SCHEDULE - 1

Page 1 of 5

PACKAGE NAME
POWER PLANT DETAIL
BIDDING DOCUMENT DETAIL
NIT NO:

Bidder's Name and Address : To

SCHEDULE OF RATES AND PRICES

Schedule No. 1 : Plant and Equipment including Type Tests charges and Mandatory Spares to be supplied from Abroad

Item Description Qty. Unit **Code * UNIT PRICE) * TOTAL PRICE


FOB CIF FOB CIF (Indian
(Indian (USD) Port of
Port of Entry)
Entry) (USD)
1 2 3 4 5 6 7 8=3x6 9=3x7

(I) (A) MAIN EQUIPMENT [Supply of HL-DSI Plant] 1 LOT


(Refer Technical Specification for Complete

(B) Scope) of dry sorbent for plant


Supply 1 LOT
commissioning and a further period of 15
days which shall include 7 day trial operation
SUB-Total (I) (MAIN EQUIPMENTS)
SCHEDULE - 1
Page 2 of 5

Item Description Qty. Unit **Code * UNIT PRICE) * TOTAL PRICE


(II) MANDATORY SPARES
1.00.00 PLC BASED CONTROL SYSTEM
1. Cables and Connectors.
2. Power Supply Modules & Power Packs
3. DI/ DO module (32 channel capacity)
4. Relays
5. Batteries used for battery backup of RAMs.
6. Fuses
7. Cooling fans for Power supply and cabinets.
1.02.00 MEASURING INSTRUMENTS
1. Pressure Transmitter
2. Temperature Transmitter
3. Level Transmitter
4. Flow Transmitter
5. RTD
6. Conductivity Meter

1.03.00 ELECTRICAL ITEMS


1. MCCB/MCB

2. Contactors

3. Fuses
SCHEDULE - 1
Page 3 of 5

Item Description Qty. Unit **Code * UNIT PRICE) * TOTAL PRICE


1.04.00 PIPES & VALVES
1. Pipes
2. Pipe Fittings
3. Manual Valves

4. Non Return Valves


5. Solenoid Valves

6. Strainer

1.05.00 ROTARY EQUIPMENT


1. Rotary Equipment bearing
2. Rotary Equipment Motor bearings
3. Shaft sleeve

SUB-Total (II) (MANDATORY SPARES)


SUB-Total (III) OF TYPE TEST CHARGES (AS
PER FURTHER BREAKUP OF TYPE TEST
CHARGES GIVEN IN SCHEDULE-8A)
GRAND Total (TOTAL I+II+III)
To Item Data In SRM
LOCAL AGENT'S COMMISSION (IF ANY) :
(included in FOB prices indicated above)
* Please state the currency and fill in the amount in figures and words.
** Bidders shall enter a code representing the country of origin of all imported plant and equipment.

Sl.No Code Count


1 .....................................................................................................
SCHEDULE - 1
Page 4 of 5

Item Description Qty. Unit **Code * UNIT PRICE) * TOTAL PRICE


2 .....................................................................................................
3 .....................................................................................................
Date : (Signature).................................................
Place : (Printed Name)
NOTE :
1 Item listed above but price in Schedule 2 will be struck off by the Bidders in this Schedule 1. However, if the nature of the items is such that it is
required to be partially priced in Schedule-2 and balance in Schedule-1 as defined in Schedule-1 and Schedule-2 items at clause 10.4(a) & 10.4(b) of
ITB, Section-II of Bid document, the bidder shall split up the item description / quantity among Schedule-1 and Schedule-2 so that together it matches
with the item description / quantity specified above.
2 Unless stated otherwise a 'set' means items or sub-items required for each type/size range of the assembly/sub-assembly, required for complete
replacement in one main equipment. It is further, intended that the assembly/sub-assembly which have different orientation (like left hand or right
hand, top or bottom), different direction of rotation or mirror image positioning or any other reasons which result in maintaining two different sets of
the spares to be used for the subject assembly/sub-assembly, these shall be considered as different types of assembly/sub-assembly.Bidder to refer
"LIST OF MANDATORY SPARES" in Sub-Section-VII of Part-A of Technical Specification regarding description of 'Set'.Under Mandatory Spares
whereever 'Lot' is mentioned, the same shall be as per desciption given in the "LIST OF MANDATORY SPARES" in Sub-Section-VII of Part-A of
Technical Specification.
3 Wherever quantity has been specified as percentage (%), the quantity of mandatory spares to be provided by the Contractor shall be the specified
percentage (%) of the total population required to meet the specification requirements. In case the quantity of Mandatory Spares so calculated to be
fraction, the same shall be rounded off to next higher whole number.
4 Whenever the quantities have been indicated for each type, size, thickness, materials, radius, range etc. these shall cover all the items supplied and
installed and the breakup for these shall be furnished in the bid.
5 In case spares indicated in the list are not applicable to the particular design offered by the bidder, the bidder should offer spares applicable to offered
design with quantities generally in line with approach followed in the above list. In case the description / quantity for mandatory spares mentioned in
Schedule is at variance from what has been stated in Technical Specification and its subsequent amendments and clarifications, the stipulations of
Technical Specification and its subsequent amendment and clarification shall prevail. In such cases, the bidders are liable to supply such mandatory
spares, as per the requirements in line with the provisions of bidding documents, without any extra cost implication to the employer.
6 Price of each and every item is to be given separately. In case bidder mentions 'Not Applicable' against an item in the bid and later on the same spare is
found to be applicable during detailed engineering, the vendor shall supply such spares free of cost.
7 Bidder are required to indicate the break-up of type test charges as per Schedule-8A.
SCHEDULE - 1
Page 5 of 5

Item Description Qty. Unit **Code * UNIT PRICE) * TOTAL PRICE


8 In case the description / quantity for any item mentioned in schedule is at variance from what has been stated in the Technical Specifications and its
subsequent amendments and clarifications, the latter shall prevail.
9 BOQ shall be read in conjunction with Section-VI , Technical Specification.