Description Of Material Submitted For Approval :
Sealed/Stamp
Specification/B.O.Q. Reference :
B.O.Q. Item No. Section G
Section G/Setion - 26 41 00
Source Of Supply : ESW Equipment Supplies and Workshop
Manufacturers Name : ERICO
Address : 2nd Floor, B-201 Sector 6F, Mehran Town, Korangi Industrial Area, Karachi
Telephone No. : Tel: +92-21-34527014 M : 0300-0451431
Approved With Comments, Resubmission Not Required. Approved With Comments, Resubmission Not Required. Approved With Comments, Resubmission Not Required.
Confirmation by contractor for acceptance required. Confirmation by contractor for acceptance required. Confirmation by contractor for acceptance required.
Approved With Comments, Resubmission Required Approved With Comments, Resubmission Required Approved With Comments, Resubmission Required
Not Approved, Resubmission Required Not Approved, Resubmission Required Not Approved, Resubmission Required Final Approval
by Project Manager for Procurement
Approved By Consultant Name & Designation Approved By Owner Name & Designation (Signature) Name & Designation
(Signature) (Signature)
INDEX
NO. DESCRIPTION
1. BOQ REFERENCE
2. SPECIFICATIONS
3. COMPLIANCE
4. TECHNICAL DATA
5. TEST CERTIFICATES
6. COUNTRY OF ORIGIN
7. VENDOR’S PROFILE
B I L L OF Q U A N T I T I E S
Apr-19
Notes: SECTION - F
All flexible conduits to be
SUPPLY, imported bestTESTING
INSTALLATION, quality & COMMISSIONING
Wherever dropEARTHING
wires from ceiling are required shall be done in flexible conduits
SYSTEM
Ground Floor Retail
Make Area
- Ref.isList
PEBof(Steel Structure)
approved - Most of the executions in that area are at about 16 ft height.
Manufacturers
Contractors are responsible for arrangement of complete tools and equipment for completion of their scope of works including scaffolding wherever required etc.
Following size single core PVC insulated cable in 38mm Class-D PVC Conduit from earth
1 electrode to ECP complete in all respects. Earth Test Report to be submitted by contractor
to consultant/client.
a 35 sq. mm Rm. 250
b 70 sq. mm Rm. 650
3 Meter long 20mm dia steel rod copper claded, including 10 ft deep bore holes, inspection
2 jobs 15
pit, test bar, ground enhancement materials, etc. Earth resistance should be less than 1ohm.
Bare copper strip of following size earth connecting point (ECP) with proper mounting
3
arrangements including cover as per drawing complete in all respects.
b 400 mm x 50 mm x 10 mm Nos. 6
c 300 mm x 50 mm x 10 mm Nos. 4
d 200 mm x 50 mm x 10 mm Nos. 7
TOTAL COST - carried to summary of cost
SECTION - G
SUPPLY, INSTALLATION, TESTING & COMMISSIONING
LIGHTNING PROTECTION
Make - Ref. List of approved Manufacturers
Supply, installation, Testing and Commissioning of following including all hanging,
mounting and installation accessories required to complete the job successfully as per GEP
and complete in all respects as per drawings/specs
ESE-SATALITE 3-25 ROD with mast and all mounting accessories complete in all respect as per
1 Nos. 2
details shown on drawings.
70 Sq.mm 1C Copper Conductor on RCC column, walls and roof including saddles, nails, all
2 other necessary fixing material, etc. complete in all respect and as shown on drawings / Rm. 350
specification.
3 38 mm DIA Class D UPVC Conduit Rm. 340
4 6C Fiber Optic Cable - Single Mode (Backbone between switches) - Make 3M / Schneider Rm. 450
20mm / 25mm dia PVC conduit concealed in slab / as shown in drawing including all
5 Rm. 4500
accessories and as per specifications
6 Submission of fluke test report for the entire project wherever Cat-6 cables are being used. Job. 1
\\ASSERVER\Drawings\Current Folder 2017\IMTIAZ SUPER MARKET - SIALKOT\TENDER PACKAGE\ELECTRICAL AND ALLIED WORKS\BOQ-ISM - CONTRACTOR'S SCOPE-1 Page - 9
2-Specifications
TECHNICAL SPECIFICATIONS
IMTIAZ SUPERMARKET
SIALKOT
April-2019
SECTION – 26 41 00
1.1 REFERENCE
1.3 GENERAL
1.3.1 Complete lightning system consisting of air terminals, roof conductors, down conductors and rod type
earth electrodes etc shall be designed as per Standards / codes and as indicated on drawings.:
1.3.2 The system and its associated equipment shall comply with IEC / NEC latest standards. Before execution
of the works contractor shall submit design proposal in accordance with consultant drawings from
manufacturer to confirm that the proposed lightning protection device will provide a high degree of
protection (98%).
