DETERMINATION OF MAXIMUM FLOOD DISCHARGE

A = Catchment are in hectares


RUNOFF FORMULA (25 - YEAR) A= 54,321
Q50 = 0.028PfAIc
Q50 = 0.028(0.7)(0.61)(54321)(60.11) TYPE OF CATCHMENT
Q = 39039.15
50 3. PLATEAUS LIGHTLY COVERED
Q50 = 1084.4 m³/s P= 0.70

RUNOFF FORMULA (50 - YEAR)


Q100 = 0.028PfAIc
Q100 = 0.028(0.7)(0.61)(54321)(66.9)
Q = 43449.00
100

Q100 = 1206.9 m³/s

f= 0.610
NCB ENG'G INSTINCT
NCB CHOOSE FROM THE LIST Tc =(0.87�3/�)0.385
NCB BASED ON THE GRAPH L = Distance (km)
NCB SHIFT SOLVE (calc) L= 26.53 33.4
H = Difference in elevation (m)
H= 116
Tc = [(0.87/116)(26.53)^3/]^0.385
Tc = 6.7

From Regional Flood 50 Years


57.6 - 6
Ic - 6.7
36.1 - 12
57.6 - Ic = 6.7 - 6
36.1 - 57.6 12 - 6
Ic = 60.11 mm/hr

From Regional Flood 100 Years


x 1909.74 64.1 - 6
39.5 1591.5 x - 6.7
39 1187.7 40.1 - 12
64.1 - x = 6.7 - 6
40.1 - 64.1 12 - 6
Ic = 66.90 mm/hr
RATIONAL FORMULA
Q = KCIcA
25-YEAR 50-YEAR
C = 0.005601(3.285)(Log10)(Ic) C = 0.005601(3.285)(Log10)(Ic)
C = 0.005601(3.285)(Log10)(60.11) C = 0.005601(3.285)(Log10)(66.9)
C = 0.03273 C = 0.03359

K = 1.0

Q50 = 1(0.03273)(60.11)(54321) Q100 = 1(0.03359)(66.9)(54321)


Q = 106871.15
50
Q = 122068.58
100

Q50 = 2968.6 m³/s Q100 = 3390.8 m³/s

SLOPE-AREA METHOD
2/3 1/2
Q = AR S
n
UPSTREAM AXIS DOWNSTREAM
A= 563.46 532.02 639.21
P= 163.53 171.49 204.45
R= 3.4456063 3.1023383 3.1264857

Aave = 578.23
Pave = 179.82
Rave = 3.216
n= 0.045
S = 0.002189
(578.23)(3.216)^2/3(0.002189)^1/2
Q=
0.045
Q = 1309.9 m³/s 1571.82

2/3 1/2
Q = AR S
n
CROSS SECTION 1 CROSS SECTION 2 CROSS SECTION 3
A= 791.801 746.61 741.77
P= 287.15 260.1 251.63
R= 2.7574473 2.8704729 2.94786

Aave = 760.06
Pave = 266.29
Rave = 2.854
n= 0.045
S = 0.002189
(760.06)(2.854)^2/3(0.002189)^1/2
Q=
0.045
Q= 1590.0 m³/s
to accommodate discharge due to climate change, add 20%
THEREFORE, Q = 1572.0 m³/s
II. LENGTH OF DIVERSION DAM
a.) Allowable Discharge Concentration
L = Q/q
Character of foundation Material
3. Sand and Gravel
q = 15 m³/s/m
L= 1572.0 m³/s
15 m³/s/m
L = 105 m

b.) Laycey's Formula


Pw = 4.836Q1/2
Pw = 4.836(1572)^0.50
Pw = 192 m

since both are acceptable, the crest length to be adopted is the average of the two;
Lave = Err:511
2
Lave = 148.5 say 149

Based on the actual cross section length of river L = 160


Lsw = 9 m
L = 151 m

III. DETERMINATION OF THE AFFLUX ELEVATION


qr = 1572.0 m³/s = 10.41 m³/s/m
151 m

qr = discharge required per meter run


da depth of approach
Va velocity of approach
ha velocity head
dam crest el = 37.20 Ho head causing flow
upstream apron el = 36.00
downstream apron el = 34.30
tail water el = 39.50

TRY AFFLUX EL. = 40.00 m


da = afflux el. - upstream apron el.
= 40 - 37.2
da = 4.00

Va = q/da
Va = 2.6

hva = Va2
2g
= (2.6)^2
2(9.81)
= 0.34

energy elev = Afflux el. + hva


= 40 + 0.34
= 40.34

Ho = Energy el. - Dam crest el.


