Beruflich Dokumente
Kultur Dokumente
BS 1377 (Part 9)
Test No 1 1 (Retest) 2
Depth of hole excavated mm 150 160 150
Mass of standard sand before pouring g 14000 14000 14000
Mass of standard sand after pouring g 10333 10298 10115
Mass of standard sand in hole and cone g 3667 3702 3885
Mass of standard sand in cone g 1181 1181 1181
Mass of standard sand in hole g 2486 2521 2704
Density of standard sand g/cm3 1.23 1.23 1.23
Volume of hole cm3 2021.138 2049.593 2198.374
Mass of container 1 + wet soil g 4431 4620 4762
Mass of container 1 g 480 480 480
Mass of wet soil g 3951 4140 4282
Wet density of soil g/cm3 1.9548391 2.019913 1.947803