SUBMITTAL FOR APPROVAL ELECTRICAL


Date : 02-Nov-2019 Submittal Ref. No. : ISM-EL-09

Project : Imtiaz Super Market Sialkot Contractor's Representative


Submitted By : MEP Solutions (Pvt) Ltd Name: Imran Saeed
Submitted To : A.S Consultants DesignatioAsst. Manager C & P Electrical

Description Of Material Submitted For Approval :

1 LIGHTNING PROTECTION SYSTEM

Sealed/Stamp

Specification/B.O.Q. Reference :
B.O.Q. Item No. Section G
Section G/Setion - 26 41 00
Source Of Supply : ESW Equipment Supplies and Workshop
Manufacturers Name : ERICO
Address : 2nd Floor, B-201 Sector 6F, Mehran Town, Korangi Industrial Area, Karachi
Telephone No. : Tel: +92-21-34527014 M : 0300-0451431

List Of Documents/Samples Attached To This Submittal :


1 Title Page
2 Technical Data

Architect's / Consultant's Remarks : Owner's/Client's Remarks: MEP Representative's Remarks:

Approved Approved Approved

Approved With Comments, Resubmission Not Required. Approved With Comments, Resubmission Not Required. Approved With Comments, Resubmission Not Required.
Confirmation by contractor for acceptance required. Confirmation by contractor for acceptance required. Confirmation by contractor for acceptance required.

Approved With Comments, Resubmission Required Approved With Comments, Resubmission Required Approved With Comments, Resubmission Required

Not Approved, Resubmission Required Not Approved, Resubmission Required Not Approved, Resubmission Required Final Approval
by Project Manager for Procurement

Approved By Consultant Name & Designation Approved By Owner Name & Designation (Signature) Name & Designation

(Signature) (Signature)
INDEX

NO. DESCRIPTION

1. BOQ REFERENCE

2. SPECIFICATIONS

3. COMPLIANCE

4. TECHNICAL DATA

5. TEST CERTIFICATES

6. COUNTRY OF ORIGIN

7. VENDOR’S PROFILE

8. APPROVED MANUFACTURER LIST


1-BOQ Reference
PROJECT TITLE : IMTIAZ SUPERMARKET - SIALKOT

B I L L OF Q U A N T I T I E S

ELECTRICAL & ALLIED WORK -

LOW VOLTAGE SYSTEMS

Apr-19

SUPPLY SUPPLY INSTALLATION INSTALLATION COMPOSITE TOTAL AMOUNT


TOTAL RATE AMOUNT RATE AMOUNT RATE
S.# DESCRIPTION UNIT
QTY.
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)

Notes: SECTION - F
All flexible conduits to be
SUPPLY, imported bestTESTING
INSTALLATION, quality & COMMISSIONING
Wherever dropEARTHING
wires from ceiling are required shall be done in flexible conduits
SYSTEM
Ground Floor Retail
Make Area
- Ref.isList
PEBof(Steel Structure)
approved - Most of the executions in that area are at about 16 ft height.
Manufacturers
Contractors are responsible for arrangement of complete tools and equipment for completion of their scope of works including scaffolding wherever required etc.

Following size single core PVC insulated cable in 38mm Class-D PVC Conduit from earth
1 electrode to ECP complete in all respects. Earth Test Report to be submitted by contractor
to consultant/client.
a 35 sq. mm Rm. 250
b 70 sq. mm Rm. 650

3 Meter long 20mm dia steel rod copper claded, including 10 ft deep bore holes, inspection
2 jobs 15
pit, test bar, ground enhancement materials, etc. Earth resistance should be less than 1ohm.

Bare copper strip of following size earth connecting point (ECP) with proper mounting
3
arrangements including cover as per drawing complete in all respects.

b 400 mm x 50 mm x 10 mm Nos. 6
c 300 mm x 50 mm x 10 mm Nos. 4
d 200 mm x 50 mm x 10 mm Nos. 7
TOTAL COST - carried to summary of cost
SECTION - G
SUPPLY, INSTALLATION, TESTING & COMMISSIONING
LIGHTNING PROTECTION
Make - Ref. List of approved Manufacturers
Supply, installation, Testing and Commissioning of following including all hanging,
mounting and installation accessories required to complete the job successfully as per GEP
and complete in all respects as per drawings/specs
ESE-SATALITE 3-25 ROD with mast and all mounting accessories complete in all respect as per
1 Nos. 2
details shown on drawings.
70 Sq.mm 1C Copper Conductor on RCC column, walls and roof including saddles, nails, all
2 other necessary fixing material, etc. complete in all respect and as shown on drawings / Rm. 350
specification.
3 38 mm DIA Class D UPVC Conduit Rm. 340

