Beruflich Dokumente
Kultur Dokumente
Prepared by Bangladesh Railway, for the Government of the People’s Republic of Bangladesh
and the Asian Development Bank.
This Social Monitoring Report is a document of the borrower. The views expressed herein do not
necessarily represent those of ADB's Board of Directors, Management, or staff, and may be
preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation
of or reference to a particular territory or geographic area in this document, the Asian
Development Bank does not intend to make any judgments as to the legal or other status of any
territory or area.
GOVERNMENT OF THE PEOPLE’S REPUBLIC OF BANGLADESH
MINISTRY OF RAILWAYS
BANGLADESH RAILWAY
January 2019
Dohazari-Cox’s Bazar Railway Project (DCRP)
ABBREVIATIONS
Page 2 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
CONTENTS
Page
EXECUTIVE SUMMARY 5
I. INTRODUCTION, PROJECT DESCRIPTION AND OBJECTIVES 6
A. Introduction 6
B. Project description 6
C. Project Objectives 6
D. Project Scope 7
E. Project Location Map 8
B. Field Visit 9
C. Objectives of RP 10-11
24
V. CONCLUSION
Page 3 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
LIST OF TABLES:
Table 1: The Districts, Upazilla & Mouza of Dohazari Cox’s Bazar Railway Project (DCRP)
Table 2: Project Impacts Summary
Table 6: Status of notice u/s of Chittagong and Cox’sbazar District up to December, 2018
Table-7: Status of land handover to BR, and CCL payment up to December 2018
Table-8: Payment status of the Resettlement Benefits and ID Card Distribution for Title Holders
(TH) up to December 2018
Table-9: Payment status of Resettlement Benefits and ID Card Distribution for Non-Title Holders
(NTH)
ANNEXURES: Page
Annexure 1: Information Sharing and Dissemination of Idea with PAPs 25- 30
Annexure 2: Affected Common Property Resources of Chittagong and Cox’s Bazar 31 - 32
Annexure 3: Abstract of some Focus Group Discussions/Consultation Meetings 33 - 34
Annexure 4: Attendance of Consultation Meeting 35 - 36
Page 4 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
EXECUTIVE SUMMARY
This Social Monitoring Report represents the status of the activities of the Land Acquisition and
Resettlement Plan (RP) of Chittagong – Cox’s Bazar Railway Project, Phase 1 (Dohazari Cox’s Bazar
Railway Project) in Chittagong and Cox’s Bazar District of Bangladesh. The project’s target is to construct
103.477 KM of new Single Line Dual Gauge Railway Track from Dohazari to Cox’s Bazar via Ramu, to
establish connectivity with the famous Tourist spot of Cox’s Bazar and provide access to the proposed
expected Trans-Asian Railway Corridor. The Government of the People’s Republic of Bangladesh with the
financial assistance from the Asian Development Bank (ADB) has launched Dohazari - Cox’s Bazar
Railway Project (DCRP).
The project requires new acquired land to construct a railway line and other structures which are shown in
the report details. The resettlement impacts include, but are not limited to (i) permanent loss of residential,
social and commercial structures, (ii) loss of income and livelihood, (iii) displacement of people and (iv)
loss of land.
The salient features of ADB’s Safeguard Policy Statement 2009 (SPS 2009) and Resettlement Plan have
been discussed in this report. At present, all the 10 (Ten) Land Acquisition (LA) cases are finalized and
already taken over by the Bangladesh Railway from DC’s office. Compensation payment of CCL is going
on.
A Resettlement Plan (RP) was prepared in accordance with ADB’s Safeguard Policy Statement (2009) and
the Acquisition and Requisition of Immovable Property Ordinance 1982 (ARIPO) of the Government of
Bangladesh (GOB), detail engineering design and Census survey. The RP was approved by the Ministry of
Railway on 17 August 2016 as per concurrence of ADB.
In accordance with ADB Safeguards requirements, the government of Bangladesh agreed to implement
“The ADB safeguard Policy” for the purpose of avoiding involuntary resettlement wherever possible; to
minimize involuntary resettlement by exploring project and design alternatives; to enhance, or at least
restore the livelihoods of all displaced persons in real terms relative to pre-project levels; and to improve
the standards of living of the displaced poor and other vulnerable groups.