= 40.34 - 37.2
= 3.14

P = crest el. - upstream apron el.


P = 37.2 - 36
P= 1.20

P 1.20
= 0.382
Ho 3.14

Co = 3.740 (refer to USBR Design of Small Dams page 372 figure 9-23)

Correction Due to submergence, Cs


hd = Energy Elev. - Tail water elev.
hd = 40.34 - 39.5
hd = 0.84

dsupplied, ds = tail water el. - d/s apron el.


ds = 39.5 - 34.3
ds = 5.20
hd 0.84
= 0.268
Ho 3.14

hd + d 0.84 + 5.2
= 1.924
Ho 3.14

Decrease in coeff. Of discharge = 5.700 (refer to USBR Design of Small Dams page 372 figure 9-26)

Cs = (100 - 5.7) x 3.74


100.00
Cs = 3.53
q= CsHo3/2
1.811
q= 3.53(3.14)^1.5 1637.6748
1.811
q = 10.85 m³/s/m 10.41 m³/s/m

IV. DETERMINATION OF HYDRAULIC JUMP


A. Determination of d1
Guiding equation: (Assuming no loss in Energy)
Total Energy Head = d1 + hv1 = Energy Elev - D/S Apron Elev.
d1 + hv1 = 40.34 - 34.3
d1 + hv1 = 6.04

q2
d1 + = 6.04
2gd12
(10.41)²
d1 + = 6.04
2(9.81)(d12)
d1 = 1.05 m

V1
Froude Number =
√𝑔�1
10.41
Froude Number =
1.05[9.81(1.05)]^0.5
Froude Number = 3.09

�1/2(√(1+8�𝑁) −1)
Jump Height, d2 =

d2 = 0.50(1.05)[(1 + 8x3.09^2)^0.50 - 1]
d2 = 4.09 < [dsupplied = 5.2]
OKAY!

IV. LENGTH OF THE DOWNSTREAM APRON


La = 5(d2 - d1)
La = 5(4.09 - 1.05)
La = 15.20

THEREFORE USE 16.00 m


FOR LOW STAGES OF FLOW
dam crest el = 37.20 Ho head causing flow
upstream apron el = 36.00
downstream apron el = 34.30
tail water el = 38.75 6.62 m³/s/m
Q= 1000.00

TRY ENERGY EL. = 39.50 m


Head, H = Energy El. - Crest El.
= 39.5 - 37.2
H = 2.30

Ho = 3.14

P = crest el. - upstream apron el.


P = 37.2 - 36
P= 1.20

H 2.30
= 0.732
Ho 3.14
Cc = 0.947 (refer to USBR Design of Small Dams page 372 figure 9-26)

Co = 3.740

C = CcCo
C = 0.947(3.74)
C = 3.542

Correction Due to submergence, Cs


hd = Energy Elev. - Tail water elev.
hd = 39.5 - 38.75
hd = 0.75

dsupplied, ds = tail water el. - d/s apron el.


ds = 38.75 - 34.3
ds = 4.45

hd 0.75
= 0.326
H 2.30

hd + d 0.75 + 4.45
= 2.261
H 2.30

Decrease in coeff. Of discharge = 3.500 (refer to USBR Design of Small Dams page 372 figure 9-26)

Cs = (100 - 3.5) x 3.54178


100.00
Cs = 3.42

q= CsH3/2
1.811
q= 3.42(2.3)^1.5
1.811
q= 6.59 m³/s/m RAISE ENERGY ELEVATIO

IV. DETERMINATION OF HYDRAULIC JUMP


A. Determination of d1
Guiding equation: (Assuming no loss in Energy)
Total Energy Head = d1 + hv1 = Energy Elev - D/S Apron Elev.
d1 + hv1 = 39.5 - 34.3
d1 + hv1 = 5.20

q2
d1 + = 5.20
2gd12
(6.62)²
d1 + = 5.20
2(9.81)(d12)
d1 = 0.69 m

V1
Froude Number =
√𝑔�1
6.62
Froude Number =
0.69[9.81(0.69)]^0.5
Froude Number = 3.69

