Notes:

All mains, services and ducts that will contain electric cables must be
overlaid with electric marker tape with 240mm ground cover.
Mains and services should have a minimum of 250mm clearance from other
06/09/18 utilities.

ESP Utilities Group


ESP Mains
Electric mains should be routed as per the project drawing and generally,
mains shall be installed in accordance with the layout described in NJUG 7,
Bluebird House
Mole Business Park which is shown in the diagram below:
Leatherhead
Surrey KT22 7BA
Tel: 01372 587500 Recommended Arrangement of Mains in a 2m Footpath

NORTH
Standard
ESPE REF:- ESPE021259 Lamp
All Dimensions in mm

2000
1720
1550
1255
960

Boundary
690
430

250

350
Outside Stop Valve

Elec LV
450

600

600

900
4 PIN
1701

Water
AS
FFL
W

Elec LV Alt pos'n

Cable TV

Telecomms
T

Elec HV

Gas
54

W
54 O 280 170 295 295 270 260 430

3 PE 1057

FFL

SDG
PLA 6

flue
AS
179

G
E

E
G
T
A OPP

SDG
flue
4 AC
53
Mains Depth (mm)

T
1550 FFL
53

FFL
OPP
Verge Footpath Roadway Agricultural

A4CA
P4IN 701
G

AS

4P
52

OPP
E
LV 450 450 600 1100

A
FFL
FFL
flue

55 52

FFL

336M
1

W
OPP
63
L4IL HV 600 600 750 1100
1394

flue
flue
55 W

G
G

E
E T

1550
63

1
T
G

OPP

E
Services

G
50
50

95 W
flue
56
FFL

3 PE 1057
51 Unless otherwise stated, domestic services shall be of 35mm diameter.

DG
G
62 51

OPP
Services shall conform to the routes shown and should be installed in a

flue
W

FFL

FM
S
T
57
64 62 direct line from the meter position to the main. All service cable ducts are to

SDG
64

SDG
G
be 38mm black polypipe ducting compliant with ENA TS 12-24. The services

E
SDG
should be laid at a minimum depth of 450mm.

A4C
61

T
95 WFM
49

A
OP FL
61 49

T
F
Ducts

P
48

3 0507
flu
e

15 S
48
No service ducts are shown on drawing but are to be installed on site for all

PE
15

W
3 PEO 47

FFL
E

1228
CA

4 RO
G

O
A4

W
70 47 road crossings.

A L
3 CHE
G

AS
E
0
1551057 3 CHE

95
FF
FFL

flue
802

3HO4
G

E
70

G
802

E
E

97 P
E OPP
3 CH2 AS
W W

W
AS

OP
G

AS

FFL
flue

OPP All ESP cable and ducts to have warning tape and tile to ESP specification.

R
FFL
80

FM
FFL FFL

T
FFL
flue
105
65 E OPP FFL

W
3 CH
AS 3 PE7
G
G

SDG
FFL
W
G

802
W O

flu
E

All NPG cable and ducts to have warning tape and tile to NPG specification.

13
G E SDG 105

95 WFM
E
69 65 E T

3 PE7

36
T

AS G

G
M
69

4 W99
W

E
E O
FFL

11
A4 P
T T

The developer is responsible for the installation of ducts at road crossings

AS L

AL
FF
G
59 59 58 58

O FL
E
57 as shown and for all service ducts to each unit.

PP

SD
56

4 99
T
68

F
60

W
11 S

18

flu
e

G
60

AL
68

W
95

A FL

SD
Road Crossings - Mains & Services

5W
T

F
W
185 WFM

G
Sa
flu
All ESP/NPG road crossing cable ducts to be 150mmØ black twin walled

e
FM

G
FM
l

E
es
W

G
46 ridgeduct to ENATS 12-24 marked "electric cable duct C1/C2" on opposing

ar
45 sides.

4 28
46

G
E
Any sizes given on drawing(s) refer to internal diameter. All cables to be

12 S
RO
67 185

A L
G
45 fully ducted in the road with marker tape cover.

W
E
WF

flu
e
FF
W
66 M

W
FM

flu
67

e
W
T

Dwelling Duct/Service

4PL 96
5
flue
T FFL W
E

18
35

flu
P4I 1

17 e
66 G

A
34 36

G
Install 38mmØ continuous black polypipe ducting from joint location to entry

N 70
FFL

T
AS

E
W

O FL
flue

ASFL
E

PP

F
OPP G

into dwellings - ducts to be compliant to ENATS 12-24.


1228

G
E

E
4 ROW G

1
RO4W 1228
34
35
36
44 Material Specification:
FFL
All IDNO LV cable & accessories to ESP specification. All technical and

W
95 W

AS 9 44
W

T
L
FM FF 9 E

compliance documents can be found at: www.espug.com/

W
P 19911 AL

W
flue G

37

18
P
O 1 4W

5
G SD 38
All DNO LV cable & accessories to NPG specification. All technical and

W
SDG SDG AL W

FM

18
4W 37 compliance documents can be found at:

5W
PL 1
https://myservices.northernpowergrid.com/connections
flue

PL 17
E
38

A4 79
G

FM

T
T

O FFL

A4 96
flu

OP FL
e
PP
T

flu
e
e
flu
6

P
G
G All electrical installations must comply with BS 7671 - 17th Edition.