1.3.3 Components of lightning protection system shall be from a register and reputed manufacturer (Furse,
Erico ). No locally fabricated components shall be acceptable.
1.3.4 The ground rod shall be 3/8" dia 10' long to be driven in earth / as specified in Boq.
1.4.1 The scope of work shall cover the supply, design, manufacture, testing in the factory, packing,
insurance, delivery to site, un loading, installation, testing and commissioning of all components with all
the necessary accessories in accordance with this technical specification / as per manufacturer
recommendation.
2.1 MATERIAL
2.1.1 The lightning arrestor shall be electronic type based on early streamer emission (ESE) principle.
2.1.2 The unit shall be corrosion- resistant made of stainless steel, outdoor type suitable to provide
maximum protection. The coverage area shall as per manufacturer recommendations.
2.1.3 The ESE arrestor shall be mounted on a tubular steel mast that is properly supported to sustain wind
and weather conditions.
Page 1 of 3
TECHNICAL SPECIFICATIONS
IMTIAZ SUPERMARKET
SIALKOT
April-2019
2.1.4 It shall have provisions to connect two down conductors up to earth Electrodes as shown on drawing.
2.2.1 The lightning protection conductor shall comprise of minimum 50 Sq.mm stranded copper conductor
with PVC covering and be fixed with copper or brass clamps/accessories at a spacing of 1000 mm and
600 mm respectively. For horizontal & vertical runs.
2.2.2 Conductors shall be free of excessive splices and sharp bends. No bend of a conductor shall form an
included angle of less than 90 degrees nor have a radius of bend of less than 8 inches. Conductors shall
be secured to the structure at intervals not exceeding 3'-0" – if recommended by the Consultant
2.2.3 Down conductors shall be of copper / aluminum – ( shall be as mentioned in Boq) and shall be
concealed in the exterior wall construction Pull Boxes shall be provided in the exterior wall for pulling
of conductor’s and shall be closed after completion of works. Height and details shall be shown in the
Shop drawings.
2.2.4 Test clamps should be provided for each down conductor at about 6 feet above plinth level. No joint in
conductor should be made below the test clamp, except at the earth terminal. The earth resistance for
the entire system, in no case, should exceed one ohm.
2.2.5 Use proper cable clamps connection and mounting arrangements to install roof conductor and to
connect it to air terminal and to down conductors.
2.3.1 Ground electrodes shall be provided for each down conductor or as mentioned in Boq / as per
manufacturer recommendation. The down conductor shall be connected to the ground rod using a
bronze ground rod clamp having at least 1-1/2" of contact between the rod and the conductor,
measured parallel to the axis of the rod, or by an exothermic welded connection. Ground rods shall be
located 2 feet below grade, preferably 2 feet from the foundation wall and shall extend a minimum of
10' vertically into the earth.
2.3.2 When a metallic water pipe buried in the ground is available, it should be bonded to the earth in
compliance with the regulations of the Institute of Electrical Engineers. Group of electrodes, if used,
should be capable of isolation for test purposes. Pipes carrying inflammable liquids or gas should not be
used as a conductor or earth terminal.
2.3.3 Earth conductor should be buried 18" deep and in straight lines of radial formation. No. of electrodes
shall be commensurate with minimum earth resistance of one ohm.
2.3.4 All reinforcement steel of columns and slabs, where possible, shall be connected with the protective
system – if specified by the Consultant Engineer.
2.3.5 Test clamps and inspection chamber should be provided with cover. Inspection chamber is to be as per
drawings.