�1/2(√(1+8�𝑁) −1)
Jump Height, d2 =

d2 = 0.50(0.69)[(1 + 8x3.69^2)^0.50 - 1]
d2 = 3.27 < [dsupplied = 4.45]
OKAY!

IV. LENGTH OF THE DOWNSTREAM APRON


La = 5(d2 - d1)
La = 5(3.27 - 0.69)
La = 12.90

La = cd2 c= 5.630
La = 5.63(3.27)
La = 18.41 if with floor blocks, La = 14.73
< 16 m THEREFORE OKAY
FOR LOW STAGES OF FLOW v.2
dam crest el = 37.20 Ho head causing flow
upstream apron el = 36.00
downstream apron el = 34.30
tail water el = 37.30
Q= 200.00
q= 1.32 m³/s/m

TRY ENERGY EL. = 38.05 m


Head, H = Energy El. - Crest El.
= 38.05 - 37.2
H = 0.85

Ho = 3.14

H 0.85
= 0.271
Ho 3.14

Cc = 0.863 (refer to USBR Design of Small Dams page 372 figure 9-26)
Co = 3.740

C = CcCo
C = 0.863(3.74)
C = 3.228

Correction Due to submergence, Cs


hd = Energy Elev. - Tail water elev.
hd = 38.05 - 37.3
hd = 0.75

dsupplied, ds = tail water el. - d/s apron el.


ds = 37.3 - 34.3
ds = 3.00

hd 0.75
= 0.882
H 0.85

hd + d 0.75 + 3
= 4.412
H 0.85

Decrease in coeff. Of discharge = 0.000 (refer to USBR Design of Small Dams page 372 figure 9-26)

Cs = (100 - 0) x 3.22762
100.00
Cs = 3.23

q= CsH3/2
1.811
q= 3.23(0.85)^1.5
1.811
q= 1.40 m³/s/m PROCEED

IV. DETERMINATION OF HYDRAULIC JUMP


A. Determination of d1
Guiding equation: (Assuming no loss in Energy)
Total Energy Head = d1 + hv1 = Energy Elev - D/S Apron Elev.
d1 + hv1 = 38.05 - 34.3
d1 + hv1 = 3.75

q2
d1 + = 3.75
2gd12
(1.32)²
d1 + = 3.75
2(9.81)(d12)
d1 = 0.15 m

V1
Froude Number = √𝑔�1
1.32
Froude Number =
0.15[9.81(0.15)]^0.5
Froude Number = 7.28

�1/2(√(1+8�𝑁) −1)
Jump Height, d2 =

d2 = 0.50(0.15)[(1 + 8x7.28^2)^0.50 - 1]
d2 = 1.47 < [dsupplied = 3]
OKAY!

IV. LENGTH OF THE DOWNSTREAM APRON


La = 3.5d2
La = 3.5(1.47)
La = 5.15

La = cd2 c= 0.000
La = 0(1.47)
La = 0.00 if with floor blocks, La = 0.00
< 16m THEREFORE La =16 m

VIII. RIPRAP PROTECTION


A. LENGTH OF RIPRAP
Lj = cd2 c= 5.300
Lj = 5.3(4.09)
Lj = 21.68
Based on the length of natural jump
Length of Riprap, LR = Lj - La
LR = 1.5(21.68 - 16)
LR = 8.52

Based on Lacey's Formula


3/2
LR (0.65𝐷𝑜/�𝑠)
= V22 ds 5.200

LR = {[0.65(5.7)/5.2]^1.5}(6.57)^2 Do Afflux el. - d/s apron el.