G
33 43
SD SD

E
W

33 RO GS G L
95 4W DG SD FF S 1 43
W The LV cable will be 300mm² Al Waveform cable (CNE), 185mm² Al

T
FM OP 1 A 70 IN 39
FM
T

FF P 228 Waveform cable (CNE) and 95mm² Al Waveform cable (CNE).

A4C
85 W
1 P
4W 4 39
1

OP L
11 AL

E
W
L

A
G

AS 99

FF
E

P
flu
e

32 flue

All single phase services to be supplied via 35mm² (1) Al/Cu straight

e
flu
FF

flue
31 42
L 133 concentric.

1554 701
W

G
36

E
6MW
A
4P 42

13
flue

1
0PIN
AS L
32

AS
Civil Works

FFL
FF
T
31 G

AP
E
G OP All on-site civil works to be undertaken by the client in accordance with the
P A4C

4M
design supplied by EDES/Alconex.
E

W
FF A
L
OP EDES/Alconex will carry out all off-site excavation.

T
185
P 154P5L

W
FF
T
30
L
flue

1790A 26
All kerb lines must be installed or clearly detailed on site with width of footpath

flue
30 SDG

SDG
flue

WFM
visible. Finished ground level marker must also be present with utility track
T

G
E
AS

DG
correctly formed and marked.
FM

95
G
FFL 26 41

SDG
E

S
W

WF G
41
185 W

M 29
E
25
29 40
40
T
28 27 L4IL

flue
28 25
1394
G W
E

4R

1394
1228OW
AS OPP

4L
27

OPP
FFL

FFL
ELECTRIC LEGEND

W
LI
G

flue
E FFL W
RO4W
1228 T
Existing LV Main
T
OPP flue

FFL G
Existing HV Main

T
T W E SDG

G
flue

E
Proposed LV Main

Proposed HV Main

Proposed Service
185 WFM
Point of Connection Meter Position

Breech Joint
Jointing by NPG Straight Joint

95 WFM Pot End

2 Way Link Box


M

2-Way Link Box


WF

200A Fuses
185

4-Way Link Box


95 WFM

125mm Duct
FM

95
5W

T T
W
E E
16 17
E T FM
18

G G G

95 WFM 95 WFM FFL


FFL FFL FFL W
flue
E

AS OPP AS
G
18
19
300 WFM
OPP 974 W
974 1228 W G
FFL
E

T
M

11993
W HOR 16 17
W 3HOR 4 RO OPP W
WF

flue

flue

4 WAL flue

18
19
T

3P
JA SD
300

T T T T G G E

G
E
G
E
E E E W W W E E W W W E
986 FFL G G
flue

G G G G G G

FFL FFLFFL FFL P


FFL FFL FFL FFL FFL FFL OP T

802 E
E
OPP OPPAS AS G

AS AS E AS AS AS E AS H FFL
840 802 840 802 3C SD
W W W W
W

3CHE 3 CHE3CHE 3 CHE 759 759 759 759 759 759 SDG SDG W
AS GS
2 OLI 2 OLI 2 OLI 2 OLI 2 OLI 2 OLI SDG S
DG 802 HE DG E
flue

flue

G
95 WFM

SDG SDG

20 3C
15 SD 95 W
SDG FFL P G FM
SD A Preliminary JB GK 30/07/18
OP G
14 W
974 R
Rev: Description: Drawn: App: Date:

3 CHE
OPP
3HO
flue

FFL
802
SDG SDG 21 THIS DRAWING AND ANY INFORMATION OR DESCRIPTIVE MATTER SET OUT HEREON ARE THE
W

T
G

E
flue

3HOR 22
flue

CONFIDENTIAL AND COPYRIGHT PROPERTY OF EDES LTD AND MUST NOT BE


986 JAP

10 HOR
3
T

W
W
24 DISCLOSED, LOANED, COPIED OR USED FOR ANY PURPOSE WITHOUT WRITTEN PERMISSION.
flue

1 1 2 2 3 3 4 4 5 6 7 8 9
974 974 3
986 JAP 11
flue

23
OPP

OPP OPP
FFL

W
FFL
3

FFL OPP

W
G
E

3 CHE
G

13 E 12 E W
T
FFL E

FFL
802
T
T

AS
G

T
95 WFM

ELECTRICITY DISTRIBUTION ENGINEERING SERVICES LTD


Yew Tree Office, 55 Bridgewater Road, Mosley Common, Worsley, Manchester M5 3EZ
T: 0161 872 6123 E: enquiries@edesltd.com
F: 0161 872 9447 www.edesltd.com

Scorers Lane,
Site Name:
Great Lumley
Developer: Bellway Homes

EDES Reference: ALNE.107.6


Drawing Title: Proposed Electric Layout
Rev:
Drawing Number: MU/ALNE.107.6.002 A
DESIGN NOT APPROVED Upstream DNO: Northern Powergrid Adopting iDNO: ESPE

DNO Ref: ENQ5392520 iDNO Ref: ESPE021259


Drawn by: Design Approval by: Date: Scale:

A Sibley G Kennedy 30/07/18 1:500 @ A1