1 FOUNDATION WORK
Page 1
4 F4,F7 2 4.5 6.5 0.25 14.63 C.Ft
5 F5,F8 2 6.5 6.5 0.25 21.13 C.Ft
6 F6,F9 2 5.5 5.5 0.25 15.13 C.Ft
7 F11 1 5.5 4.5 0.25 6.19 C.Ft
84.63
Page 2
Sloping Area 1 6.5 4.5 5.53 161.75 C.Ft
4 Footing - F4, F7
Rctangular Area 2 4.5 6.5 0.75 43.88 C.Ft
Sloping Area 2 4.5 6.5 5.53 323.51 C.Ft
Page 3
5 Footing - F5, F8
Rctangular Area 2 6.5 6.5 0.75 63.38 C.Ft
Sloping Area 2 6.5 6.5 7.94 670.93 C.Ft
6 Footing - F6, F9
Rctangular Area 2 5.5 5.5 0.75 45.38 C.Ft
Sloping Area 2 5.5 5.5 5.83 352.72 C.Ft
7 Footing - F11
Rctangular Area 1 5.5 4.5 0.75 18.56 C.Ft
Sloping Area 1 5.5 4.5 4.86 120.29 C.Ft
2,209.49
Page 4
ii Sand Filling in Grade Beam
1 S1 44.66 0.66 0.25 7.37 C.Ft
2 S2 49.98 0.66 0.25 8.25 C.Ft
3 S3 41.98 0.66 0.25 6.93 C.Ft
4 S4 47.38 0.66 0.25 7.82 C.Ft
5 S5 41.98 0.66 0.25 6.93 C.Ft
6 S6 47.3 0.66 0.25 7.80 C.Ft
7 ALL ROUND 193.24 0.66 0.25 31.88 C.Ft
iii 0.25 ft c.c 1:4:8 PCC over Sand Filling in Grade Beam
1 S1 44.66 0.66 0.25 7.37 C.Ft
2 S2 49.98 0.66 0.25 8.25 C.Ft
3 S3 41.98 0.66 0.25 6.93 C.Ft
4 S4 47.38 0.66 0.25 7.82 C.Ft
5 S5 41.98 0.66 0.25 6.93 C.Ft
6 S6 47.3 0.66 0.25 7.80 C.Ft
31.88
iv Column
1 C1 4 0.66 0.66 9.25 16.12 C.Ft
2 C2 6 1 0.66 9.25 36.63 C.Ft
3 C3 2 1.25 0.66 9.25 15.26 C.Ft
68.01 C.Ft
v Roof Beam
Page 5
1 All Round 197.07 0.66 1.25 162.58 C.Ft
2 RB2, RB3 Along Southside 31.22 0.66 1.25 25.76 C.Ft
3 RB2, RB3 Along Northside 36.34 0.66 1.25 29.98 C.Ft
4 RB6 - Longer Direction 37.15 0.66 1.25 30.65 C.Ft
5 Beam Projection on Right Side 19.49 0.66 0.416 5.35 C.Ft
6 Projection on Front Side 5.833 0.33 1.25 2.41 C.Ft
170.34
Page 6
vi Roof Slab
1 Overall 33.32 23.32 0.416 323.24 C.Ft
2 D/F For Structure
ii Columns
1 C1 4 2.66 2.75 29.26 S.Ft
2 C2 6 3.32 2.75 54.78 S.Ft
Page 7
3 C3 2 3.82 2.75 21.01 S.Ft
105.05
ii Roof Beam
1 All Round 197.07 3.16 622.74 S.Ft
2 RB2, RB3 Along Southside 20.99 3.16 66.33 S.Ft
Page 8
3 RB2, RB3 Along Northside 25.98 3.16 82.10 S.Ft
4 RB6 - Longer Direction 37.15 3.16 117.39 S.Ft
5 Beam Projection on Right Side 19.82 1.73 34.29 S.Ft
6 Projection on Front Side 5.833 3.16 18.43 S.Ft
941.28
Page 9
On Right Side
On left Side 12.69 1.25 15.86 S.Ft
Bottom 20.99 0.66 13.85 S.Ft
Side 20.99 0.416 8.73 S.Ft
On Front Side
Projection on Front Side 7 1.25 8.75 S.Ft
Bottom 5.83 0.33 1.92 S.Ft
Front 4.66 1.25 5.83 S.Ft
54.95
1349.58
iii Roof Slab
1 Slab
2 Overall 38.82 23.65 918.09
3 D/F
4 D/F for Staircase
2,267.67 2,267.67
IV BRICK WORK
GROUND FLOOR WORKS