TOTAL COST - carried to summary of cost


SECTION-H
SUPPLY, INSTALLATION, TESTING & COMMISSIONING
WIRING & ACCESSORIES FOR DATA / VOICE
Make - Ref. List of approved Manufacturers
Supply, installation, Testing and Commissioning of following complete in all respects as per
drawings/specs
Control Cables CAT 6 for Data / Voice System / Wifi system in already laid 20mm / 25mm dia
1 PVC Conduit - UPTO 4 Cat-6 cables in 25mm dia Conduit & upto 3 in 20mm dia conduit make - Nos. 365
3M / Schneider
Control Cables CAT 6 for Data / Voice / Wifi System in already laid cable tray - make - 3M /
2 Nos. 55
Schneider
3 2C Fiber Optic Cable - Single Mode (Backbone between switches) - Make 3M / Schneider Rm. 550

4 6C Fiber Optic Cable - Single Mode (Backbone between switches) - Make 3M / Schneider Rm. 450
20mm / 25mm dia PVC conduit concealed in slab / as shown in drawing including all
5 Rm. 4500
accessories and as per specifications
6 Submission of fluke test report for the entire project wherever Cat-6 cables are being used. Job. 1

\\ASSERVER\Drawings\Current Folder 2017\IMTIAZ SUPER MARKET - SIALKOT\TENDER PACKAGE\ELECTRICAL AND ALLIED WORKS\BOQ-ISM - CONTRACTOR'S SCOPE-1 Page - 9
2-Specifications
TECHNICAL SPECIFICATIONS
IMTIAZ SUPERMARKET
SIALKOT
April-2019

SECTION – 26 41 00

LIGHTNING PROTECTION SYSTEM

PART ONE GENERAL

1.1 REFERENCE

1.1.1 Conform to General Requirements for MEP Works, Division 1, Section 01 00 00


1.1.2 Conform to Special Requirements for Electrical Works, Division 26, Section 26 01 00.
1.1.3 Read and conform to all electrical Sections of these specifications and form part of all
electrical Sections.

1.2 SHOP DRAWINGS

1.2.1 Submit shop drawings as specified in Section 26 01 00.

1.3 GENERAL

1.3.1 Complete lightning system consisting of air terminals, roof conductors, down conductors and rod type
earth electrodes etc shall be designed as per Standards / codes and as indicated on drawings.:
1.3.2 The system and its associated equipment shall comply with IEC / NEC latest standards. Before execution
of the works contractor shall submit design proposal in accordance with consultant drawings from
manufacturer to confirm that the proposed lightning protection device will provide a high degree of
protection (98%).
1.3.3 Components of lightning protection system shall be from a register and reputed manufacturer (Furse,
Erico ). No locally fabricated components shall be acceptable.
1.3.4 The ground rod shall be 3/8" dia 10' long to be driven in earth / as specified in Boq.

1.4 SCOPE OF WORKS

1.4.1 The scope of work shall cover the supply, design, manufacture, testing in the factory, packing,
insurance, delivery to site, un loading, installation, testing and commissioning of all components with all
the necessary accessories in accordance with this technical specification / as per manufacturer
recommendation.

PART TWO PRODUCTS

2.1 MATERIAL

2.1.1 The lightning arrestor shall be electronic type based on early streamer emission (ESE) principle.
2.1.2 The unit shall be corrosion- resistant made of stainless steel, outdoor type suitable to provide
maximum protection. The coverage area shall as per manufacturer recommendations.
2.1.3 The ESE arrestor shall be mounted on a tubular steel mast that is properly supported to sustain wind
and weather conditions.

Page 1 of 3
TECHNICAL SPECIFICATIONS
IMTIAZ SUPERMARKET
SIALKOT
April-2019

2.1.4 It shall have provisions to connect two down conductors up to earth Electrodes as shown on drawing.

2.2 ROOF & DOWN CONDUCTORS

2.2.1 The lightning protection conductor shall comprise of minimum 50 Sq.mm stranded copper conductor
with PVC covering and be fixed with copper or brass clamps/accessories at a spacing of 1000 mm and
600 mm respectively. For horizontal & vertical runs.
2.2.2 Conductors shall be free of excessive splices and sharp bends. No bend of a conductor shall form an
included angle of less than 90 degrees nor have a radius of bend of less than 8 inches. Conductors shall
be secured to the structure at intervals not exceeding 3'-0" – if recommended by the Consultant
2.2.3 Down conductors shall be of copper / aluminum – ( shall be as mentioned in Boq) and shall be
concealed in the exterior wall construction Pull Boxes shall be provided in the exterior wall for pulling
of conductor’s and shall be closed after completion of works. Height and details shall be shown in the
Shop drawings.
2.2.4 Test clamps should be provided for each down conductor at about 6 feet above plinth level. No joint in
conductor should be made below the test clamp, except at the earth terminal. The earth resistance for
the entire system, in no case, should exceed one ohm.
2.2.5 Use proper cable clamps connection and mounting arrangements to install roof conductor and to
connect it to air terminal and to down conductors.