Bangladesh Railway engaged an NGO for the Implementation of the project's Resettlement Plan.
Accordingly, the Implementing NGO (INGO) commenced their activities effective 8 February 2017. This
Social Monitoring Report covers the status of Land Acquisition and Resettlement activities from July 2018
to December 2018, including an action plan to speed up the compensation payment so that the civil works
are not delayed. BR, CSC and INGO are working to address the Affected Persons (APs).
As of December, 2018, BR has taken over all land (1367.3664 acres) from the DC office for acquisition.
CCL payments were made to 2895 awardees out of 9597 identified awardees. Resettlement compensation
was paid to 236 NTH EPs out of 633 EPS following the recommendation of JVC. 424 for NTH and 111 of
THs ID Cards, 8130 leaflets and 4175 booklets were distributed in the project area.
Page 5 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
A. Introduction:
The report represents the present status of the Land Acquisition, Implementation of Resettlement
Plan (RP) and progress of the Dohazari – Cox’s Bazar Railway Project, in Chittagong and Cox’s
Bazar district of Bangladesh. The Government of the People’s Republic of Bangladesh represented
by the Ministry of Railways is the Project Sponsoring Agency while Bangladesh Railway (BR) is the
Project Implementing Agency. The Development Partner of the project is the Asian Development
Bank (ADB). For this project two loan agreements have been signed between Asian Development
Bank (ADB) and the Government of Bangladesh (GOB) on December 21, 2017.
The scope of the report is to provide a progress status of the land acquisition and resettlement
activities and to assess their compliance with ADB Safeguard Policy Statement 2009 (SPS 2009),
and to account for the implementation of resettlement activities at the field level. The first report
covered the period of October 2016 to March 20171, the second covered April 2017 to November
20172 and third report covered December 2017 to June 2018. Both (first and second) reports are
disclosed on ADB website. Now, this fourth semi-annual report is covering the period from July 2018
to December 2018.
During the first, second and third SMR, the land acquisition process was at its primary stage. During
this reporting period, substantial progress has been achieved and reflected in this report.
B. Project description:
Chittagong – Cox’s Bazar Railway Project, phase 1, involves new construction of 103.477 km Single
Line Dual Gauge Railway Track from Dohazari to Cox’s Bazar. The Project components include:
C. Project Objectives:
The objectives of the project are to promote the economic development and reduce poverty through
a new connectivity of railway in the southeastern part of Bangladesh, specifically Cox’s Bazar where
the largest natural sea beach is situated. This project will link the Capital City (Dhaka) and other
integrated railway networks of Bangladesh. The project will directly contribute to earning Foreign
Exchange through the development of the Tourism Industry and the export of Garments and Agro
based products, including an internal carriage of imported and local goods.
1
https://www.adb.org/projects/documents/ban-46452-003-smr
2
https://www.adb.org/projects/documents/ban-46452-003-smr-0
Page 6 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
D. Project Scope:
The name of the project is Single Line Dual Gauge Railway Track Construction Project Phase 1,
between Dohazari of Chittagong district to Cox’s Bazar Sadar of Cox’s Bazar district significant
namely Chittagong and Cox’s Bazar. The project area is shown below in a table:
Table-1: The Districts, Upazillas & Mouzas of Dohazari Cox’s Bazar Railway Project (DCRP):
Chittagong
Chittagong
Kathgar, Kaliaish, Temohoni, Janarkeochia, Uttar
Satkania Dhemsa, Dakkin Dhemsa, Paschim Dhemsa,
Rupkania, Bardona
Lohagara Amirabad, Lohagara, Adunagar, Amtali, Chunti and
Jungle Chunti.
