5570 Mines RDM MNS/RDM/KZN/201819/001 Savings in purchase of cartridge


ARRANGEMENT FOR SAFETY OF 1220 BELT
6111 Mines RDM MNS/RDM/KZN/201819/002 CONVEYOR
1220 HEAD SNUB PULLEY CHANGE 2-3 HR
6112 Mines RDM MNS/RDM/KZN/201819/003 EARLY AS PLANNED
G-80 modified with G-100 casing and
6155 Mines RDM MNS/RDM/KZN/201819/004 impeller.
3/4 inch pipe was aranged for pump jam
6156 Mines RDM MNS/RDM/KZN/201819/005 removal

6176 Mines RDM MNS/RDM/KZN/201819/006 Pump performance increase

Better access for water control for filling


cyclones trough to reduce water injection in
6178 Mines RDM MNS/RDM/KZN/201819/007 FST

Fill MCC water control level control to avoid


6179 Mines RDM MNS/RDM/KZN/201819/010 plant tripping

To avoid tailing lines leakage above fill plant


6180 Mines RDM MNS/RDM/KZN/201819/009 transformer area

6181 Mines RDM MNS/RDM/KZN/201819/008 Cleaning of SIPX tank


Improved illumination by installing LED
6186 Mines RDM MNS/RDM/KZN/201819/011 lights
Illumination improvement at new bore hole
6191 Mines RDM MNS/RDM/KZN/201819/020 site

6192 Mines RDM MNS/RDM/KZN/201819/019 welding chain in every gate end box
Arrangement of power source for diesel
6206 Mines RDM MNS/RDM/KZN/201819/012 pump as main cable failure occured

6207 Mines RDM MNS/RDM/KZN/201819/014 Installation of siren on flotation crane

Installtion of tullu pump with automation in


6208 Mines RDM MNS/RDM/KZN/201819/013 cable trench of fill plant mcc

6272 Mines RDM MNS/RDM/KZN/201819/018 Damage prevention of -35mRL Crane

Pull out test of exposed rock bolts for


6293 Mines RDM MNS/RDM/KZN/201819/016 hanging beams

Identification 2.4 m & 1.8 m rock bolt after


6294 Mines RDM MNS/RDM/KZN/201819/015 grouting

6332 Mines RDM MNS/RDM/KZN/201819/017 rerouting of EOT cable in crusher

Installation of density meter at tailing pump


6334 Mines RDM MNS/RDM/KZN/201819/021 redundant line
Drain valve replaced with 3 inch socket and
6352 Mines RDM MNS/RDM/KZN/201819/022 plug.

Installation of a Surface Drilling water line to


have the continuty of flow of water for
6370 Mines RDM MNS/RDM/KZN/201819/023 Drilling in VRM Section(150,125,100 Mrl)

6459 Mines RDM MNS/RDM/KZN/201819/024 Welding Machine :electrocution protection


6512 Mines RDM MNS/RDM/KZN/201819/030 Improvement in illumination range

Monitoring of Crusher screens for process


6513 Mines RDM MNS/RDM/KZN/201819/025 improvement and enhancing its avialibilty

6515 Mines RDM MNS/RDM/KZN/201819/026 In house repairing of Ball mill isolator switch
320m3 tank at PDO amperage shown in
6516 Mines RDM MNS/RDM/KZN/201819/027 scada at control room
Frequent burning of motor of P-7 water
6517 Mines RDM MNS/RDM/KZN/201819/028 recovery pump due to jamming
Local control stop switch provided near
6518 Mines RDM MNS/RDM/KZN/201819/029 magnet of 1085

6536 Mines RDM MNS/RDM/KZN/201819/031 Hammer Stand

Metal Hammer replaced with Plastic


6595 Mines RDM MNS/RDM/KZN/201819/037 Hammer for core extraction from inner tube
To change chute modification at 1085
6610 Mines RDM MNS/RDM/KZN/201819/032 conveyor
BALLOW HOSE REPLACED IN PLACE OF MS
6611 Mines RDM MNS/RDM/KZN/201819/033 LINE

6631 Mines RDM MNS/RDM/KZN/201819/034 TCS on Royalty Updation in 26 AS

Detail Cost review analysis and presentation


6632 Mines RDM MNS/RDM/KZN/201819/035 for cost review

Development saving by using unused X Cut


6662 Mines RDM MNS/RDM/KZN/201819/036 for Reserve station`

6671 Mines RDM MNS/RDM/KZN/201819/038 Reflector strip for parking


Reduction in failure coolant filter mounting
6673 Mines RDM MNS/RDM/KZN/201819/040 and hose
REDUCTION IN DAMGE TO AUTO LUBE
6674 Mines RDM MNS/RDM/KZN/201819/041 SYSTEM
6675 Mines RDM MNS/RDM/KZN/201819/039 Coating at Chemical Area

6676 Mines RDM MNS/RDM/KZN/201819/050 Rear Parking light mounting modification.

6677 Mines RDM MNS/RDM/KZN/201819/049 Re Shuffling of oil room and container

6678 Mines RDM MNS/RDM/KZN/201819/048 MU antena position change in new ST1030


Pneumatic greasing pump installed in
6679 Mines RDM MNS/RDM/KZN/201819/047 HEMM
MT436B -03 Steering cylinder rod covered
6680 Mines RDM MNS/RDM/KZN/201819/046 by conveyor belt.