1 All Round Main Wall 8" 113.28 9.25 0.66 691.57 C.Ft
2 Partition 70.39 9.25 0.33 214.87 C.Ft
3 Staircase
906.44
Deduction
Door D 1 1 3.5 7 0.375 9.19 C.Ft
Page 10
D2 1 2.5 7 0.375 6.56 C.Ft
D3 1 2.5 7 0.375 6.56 C.Ft
MD 1 3.6 7 0.66 16.63 C.Ft
Window 1 2 5 4 0.66 26.40 C.Ft
Window 2 1 4 4 0.66 10.56 C.Ft
Ventilator V1 1 2 1.5 0.66 1.98 C.Ft
77.88
828.56
Total Brick Work Quantity ( In Ground Floor)
GROUND FLOOR WORKS
1 Parapet Wall 4" 1 157.44 4 0.33 207.82 C.Ft
VI PLASTERING WORK
GROUND FLOOR WORKS
1 All Round Main Wall 8" 2 113.28 9.25 0.47 984.97 C.Ft
2 Partition 2 52.66 9.25 0.47 457.88 C.Ft
3 Staircase
1442.85
Page 11
Deduction
1 Door D 1 1 3.5 7 0.375 9.19 C.Ft
2 D2 1 2.5 7 0.375 6.56 C.Ft
3 D3 1 2.5 7 0.375 6.56 C.Ft
4 MD 1 3.6 7 0.66 16.63 C.Ft
5 Window 1 2 5 4 0.66 26.40 C.Ft
6 Window 2 1 4 4 0.66 10.56 C.Ft 38.94
7 Ventilator V1 1 2 1.5 0.66 1.98 C.Ft
77.88 1364.96
Total Plastering Quantity ( In Ground Floor)
OPEN TERRACE
1 Parapet Wall 4" 1 157.44 4 0.33 207.82 C.Ft
Total Plastering Quantity ( Terrace)
VII FLOORING WORKS
GROUND FLOOR WORKS
1 Flooring Works 826.96 S.Ft
Total Flooring Quantity ( In Ground Floor)
VIII WEATHERING COARSE WORKS
GROUND FLOOR WORKS
1 Flooring Works 157.44 S.Ft
Total Weathering Coarse Quantity ( In Ground Floor)
IX PAINTING WORKS
1 Outside & Inside 2 113.28 9.25 0.47 984.97 C.Ft
2 Ceiling Portion 2 52.66 9.25 0.47 457.88 C.Ft
1,442.85
Page 12
Total Painting works Quantity
Page 13
BAR BENDING SCHEDULE
S.No Description of Works Diameter of Qty Nos Length in Ft Total length in M Weight /M Total Weight in kg Total REMARKS
1 FOOTING
F1 & F10
Long Bar 10 2 12 54 16.46 0.616 10.14 20.28
Short Bar 10 2 12 54 16.46 0.616 10.14 20.28
F3 & F12
Long Bar 10 2 9 40.5 12.35 0.616 7.61 15.21
Short Bar 10 2 9 40.5 12.35 0.616 7.61 15.21
F2
Long Bar 10 1 13 84.5 25.76 0.616 15.87 15.87
Short Bar 10 1 9 40.5 12.35 0.616 7.61 7.61
F4 & F7
Long Bar 10 2 12 54 16.46 0.616 10.14 20.28
Short Bar 10 2 18 117 35.67 0.616 21.97 43.95
F5 & F8
Long Bar 10 2 13 84.5 25.76 0.616 15.87 31.74
Short Bar 10 2 13 84.5 25.76 0.616 15.87 31.74
F6 & F9
Long Bar 10 2 11 60.5 18.45 0.616 11.36 22.72
Short Bar 10 2 11 60.5 18.45 0.616 11.36 22.72
F11
Long Bar 10 2 11 60.5 18.45 0.616 11.36 22.72
Short Bar 10 2 9 40.5 12.35 0.616 7.61 15.21
305.5585
2 COLUMN BELOW G.L
C1-F1
Main Rod 16 1 6 27 8.23 1.579 13.00 13.00
Strirrups 8 1 6.85 19.18 5.85 0.394 2.30 2.30
C2-F2
Main Rod 16 1 8 36 10.98 1.579 17.33 17.33
Strirrups 8 1 6.85 23.83 7.27 0.394 2.86 2.86
C1-F3