Harbang, Reserve Harbang, Paharchanda, Veola
Chakaria Manikchar, Bethua ,Purba Baro Veola, Kahariagona,
Rampur, Koraiyagona, PalaKata, Ringvong,
Bangladesh
Cox’s Bazar
Page 7 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
Page 8 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
The resettlement activities information has been collected from the field. The Project Office (PIU)
frequently co-ordinates the entire work and processes the data for facilitating the smooth operation of
the RP implementation. Resettlement data have been collected by the INGO through the census and
Losses of project affected persons (PAPs). Presently, the Land Acquisition (LA) process is underway
A. Documents Reviewed:
Page 9 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
A legal framework outlining the principles and guidelines which will be used to acquire lands
and other assets from private ownership, as well as to acquire public lands from authorized
and unauthorized private uses;
A detailed policy matrix defining the entitlements, entitled persons, application guidelines and
implementation , and the institutional responsibility to implement them;
A grievance redresses procedure to deal with disputes and complaints related to the planning
and implementation of the resettlement activities;
A monitoring and evaluation framework to be used for land acquisition; and (please explain
further)
A planning process defining the tasks leading to preparation of the location-specific land
acquisition proposals, identification of the impact details, policy review, budgeting, task
scheduling, etc. please define in what sections of the RP are these found.
The impact of involuntary Land Acquisition and Resettlement as per approved RP (May 2016)
shown in following Table;
Page 10 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
The RP complies with the ADB Safeguard Policy Statement (SPS) 2009 Principles as Follows;
Sl.
Position Number Status
No
Deputy Director (Resettlement) On Role
01 1
Total 2
Page 11 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
The Composition of key staffs as per Contract Agreement between BR and DORP
PATHMARK are as follows:
08 Area Manager 2
Total 10
In short, the key responsibilities of the INGO are to support BR to effective, timely and efficiently
implement the RP. In addition, the NGO is updating the detailed surveys of the affected persons
(APs) and their assets, business, Common Property Resources (CPRs) and resettlement
benefits. The scope of work of INGO as mentioned in the RP is as follows;
1. Conduct census, inventory of lost assets and support to JVC and PVAC;
2. Assist in the Land Acquisition Process;
3. Support in the compensation/assistance distribution process;
4. Resettlement and Land Acquisition Consultation and Participation activities;
5. Resettlement activities data management and monitoring;
6. Assistance in finding an alternative place / plot to rent/buy;
7. Assistance and participation to Grievance Redress Committee (GRC) and
8. Coordinate with and support DORP-PATHMARK in conducting the Livelihood
Improvement Training Program (LITP)
9. Conduct/Liaise HIV/AIDS and Anti-Trafficking Awareness Campaign,
10. Support in the implementation of Gender-related activities;
11. Support the implementation of the Railway Safety Awareness campaign to the
communities.
12. Carrying out assistance in Land Acquisition and identification of titled and Non-titled
holders.
Bangladesh Railway had recruited the Construction Supervision Consultant (CSC) SMEC
international in JV with CANARAIL, SYSTRA and ACE under Contract No. PD/HHZ-COX/CSC1
Loan No.3439 (SF) -BAN dated 14 September, 2017. The CSC Resettlement Team is
composed of the following:
Page 12 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
Sl.
Position Number Status
No
International Senior Social/ Resettlement Specialist
01 1 On Role
2
National Jr. Resettlement & Gender Specialist
05 On Role
Total 5
The ADB Headquarters visited the project several times.ADB BRM conducts periodic review
meetings on a regular basis.
Page 13 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
The government constituted the Joint Verification Committee (JVC), the Property Valuation
Advisory Committee (PVAC) and the Grievance Redress Committee (GRC) for the Project to
ascertain the quantum of losses and valuation of affected assets through an administrative
order No. 54.00.0000.006.014.11.2016-555 dated 02 November 2017. Meanwhile BR has
formed all the committees and are all functioning accordingly.
The Property Valuation Advisory Committee (PVAC) determines the current market price /
replacement cost of affected assets.
Page 14 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
The INGO is collecting data as per approved questionnaires; verifying,, tabulating, and
valuating the losses. The INGO then prepares the compensation estimates, including
necessary support to the JVC/PVAC/GRC.
To acquire the lands for undertaking the project, Bangladesh Railway (BR) has followed the
procedures and principles laid down in the Ordinance, as promulgated by the President of
Bangladesh. The Deputy Commissioner (DC) of project influence Zones are exercising the
Regulatory Authority as ‘Acquiring Body (AB)’ some important sections of the Ordinance-1982
highlighted below,
Page 15 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
Any person interested in any property which has been notified under section
Objection 3 as being needed or likely to be needed for a public purpose or in the
Under
against public interest may, within 15 (fifteen days after the publication of the
Section-4
acquisition notice, submit written.