6681 Mines RDM MNS/RDM/KZN/201819/045 Dust seal fitted in Bucket pin ST1030 -06

6682 Mines RDM MNS/RDM/KZN/201819/044 Dust seal fitted in Bucket pin ST1030 -06
Painting Done in Brake metal pipe MT436B-
6683 Mines RDM MNS/RDM/KZN/201819/043 02

6684 Mines RDM MNS/RDM/KZN/201819/042 Radiator mounting modification in ST 7

Use of spray paints instead of using manual


6688 Mines RDM MNS/RDM/KZN/201819/051 paints with Jutes
Production Drill hole marking with colour
6689 Mines RDM MNS/RDM/KZN/201819/052 and steel pegs

Water line laying for ball mill no-4 feed


6701 Mines RDM MNS/RDM/KZN/201819/056 chute

Providing stand for welding machine to


6715 Mines RDM MNS/RDM/KZN/201819/055 prevent damage from water splash

6717 Mines RDM MNS/RDM/KZN/201819/054 Use wrap seal to prevent pipeline leakage

6767 Mines RDM MNS/RDM/KZN/201819/053 WIRE PROTECTION


#SGA : Shifting of air conditioned Drill
6949 Mines RDM MNS/RDM/KZN/201819/057 Jumbo Sandvik DD321 in RDM-UG
#SGA- online arresting the oil leakage in
6951 Mines RDM MNS/RDM/KZN/201819/060 1.5MVA transformer

monitoring of shaft inset CCTV camera on


6952 Mines RDM MNS/RDM/KZN/201819/059 mobile phone
1295 crusher centrifuge pump fitted &
6964 Mines RDM MNS/RDM/KZN/201819/058 taken in circuit

# SGA-Stripping of 350m in 100mRL Main


7110 Mines RDM MNS/RDM/KZN/201819/061 drive to facilitate more space in the drive

# SGA-Ventilation problem in lower east


7111 Mines RDM MNS/RDM/KZN/201819/062 lode section
# SGA-To study and reduce the Blast cycle
7138 Mines RDM MNS/RDM/KZN/201819/063 time

Alternative source of filling 180mRL Stope-


351 and thus not laying 500m HDPE pipeline
for filling saving Manpower and reducing
7151 Mines RDM MNS/RDM/KZN/201819/064 NVA

#SGA-To draw power cable from -87mRL to


-65mRL through Borehole for Operation of
7271 Mines RDM MNS/RDM/KZN/201819/065 Jumbo , solo & Aux fan

7351 Mines RDM MNS/RDM/KZN/201819/066 Safety guard made at jaw crusher

Retrofitting of reagent/chemical area crane


7505 Mines RDM MNS/RDM/KZN/201819/068 by flame proof crane

Fill Plant Transformer area Site improvement


7507 Mines RDM MNS/RDM/KZN/201819/067 to increase safety and reliability
7617 Mines RDM MNS/RDM/KZN/201819/070 Dust control from exhaust of MT436B

Partition between engine and steering


7619 Mines RDM MNS/RDM/KZN/201819/069 pump
SCRREN U/D PANEL CHANGE WITH MODIFY
7647 Mines RDM MNS/RDM/KZN/201819/071 INHOUSE PLATE
HEMM Waste Transport Procedure
7729 Mines RDM MNS/RDM/KZN/201819/073 Improvement

Shifting the grinding and floation area


welding machine on stand to save them
7740 Mines RDM MNS/RDM/KZN/201819/072 from damage while hosing the area

7807 Mines RDM MNS/RDM/KZN/201819/074 Increasing communication in NL

7810 Mines RDM MNS/RDM/KZN/201819/075 Stand for radiatopr frame

7812 Mines RDM MNS/RDM/KZN/201819/076 Direction of LHD movement

7814 Mines RDM MNS/RDM/KZN/201819/077 maintennace bay at door of container

7816 Mines RDM MNS/RDM/KZN/201819/078 zero power isolation in equipment

7817 Mines RDM MNS/RDM/KZN/201819/079 Turning of HEMM in workshop


7826 Mines RDM MNS/RDM/KZN/201819/080 Emergecy switch at Remote working
DAMAGE PROTECTION TO HOSES AND
7827 Mines RDM MNS/RDM/KZN/201819/081 ELECTRICAL ITEMS
Provision of greasing system in ST1030
7837 Mines RDM MNS/RDM/KZN/201819/082 radiator fan hub

Replacing the 6 inch foot valve to 4 inch foot


7843 Mines RDM MNS/RDM/KZN/201819/083 valve for compressor house pump
EXTRA LINE CONNECTED TO OLD FST FOR
7931 Mines RDM MNS/RDM/KZN/201819/084 CONTINUOUS FILLING.