2.3 GROUND TERMINATIONS

2.3.1 Ground electrodes shall be provided for each down conductor or as mentioned in Boq / as per
manufacturer recommendation. The down conductor shall be connected to the ground rod using a
bronze ground rod clamp having at least 1-1/2" of contact between the rod and the conductor,
measured parallel to the axis of the rod, or by an exothermic welded connection. Ground rods shall be
located 2 feet below grade, preferably 2 feet from the foundation wall and shall extend a minimum of
10' vertically into the earth.
2.3.2 When a metallic water pipe buried in the ground is available, it should be bonded to the earth in
compliance with the regulations of the Institute of Electrical Engineers. Group of electrodes, if used,
should be capable of isolation for test purposes. Pipes carrying inflammable liquids or gas should not be
used as a conductor or earth terminal.
2.3.3 Earth conductor should be buried 18" deep and in straight lines of radial formation. No. of electrodes
shall be commensurate with minimum earth resistance of one ohm.
2.3.4 All reinforcement steel of columns and slabs, where possible, shall be connected with the protective
system – if specified by the Consultant Engineer.
2.3.5 Test clamps and inspection chamber should be provided with cover. Inspection chamber is to be as per
drawings.
2.3.6 Earth should be filled and compacted properly with Ground Enhanced Material.

Page 2 of 3
TECHNICAL SPECIFICATIONS
IMTIAZ SUPERMARKET
SIALKOT
April-2019

PART THREEE EXECUTION:

3.1 INSTALLATION/ TESTING / COMMISSIONING

3.1.1 Routing and general arrangement shall be generally shown in drawings, but actual position of air
terminal runs of roof conductors, actual location and routing of down conductors, test clamps and
earth electrodes shall be laid out at the job site after approval. Shop drawings to be submitted and to
be approved by the consultant before execution of the works
3.1.2 The down conductors shall follow the most direct route to the earth rod, and bends if any, shall have
the largest practical radius and no “up-turn” conductors are permitted.
3.1.3 All metal work, metal pipes/frames within 600 mm of the down conductor shall be bonded to the
down conductor.
3.1.4 The overall resistance of the earthing for lightning protection system shall not exceeds 10 Ohms. The
system shall be installed in compliance with BS / EN latest edition.
3.1.5 Bond roof vents, flashing, flag. pole supports and any other metal masses projecting through the roof
to the lightning protection grid.
3.1.6 Thermo weld all connections between cables, aerial terminals and ground rods. Compression type
connectors may be used where approved.
3.1.7 Measure resistance of the complete installation and submit for review to the Engineer.
3.1.8 Test clamps shall be provided in each inspection pit to allow for testing and commissioning.
3.1.9 Upon completion of the Work, submit a certificate of installation from licensed contractor to the
Engineer for reviews and approval.
3.1.10 Include a copy of the installation certificate in the building operation manuals.
3.1.11 Concrete inspection pits shall be installed flush with finished floor level and be fully accessible.

------------- x --- x -------------

END OF SECTION

Page 3 of 3
3-Compliance
TECHNICAL SPECIFICATIONS
IMTIAZ SUPERMARKET
SIALKOT
April-2019

SECTION – 26 41 00

LIGHTNING PROTECTION SYSTEM

PART ONE GENERAL

1.1 REFERENCE

1.1.1 Conform to General Requirements for MEP Works, Division 1, Section 01 00 00


1.1.2 Conform to Special Requirements for Electrical Works, Division 26, Section 26 01 00.
1.1.3 Read and conform to all electrical Sections of these specifications and form part of all
Comply
electrical Sections.

1.2 SHOP DRAWINGS

1.2.1 Submit shop drawings as specified in Section 26 01 00.

1.3 GENERAL

1.3.1 Complete lightning system consisting of air terminals, roof conductors, down conductors and rod type
earth electrodes etc shall be designed as per Standards / codes and as indicated on drawings.: Comply
1.3.2 The system and its associated equipment shall comply with IEC / NEC latest standards. Before execution
of the works contractor shall submit design proposal in accordance with consultant drawings from
manufacturer to confirm that the proposed lightning protection device will provide a high degree of
protection (98%).
1.3.3 Components of lightning protection system shall be from a register and reputed manufacturer (Furse,
Erico ). No locally fabricated components shall be acceptable.
1.3.4 The ground rod shall be 3/8" dia 10' long to be driven in earth / as specified in Boq. Comply

1.4 SCOPE OF WORKS

1.4.1 The scope of work shall cover the supply, design, manufacture, testing in the factory, packing,
insurance, delivery to site, un loading, installation, testing and commissioning of all components with all
the necessary accessories in accordance with this technical specification / as per manufacturer
recommendation.