Main Rod 16 1 4 18 5.49 1.57 8.62 8.62
Lap Length 12 1 2 9 2.74 0.88 2.41 2.41
Strirrups 8 1 6.85 19.18 5.85 0.394 2.30 2.30
C2-F4
Main Rod 16 1 4 18 5.49 1.57 8.62 8.62
Lap Length 12 1 4 18 5.49 0.88 4.83 4.83
Strirrups 8 1 6.85 23.83 7.27 0.394 2.86 2.86
C3-F5
Main Rod 16 1 12 54 16.46 1.579 26.00 26.00
Strirrups 8 1 6.85 27.263 8.31 0.394 3.27 3.27
C2-F6
Main Rod 16 1 4 18 5.49 1.579 8.67 8.67
Lap Length 12 1 2 9 2.74 0.88 2.41 2.41
Strirrups 8 1 6.85 23.83 7.27 0.394 2.86 2.86
C2-F7
Main Rod 16 1 6 27 8.23 1.579 13.00 13.00
Strirrups 8 1 6.85 23.83 7.27 0.394 2.86 2.86
C3-F8
Main Rod 16 1 12 54 16.46 1.579 26.00 26.00
Strirrups 8 1 6.85 27.263 8.31 0.394 3.27 3.27
C2-F9
Main Rod 16 1 4 18 5.49 1.579 8.67 8.67
Lap Length 12 1 2 9 2.74 0.88 2.41 2.41
Strirrups 8 1 6.85 23.83 7.27 0.394 2.86 2.86
C1-F10
Main Rod 16 1 6 27 8.23 1.579 13.00 13.00
Strirrups 8 1 6.85 19.18 5.85 0.394 2.30 2.30
C2-F11
Main Rod 16 1 4 18 5.49 1.579 8.67 8.67
Lap Length 12 1 2 9 2.74 0.88 2.41 2.41
Strirrups 8 1 6.85 23.83 7.27 0.394 2.86 2.86
C1-F12
Main Rod 16 1 4 18 5.49 1.579 8.67 8.67
Lap Length 12 1 2 9 2.74 0.88 2.41 2.41
Strirrups 8 1 6.85 19.18 5.85 0.394 2.30 2.30
C1 A FLOATING 16 1 4 18 5.49 1.579 8.67 8.67
218.72
3 GRADE BEAM
Top Rod 1 16 2 6 55.5 16.92 1.579 26.72 53.44
Top Rod 2 12 2 4 37 11.28 0.88 9.93 19.86
` Bottom rod 10 1 2 34 10.37 0.616 6.39 6.39
` Tie rod
`
6 BEAM
GROUND FLOOR
RB 1
Top Rod 1 12 1 3 69.99 21.34 0.88 18.78 18.78
Top Rod 2 12 1 2 46.66 14.23 0.88 12.52 12.52
Bottom Rod 12 1 3 69.99 21.34 0.88 18.78 18.78
Tie Rod
RB 2
Top Rod 1 12 1 3 69.99 21.34 0.88 18.78 18.78
Top Rod 2 12 1 2 46.66 14.23 0.88 12.52 12.52
Bottom Rod 1 12 1 3 69.99 21.34 0.88 18.78 18.78
Bottom Rod 2 12 1 2 46.66 14.23 0.88 12.52 12.52
Tie Rod
RB 3
Top Rod 1 12 1 3 69.99 21.34 0.88 18.78 18.78
Top Rod 2 12 1 2 46.66 14.23 0.88 12.52 12.52
Bottom Rod 1 12 1 3 69.99 21.34 0.88 18.78 18.78
Bottom Rod 2 12 1 2 46.66 14.23 0.88 12.52 12.52
Tie Rod
RB 4
Top Rod 1 16 1 3 70.2 21.40 1.579 33.79 33.79
Top Rod 2 16 1 4 93.6 28.54 1.579 45.06 45.06
Bottom Rod 1 16 1 3 70.2 21.40 1.579 33.79 33.79
Bottom Rod 2 16 1 2 46.8 14.27 1.579 22.53 22.53
Tie Rod
RB 5
Top Rod 12 1 3 107.49 32.77 0.88 28.84 28.84
Bottom Rod 12 1 2 71.88 21.91 0.88 19.28 19.28
Tie Rod 12 1 3 107.49 32.77 0.88 28.84 28.84
RB 6
Top Rod 12 1 3 107.49 32.77 0.88 28.84 28.84
Bottom Rod 12 1 2 71.88 21.91 0.88 19.28 19.28
Tie Rod 12 1 3 107.49 32.77 0.88 28.84 28.84
RB 7
Top Rod 1 16 1 2 66.66 20.32 1.579 32.09 32.09
