Sie sind auf Seite 1von 3

Natividad, Kristine Joy A.

Design

1. I PROJECT TITLE (and General Description): A Proposed Medium-Rise NATIONAL


GOVERNMENT OFFICE Project [development with Basement, Podium (optional parking) and Tower
components]

II. STATEMENT OF THE PROBLEM: A National Government-Owned and Controlled Corporation


(GOCC) has decided that its two thousand square meter (2,000.0 sqm) property located somewhere
in Quezon City shall host a medium-rise office building (the “Project”) to serve as their headquarters.

2. I. PROJECT TITLE (and General Description): Proposed Exclusive/ Upscale Family Compound
Project [consisting of 135.0 Sq.M. and 150.0 Sq.M. Two and One-Half (2.5)-Storey to Three (3.0)-
Storey Single-Detached Residential Prototypes cum Site Planning Project on a site having a four
(4.0%) slope]

II. STATEMENT OF THE PROBLEM: A development company has decided that its four thousand two
hundred thirty seven point five square meter (4,237.5 Sq.M.) property located somewhere in the
better parts of Quezon City shall be developed to host an exclusive/ upscale family compound project
(the “Project”).

3. I. PROJECT TITLE A Proposed Three (3) Storey Commercial Arcade, C-1 Project Development,
on a Project Site with a 1% slope towards the (RROW) road right of way.

II STATEMENT OF THE PROBLEM:


A Retired officer has decided that it’s ONE THOUSAND FORTY_FOUR SQUARE METER
(1,044.0 SQ.M.) Property located along commercial zone of Quezon City shall be developed to a
business/residential establishment.

III PROJECT FEATURES


The Project Site is an inside lot with 72-meter wide frontage that is facing north. The 18meter road
right of way (RROW) is at 0.0 elevation. Under section 1004 of the National Building Code (PD
1096), the width of the sidewalk shall not be less than 1/6 of the road right of way. A rear setback of
2-meter for courts and yards will serve as pedestrian access toward adjacent parking area. Parking
as one of the essential needs of a commercial establishment, 1/3 of the lot at the west side will be the
temporary parking for costumers and tenants.

4. I PROJECT TITLE A Proposed Two (2) Storey Clubhouse on a middle class community. The
Project will be on an open planning.

II STATEMENT OF THE PROBLEM:


A Group of young and aggressive businessman & realty developer acquired a 2.8-hectared lot to
put a middle class community with a typical 10-storey condominium that has 139 dwelling units on
each structure on a central location that everyone will enjoy all the convenience of a city living and
retreat to your personal sanctuary in minutes.
III PROJECT FEATURES
The Project Site is located 20-minutes drive from Ortigas Center, home to some of the city’s finest
commercial and business establishment and 40-minutes drive from Makati area.

5. I PROJECT TITLE A Proposed Eight (8) Storey Office Building/Structure, C-2 Project
Development, on a Project Site with a 3% slope from center of the development towards Northwest
and Southeast.

II STATEMENT OF THE PROBLEM:


A Businessman & Realty Developer commission an Architect to put up an Office
Building/Structure intended for Prime Companies to house & establish a main office within Global City
as prime location for businesses.

III PROJECT FEATURES


The Project Site having Total Lot Area (TLA) of 4,335 square meters with 42.5-meter frontage
that is facing northwest with 18-meter wide road including half of the island and a 3-meter sidewalk
and a 6.5-meter one-way service road toward southwest direction. Consider setback requirement as
set forth by authorities. Provision of firewall will be consider on both side with appropriate provision of
maintenance.

6. I PROJECT TITLE A Proposed One (1) Paradise Travelers Inn, on a Project site with 1:1 slope
downhill towards east direction.

II PROJECT FEATURES
The Project Site is an inside lot, located in Tagaytay City with 76-meter wide frontage that is
facing National Highway with 12-meter wide road toward north going to people’s park and 2-meter
sidewalk. The 56-meter depth is within 1:1 slope downhill toward east direction. Consider setback
requirement as set forth by the local authorities, 5-meter front setback.

7. I PROJECT TITLE A Proposed Forty-Five (45) Storey Mixed-Use Building/Structure, C-3 Project
Development, on a Project Site with a 5% slope towards Southwest.

II STATEMENT OF THE PROBLEM:


A well-known corporation decided to put up a multi-billion project within Ortigas Avenue on a
commercial zone with Total Lot Area (TLA) of THIRTEEN THOUSAND SEVEN HUNDRED FIFTY
SQUARE METERS (13,750 SQM.)
A Mixed-Use type of building/structure having a complete commercial facilities within the podium
of the structure and an office and residential spaces on top of it. The five (5) level basement parking
is allotted for office and residential tenants and the five (5) level podiums is for shopping mall with
supermarket and adjacent parking at each level of commercial use. The condominium type of
residential units will be on top of the seventeen (17) level of rentable office space.

III PROJECT FEATURES


The Project Site is a corner lot with 125-meter wide frontage that is facing northeast. The
commercial level consider 3-meter floor to floor height distance for except for upper ground that has
5-meter floor to floor height distance, and the lower ground level consider 4-meter floor to floor height
distance. The major roas of 20-meter right of way (RROW) and a minor road of 14-meter right of way
(RROW) and a minor road of 14-meter right of way (RROW) facing southeast. NOTE: Minor road
sloping downward 5% slope from the elevation of the front ground line (+20.0m. elevation) @ east
side.

Das könnte Ihnen auch gefallen