Samota Groundworks Services provides building construction, water and sewerage works, and road repair and maintenance works. The document provides details of a proposed sewer extension project including a bill of quantities listing items, descriptions, quantities, units, rates and amounts. Key items include connection fees, road opening permits, supply and installation of concrete pipes and manholes, excavation works, backfilling, hardcore filling, blinding and concrete works. The total cost for the project is KES 3,904,734.30 inclusive of 16% VAT.
Samota Groundworks Services provides building construction, water and sewerage works, and road repair and maintenance works. The document provides details of a proposed sewer extension project including a bill of quantities listing items, descriptions, quantities, units, rates and amounts. Key items include connection fees, road opening permits, supply and installation of concrete pipes and manholes, excavation works, backfilling, hardcore filling, blinding and concrete works. The total cost for the project is KES 3,904,734.30 inclusive of 16% VAT.
Samota Groundworks Services provides building construction, water and sewerage works, and road repair and maintenance works. The document provides details of a proposed sewer extension project including a bill of quantities listing items, descriptions, quantities, units, rates and amounts. Key items include connection fees, road opening permits, supply and installation of concrete pipes and manholes, excavation works, backfilling, hardcore filling, blinding and concrete works. The total cost for the project is KES 3,904,734.30 inclusive of 16% VAT.
PROPOSED SEWER EXTENSION TO SERVE LR NO. 4275/60 KIRICHWA CLOSE OFF RIVERSIDE DRIVE.
ITEM DESCRIPTIONS QTY UNIT RATE AMOUNT
NO. 1. a) Allow a prime cost of Kenya Item 200,000 200,000 00 Shillings Two hundred Thousand shillings (200,000/-) only to Nairobi water company sewer line OK connection fees including, survey, design, circulations and approvals.
b) Allow a provisional sum of Kenya Item 250,000 250,000 00
Shillings Two Hundred Fifty Thousand shillings (250,000/-) only for road opening permit from the OK county and other Authorities
2.00 Supply and install the following S&S
sewer concrete pipes pipes (1.0LM) or equals and approved including the rates of joining accessories.
a) 225mm diameter pipe in trenches 156 LM 1700 265,200 00
Supply and fix to position with
tight seals and joints the following OK concrete pipes ditto.
b) 1050x1050mm rings Supply and fix
to position with air tight seal and joints the concrete rings to 12 No. 16500 198,000 00 position OK c) Concrete manhole slabs, and Triangular frame C.I cover Ref.C31A8 with solid cast iron 6 No. 32500 195,000 00 cover. Supply and fix in position as directed on site the following. OK
cast step irons. OK e) Supply and apply 75mm thick premix bitumen/ asphalt as a road surface finish to damaged road 8.4 𝑴𝑴³ 22500 189,000 00 carriage,verge,path and parking OK 889,200 00 2.10 Subtotal 2 Sum
3.00 ALL IN PROVISIONAL
1,339,200 SUBSTRUCTURES EXCAVATIONS & EARTH WORKS a) Excavate on heavy premix and concrete average 800mm wide 64 M³ 2500 160,000 00 including uprooting of Stumps on sewer alignment and transport 1800 excavated materials away from site 115,200
b) Excavate trench not exceeding
1.50meters deep uprooting tree roots and cart away the spoil to from site. 102.4 M³ 800 81,920 00
c) Excavate trench below reduced level OK
but not exceeding 3.00meters deep Murram to rocky levels and store the materials in heap at safe location 80 M³ 1800 144,000 00 within site. 1450 116,000 d) Excavate manhole bottoms not exceeding 3.00meters deep and carry 42.8 M³ 2250 96,300 00 away materials from site. 1450 62,060 e) Return fill and ram excavated materials and compact in layers of 98 M³ 800 78,400 00 150mm OK f) Allow for plunking and strutting the whole excavation. Item 80,000 00 OK g) Allow keeping the whole excavation free from all foul water including Item 70,000 00 sewage. OK h) Filling
Hard-core filling
300mm Thick layer of imported hard-
core filling including levelling and consolidating in 150mm layers 69 M³ 1200 82,800 00
Murram OK
i) 50mm thick Murram blinding to
surface of hard core and sewer line 78 M³ 1000 78,000 00 surround 800 Mass concrete class 15/20(1:3:6) 62,400 j) 50mm thick blinding to manholes 96 M² 700 67,200 00 including all necessary benching and making good all affected areas 400
Insitu concrete mix(1:1.5:3) grade 38,400
25(20mm aggregate):
Vibrated and reinforced in-: 216,000
K). Trench cover on carriageway, 18 M³ 14500 261,000 00