LR = 25.96 f Do 5.700
LR = 7.91 m v2 q/ds
v2 2.002 6.57 f/s
THEREFORE, USE LR = 9.00 m

B. SIZE OF RIPRAP
2.57√�
V2 =
for Q = 1572.0 m³/s for Q = 200.0 m³/s
V2 = q/ds V2 = q/ds
V2 = 2.002 V2 = 0.442

for Q = 1000.0 m³/s


V2 = q/ds
V2 = 1.488
THEREFORE USE V2 = 2.00 m/s
2 V2 = 6.57 f/s
d =(�2/2.57)
d = 1.25(6.57/2.57)^2
Ø = d = 8.17 inches ADOPT 9 in. Ø STONE RIPRAP

4/3 𝜋𝑟^3 x density


W= d = 165 lbs/cu. f
W = (4/3)(3.14)(9/24)^3 x 165
W = 36.45 lbs SAY 17 kgs

THEREFORE USE 17 kgs. Or 9in. Ø BOULDER RIPRAP

THICKNESS OF RIPRAP(TR) AND GRAVEL BLANKET(TGB)


TR = 1.5Ø
TR = 1.5(9)
TR = 13.50 inches THEREFORE 34 cm THK. OF RIPRAP

TGB = 0.5TR
TGB = 0.5(13.5)
TGB = 6.75 inches THEREFORE 17 cm THK. GRAVEL BLANKET
VIII. DEPTH OF SCOUR
Looseness Factor, LF = LP
PW
= 151/192
= 0.79

R = 1.337(q^2/f)^1/3

f = 1.428(1,788s)3/5Q1/10
f = {1.428[(1788)(0.002189)]^(3/5)}(1572^(1/10)
f = 2.36 6.76

R = 1.337[(10.41^2)/2.36]^(1/3)
R = 4.79 6.225

Depth of Scour = 1.250R - ds *1.25 - FS


Depth of Scour = 1.25(4.79) - 5.2
Depth of Scour = 0.79 THEREFORE DEPRESS RIPRAP BY 0.80 m

VIII. DETERMINATION OF CREST SHAPE

n
y =-KHo(𝑥/�𝑜)

Ho = Energy el. - Dam Crest el.


Ho = 40.34 - 37.2
Ho = 3.14

ha = Energy el. - Afflux el.


ha = 40.34 - 40
ha = 0.34

ha 0.34
= 0.11
Ho 3.14
K= 0.510 y= -0.51(3.14)(x/3.14)^1.834
n= 1.834
x y x y
x = Ho/4 0.2 -0.010 2.2 -0.834
x = 3.14/4 0.4 -0.037 2.4 -0.978
x = 0.79 0.6 -0.077 2.6 -1.133
0.8 -0.130 2.8 -1.298
y = Ho/8 1.0 -0.196 3.0 -1.473
y = 3.14/8 1.2 -0.274 3.2 -1.658
y = 0.39 1.4 -0.364 3.4 -1.852948
1.6 -0.465 3.6 -2.057736
1.8 -0.577 3.8 -2.272239
2.0 -0.700 3.9 -2.383106
R = 5Ho/16
R = 5(3.14)/16
R = 0.98

Transforming the parabolic curve into compound circular curve joined by a tangent line;

R1 R
R2 3 R3

R
2

tangent Line:
From the parabolic curve
Points (2.8,1.298) & (3.4,1.853) more or less can be joined as a straight line and can be
assumed to be the tangent line.

y3 - y2 1.853 - 1.298
tan Ø = = = 0.925
x3 - x2 2.8 - 3.4
Ø = 42.77

upper circular curve:


R2 = x2
sinØ
R2 = 2.8
sin42.77
R2 = 4.12 m

lower circular curve:


d' = crest el - d/s apron el
d' = 2.90

R3 = d' - y3
1 - cosØ
R3 = 2.9 - 1.853
1 - cos42.77
R3 = 1.08

X4 = R3sinØ
X4 = 0.733

Base of the dam = X0 + X1 + X3 + X4 assumed X0 = 0.50


= 0.5 + 0.785 + 3.4 + 0.733
= 5.42 m

VIII. LENGTH OF PERCOLATION

A B C D E F G H I
1.20 1.20 3.80 0.00 2.60 5.80 2.05 1.05 2.30
a b c d e f g n-0v x
5.00 0.80 1.15 0.60 3.30 0.35 2.30 0.40
0-1 1-2 12-13v 14-15v 16-0v 9-10v x-9v x-9h x-10v
0.4 0.8 1.2 0.6 0.30 0.7 0.5 0.90 1

