/HLY Scheduled Maintenance JAN– 2019

Date of
S/N. Unit No.
Completion

GJ-1R-1426 ACID
1 (QLY)
PUMPER

GJ-18H-7549 ACID
2 (QLY)
PUMPER

GJ-18H-9014ACID
3 (MLY)
PUMPER

GJ-18A-8513 ACID
4 (QLY)
PUMPER

GJ-18H-7711 ACID
5 (QLY)
PUMPER

6 GJ-1R-1139 CTU (MLY)

7 GJ-18H-7733 CTU (HLY)

8 GJ-1R-5983 CTU NOT IN USE

9 GJ-1HE-6016 CTU (MLY)

GJ-1BK-8072 SAND
10 (HLY)
BLENDER

GJ-18H-7734 SAND
11 (HLY) PENDING
BLENDER

GJ-18H-9007 SAND
12 (QLY)
BLENDER

13 GJ-18AU-8907 HOC (HLY)

14 GJ-18H-9006 CAS (MLY)

15 GJ-18H-9013 MPPU (QLY)

16 GJ-1-HA-6824 MPPU (MLY)


GJ-1R-6344 FRAC
17 Not in use
PUMPER

18 FRC GJ-1R1381 PUMPER Not in use

GJ-18H-7550 FRAC
19 (HLY)
PUMPER(Deck)

GJ-18H-7697 FRAC
20 UMM
PUMPER

GJ-18A-7653 FRAC
21 (QLY)
PUMPER

22 GJ-1R-1465 N2PUMPER (HLY)

23 GJ-18H-7696 N2 PUMPER (MLY)

24 GJ-1R-1540 N2 Pumper (HLY)

25 GJ-18A-8507 N2 Pumper (MLY)

GJ-1U-5143 SAND
26 (MLY)
DUMPER

GJ-1X-4972 SAND
27 (HLY) 09.01.19
DUMPER

GJ-18H-7695 SAND
28 (QTY)
DUMPER

29 GRR-3651 SAND DUMPER (MLY)

GJ-1X-6283 SAND
30 (MLY) 09.01.19
DUMPER

GJ-18 H-9611 LORRY


31 (HLY)
LOADER

GJ-1UU-8320 LORRY
32 (QLY)
LOADER

33 GJ-18H-9015 DATA VAN (QLY)

GJ-18-AU-9744 ACID
34 (HLY)
TANKER

GJ-18X-9688 ACID
35 NOT IN USE
TANKER

GJ-18-AU-8250 ACID
36 (HLY)
TANKER

37 GJ-18H 9281 CTU (HLY)

38 GJ-18H 9282 CTU (HLY)

GJ-18H 9380 VOLVO ACID


39 (MNY)
PUMPER
GJ-18H 9381 VOLVO ACID
40 (MLY)
PUMPER

41 GJ-18-H-9650 FP-TRAILER (HLY) PENDING

42 GJ-18-H-9651 FP-TRAILER (HLY) PENDING

43 FORK LIFTER (Sertha) (HLY)

44 FORK LIFTER (Saij) 9042 (HLY)

45 AS-04-AC-3646 (MLY) PENDING

46 GEN SET (SAIJ) (HLY) PENDING

47 GEN SET (SHERTHA) (HLY)

48 GJ-18-H-9764 FP-N2 SKID (HLY)

GJ-18-AZ-3501
49 (ANNUAL)
PRIMEOVER M.

GJ-18-AZ-3821
50 (ANNUAL)
PRIMEOVER M.

GJ-18-AZ-3842
51 (ANNUAL)
PRIMEOVER M.

GJ-18-AZ-6290
52 (MLY)
PRIMEOVER M.

N.B. - KINDLY ENSURE THAT THE VEHICLE HAS BEEN CLEANED /


WASHED BEFORE PARKING AT THE SERVICING SECTION​.