Top Rod 2 16 1 3 99.99 30.48 1.579 48.14 48.14
Bottom Rod 6 1 2 66.66 20.32 1.579 32.09 32.09
Tie Rod
RB 8
Top Rod 12 1 2 5.86 1.79 0.88 1.57 1.57
Bottom Rod 12 1 2 5.86 1.79 0.88 1.57 1.57
Tie Rod
CB 1
Top Rod 12 1 3 48.96 14.93 0.88 13.14 13.14
Bottom Rod 12 1 3 48.96 14.93 0.88 13.14 13.14
Tie Rod
7 ROOF SLAB
GROUND FLOOR
Longer Direction S1 10 1 26 329.16 100.35 0.616 61.82 61.82
Longer Direction S1 10 1 22 241.78 73.71 0.616 45.41 45.41
Longer Direction S2 10 1 48 1151.52 351.07 0.616 216.26 216.26
Longer Direction S2 10 1 26 329.16 100.35 0.616 61.82 61.82
Longer Direction (overall left)
Longer Direction S4 10 1 48 1151.52 351.07 0.616 216.26 216.26
Longer Direction S4 10 1 23 260.36 79.38 0.616 48.90 48.90
Longer Direction S5 10 1 23 260.36 79.38 0.616 48.90 48.90
Longer Direction S5 10 1 22 241.78 73.71 0.616 45.41 45.41
Longer Direction S6 10 1 48 1151.52 351.07 0.616 216.26 216.26
Longer Direction S5 10 1 23 260.36 79.38 0.616 48.90 48.90
Alternate bar (Front Side)
8 OVERHEAD TANK
OHT Bottom Slab
OHT Top Slab
MATERIAL
S.No DESCRIPTION QUANTITY UNITS RATE TOTAL AMOUNT (Rs.) REMARKS
(RS.)
I FOUNDATION WORKS
Excavation for foundation upto 4m below the existing ground level in any
type of soil except hard rock. Rate to include dressing the sides and bottom,
bailing out of water if encountered, shorng, strutting, compacting by the side
of the foundation and disposal of excavated earth within/Outside premises to
1 an unobjectionable place, as directed bythe Engineer in Charge including 38.346077598 C.M NA
spreading, watering and compaction, complete
PCC Over Sand Filling: Supply of materials for PCC 1:4:8 using 40 mm and
down size graded stone aggregates include machine mixing, providing
3 formwork if required, placing, compacting by hand ramming, curing etc 3.1483998867 C.M 4,301.15 13541.7401727556
complete.
PCC work above Sand Filling: Supply of materials for PCC 1:4:8 using 40
11 mm and down size graded stone aggregates 0.9028603795 C.M 4,301.15 3883.3379212688
Placing of Reinforcement in Grade Beam: Supply of TMT steel (FE 415 Gr)
reiforcement bar conforming to IS 1786 - Latest Edition Grade FE 415 as per
detailed drawing and specifications. The rates shall be applicable for all
heights and depths. Payment shall be made as per reinforcement drawings
12 and with theoretical weigths only including all authorised laps and hooks. 318.12 Kg 68.10 21663.972
Weight of binding wire shall not be considered for payment.