PART TWO PRODUCTS

2.1 MATERIAL

2.1.1 The lightning arrestor shall be electronic type based on early streamer emission (ESE) principle.
2.1.2 The unit shall be corrosion- resistant made of stainless steel, outdoor type suitable to provide
maximum protection. The coverage area shall as per manufacturer recommendations.
Comply
2.1.3 The ESE arrestor shall be mounted on a tubular steel mast that is properly supported to sustain wind
and weather conditions.

Page 1 of 3
TECHNICAL SPECIFICATIONS
IMTIAZ SUPERMARKET
SIALKOT
April-2019

2.1.4 It shall have provisions to connect two down conductors up to earth Electrodes as shown on drawing.

2.2 ROOF & DOWN CONDUCTORS

2.2.1 The lightning protection conductor shall comprise of minimum 50 Sq.mm stranded copper conductor
with PVC covering and be fixed with copper or brass clamps/accessories at a spacing of 1000 mm and
600 mm respectively. For horizontal & vertical runs.
2.2.2 Conductors shall be free of excessive splices and sharp bends. No bend of a conductor shall form an
included angle of less than 90 degrees nor have a radius of bend of less than 8 inches. Conductors shall
be secured to the structure at intervals not exceeding 3'-0" – if recommended by the Consultant
2.2.3 Down conductors shall be of copper / aluminum – ( shall be as mentioned in Boq) and shall be
concealed in the exterior wall construction Pull Boxes shall be provided in the exterior wall for pulling
of conductor’s and shall be closed after completion of works. Height and details shall be shown in the
Shop drawings.
2.2.4 Test clamps should be provided for each down conductor at about 6 feet above plinth level. No joint in
conductor should be made below the test clamp, except at the earth terminal. The earth resistance for
the entire system, in no case, should exceed one ohm.
2.2.5 Use proper cable clamps connection and mounting arrangements to install roof conductor and to
connect it to air terminal and to down conductors.
Comply
2.3 GROUND TERMINATIONS

2.3.1 Ground electrodes shall be provided for each down conductor or as mentioned in Boq / as per
manufacturer recommendation. The down conductor shall be connected to the ground rod using a
bronze ground rod clamp having at least 1-1/2" of contact between the rod and the conductor,
measured parallel to the axis of the rod, or by an exothermic welded connection. Ground rods shall be
located 2 feet below grade, preferably 2 feet from the foundation wall and shall extend a minimum of
10' vertically into the earth.
2.3.2 When a metallic water pipe buried in the ground is available, it should be bonded to the earth in
compliance with the regulations of the Institute of Electrical Engineers. Group of electrodes, if used,
should be capable of isolation for test purposes. Pipes carrying inflammable liquids or gas should not be
used as a conductor or earth terminal.
2.3.3 Earth conductor should be buried 18" deep and in straight lines of radial formation. No. of electrodes
shall be commensurate with minimum earth resistance of one ohm.
2.3.4 All reinforcement steel of columns and slabs, where possible, shall be connected with the protective
system – if specified by the Consultant Engineer.
2.3.5 Test clamps and inspection chamber should be provided with cover. Inspection chamber is to be as per
drawings.
2.3.6 Earth should be filled and compacted properly with Ground Enhanced Material. Comply

Page 2 of 3
TECHNICAL SPECIFICATIONS
IMTIAZ SUPERMARKET
SIALKOT
April-2019

PART THREEE EXECUTION:

3.1 INSTALLATION/ TESTING / COMMISSIONING

3.1.1 Routing and general arrangement shall be generally shown in drawings, but actual position of air
terminal runs of roof conductors, actual location and routing of down conductors, test clamps and
earth electrodes shall be laid out at the job site after approval. Shop drawings to be submitted and to
be approved by the consultant before execution of the works
3.1.2 The down conductors shall follow the most direct route to the earth rod, and bends if any, shall have
the largest practical radius and no “up-turn” conductors are permitted.
3.1.3 All metal work, metal pipes/frames within 600 mm of the down conductor shall be bonded to the
down conductor.
3.1.4 The overall resistance of the earthing for lightning protection system shall not exceeds 10 Ohms. The
system shall be installed in compliance with BS / EN latest edition. Comply
3.1.5 Bond roof vents, flashing, flag. pole supports and any other metal masses projecting through the roof
to the lightning protection grid.
3.1.6 Thermo weld all connections between cables, aerial terminals and ground rods. Compression type
connectors may be used where approved.
3.1.7 Measure resistance of the complete installation and submit for review to the Engineer.
3.1.8 Test clamps shall be provided in each inspection pit to allow for testing and commissioning.
3.1.9 Upon completion of the Work, submit a certificate of installation from licensed contractor to the
Engineer for reviews and approval.
3.1.10 Include a copy of the installation certificate in the building operation manuals.
3.1.11 Concrete inspection pits shall be installed flush with finished floor level and be fully accessible.