LPreq'd = CH 1.2799291 material = d. Coarse sand


LPreq'd = 5(2.9) C=5
LPreq'd = 14.50 m 16.533333 4.8116279
LPsupplied = ΣV + ΣH/3
0.2 + 2.6 + 0.2 + 5.8 + 2.05
LPsupplied = 1.2 + 1.2 - 0.2 + 1.2 + 3.8x2 + 0 +
3
LPsupplied = 14.68 > LPreq'd THEREFORE OKAY

Check for the possible occurrence of short-cut path between points 1 and 2
LP1-2 = ΣV + ΣH/3
0.2 + 2.6 + 0.2
LP1-2 = 1.2 + 1.2 - 0.2 + 1.2 + 3.8 +
3
LP1-2 = 8.2

d1-2 = √(�2+(�+�+�−�)2)
d1-2 = [2.6^2 + (3.8 + 1.2 + 0.2 - 1.2)^2]^0.5
d1-2 = 4.77 > 0.5LP1-2 THEREFORE OKAY

II. STABILITY ANALYSIS

total length of creep:


1.2 + 1.2 - 0.2 + 1.2 + 3.8x2 + 0 + 0.2 + 2.6 + 0.2 + 5.8 + 2.05 + 1.05 + 2.3 + 16
3
= 21.8
Head available, Hw
Hw = Afflux el. - Tail water el.
Hw = 0.50

Percolation factor, C
C = total length of creep
head available
C = 43.6

hd
= 0.268
Ho

hd + d
= 1.924
Ho

CALCULATION FOR PRESSURE HEADS ABOVE OGEE CREST


at point 13: Dist. From crest 5.40
= = 1.72
Ho 3.140
y13 = 0.66Ho = 2.07
h13 = 2.07 + 2.90 = 4.97

at point 14: Dist. From crest 5.05


= = 1.61
Ho 3.140
y14 = 0.65Ho = 2.04
h14 = 2.04 + 2.90 = 4.94

at point 15: Dist. From crest 4.45


= = 1.42
Ho 3.140
y15 = 0.62Ho = 1.95
h15 = 1.95 + 2.30 = 4.25

at point 16: Dist. From crest 1.15


= = 0.37
Ho 3.140
y16 = 0.63Ho = 1.98
h16 = 1.98 + 0.3 = 2.28

at point 0: Dist. From crest 0


= = 0.00
Ho 3.140
y0 = 0.20Ho = 0.63
h0 = 0.63 + 0 = 0.63

h1 = 0.63 + 0.4 = 1.03

Probable Head during the maximum flood condition


Hm = Ho - y11
= 1.10

Head loss due to creep, hL = Lc/c


hL =

3.2212724

Ho = C172
2.55
length of
point avail. Head head loss, Lc/C net head pressure
creep, Lc

