Beruflich Dokumente
Kultur Dokumente
20
00
20
00
00
20
20
00
3098
20
00
00 NOTES
2000
20
20
00 SOUTH
00
20 1. ORIGINAL DRAWING SIZE - A3
2000
S/S
00
20
Boring
1000
9956
20
00 2. ALL DIMENSIONS ARE IN MILLIMETERS (MM),
45
00
20
20
00 UNLESS OTHERWISE STATED.
20
00
00
00
0 3. USE WRITTEN DIMENSION ONLY
20
20
00
2681 4500 1000 5000 1000 5000
2000
00
20 4. ASSUME ALL DETAILS ARE EXISTING UNLESS OTHERWISE
00
20
Toilet 20 SPECIFIED.
EL +1000 EL +2500 00
00
900 1 20
00
20
3000
DG GENERALNOTES:
Operator EQUIPMENT 20
2500
4500
3000 00
00
House CONTAINER 20 The contractor shall notify the DESIGN ENGINEERG in advance of any changes
20
00
20 on site that do not confirm to the design specification and requirements in the
1200 00 Detailed Design Drawings.
00
20
30
00
20
00
Any changes on the execution of work and site methology, shall be carried
00
20
00
00
7887
00 obtained and approved by the customer.
20
00
00
20
00
7389 5090 1000 10680 1000 10680 16415 CONSTRUCTION NOTES:
10
10
00
00
500
20
20
992
2990 3100 2490 3100 The contractor shall ensure that all existing underground and
00
20
aboveground services and utilies found within the site perimeter and not
00
Solar Panels
20
4036
4036
indicated in the detail design drawing shall be reported to the proper
1809
00
20
00
20
20
00
2V5
20
00
ALL HSE POLICIES and procedures shall be strictly implemented during
2500
4727
2500
20
00
construction.
20
00
20
The site area is shadow-free on the south, east and west sides. The
Solar Panels
00
20
00
4036
4036
1809
20
00
2V5
20
00
600
20
1. All Reinforced Concrete must be minimum of M -25
00
1002
20
00
2500
2500
2. All Reinforcement Tensile Steel must be minimum of G-60.
20
00
00
20
Solar Panels
4. All Plain Concrete must be M - 15
00
20
4036
4036
00
20
REV NO. DESCRIPTION DATE REMARKS
2V5
20
00
00
20
20
00 13295 5090 1000 10680 1000 5090 500 5090 6000 0 SITE LAYOUT PLAN DRAWING 13-05-2019
00
20
00
0
20
20
00
00
00
20
7670
20
00
45
20
00
00
20
20
00
20
00
00
20
20
00
00
20
00
20
20
00
20654
00
20
20
00
20 TITLE
00
00
SITE LAYOUT PLAN DRAWING
20
20
00
20
00
00
COMPANY
20
20
00
MANDALAY YOMA ENERGY
00
20
00
20
20
00 PROJECT
00
20 3 0°
20
00
20 MINIGRID SOLAR PLANT
00
00
20
20
00
20
LATITUDE : LONGITUDE:
00
00
20
DRG. NO.
10
00 DRAWN BY CHECKED BY APPROVED BY