------------- x --- x -------------

END OF SECTION

Page 3 of 3
4-Technical
Data
Early Streamer Emission Terminal – SI25I

nVent ERICO INTERCEPTOR ESE i-Series generates controlled magnitude and frequency pulses at the tip of the terminal during
high static fields prior to a lightning discharge. This enables the creation of an upward leader from the terminal that propagates
toward the downward leader coming from the thunder cloud. These early streamer emission air terminals (ESEAT) are in
accordance with the 2011 edition of NFC 17-102. The design requirements, protection level calculations and protection radius are
obtained from this standard. Due to the internal control circuit, the nVent ERICO INTERCEPTOR ESE i-Series enables the early
launching of an upward leader compared to other passive components. The nVent ERICO INTERCEPTOR ESE i-Series has been
extensively tested at an independent high-voltage laboratory in accordance with the revised 2011 requirements of French NFC
17-102. The testing, as defined in the standard, was designed to simulate naturally occurring conditions and allow comparison of
the performance between differing types of lightning protection systems.

• Designed and tested to NF C 17-102 and similar standards


• Available in three models to suit specific site requirements
• Suitable for use with a variety of downconductor systems including tape, stranded conductor and nVent ERICO Ericore
conductor

TS

Part Number SI25I


Material Stainless Steel 304L (EN 1.4306)
Triggered Advance, ∆T 25 µs
Effective Projected Area 17,613 mm²
Temperature 120 °C Max
Diameter (Ø) 28 mm
Height (H) 684.6 mm
Thread Size (TS) MF25
Unit Weight 1.53 kg
Complies With NF C17-102:2011
NP 4426:2013
UNE 21186:2011
Certifications ICECON AT 016-05-3747-2018 (Romania)
Qualifoudre
Part Number SI25I
Standard Packaging Quantity 1 pc
UPC 78285684793
EAN-13 8711893132649

WARNING
nVent products shall be installed and used only as indicated in nVent's product instruction sheets and training materials. Instruction sheets are available at www.erico.com and from
your nVent customer service representative. Improper installation, misuse, misapplication or other failure to completely follow nVent 's instructions and warnings may cause product
malfunction, property damage, serious bodily injury and death and/or void your warranty.
 
© 2019 nVent  All rights reserved
nVent, nVent CADDY, nVent ERICO, nVent ERIFLEX and nVent LENTON are owned by nVent or its global affiliates.
All other trademarks are the property of their respective owners. nVent reserves the right to change specifications without prior notice.
Mechanical Lightning Event Counter – LECIV (702050)

• Installs on downconductor to record number of lightning strikes


• For use with nVent ERICO Ericore, conventional conductors or tape

Part Number LECIV


Article Number 702050
Enclosure Rating IP 67
Trip Threshold 2 kA 8/20 μs
Depth (D) 65 mm
Height (H) 110 mm
Width (W) 80 mm
Temperature -40 to 50 °C
Unit Weight 0.52 kg
Standard Packaging Quantity 1 pc
UPC 78285647552
EAN-13 8711893019872

WARNING
nVent products shall be installed and used only as indicated in nVent's product instruction sheets and training materials. Instruction sheets are available at www.erico.com and from
your nVent customer service representative. Improper installation, misuse, misapplication or other failure to completely follow nVent 's instructions and warnings may cause product
malfunction, property damage, serious bodily injury and death and/or void your warranty.
 
© 2018 nVent  All rights reserved
nVent, nVent CADDY, nVent ERICO, nVent ERIFLEX and nVent LENTON are owned by nVent or its global affiliates.
All other trademarks are the property of their respective owners. nVent reserves the right to change specifications without prior notice.
Early Streamer Emission Terminal to nVent ERICO Ericore Adaptor – INTCPTSIIERICOR

• Connects Early Streamer Emission Terminal to nVent ERICO Ericore upper termination

Ø1
TS1

TS2
Ø2

Part Number INTCPTSIIERICOR


Material Stainless Steel 304L (EN 1.4306)
Thread Size 1 (TS1) MF25
Thread Size 2 (TS2) 1/2 BSPP
Diameter 1 (Ø1) 38.1 mm
Diameter 2 (Ø2) 29 mm
Height (H) 71 mm
Unit Weight 0.161 kg
Standard Packaging Quantity 1 pc
UPC 78285684324
EAN-13 8711893142167

Metric extra fine thread is M25x1.

WARNING
nVent products shall be installed and used only as indicated in nVent's product instruction sheets and training materials. Instruction sheets are available at www.erico.com and from
your nVent customer service representative. Improper installation, misuse, misapplication or other failure to completely follow nVent 's instructions and warnings may cause product
malfunction, property damage, serious bodily injury and death and/or void your warranty.
 