2.3.6 Earth should be filled and compacted properly with Ground Enhanced Material.
Page 2 of 3
TECHNICAL SPECIFICATIONS
IMTIAZ SUPERMARKET
SIALKOT
April-2019
3.1.1 Routing and general arrangement shall be generally shown in drawings, but actual position of air
terminal runs of roof conductors, actual location and routing of down conductors, test clamps and
earth electrodes shall be laid out at the job site after approval. Shop drawings to be submitted and to
be approved by the consultant before execution of the works
3.1.2 The down conductors shall follow the most direct route to the earth rod, and bends if any, shall have
the largest practical radius and no “up-turn” conductors are permitted.
3.1.3 All metal work, metal pipes/frames within 600 mm of the down conductor shall be bonded to the
down conductor.
3.1.4 The overall resistance of the earthing for lightning protection system shall not exceeds 10 Ohms. The
system shall be installed in compliance with BS / EN latest edition.
3.1.5 Bond roof vents, flashing, flag. pole supports and any other metal masses projecting through the roof
to the lightning protection grid.
3.1.6 Thermo weld all connections between cables, aerial terminals and ground rods. Compression type
connectors may be used where approved.
3.1.7 Measure resistance of the complete installation and submit for review to the Engineer.
3.1.8 Test clamps shall be provided in each inspection pit to allow for testing and commissioning.
3.1.9 Upon completion of the Work, submit a certificate of installation from licensed contractor to the
Engineer for reviews and approval.
3.1.10 Include a copy of the installation certificate in the building operation manuals.
3.1.11 Concrete inspection pits shall be installed flush with finished floor level and be fully accessible.
END OF SECTION
Page 3 of 3
3-Compliance
TECHNICAL SPECIFICATIONS
IMTIAZ SUPERMARKET
SIALKOT
April-2019
SECTION – 26 41 00
1.1 REFERENCE
1.3 GENERAL
1.3.1 Complete lightning system consisting of air terminals, roof conductors, down conductors and rod type
earth electrodes etc shall be designed as per Standards / codes and as indicated on drawings.: Comply
1.3.2 The system and its associated equipment shall comply with IEC / NEC latest standards. Before execution
of the works contractor shall submit design proposal in accordance with consultant drawings from
manufacturer to confirm that the proposed lightning protection device will provide a high degree of
protection (98%).
1.3.3 Components of lightning protection system shall be from a register and reputed manufacturer (Furse,
Erico ). No locally fabricated components shall be acceptable.
1.3.4 The ground rod shall be 3/8" dia 10' long to be driven in earth / as specified in Boq. Comply
1.4.1 The scope of work shall cover the supply, design, manufacture, testing in the factory, packing,
insurance, delivery to site, un loading, installation, testing and commissioning of all components with all
the necessary accessories in accordance with this technical specification / as per manufacturer
recommendation.
2.1 MATERIAL
2.1.1 The lightning arrestor shall be electronic type based on early streamer emission (ESE) principle.
2.1.2 The unit shall be corrosion- resistant made of stainless steel, outdoor type suitable to provide
maximum protection. The coverage area shall as per manufacturer recommendations.
Comply
2.1.3 The ESE arrestor shall be mounted on a tubular steel mast that is properly supported to sustain wind
and weather conditions.
Page 1 of 3
TECHNICAL SPECIFICATIONS
IMTIAZ SUPERMARKET
SIALKOT
April-2019
2.1.4 It shall have provisions to connect two down conductors up to earth Electrodes as shown on drawing.
2.2.1 The lightning protection conductor shall comprise of minimum 50 Sq.mm stranded copper conductor
with PVC covering and be fixed with copper or brass clamps/accessories at a spacing of 1000 mm and
600 mm respectively. For horizontal & vertical runs.
2.2.2 Conductors shall be free of excessive splices and sharp bends. No bend of a conductor shall form an
included angle of less than 90 degrees nor have a radius of bend of less than 8 inches. Conductors shall
be secured to the structure at intervals not exceeding 3'-0" – if recommended by the Consultant
2.2.3 Down conductors shall be of copper / aluminum – ( shall be as mentioned in Boq) and shall be
concealed in the exterior wall construction Pull Boxes shall be provided in the exterior wall for pulling
of conductor’s and shall be closed after completion of works. Height and details shall be shown in the
Shop drawings.