0 0 0.63 0 0.63 6.18


1 0 1.03 0 1.03 10.10
2 0 4.00 0 4.00 39.24
3 0 4.00 0 4.00 39.24
4 3.07 4.20 0.07 4.13 40.51
5 4.27 5.40 0.10 5.30 52.01
6 12.00 5.40 0.28 5.12 50.27
7 13.93 5.40 0.32 5.08 49.84
8 13.93 5.40 0.32 5.08 49.84
9 14.62 5.40 0.34 5.06 49.69
10 14.97 6.10 0.34 5.76 56.47
11 15.77 6.90 0.36 6.54 64.14
12 16.53 6.90 0 6.52 63.97
13 0 4.97 0 4.97 48.76
14 0 4.94 0 4.94 48.46
15 0 4.25 0 4.25 41.69
16 0 2.28 0 2.28 22.37
Vertical forces acting on the dam (external)
Moment about toe:
External Forces Lever Arm
Righting Overturning
0-1 6.51 5.77 37.57
2-3 196.20 8.70 1706.94
13-14 17.01 0.17 2.97
14-15 27.05 0.64 17.38
15-16 10.77 2.43 26.23
16-0 16.41 4.72 77.42
TOTAL 273.96 1868.50
Horizontal forces acting on the dam (external)
Moment about toe:
External Forces Lever Arm
Righting Overturning
0-1 3.26 3.88 12.65
1-2 19.74 3.22 63.58
14-15 -27.05 1.49 40.37
15-16 -64.06 2.70
16-0 -4.28 3.92 16.79
-72.39 57.16 76.23
Horizontal forces acting on the dam (internal)
Moment about toe:
External Forces Lever Arm
Righting Overturning
4-5 55.52 1.28 70.79
7-8 0.00 0.70 0.00
9-10 37.16 1.14 42.45
10-11 48.25 0.41 19.71
140.92 0.00 132.95
Uplif forces acting on the dam
Moment about toe:
External Forces Lever Arm
Righting Overturning
6-7 290.33 8.30 2408.50
8-9 102.01 4.37 446.25
9-10 55.73 2.81 156.82
11-12 147.33 1.15 169.43
595.40 3181.00
Self weight
w1 164.81 8.7 1433.8296
w2 45.20 5.79 261.68371
w3 58.21 4.81 280.09708
w4 77.70 3.15 244.73988
w5 55.09 2.15 118.44986
w6 64.98 1.15 74.728656
465.99 2413.5288

ΣMr = summation of Righting Moment


= 1868.5 + 57.16 + 0 + 2413.528794
ΣMr = 4339.19

Σmo = summation of Overturning Moment


= 76.23 + 132.94911 + 3180.9998359375
Σmo = 3390.18

ΣM = ΣMr - Σmo
= 4339.188794 - 3390.1789459375
ΣM = 949.01 1.2799291
ΣV = summation of vertical forces
= 273.96 - 595.4 + 465.99
ΣV = 144.55 2.1092952

ΣH = summation of horizontal forces


= 140.92 + -72.39
ΣH = 68.53

Check for the Middle-Third Theory

ΣM
x=
ΣV
949.01
=
144.55
x= 6.57

e = B/2 - x B = 11.40
= 11.4/2 - 6.57 B/6 = 1.90
e = -0.87 > [B/6=1.9] therefore, the reaction falls within the middle thirds

Factor of Safety against Overturning:


FSO = ΣMr
Σmo
FSO = 4339.19
3390.18
FSO = 1.28 < 1.5 THEREFORE UNSAFE. REDESIGN!

Factor of Safety against Sliding:


uΣV
FSS =
ΣH
FSS = 0.55(144.55)
68.53
FSS = 1.1601124 < 1.5 THEREFORE UNSAFE. REDESIGN!
3.285)(Log10)(Ic)
3.285)(Log10)(66.9)

1.000

(66.9)(54321)

DOWNSTREAM

CROSS SECTION 3
372 figure 9-26)
372 figure 9-26)

372 figure 9-26)


372 figure 9-26)
Chart Title
0.000
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0

-0.500

-1.000

-1.500

-2.000

-2.500
-1.500

-2.000

-2.500
t
0.20
15-16v
2.00
10-11v
0.8
last part
Q = AR S
2/3 1/2
39.5
n
UPSTREAM AXIS
A= 793.43 744.66
P= 287.21 259.96
R= 2.762543 2.864518

Aave = 760.05
Pave = 265.97
Rave = 2.858
n= 0.045
S = 0.002189
(760.05)(2.858)^2/3(0.002189)^1/2
Q=
0.045
Q = 1591.5 m³/s

Q = AR S
2/3 1/2
39
n
UPSTREAM AXIS
A= 655.49 617.29
P= 272.81 256.4
R= 2.402735 2.407527

Aave = 630.78
Pave = 258.8
Rave = 2.437
n= 0.045 L
S = 0.002189
(630.78)(2.437)^2/3(0.002189)^1/2
Q=
0.045
Q = 1187.7 m³/s

