Plan of Work

Sub Strategic Preparation Concept


Ref Section Credits Definition & Brief Design

Wat 01 Water Consumption 0.5 1


Wat 02 Water Monitoring

Wat 03 Water Leak Detection


Wat 04 Water Efficient Equipment 0.5
Plan of Work

Developed Technical Construction Handover &


Design Design Close Out

2 2 3 4
1 2 3 4

1 3 4 4
2 2 3 4
E
C x
e
r m
Aim e p
d
1 la
it r
2 y
To reduce the consumption of
potable water for sanitary use in new 3
Wat 01 Water consumption buildings through the use of water
efficient components and water 4
recycling systems.
5
1
12.5% improvement over baseline building water consumption
25.0% improvement over baseline building water consumption
40.0% improvement over baseline building water consumption

50.0% improvement over baseline building water consumption


55.0% improvement over baseline building water consumption
65.0% improvement over baseline building water consumption
Assessment criteria
1 Use the BREEAM Wat 01 calculator to assess the efficiency of
the domestic water-consuming components.
2 Use the standard Wat 01 method (see Methodology on the
next page) to compare the water consumption
(litres/person/day) for the assessed building against a baseline
performance. Award BREEAM credits based
upon Table 8.1 below. Where it is not possible to use the
standard method, complete the assessment using the
alternative Wat 01 method (see Methodology on the next
page).
3 If a greywater or rainwater system (see Definitions on page
210) is specified, use its yield in L/person/day to offset potable
water demand from components.
4 If a greywater or rainwater system is specified and installed:
4.a Greywater systems in compliance with BS 8525-1:2010
Greywater systems - Part 1 Code of Practice (157).
4.b Rainwater systems in compliance with BS EN 16941-
1:2018(158).