Final The Government or, as the case may be, the Divisional Commissioner, after
Under decision considering the report submitted by the Deputy Commissioner under section
Section 5 regarding 4 (3), shall make a decision about the acquisition of the property and such
acquisition decision shall be final.
When the Government, the Divisional Commissioner or the Deputy
Commissioner, as the case may be, has made a decision for acquisition of
any property under section 5 or the proviso to section 4 (3) (b), as the case
Notice may be, the Deputy Commissioner shall cause public notice to be given in
Under to the prescribed manner at convenient places on or near such property stating
Section 6 person
interest that decision has been taken to-
ed. Acquire the property and intends to take possession thereof and that claims
to compensation for all interests in such property may be made to him.
Page 16 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
The Land Acquisition progress is implemented based on the approved RP as well as the
revised alignment. The Design Consultant prepared the Land Acquisition Proposals (LAPs)
and submitted the same to the BR. After verifications of the LA Proposals, some LAPs have
been corrected and changed. At present, a total of 553.5896 hectares (1367.3664 acres) of
the Land has been finalized for acquisition, which has been segregated in 10 LA Cases for
the two districts. Meanwhile, all land handed over to BR by DCs and Deputy Commissioners
of Chittagong and Cox’s Bazar, also been disbursing the compensation payment to the titled
holders continuously. BR will pay the Top-up and RB Payment of Title Holders (TH) as per the
approved RP which have been initiated. ID card distribution of TH also underway and payment
will be started very soon.
The following table shows the land acquisition and payment related information:
Table - 6: Status of notice u/s of Chittagong and Cox’s Bazar district up to December, 2018:
[U/S-3(Preliminary notice to people): Publication of Preliminary Notice of Acquisition of Property saying that
proposal sent to government for acquiring the land for public interest. The interested people can lodge objection
against these acquision within 15 days, if any.
U/S-6(notice to interested person): Government has decided to acquire the land. The affected persons entitled to
claim compensation as against his/her losses, according to the legal framework.
U/S-7(notice to respective people saying to come at DC office with papers for compensation): Deputy
Commissioner office declared and ensure the compensation payment for affected persons as against the loss of land
and assets.in this notice amount of money is include with necessary identity of affected people and this notice also
tells the affected people to come at DC office with necessary documents so that affected people can get the
compensation.]
Page 17 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
35/2016-17 85.0401 85.0401 02.08.18 +15.400 +22.200 905 905 100 290 32.04 2018.66 794.62 39.36
Lohagara 44.1791
36/2016-17 92.8764 92.8764 28.11.18 +22.200 29.000 548 548 100 5 0.91 1169.47 1.25 0.11
Sub-Total 364.4405 364.4405 – – 3753 3753 100 1025 27.31 6869.39 2230.93 32.48 118.0759
B. Cox’s Bazar District
Chakaria 02/2016-17 514.0091 514.0091 22.12.18 +29.000 +68.351 2640 2640 100 18 0.68 3241.01 15.00 0.46 6.0089
Ramu 03/2016-17 278.4908 278.4908 19.07.18 +77.658 +98.100 2062 2062 100 652 31.62 3047.02 459.60 15.08 114.0209
CCL
payment
Cox’s +68.351 +77.658 on going
Bazar 04/2016-17 210.4260 210.4260 08.01.18 1776 1142 100 1200 67.56 8845.40 4030.00 45.56 179.9008
Sadar
+98.100 +101.477
Sub-Total 1002.9259 1002.9259 5844 5844 100 1870 32.00 15133.55 4504.6 29.77 299.9306
Grand Total 1367.3664 1367.3664 9597 9597 100 2895 30.17 22002.94 6735.5 30.61 418.0066
Page 18 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
The payment of the Resettlement Benefits (RB) has started for Non-titled holders (NTHs).. INGO started the identification of NTHs as
per the existing alignment. The INGO is following the correct alignment as per the final LAP to identify the NTHs in the prioritized
section for a smooth handover to the Contractors. The PVAC is determining the price in the prioritized sections. The INGO prepared
the budget and EP files accordingly, BR will disburse the Resettlement Benefits (RB) priority area to start the construction work. The
payment of RB to Titled holders have been initiated by BR. Meanwhile, ID cards have been distributed to the THs partially and
payment will be started very soon.