2.2.4 Test clamps should be provided for each down conductor at about 6 feet above plinth level. No joint in
conductor should be made below the test clamp, except at the earth terminal. The earth resistance for
the entire system, in no case, should exceed one ohm.
2.2.5 Use proper cable clamps connection and mounting arrangements to install roof conductor and to
connect it to air terminal and to down conductors.
Comply
2.3 GROUND TERMINATIONS
2.3.1 Ground electrodes shall be provided for each down conductor or as mentioned in Boq / as per
manufacturer recommendation. The down conductor shall be connected to the ground rod using a
bronze ground rod clamp having at least 1-1/2" of contact between the rod and the conductor,
measured parallel to the axis of the rod, or by an exothermic welded connection. Ground rods shall be
located 2 feet below grade, preferably 2 feet from the foundation wall and shall extend a minimum of
10' vertically into the earth.
2.3.2 When a metallic water pipe buried in the ground is available, it should be bonded to the earth in
compliance with the regulations of the Institute of Electrical Engineers. Group of electrodes, if used,
should be capable of isolation for test purposes. Pipes carrying inflammable liquids or gas should not be
used as a conductor or earth terminal.
2.3.3 Earth conductor should be buried 18" deep and in straight lines of radial formation. No. of electrodes
shall be commensurate with minimum earth resistance of one ohm.
2.3.4 All reinforcement steel of columns and slabs, where possible, shall be connected with the protective
system – if specified by the Consultant Engineer.
2.3.5 Test clamps and inspection chamber should be provided with cover. Inspection chamber is to be as per
drawings.
2.3.6 Earth should be filled and compacted properly with Ground Enhanced Material. Comply
Page 2 of 3
TECHNICAL SPECIFICATIONS
IMTIAZ SUPERMARKET
SIALKOT
April-2019
3.1.1 Routing and general arrangement shall be generally shown in drawings, but actual position of air
terminal runs of roof conductors, actual location and routing of down conductors, test clamps and
earth electrodes shall be laid out at the job site after approval. Shop drawings to be submitted and to
be approved by the consultant before execution of the works
3.1.2 The down conductors shall follow the most direct route to the earth rod, and bends if any, shall have
the largest practical radius and no “up-turn” conductors are permitted.
3.1.3 All metal work, metal pipes/frames within 600 mm of the down conductor shall be bonded to the
down conductor.
3.1.4 The overall resistance of the earthing for lightning protection system shall not exceeds 10 Ohms. The
system shall be installed in compliance with BS / EN latest edition. Comply
3.1.5 Bond roof vents, flashing, flag. pole supports and any other metal masses projecting through the roof
to the lightning protection grid.
3.1.6 Thermo weld all connections between cables, aerial terminals and ground rods. Compression type
connectors may be used where approved.
3.1.7 Measure resistance of the complete installation and submit for review to the Engineer.
3.1.8 Test clamps shall be provided in each inspection pit to allow for testing and commissioning.
3.1.9 Upon completion of the Work, submit a certificate of installation from licensed contractor to the
Engineer for reviews and approval.
3.1.10 Include a copy of the installation certificate in the building operation manuals.
3.1.11 Concrete inspection pits shall be installed flush with finished floor level and be fully accessible.
END OF SECTION
Page 3 of 3
4-Technical
Data
Early Streamer Emission Terminal – SI25I
nVent ERICO INTERCEPTOR ESE i-Series generates controlled magnitude and frequency pulses at the tip of the terminal during
high static fields prior to a lightning discharge. This enables the creation of an upward leader from the terminal that propagates
toward the downward leader coming from the thunder cloud. These early streamer emission air terminals (ESEAT) are in
accordance with the 2011 edition of NFC 17-102. The design requirements, protection level calculations and protection radius are
obtained from this standard. Due to the internal control circuit, the nVent ERICO INTERCEPTOR ESE i-Series enables the early
launching of an upward leader compared to other passive components. The nVent ERICO INTERCEPTOR ESE i-Series has been
extensively tested at an independent high-voltage laboratory in accordance with the revised 2011 requirements of French NFC
17-102. The testing, as defined in the standard, was designed to simulate naturally occurring conditions and allow comparison of
the performance between differing types of lightning protection systems.
