THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
12 High Pressure TRIP Set point PSIG
13 Low Pressure TRIP Set point (If applicable) PSIG
14 HIPS Full Response Time Seconds
15 Process Safety Time Seconds
16 Inspection Frequency (Full Proof Test) Months
17 Number of Logic Solvers
18 Number of Pressure Sensors
19 Number of Final Elements
20 Mean Time To Repair( MTTR) Hours
Leak Test Function Frequency (Seat Leakage test available, N/A 3 Months 6 Months 9 Months 12 Months
21 attach in WF) (N/A Offshore Oil Applications)
22 HIPS Information
23 Logic Solver
3 Months 6 Months 9 Months 12 Months High Trip Set point
24 Inspection Frequency Number of
value
outputs used
25 Tag No. Type Model Manufacturer PSIG
26 E/PE SS/E RL/HY
28 Sensors
29 Inspection Frequency 3 Months 6 Months 9 Months 12 Months Sensor Set point value
30 Tag No. Type Model Manufacturer Pressure Range PSIG (High Trip)
E-PT HI/LO-PT E-PS
31
E-PT HI/LO-PT E-PS
32
33 E-PT HI/LO-PT E-PS
37 Final Elements
38 Enter valve data (For Offshore Oil Applications ‐ Use line Item 62 to 92 ) Final Element (ZV Valves only)
39 Tag No. Type Model Manufacturer Testing Schedule
40 Partial Stroke
41 3 Months 6 Months
42
9 Months 12 Months
43
Not applicable
44
45 Full Stroke Test (if different from full
proof test frequency, Offshore Gas)
46
47 3 Months 6 Months
48
9 Months 12 Months
49
50 Actuators (N/A for OFFSHORE OIL)
51 Tag No. Type Model Manufacturer Partial Stroke capability
52 PN HY EM Yes NO
53 PN HY EM Yes NO
54 PN HY EM Yes NO
55 PN HY EM Yes NO
56 PN HY EM Yes NO
57 PN HY EM Yes NO
58 PN HY EM Yes NO
59 PN HY EM Yes NO
60 PN HY EM Yes NO
61 PN HY EM Yes NO
SHT.NO. REV.NO.
1 of 2
Saudi Aramco SA-373-ENG (06/2016)
62 Final Elements Offshore OIL (Relays‐HV switchgear)
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
70 Undervoltage Interposing Yes NO
78 Yes NO
79 Yes NO
80 Yes NO
Adjustable Frequency Drives Final Elements : Can be contact in the AFD or in breaker supplying AFD
81 (OFFSHORE OIL Only. Note: will have same inspection frequency as line item 74)
Model: Insert AFD model if the
Manufacturer: Insert AFD manufacturer if contact is in the
contact is in the AFD, otherwise AFD Final Element Contact type
Tag No. AFD,otherwise insert relay manufacturer used in the breaker supplying
insert relay model used in the Volt Free /interposing or undervoltage
82 the AFD
breaker supplying AFD
83 Volt free/interposing Undervoltage
93 Additional Info
HIPS Trip Push Button Flow line number for
Offshore GAS / ESD PB for SAT date MCC signed date Onshore HIPS or WHP Trunkline HIPS is connected to:
94 Khuff Gas WSD number for offshore HIPS
95 Tag No.
96
99 For Onshore OIL (Requirements as per Letter P&CSD T348/2012)
9 Months 12 Months Number of HIPS per Trunkline HIPS Architecture
100
102
Project Engineer Initiator
SHT REV
103 Date
NO. NO.
Name ,signature & badge number:
Senior Project Engineer
104 Date 2 of 2
Name , signature & badge number: