Beruflich Dokumente
Kultur Dokumente
xls
Tools for a preliminary assessment of coastal problems and solutions
Bed level to
datum in Width Lateral slope Bed
Subsection middle of of subsection subsection roughness
from left bank subsection tangent
zb b of slope ks
(m) (m) (-) (m)
1 5 2 1 0.01
2 4 150 0 0.03
3 2.5 30 0.1 0.03
4 1 100 0 0.05
5 2.5 30 0.1 0.03
6 4 150 0 0.03
7 5 2 1 0.01
8 0 0 0 0
9 0 0 0 0
10 0 0 0 0
11 0 0 0 0
12 0 0 0 0
13 0 0 0 0
14 0 0 0 0
15 0 0 0 0
16 0 0 0 0
17 0 0 0 0
18 0 0 0 0
19 0 0 0 0
464
rt
b1 bi
h1 hi
tan i Stage H
zb bed level
to zb1 zbi
datum
DATUM
c=Qs/Q
0.1054948601 (kg/m3)
Susp. load Total load Bed load Susp. load Total load
transport transport transport transport transport
volume volume mass mass mass
(m3/s) (m3/s) (kg/s) (kg/s) (kg/s)
2.10983331E-05 2.705878E-05 0.015795188 0.0559105828 0.0717057708
0.0074176131 0.0085561144 3.017028314 19.6566748045 22.673703118
0.0083449596 0.0090308429 1.817590964 22.1141428235 23.931733788
0.054688715 0.0581336936 9.129193436 144.925094735 154.05428817
0.0083449596 0.0090308429 1.817590964 22.1141428235 23.931733788
0.0074176131 0.0085561144 3.017028314 19.6566748045 22.673703118
2.10983331E-05 2.705878E-05 0.015795188 0.0559105828 0.0717057708
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0.086256057 0.0933617259 18.83002237 228.578551157 247.40857352
(m3/s) (m3/s) (kg/s) (kg/s) (kg/s)
c=Qs/Q
0.1921202655 (kg/m3)
3 ks=0.0
1m
2
ks=0.0
Inbank discharge 5m
1
0
0 200 400 600 800 1000 1200 1400 1600 1800
Discharge Q (m3/s)
ks=0.0
1m
ks=0.0
5m