TS
WARNING
nVent products shall be installed and used only as indicated in nVent's product instruction sheets and training materials. Instruction sheets are available at www.erico.com and from
your nVent customer service representative. Improper installation, misuse, misapplication or other failure to completely follow nVent 's instructions and warnings may cause product
malfunction, property damage, serious bodily injury and death and/or void your warranty.
© 2019 nVent All rights reserved
nVent, nVent CADDY, nVent ERICO, nVent ERIFLEX and nVent LENTON are owned by nVent or its global affiliates.
All other trademarks are the property of their respective owners. nVent reserves the right to change specifications without prior notice.
Mechanical Lightning Event Counter – LECIV (702050)
WARNING
nVent products shall be installed and used only as indicated in nVent's product instruction sheets and training materials. Instruction sheets are available at www.erico.com and from
your nVent customer service representative. Improper installation, misuse, misapplication or other failure to completely follow nVent 's instructions and warnings may cause product
malfunction, property damage, serious bodily injury and death and/or void your warranty.
© 2018 nVent All rights reserved
nVent, nVent CADDY, nVent ERICO, nVent ERIFLEX and nVent LENTON are owned by nVent or its global affiliates.
All other trademarks are the property of their respective owners. nVent reserves the right to change specifications without prior notice.
Early Streamer Emission Terminal to nVent ERICO Ericore Adaptor – INTCPTSIIERICOR
• Connects Early Streamer Emission Terminal to nVent ERICO Ericore upper termination
Ø1
TS1
TS2
Ø2
WARNING
nVent products shall be installed and used only as indicated in nVent's product instruction sheets and training materials. Instruction sheets are available at www.erico.com and from
your nVent customer service representative. Improper installation, misuse, misapplication or other failure to completely follow nVent 's instructions and warnings may cause product
malfunction, property damage, serious bodily injury and death and/or void your warranty.
© 2018 nVent All rights reserved
nVent, nVent CADDY, nVent ERICO, nVent ERIFLEX and nVent LENTON are owned by nVent or its global affiliates.
All other trademarks are the property of their respective owners. nVent reserves the right to change specifications without prior notice.
Water Pipe Mast Adaptor – INTCPTADF2NSP (702298)
TS1
TS2
Ø
WARNING
nVent products shall be installed and used only as indicated in nVent's product instruction sheets and training materials. Instruction sheets are available at www.erico.com and from
your nVent customer service representative. Improper installation, misuse, misapplication or other failure to completely follow nVent 's instructions and warnings may cause product
malfunction, property damage, serious bodily injury and death and/or void your warranty.
© 2018 nVent All rights reserved
nVent, nVent CADDY, nVent ERICO, nVent ERIFLEX and nVent LENTON are owned by nVent or its global affiliates.
All other trademarks are the property of their respective owners. nVent reserves the right to change specifications without prior notice.
5-Certificates
1.2 Marking [C.3.1.2]
The identification label has passed the test according to the procedure of clause C.3.1.2 NF C 17-102
(2011).
No degradation of the label and its markings has been observed at the end of the tests and the marking is
still legible.
Result : compliant
The checking of the dimensional characteristics is carried out according to manufacturer drawings and
data according to clause C.2.4.
The sensor part has a diameter of 28 mm, that lead to a cross section of 616 mm² greater than the
required 200 m². Material is stainless steel.
Result : compliant
Test report N° RT13/01
Introduction
These tests have been performed according to French standard NF C 17-102 (2011) Annex C
Test have been performed on ESE supposed to follow the complete test procedure, i.e. :
ESE type SI 25 (S/N : 110);
ESE type SI 40 (S/N : 1111);
and ESE type SI 60 (S/N : 1118).
Marking according to the requirements of C.2.1.2 NF C 17-102 (2011) is made by labels. Compliance of
marking is checked by visual inspection. It shall include at least the name, logo or trade mark of the
manufacturer, the reference of the product and the serial number.
