RAMSIS ENGINEERING

Project Name:
Hot Work Permit Check List - Daily
Permit Number: Closing Date of Permit: Month: Location:
Sr.
No. Items for checking 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1 Vessel /line to be depressured,


drained, vented
Vessel /line to be positively
2 isolated/blinded (List Attachment)
Power Supply to be Positively
3 Locked Out
Fresh Air Breathing Apparatus to be
4 used/Qualified men to stand by
5 Gas Test to be taken at intervals
6 Job/fire watcher required
Permission to use fire line to be
7
obtained
Sewer/Opening to be flushed and
8
sealed
9 Low voltage equipment to be used
Fire fighting equipment to be
10
checked for operation
All combustibles material ( papers,
11 Rags, Oil, Spills etc) to be removed

Stand by fire protection to be


12
provided
13 Grit blasting hose to be checked
Welding work piece to be properly
14
earthed
15 House Keeping Satisfactory

RAMSIS Supervisor - Initial

RAMSIS HSE Officer - Initial


Doc.No. RE/HSE/HWPCL/FM 324 * Date Issued: 10.02.2011 * Revision No. 000 RE324 - 0

Page 1 of 1