© 2018 nVent  All rights reserved
nVent, nVent CADDY, nVent ERICO, nVent ERIFLEX and nVent LENTON are owned by nVent or its global affiliates.
All other trademarks are the property of their respective owners. nVent reserves the right to change specifications without prior notice.
Water Pipe Mast Adaptor – INTCPTADF2NSP (702298)

• Mounts air terminals to non-insulated water pipe masts

TS1

TS2
Ø

Part Number INTCPTADF2NSP


Article Number 702298
Material Aluminum
Thread Size 1 (TS1) 1/2 BSPP
Thread Size 2 (TS2) 2 NPSF
Diameter (Ø) 70 mm
Height (H) 87.8 mm
Unit Weight 0.2 kg
Standard Packaging Quantity 1 pc
UPC 78285664574
EAN-13 8711893021714

WARNING
nVent products shall be installed and used only as indicated in nVent's product instruction sheets and training materials. Instruction sheets are available at www.erico.com and from
your nVent customer service representative. Improper installation, misuse, misapplication or other failure to completely follow nVent 's instructions and warnings may cause product
malfunction, property damage, serious bodily injury and death and/or void your warranty.
 
© 2018 nVent  All rights reserved
nVent, nVent CADDY, nVent ERICO, nVent ERIFLEX and nVent LENTON are owned by nVent or its global affiliates.
All other trademarks are the property of their respective owners. nVent reserves the right to change specifications without prior notice.
5-Certificates
1.2 Marking [C.3.1.2]

The identification label has passed the test according to the procedure of clause C.3.1.2 NF C 17-102
(2011).
No degradation of the label and its markings has been observed at the end of the tests and the marking is
still legible.

Result : compliant

Pictures made after the tests.

1.3 Mechanical tests [C.3.2]

The checking of the dimensional characteristics is carried out according to manufacturer drawings and
data according to clause C.2.4.
The sensor part has a diameter of 28 mm, that lead to a cross section of 616 mm² greater than the
required 200 m². Material is stainless steel.

Result : compliant
Test report N° RT13/01

17th July 2013

ESE ERITECH Interceptor ERICO

Introduction

Tests have been performed by APS (France)

These tests have been performed according to French standard NF C 17-102 (2011) Annex C

1. Tests according to NF C 17-102 (2011)

Test have been performed on ESE supposed to follow the complete test procedure, i.e. :
ESE type SI 25 (S/N : 110);
ESE type SI 40 (S/N : 1111);
and ESE type SI 60 (S/N : 1118).

1.1 Documentary information and identification [C.3.1.1]

Marking according to the requirements of C.2.1.2 NF C 17-102 (2011) is made by labels. Compliance of
marking is checked by visual inspection. It shall include at least the name, logo or trade mark of the
manufacturer, the reference of the product and the serial number.

Result : compliant
6-Country Of
Origin
FRANCE
7-COMPANY
PROFILE
EQUIPMENT SUPPLIES
& WORKSHOP

COMPANY PROFILE

ADDRESS: Ground Floor, 93/H, BLOCK 6


P.E.C.H.S KARACHI.

PH: 92-21-34527014. 34320676

E-MAIL: infoesw@cyber.net.pk ,
sales@eswelect.com

WEBSITE:www.eswelect.com
TABLE OF CONTENTS
INTRODUCTION…………………………………………….….3-4

 VISION STATEMENT……………..………..3

 OUR OFFERINGS.................……………3

 ESW TEAM…………..………………………..4

 REPRESENTATIONS…………………..…...4

 OUR CUSTOMERS…………….…………...4

 OUR MISSION………………….…………….4

FINANCIAL BRIEFS………………………..…………………..5

INTERNATIONAL REPRESENTATIONS…………..……..6

PROJECTS REFERENCES &


MAINTENANCE CONTRACTS …………………………….8-11

 EARTHING SYSTEM

 LIGHTNING PROTECTION SYSTEM

 ACCESS CONTROL SYSTEM

 EXPLOSION PROOF PRODUCTS

 MISCELLANEOUS

Company Profile Page 1


INTRODUCTION

EQUIPMENT SUPPLIES & WORKSHOP is a total solution Fire, Safety and


Security Company. It started its business operations in the year 1990 & was
formed by a group of highly qualified & experienced team to cater to the growing
needs of every industry.

VISION STATMENT

Our vision is to provide our customers a wide range of high quality, innovative &
leading offerings in the diversified fields of Fire & Security, Explosion proof
protections & other leading emerging building & industrial systems & solutions.

OUR OFFERINGS

In brief, our areas of expertise are:

Voice Evacuation System Central battery System

Emergency lighting Public address system

Cad-welding Products Explosion proof lights

Explosion proof panel boards Fire resistant cables

Explosion proof control stations Surge protection

Hazardous & safe areas cable glands Cable lugs

Lightning protection & grounding

Company Profile Page 2


ESW TEAM

ESW’s strength lies in its highly skilled, trained & qualified team. As a total
solution integration company, our main emphasis is to maintain high level of
technical expertise in our team. It is achieved by maintaining a continuous
learning process via technical trainings & updates by international reputed
companies, which we represent.