Out of the 3 (three) Upazillas of Chittagong district, 125 Non-Title Holders were found in Chandanaish and Lohagara. Out of 125 Non-
Title Holder, 125 EP ID cards also prepared and distributed. Out of 3 (three) Upazillas of Cox’s Bazar district, a total of 508 Non-Title
Holders were found in Chakaria, Ramu and Cox’s Bazar Sadar, 299 EP ID cards have been prepared and distributed. In terms of
financial reporting, BDT 1,40,70,000 in Chittagong and BDT 5,74,00000 in Cox’s Bazar have been disbursed till the end of December,
2018. The progress and status of disbursements of Resettlement Benefits for TH and NTHs and ID card distribution status are
mentioned in the Tables 8 and 9.
Page 19 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
Table 8: Payment status of the Resettlement Benefits and ID Card Distribution for Title Holders (TH) up to December 2018
Page 20 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
Table 9: Payment status of Resettlement Benefits and ID Card Distribution for Non-Title Holders (NTH)
Note 1: Total number of NTH will be finalized after JVC meeting to subsequently.
Page 21 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
In accordance with SPS, assistance measures to support the households who are physically
displaced and special measures for vulnerable households have been included in the RP. As of
December 30, 2018, the JVC has identified 188 vulnerable households out of 253, accordingly
BR has paid 67 and the rest is in progress. Table -10 shows the details.
As of December 30, 2018, a total of 48 CPRs were identified: 12 CPRs in Chittagong District and
36 in Cox’s Bazar. The JVC has approved 2 CPRs and the PVAC will determine their
Replacement Value. BR will arrange compensation and other Resettlement Benefits. The INGO
will continue the consultation with individual CPRs meticulously. Details in Annexure-2.
At the onset of the RP implementation, the INGO started the distribution of a Leaflet and Booklet
among the affected people. During the field visit of the ADB External monitor, BR, the CSC and the
INGO, consultations were conducted with the affected persons and stakeholders which will be
continuing subsequently. Details shown in the Table-11 below;
Page 22 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
Achieved up to December
Sl No. Activities Unit 2018
5 Meetings/workshops/presentations// Discussions/Trainings
135
5.2 Focus Group Discussion Nos
The Grievance Redress Mechanism (GRM) was formed to voice and resolve all concerns linked to
the project, and ensure accountability towards affected persons. This mechanism will be readily
accessible to all project- affected persons or other concerned people. The GRM will be composed
of a series of local-level committees (at municipality or local administration level) and one project-
level committee (based in Chittagong). Cases that are not resolved at the local-level will be
escalated to the project-level committee. The contact information of the local level committee focal
person will be posted on sign boards in different relevant locations along the alignment. In the
meantime, BR established GRCs to resolve any grievance during the project intervention.
Grievance Redress Committees (GRCs) will try to resolve amicably by bringing together the
contestants. The GRCs will however not provide legal advice to the contestants. Decisions made
by using this mechanism will be binding on Bangladesh Railway. Unless the land acquisition
process is completed, grievance petitions can’t be enumerated. Until now, no petition has been
received by any of the Grievance Redress Committees. Total 32 of GRC have formed and
circulated notice mentioned in the below table -12;
Table 12: Status of GRC:
Sl # Name Of Upazila No.of GRC formed Remarks
01. Chandanaish 1
02. Sathkania 5
03. Lohagara 5
No grievance received yet.
04. Chakaria 10
05. Ramu 5
06. Cox,s Sazar Sadar 6
Total 32
Page 23 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
V. CONCLUSION:
The implementation of the Resettlement Plan (RP) is being done by BR with the assistance of the
CSC team and the INGO. BR will explore all possible ways to mitigate adverse situations. The
land already handed over to BR by Deputy Commissioner of Chattagram and Cox’s Bazar and
payment of land by DCs is underway. BR is giving priorities to the payment of compensation and
resettlement benefit to the affected people (Titled & Non-Titled) who are in priority sections of
construction works. This may be completed within the stipulated time to ensure the start of
construction work.