Result : compliant
6-Country Of
Origin
FRANCE
7-COMPANY
PROFILE
EQUIPMENT SUPPLIES
& WORKSHOP
COMPANY PROFILE
E-MAIL: infoesw@cyber.net.pk ,
sales@eswelect.com
WEBSITE:www.eswelect.com
TABLE OF CONTENTS
INTRODUCTION…………………………………………….….3-4
VISION STATEMENT……………..………..3
OUR OFFERINGS.................……………3
ESW TEAM…………..………………………..4
REPRESENTATIONS…………………..…...4
OUR CUSTOMERS…………….…………...4
OUR MISSION………………….…………….4
FINANCIAL BRIEFS………………………..…………………..5
INTERNATIONAL REPRESENTATIONS…………..……..6
EARTHING SYSTEM
MISCELLANEOUS
VISION STATMENT
Our vision is to provide our customers a wide range of high quality, innovative &
leading offerings in the diversified fields of Fire & Security, Explosion proof
protections & other leading emerging building & industrial systems & solutions.
OUR OFFERINGS
ESW’s strength lies in its highly skilled, trained & qualified team. As a total
solution integration company, our main emphasis is to maintain high level of
technical expertise in our team. It is achieved by maintaining a continuous
learning process via technical trainings & updates by international reputed
companies, which we represent.
The ESW team is a group of specialized trained individuals who share one value in
them
OUR CUSTOMERS
ESW has a very versatile & long list of customers that includes Government &
Semi Government Institutions, Oil & Gas Exploration Companies, Commercial
Buildings, Banks, Private Offices, Refineries, Oil terminals, Hospitals, Industrial
& Pharmaceutical Units, Art galleries, Airports, Hotels, Textile units, ATM
outlets, Libraries, Residences of celebrities, Mosques & many others.
OUR MISSION
Quest to serve our clients in the best way by adding to our efficiency via
learning, trainings, innovation & feedback
Business Information:
1. Address:
Equipment Supplies & Workshop
Ground Floor, 93/H, Block 6 P.E.C.H.S Karachi.
Karachi.
Phone: 0092-21-4527014, 4320676
2. Bankers:
Bank Al-Habib Ltd.,
Shabbirabad Branch,
Karachi.
A/c No: 1169-0981-0007-1801-1
No. 32-77-8761-371-20
No. 7393408-7
------------ COMMERCIAL/EMERGENCY
LIGHTING AND CENTRAL BATTERY
SYSTEM (UK)
Installations on the following projects have been carried out with the products supplied by
ESW.
S/No. PROJECT
9 Sub-station in Afghanistan
14 Nishat Textile
16 Lahore Gymkhana
24 Getz Pharma
25 Renovation of GHQ
30 K2 Facility at KANNUP
37 Hilton Pharma
42 Soorty Textiles
50 GSK Pharmaceuticals
55 Alstom Pakistan
58 Imroze Office
59 UEPL Office
60 K2-Project, Kanupp
65 SSGCL Gasfield-Hyderabad
75 Chevron Pakistan
85 Wapda Sub-stations
86 Engro
87 Descon
89 Bahria Mosque-Lahore
90 Margalla Towers
91 KESC Substations
92 Emporuim Mall
94 PTCL
OPTION-1 OPTION-2
Dadex.
CIVIC.
Pakistan Cables.
Newage Cables
Fast Cables
Pakistan Cables
Clipsal.
Orange Electric
MK
Libra engineering
HRA Switchgears
Hussain & co.
Premier engineering
FURSE – UK
ERICO – USA
Ezzi Engineering.
Electroline.
\\ASSERVER\Drawings\Current Folder 2017\IMTIAZ SUPER MARKET - SIALKOT\TENDER PACKAGE\ELECTRICAL AND ALLIED WORKS\Revised List of Suppliers (F) -.doc
List of Approved Suppliers Page 1 /2
LIST OF APPROVED MANUFACTURERS
IMTIAZ SUPERMARKET
SIALKOT
April-2019
Shizuki - Japan.
Nokia - Japan.
Fuji – Japan
RTA, Spain
3M Pakistan
Cisco
Schneider
Ducati – Smart 96
Lovato Italy
Schneider
Erico UK
Furse UK
Prysmian – UK
Eurosafe- UK
Note:
Evaluation shall be based on above with technical comparison.
------------ x -- x ------------
\\ASSERVER\Drawings\Current Folder 2017\IMTIAZ SUPER MARKET - SIALKOT\TENDER PACKAGE\ELECTRICAL AND ALLIED WORKS\Revised List of Suppliers (F) -.doc
List of Approved Suppliers Page 2 /2