We strive to provide technical support at all level of projects, starting from


concepts to designs, system installations, testing, commissioning & most
important; AFTER SALES SUPPORT.

The ESW team is a group of specialized trained individuals who share one value in
them

“To increase the number of satisfied customers……continuously!”

OUR CUSTOMERS
ESW has a very versatile & long list of customers that includes Government &
Semi Government Institutions, Oil & Gas Exploration Companies, Commercial
Buildings, Banks, Private Offices, Refineries, Oil terminals, Hospitals, Industrial
& Pharmaceutical Units, Art galleries, Airports, Hotels, Textile units, ATM
outlets, Libraries, Residences of celebrities, Mosques & many others.

OUR MISSION
Quest to serve our clients in the best way by adding to our efficiency via
learning, trainings, innovation & feedback

Company Profile Page 3


COMMERCIAL BRIEFS

Business Information:

1. Address:
Equipment Supplies & Workshop
Ground Floor, 93/H, Block 6 P.E.C.H.S Karachi.
Karachi.
Phone: 0092-21-4527014, 4320676

EMAIL: infoesw@cyber.net.pk, sales@eswelect.com


www.eswelect.com

2. Bankers:
Bank Al-Habib Ltd.,
Shabbirabad Branch,
Karachi.
A/c No: 1169-0981-0007-1801-1

3. General Sales Tax Registration (GST):

No. 32-77-8761-371-20

4. National Tax Number (NTN):

No. 7393408-7

Company Profile Page 4


PRODUCTS & BRANDS
ESW has representation arrangements and capability for sales & technical
support of following reputed companies & brands

----------- ELECTRICAL INSTALLATION MATERIALS


FOR INDUSTRIAL & HAZARDOUS AREAS

---------- LIGHTNING PROTECTION, GROUNDING


SURGE PROTECTION SYSTEMS (USA)

------------- CABLE GLANDS (UK)

------------ FIRE RESISTANT CABLES (UK)

------------ COMMERCIAL/EMERGENCY
LIGHTING AND CENTRAL BATTERY
SYSTEM (UK)

--------------- CABLE CONNECTORS, LUGS AND SAFETY


EQUIPMENTS (SPAIN)

Company Profile Page 5


SELECTED PROJECT REFERENCES

Installations on the following projects have been carried out with the products supplied by
ESW.
S/No. PROJECT