It is confirmed that during the implementation of the project, social safeguard issues are being
addressed properly. No issue has yet been raised. Because the PIU is following the safeguard
issue as well as ADB SPS 2009 from the beginning stage and it is being continued.
Page 24 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
Annexure-1
DD/Resettlement of BR distributing Checque to Aps at A old age AP Abdus Salam, ID- 2514#0139 receiving his
Dholichara, Cox’s Bazar. checque from BR officer at Dholichara, Cox’s Bazar.
Page 25 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
Project Director of DCRP addressing and Cheque Distribution Among EP’s at Chandanaish
Page 26 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
Coordination Meeting with ADB, Bangladesh Railway-PMU, DORP-Pathmark & Construction Supervision
Consultant on 11 November, 2018 at CRB, Chattogram.
ADB site visit along with Bangladesh Railway-PMU & Construction Supervision Consultant on 11
November, 2018 below:
Page 27 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
Page 28 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
Page 29 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
Page 30 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
Annexure-2
Affected Common Property resources of Chittagong & Cox’s Bazar Areas (Primarily
identified)
District Mouza SL Name of CPRs Nature of Partial/Fully Title/N
. PCR affected on-
No (religious Title
. , school,
health,
etc…)
Abdus Jabbar Sowdagor Non-
Chittagong Jamirzori 1 Barir Koborstan Graveyard Fully affected titled
Madrasha Azizia Quasemul
2 Ulum Hefozkhana o Partial Non-
Chittagong Jamirzori Atimkhana Madrasha affected titled
Chittagong Jamirzuri 3 Baitur Rahman Jame Mosque Fully affected Titled
Mosjid
Chittagong Dohazari 4 Khan Bari Kobarstan Graveyard Partial Titled
affected
Chittagong North 5 Jobber Ali Sikder Para Mosque Partial Titled
Demsha Jamamosjid affected
Chittagong North 6 Jobber Ali Sikder Para Graveyard Partial Titled
Demsha Koberstan affected
Chittagong Rupkania 7 Rupkania Moha Soshan Soshan Fully affected Non-
titled
Chittagong Lohagara 8 Akbor Ali Munshi Para Sha Mos Partial Titled
Mojidia Forkania Mosjid que affected
Chittagong Lohagara 9 Akbor Ali Munshi Para Sha Graveyard Fully affected Titled
Mojidia Forkania Koberstan
Chittagong Lohagara 10 Sah Mojidia Azizia Ibtadai Madrasha Fully affected Titled
Cadet Madrasha
Chittagong Lohagara 11 Saba Khola Pagoda Fully affected Titled
Chittagong Amirabad 12 Nuton Bazar Govt. Primary School Fully affected Titled
School
Cox’s Dulahazara 13 East Dumkhali Reserve Mosque Fully affected Non-
Bazar Para Baitul Mokarom Jame Titled
Mosque
Cox’s Dulahazara 14 East Dumkhali Reserve Graveyard Fully affected Non-
Bazar Para Baitul Mokarom Jame Titled
Mosque Graveyard
Cox’s Ring Vong 15 Baitur Rahman Jame Mosque Fully affected Non-
Bazar Mosque Dorger Gate Titled
Cox’s Ring Vong 16 Ayasha Abdullah Jame Mosque Fully affected Non-
Bazar Mosque/Madrasha Titled
Cox’s Khuta Khali 17 Nolbunia Ongiker Cria Club & Fully affected Non-
Bazar Shonshad & Brac Pre School Titled
Primary School
Cox’s Dulahazra 18 Kali Mondir (Family) East Mondir Fully affected Non-
Bazar Dhumkhali Titled
Cox’s Dulahazra 19 East Dumkhali Riserve School Fully affected Non-
Bazar Para Brac Pre Primary Titled
School
Cox’s Dulahazra 20 Chirstan Mamorial Hospital Hospital Pertial Titled