IV BEAM WORKS
GROUND FLOOR
Supply of materials for RCC 1:1.5:3 mix with ordinary Portland cement
using 20 mm and down size graded crushed aggregate. Rate shall be
exclusive of the cost of steel reinforcement, which will be paid under a
14 separate item. Concrete shall conform to relevant specifications of IS 456 4.8241291419 C.M 5,970.60 28802.9454545455
Latest Edition
V SLAB WORKS
GROUND FLOOR
Supply of materials for RCC 1:1.5:3 mix with ordinary Portland cement
using 20 mm and down size graded crushed aggregate. Rate shall be
exclusive of the cost of steel reinforcement, which will be paid under a
15 separate item. Concrete shall conform to relevant specifications of IS 456 9.1543472104 C.M 5,970.60 54656.9454545455
Latest Edition
23.46530728 11732.65364
TERRACE
21 Supply of material for RCC1 1.5 3 mix with ordinary portland cement using C.M 5,970.60
20mm & down size graded crush aggregate .Rate shall be exclusive of the
cost of steel reinforcement,which will be paid under a seprate item .Concrete
shall conform to relevant specification of IS456 Latest Edition
Supply of TMT steel (FE 415 Gr) reinforcement bars conforming to IS 1786-
22 Latest Edition Grade FE 415 as per detailed drawing & specification.The Kg 68.1
rates shall be applicable for all height & depths.Payment shall be made as per
reinforcement drawings & with theoritical weights only including all
authorised laps & hooks.Weight of binding wire shall be not considered for
payments
X OVER HEAD TANK
23 Supply of material for RCC1 1.5 3 mix with ordinary portland cement using C.M 5,970.60
20mm & down size graded crush aggregate .Rate shall be exclusive of the
cost of steel reinforcement,which will be paid under a seprate item .Concrete
shall conform to relevant specification of IS456 Latest Edition
Supply of TMT steel (FE 415 Gr) reinforcement bars conforming to IS 1786-
Latest Edition Grade FE 415 as per detailed drawing & specification.The
24 rates shall be applicable for all height & depths.Payment shall be made as per Kg 68.1
reinforcement drawings & with theoritical weights only including all
authorised laps & hooks.Weight of binding wire shall be not considered for
payments
XI PLASTERING WORK INTERIOR & EXTERIOR
GROUND FLOOR
Supply of all material for average12mm thick sand faced cement plaster in
single coat in CM 1 - Rate shall include providing necessary scafolding
,chicken wire mesh at all joint of bricks & concrete surface,with a minimum
25 overlap of 150mm in all direction &curing complete .No extra payment shall 38.656471255 C.M 4,172.05 161276.730897763
be made for addtional thickness if recquired to achieve perfect line & level
Marble Flooring
Supply of white marble slan makrana secound quality plain veined 18mm
thick,mareble slabs,od size & colour ,shade as decided by managerfor
26 76.826458566 S.M 2,000.00 153652.917131178
flooring approved shade & free from cracks,wrapage,fissure & flakes with
straight edges & perfect corner laid at right angle as per design & pattern
over a bedding of 30mm thick 1 4 cement motar & neat cement
slurry,finishing the joints neatly with white cement mixed with matching
colour pigment & finsh in all respect & i material & labour complete
XIII WEATHERING COARSE WORKS
Supply of all material for weathering courase concrete in propotion of
27 brickjelly to lime 32 12 1/2 by volume using 20mm broken brickjelly beating 14.626532887 S.M 21.25 310.8138238573
etc .
XIV PAINTING WORK INTERIOR & EXTERIOR
Supply of ACRYLIC EMULSION PAINT 2coats (first coat with brush &
final coat with roller ) of Acrylic Emulsion paint of approved make & shade
28 on all surface & heights to give an even shade including primer & full putty 126.80787811 S.M 32.95 4178.3195837979
after thoroughly brushing the surface free from motar droping & other
foregin mater & also including preparing surface even & sand papered
smooth etc..all material & labour complete
XV DOOR WORKS
Main Door -Teak Wood