1 LASMO Oilfield at Bhit

2 PIA Workshop at New International Airport – Lahore

3 Dubai Islamic Bank

4 Dewan Mushtaq Offices at Finance & Trade Centre

5 Maersk Office Bahria Complex

6 Bristol Myers & Squibb

7 Tax Payer Facilities in Karachi, Lahore, Faisalabad, Rawalpindi, Peshawar

8 Habib Oil Mills

9 Sub-station in Afghanistan

10 Office in Football Stadium-Lahore

11 CDC Corporate Office

12 State Bank of Pakistan

13 BP Pakistan Office – Baharia Complex

14 Nishat Textile

15 Main ATC Building at Sialkot Airport

16 Lahore Gymkhana

17 Pepsi Cola Factory

18 IGI- Office at the Forum

19 Jaffer Brother’s Limited

20 Regional Tax payer head Office – Main IT Building

21 Pakistan Refinery Ltd

Company Profile Page 6


22 National Art Gallery

23 Warehouses at Sialkot International Airport

24 Getz Pharma

25 Renovation of GHQ

26 Cancer Hospital Karachi for Shaukat Khanum

27 Maritime Complex in Karachi

28 UEPL Office in Baharia Complex

29 Military Hospital - Rawalpindi

30 K2 Facility at KANNUP

31 College of Physician and Surgeons – Karachi

32 PRL Oil Terminal, Keamari

33 Liaquat National Hospital

34 Fauji Fertilizer, Mirpur Mathelo

35 BP Site Facilities at Fields

36 Atherton & Imbroze

37 Hilton Pharma

38 Habib Bank Tower

39 Dewan Mushtaq Head Office

40 Dewan Mushtaq Regional office

41 Beach Luxury Hotel.

42 Soorty Textiles

43 Gerry D’Nata facilities at Karachi Airport

44 Jaffer Brother’s Limited

45 Printing Press – Karachi

46 Habib Bank Ltd for ATMs

47 Central Depository Company

Company Profile Page 7


48 Dewan Mushtaq Head Office

49 Dubai Islamic Bank

50 GSK Pharmaceuticals

51 National Clearing Company

52 Jaffer Brothers Limited

53 Dewan Mushtaq Head Office

54 Jaffer Brothers Ltd Corporate Office

55 Alstom Pakistan

56 Aman Towers, Karachi

57 Corporate Office & Lobby for Dolmen City Harbor Front

58 Imroze Office

59 UEPL Office

60 K2-Project, Kanupp

61 Military Hospital - Rawalpindi

62 Judicial Academy - Peshawar

63 Eni Field at Bhit

64 PPL Vehari Gasfield + other facilities

65 SSGCL Gasfield-Hyderabad

66 SSGC Field –Shikarpur

67 SSGC Field – Qadirpur

68 Engro Pakistan Dharki Facility

69 OMV Miyano – Kandanwari Field

70 PRL Plant at Karachi

71 ARL Processing Plant in Rawalpindi

72 Fauji Fertilizer Mirpur Mathelo & Sadiqabad

Company Profile Page 8


73 PARCO facilities

74 Shell Pakistan Limited

75 Chevron Pakistan

76 NED University of Engineering – Karachi

77 PNG Plant at Bin Qasim (Electronic Lightning Protection)

78 Serena Hotel Islamabad (Electronic Lightning Protection)

79 PT&T Tower, Islamabad (Electronic Lightning Protection)

80 PNRA Building, Islamabad (Electronic Lightning Protection)

81 EMMAR Housing, Islamabad (Electronic Lightning Protection)

82 Japanese Factory, Hattar (Electronic Lightning Protection)

83 Private Power Plant, Punjab

84 Maritime Facility, Hub Chowki

85 Wapda Sub-stations

86 Engro

87 Descon

88 Numerous Defence Facilities

89 Bahria Mosque-Lahore

90 Margalla Towers

91 KESC Substations

92 Emporuim Mall

93 Shaukat Khanum Memorial Hospital

94 PTCL

Company Profile Page 9


9-Approve
Manufacturer list
LIST OF APPROVED MANUFACTURERS
IMTIAZ SUPERMARKET
SIALKOT
April-2019

APPROVED MANUFACTURERS TO BE FILLED IN BY CONTRACTOR ON WHICHEVER MANUFACTURER


QUOTATION IS BASED WITH COUNTRY OF ORIGIN

OPTION-1 OPTION-2

1. PVC CONDUITS & ACCESSORIES __________________ _________________

 Dadex.
 CIVIC.

2. MAIN, SUB-MAIN POWER CABLES _____________________________ _____________________________

 Pakistan Cables.
 Newage Cables
 Fast Cables

3. LIGHTING & POWER WIRING

 Pakistan Cables

4. SWITCH, SOCKET & DIMMERS / _____________________________ ____________________________


OCCUPANCY SENSORS

 Clipsal.
 Orange Electric
 MK

5. LV DISTRIBUTION BOARDS _____________________________ _____________________________

 Libra engineering
 HRA Switchgears
 Hussain & co.
 Premier engineering

6. EARTHING MATERIAL _____________________________ _____________________________

 FURSE – UK
 ERICO – USA

7. CABLE TRAYS / LADDER


& ACCESSORIES _____________________________ _____________________________

 Ezzi Engineering.
 Electroline.

8. LV CIRCUIT BREAKERS _____________________________ _____________________________

 Schneider Electric – Europe


 Terasaki - Japan

\\ASSERVER\Drawings\Current Folder 2017\IMTIAZ SUPER MARKET - SIALKOT\TENDER PACKAGE\ELECTRICAL AND ALLIED WORKS\Revised List of Suppliers (F) -.doc
List of Approved Suppliers Page 1 /2
LIST OF APPROVED MANUFACTURERS
IMTIAZ SUPERMARKET
SIALKOT
April-2019

9. POWER FACTOR CAPACITORS _____________________________ _____________________________


(PFI) / CONTROLLERS.

 Shizuki - Japan.
 Nokia - Japan.
 Fuji – Japan
 RTA, Spain

10. MAGNETIC CONTACTORS _____________________________ _____________________________

 Schneider Electric – Europe


 Terasaki - Japan
 Lovato – Italy
 ABB – Germany

11. LV/MV CABLE JOINTING / _____________________________ _____________________________


TERMINATION KITS

 3M Pakistan (Pvt.) Ltd.


 Raychem.

12. DATA & VOICE _____________________________ _____________________________

 3M Pakistan
 Cisco
 Schneider

13. MS BACK BOXES _____________________________ _____________________________

 Hussain & Co.


 Liamra Engg.

14. ENERGY ANALYZERS / METERS _____________________________ _____________________________

 Ducati – Smart 96
 Lovato Italy
 Schneider

15. LIGHTNING ARRESTOR _____________________________ _____________________________

 Erico UK
 Furse UK

16. FIRE RESISTANT CABLE _____________________________ _____________________________

 Prysmian – UK
 Eurosafe- UK

Note:
Evaluation shall be based on above with technical comparison.