Bazar Malumghat
Cox’s Dulahazra 21 Agriculture Research Forest Fully affected Titled
Bazar Center Research
Center
Cox’s Palakata 22 Palakata High School School Fully affected Titled
Page 31 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
Bazar
Cox’s Dulahazra 23 Shantirghat Gonga Mondir Mondir Fully affected Titled
Bazar
Cox’s Khuta Khali 24 Khutakhali Maizpara Jame Mosque Fully affected Titled
Bazar Mosque
Cox’s Reserve 25 Gaina kata Koborstan Graveyard Fully affected Non-
Bazar Harbang Titled
Cox’s Reserve 26 Brindabon Khil Crematori Fully affected Non-
Bazar Harbang Crematorium/Burning um/Burnin Titled
Ground g Ground
Cox’s Harbang 27 Debol Toly Jame Mosque Mosque Fully affected Non-
Bazar Titled
Cox’s Harbang 28 Mehedi Sah Jame Mosque Mosque Partial Non-
Bazar affected Titled
Cox’s Harbang 29 Mehedi Sah Jame Mosque Graveyard Fully affected Non-
Bazar Koberstan Titled
Cox’s Poharchand 30 Brac Pre Primary School School Fully affected Titled
Bazar a
Cox’s Harbang 31 Boruapara Crematori Fully affected Titled
Bazar Crematorium/Burning um/Burnin
Ground g Ground
Cox’s Harbang 32 Boruapara Mondir (1) Mondir Fully affected Titled
Bazar
Cox’s Harbang 33 Boruapara Mondir (2) Mondir Fully affected Titled
Bazar
Cox’s Boro Bewla 34 Baitul Habib Jame Mosque Mosque Fully affected Titled
Bazar
Cox’s Boro Bewla 35 Baitul Ijjot Jame Mosque Mosque Fully affected Titled
Bazar
Cox’s Boro Bewla 36 East Boro Bewla Sikder Graveyard Fully affected Titled
Bazar Para Koborstan
Cox’s Boro Bewla 37 Brac Pre Primary School School Fully affected Titled
Bazar
Cox’s Koraiya 38 Baitul Mamur Jame Mosque Mosque Fully affected Titled
Bazar Ghona Chonkola
Cox’s Zhilongja 39 Cox's Bazar School Fully affected Titled
Bazar Besic Accadimy
Cox’s Zhilongja 40 Mohori Para Jame Mosjid Mosque Partial Titled
Bazar affected
Cox’s Eidgao 41 Eidgao Rabar Dram Jame Mosque Fully affected Titled
Bazar Mosjid
Cox’s Eidgao 42 Eidga Jalia Graveyard Graveyard Fully affected Non-
Bazar Titled
Cox’s Napit Khali 43 Bashkhata Community Fully affected Titled
Bazar Clinic Community
Clinic
Cox’s Varua Khali 44 Varua Khali Shelter Project Community Fully affected Titled
Bazar Community Clinic Clinic
Cox’s Varua Khali 45 Shak Rashel Community School Fully affected Non-
Bazar School Title
Cox’s Fatekar 46 Lombori Para Graveyard Graveyard Fully affected Titled
Bazar Khul
Cox’s Rajarkhul 47 Rajarkhul Forkania Madrasha Fully affected Non-
Bazar Madrasha Titled
Cox’s Dhlirchora 48 North Kahatia Para Community Fully affected Titled
Bazar Commity Clinic Clinic
Page 32 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
Annexure-3
Abstract of some Focus Group Discussions/ Consultation Meetings.
Page 33 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
8 3.4.18 Bhairakhali
APs 0 25 25
Resettlement
procedure
Required
Necessary
papers to
receive CCL
9 3.4.18 Hossain Market
APs 33 0 33
How to get
CCL form DC
office without
hassle
Required
Necessary
papers to
receive CCL,
Compensation
procedure of
Sharecropper
10 24.4.18 Abul Hossain
APs 13 2 15
Resettlement
procedure,
House
Required
Necessary
papers to
receive CCL
NB: Total 135 FGD has completed till December 2018
Page 34 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
Annexure-4
Attendance of a Consultation Meeting
1 & 2;
Page 35 of 36
Dohazari-Cox’s Bazar Railway Project (DCRP)
Page 36 of 36