Beruflich Dokumente
Kultur Dokumente
PROJECT REPORT
REFRIGERATION WORKSHOP
Sr No Title Page
1 Introduction 3
2 Promoter Profile 4
3 Firm Details 5
4 Location Selection 6-7
5 Products and Raw Material 8
6 Market Analysis 9
7 Project Cost 10
8 Finance 11
9 Project Timelines 12
2
1) INTRODUCTION
Our Industrial refrigeration covers a wide range of applications, from high temperature process
chilling, through to very low temperature applications, these include.
Indu Refrigeration Service offers the most complete refrigeration solutions in the industry for
commercial and industrial applications. Our team of skilled labor and knowledge about refrigeration
units and its application provides best in class service to respective process industries where industrial
refrigeration if required.
To take benefit of new developing industrial area of Chalisgaon MIDC we propose to set up a
dedicated workshop at Plot E- 14, Chalisgaon MIDC. This reports shall brief in details regarding our
prosed workshop and its respective prospects.
3
2) PROMOTER PROFILE
4
3) FIRM DETAILS
Registered Address of The 201, Datta Prabha, Near Hotel Mirage, Roha,
Company Raigad. Maharashtra
5
4) LOCATION SELECTION
LAND:
Land is prime requirement for setting up any workshop or manufacturing unit. Land is available at
very affordable rates in Chalisgaon and hence Chalisgaon MIDC is first choice for set up of our
workshop. There also good availability of land in MIDC which provides scope for additional industries
to come and start business which in turn shall provide us additional business opportunities.
MARKET:
Chalisgaon is MIDC area. There are many existing and upcoming process and other industries. Every
industry has requirement of refrigeration or HVAC systems. Thus this will definitely provide business
opportunity for our firm. For such kind of industrial service nearest big town is either Aurangabad or
Jalgaon, thus our firm will have ready market available for providing refrigeration equipment and
associated services. We can also provide service to near-by Dhule MIDC area and Malegaon Industrial
areas.
6
MANPOWER:
Chalisgaon has good educational institute which can provided required skilled manpower to the firm.
Company plans to appoint technicians from near-by ITI institutes for refrigeration and mechanicals
works. Chalisgaon is agriculture area so availability of unskilled manpower is also easily available for
non-technical works in workshop.
Supervisor level 2
Skilled Labor 4
Un Skilled Labor 4
Total 10
Along with direct employment our business will also generate indirect employment in this region.
INFRASTRUCTURE:
Chalisgaon being a MIDC area, MIDC has go excellent infrastructure like internal roads, access, and
streetlights wherever required. Chalisgaon has also good train and road connectivity for travelling to
near-by metro or transportation of equipment and machineries. There are sufficient hospitals and
public facilities in Chalisgaon city for accommodation of employees
POWER:
Chalisgaon MIDC area has go 33 kVA power supply facilities. Power requirement of our workshop is
very less which is 5 KW. This requirement is for welding machines, grinders, lighting and lifting
arrangements.
WATER:
Chalisgaon MIDC has continuous supply of water. Our water requirement is only for domestic
purpose (1 CMD) and industrial purpose (0.5 CMD) for equipment testing purpose as on when
required which can be sourced from MIDC water supply sources.
7
5) PRODUCTS AND RAW MATERIALS
Products of Company:
As described earlier Chalisgaon MIDC is upcoming industrial area where new process and other big
manufacturing industries are setting up units. This provides us opportunity for our proposed business
of industrial refrigeration.
Raw Materials:
Major raw material are spares and consumables required for fabrication and repairing of refrigeration
units and its accessories. Firm plans to source these spares and consumable from near-by city like
Jalgaon and Aurangabad. In case of special spares which are mostly available in metro like Mumbai
and Pune, Chalisgaon is very well connected with both metro cities by railways and roads as well where
our representative can bring these spares with a day in case of emergency requirements.
8
6) MARKET ANALYSIS
Our major markets are big industries which shall require repairs and supply services for
operation and maintenance of there industrial refrigeration units and HVAC systems.
Our firm plans to provide supply and services to such big manufacturing set up which
provides a definite business to our firm in long term. Our knowledge and experience in the field of
industrial refrigeration is 25 years. We have knowledgeable people who can train new employee and
provide best services to such industries and major hotels in near-by area. Presently there are no such
technical solution provider for industrial refrigeration in this region which provides us excellent
opportunities for our business and future prospects.
9
7) PROJECT COST
Firm plans to set up a workshop will all basic requirements for handling, repairing of heavy
equipment and fabrication of equipment. We plan to setup this workshop is best possible cost.
Firm has detailed knowledge of all equipment and systems required for setting up workshop
required for industrial refrigeration repairs and fabrication. Above expense shall be done from own
source of funds by proprietor.
Civil 3,20,125
Plant and Machineries 12,20.000
10
8) FINANCE
Above mentioned project cost of 15.4 lakhs shall be provided by proprietor as per
requirement of site developments and project activities
Yr 0 Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Yr 10
Revenue 6.00 7.50 9.38 11.72 14.65 18.31 22.89 28.61 35.76 44.70
Expenses 4.20 5.25 6.56 8.20 10.25 12.82 16.02 20.03 25.03 31.29
Profits 1.80 2.25 2.81 3.52 4.39 5.49 6.87 8.58 10.73 13.41
% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30%
Cash
1.80 4.05 6.86 10.38 14.77 20.27 27.13 35.72 46.44 59.86
Accruals
From the estimated profit and loss statement following are observation
Thus proposed workshop is financially viable and has good returns on investment.
11
9) PROJECT TIMELINES
Proposed time lines for completion of civil and project activites of proposed workshop at Chalisgaon
MIDC
Firm plans to complete all site and required project work to start the plant in or before 3 years from
procession of the land.
- Thank You-
12