2/3 1/2
Q = AR S 38.5
n
UPSTREAM AXIS
A= 521.93 492.77
P= 271.63 249.08
R= 1.921474 1.97836
Aave = 505.01
Pave = 255.01
Rave = 1.98
n= 0.045
S = 0.002189

Q= (505.01)(1.98)^2/3(0.002189)^1/2
0.045
Q= 827.9 m³/s

Q = AR S
2/3 1/2
38
n
UPSTREAM AXIS
A= 389.39 369.83
P= 270.41 247.88
R= 1.439999 1.491972

Aave = 382.36
Pave = 253.36
Rave = 1.509
n= 0.045
S = 0.002189
(382.36)(1.509)^2/3(0.002189)^1/2
Q=
0.045
Q = 523.0 m³/s

Q = AR S
2/3 1/2
37.5
n
UPSTREAM AXIS
A= 251.51 249.73
P= 241.23 238
R= 1.042615 1.049286

Aave = 255.03
Pave = 239.2
Rave = 1.066
n= 0.045
S = 0.002189
(255.03)(1.066)^2/3(0.002189)^1/2
Q=
0.045
Q = 276.7 m³/s
Q = AR S
2/3 1/2
37
n
UPSTREAM AXIS
A= 133.77 121.44
P= 160.75 137.11
R= 0.832162 0.885712

Aave = 134.55
Pave = 162.32
Rave = 0.829
n= 0.045
S = 0.002189
(134.55)(0.829)^2/3(0.002189)^1/2
Q=
0.045
Q = 123.5 m³/s

Q = AR S
2/3 1/2
36.5
n
UPSTREAM AXIS
A= 64.17 56.76
P= 126.84 118.06
R= 0.505913 0.480772

Aave = 60.16
Pave = 119.65
Rave = 0.503
n= 0.045
S = 0.002189
(60.16)(0.503)^2/3(0.002189)^1/2
Q=
0.045
Q = 39.6 m³/s
39.89 1909.7448
DOWNSTREAM 39.5 1591.5 m³/s 1471.454 1909.7448 39.5
742.05 39 1187.7 m³/s 1067.660 1425.192 1591.5 m³/s Chart Title
250.75 38.5 827.9 m³/s
41 707.918 993.5016
2.959322 38 523.0 m³/s 403.009 627.6108
37.5 276.7 m³/s 156.698 332.0376
37 40
123.5 m³/s 3.452 148.1424
36.5 39.6 m³/s 0.000 47.4732
36 39

0.0 m³/s
38 0.0 m³/s
0.0 m³/s
0.0 m³/s
37
0.0 m³/s
0.0 m³/s
36 0.0 m³/s

DOWNSTREAM
619.56 35

247.2
2.506311
34
0 500 1000

DOWNSTREAM
500.34 Q=
244.33
2.047804
Q=

Q=

DOWNSTREAM
387.87
241.79
1.604161

DOWNSTREAM
263.84
238.36
1.106897
DOWNSTREAM
148.43
189.11
0.784887

DOWNSTREAM
59.56
114.04
0.522273
39 38.5 38.0000 37.5 37 36.5
Chartm³/s
1187.7 Title 827.9 m³/s 523.0090 276.7 m³/s 123.5 m³/s 39.6 m³/s

2.65 0.2 -0.0075


2.65 0.4 -0.0302
2.65 0.6 -0.0679
2.65 0.8 -0.1208
2.65 1 -0.1887
2.65 1.2 -0.2717
1000 2.65 1500 1.4 -0.3698 2000 2500
2.65 1.6 -0.4830
2.65 1.8 -0.6113
2.65 2 -0.7547
2.65 2.2 -0.9132
2.65 2.4 -1.0868
2.65 2.6 -1.2755
2.65 2.8 -1.4792
2.65 3 -1.6981
2.65 3.2 -1.9321

AR2/3S1/2 38.5
n
UPSTREAM AXIS DOWNSTREAM
A= 742.05 744.66 793.42
P= 250.75 259.96 287.2
R= 2.95932203 2.86451762 2.762604

Aave = 760.04
Pave = 265.97
Rave = 2.858
n= 0.045
S = 0.002189
(760.04)(2.858)^2/3(0.002189)^1/2
0.045
1591.4 m³/s