Installation of load cell in Mill EOT cranes for


7962 Mines RDM MNS/RDM/KZN/201819/087 display of Load being lifted by crane

Installation of proximity switch for providing


Dumper dump body positioning status in
7963 Mines RDM MNS/RDM/KZN/201819/086 driver cabin by siren to enhance safety

Electrical damaged Panel replacement of 5


7964 Mines RDM MNS/RDM/KZN/201819/085 ton MCC side Crane

Replacement of 5 Ton MCC side and 5 Ton


Filter side crane lifting hook and wire rope
to enhance safety as latch were not
7965 Mines RDM MNS/RDM/KZN/201819/089 available in old look

Replacement of OLD ball Mill 3 conventional


type LRS by Vapromatic type LRS to save
7966 Mines RDM MNS/RDM/KZN/201819/088 water leakage and enhance safety
Illumination improvement near Tailing
battery and cement mising tanks to enhnace
7967 Mines RDM MNS/RDM/KZN/201819/091 safety while opening the manual valve

Installation of flame proof loght in grease


7968 Mines RDM MNS/RDM/KZN/201819/090 and lubricant room to enhance fire safety
Provide oil level indication in control room
7971 Mines RDM MNS/RDM/KZN/201819/092 for 1296 crusher.

7972 Mines RDM MNS/RDM/KZN/201819/094 1220 Take up structure Restrengthen

7973 Mines RDM MNS/RDM/KZN/201819/093 Provide lock spring in 1296 Crusher

8009 Mines RDM MNS/RDM/KZN/201819/098 1085 DISCHARGE CHUTE MODIFICATION

8010 Mines RDM MNS/RDM/KZN/201819/097 1085 DECK PLATE FIXING WORK


RALLING & TOE GUARD PROVIDED AT
8011 Mines RDM MNS/RDM/KZN/201819/096 SCREEN HOUSE

8012 Mines RDM MNS/RDM/KZN/201819/095 lADDER TO BE MODIFY AT SCREEN HOUSE

8166 Mines RDM MNS/RDM/KZN/201819/100 Mixing tank drain plug direction changed.

seperate line placed for 7300B recirculation


8167 Mines RDM MNS/RDM/KZN/201819/099 pump

Crusher crane current carring wheel inhouse


8176 Mines RDM MNS/RDM/KZN/201819/104 modification work

Aligned compound delivery header to


ensure uniform lubrication of ball mill girth
8178 Mines RDM MNS/RDM/KZN/201819/103 gear.
Replacing FST cyclone feed nipple with
8179 Mines RDM MNS/RDM/KZN/201819/101 HDPE nipple
The ckt-4 cleaner distribution box height
8185 Mines RDM MNS/RDM/KZN/201819/102 increased
Provision of Seperate Stop push button near
8208 Mines RDM MNS/RDM/KZN/201819/107 field operator

Shiftting of Pull card above conveyor guard


8209 Mines RDM MNS/RDM/KZN/201819/106 at 1270 conveyor

8210 Mines RDM MNS/RDM/KZN/201819/105 Provision of antipanic gate in MCC


Provision of hooter alarm for sodium
8212 Mines RDM MNS/RDM/KZN/201819/109 cyanide

Provide the auto drainner system in


8213 Mines RDM MNS/RDM/KZN/201819/108 compressor air tank

8215 Mines RDM MNS/RDM/KZN/201819/113 Shifting of AC out door unit at ground level

8216 Mines RDM MNS/RDM/KZN/201819/112 Proper storage of arc flash dress


Arrangement of keeping the rescue hook &
8217 Mines RDM MNS/RDM/KZN/201819/111 earthing rod in MCC

8218 Mines RDM MNS/RDM/KZN/201819/110 ELR system provision in drill m/c supply

Fire Alarm system/smoke deductor provide


8223 Mines RDM MNS/RDM/KZN/201819/116 in MCC & chemical area
Illumination to be improve in vaccume
8224 Mines RDM MNS/RDM/KZN/201819/115 pump area
RCC stand to be made for UPS/server
8225 Mines RDM MNS/RDM/KZN/201819/114 Battery bank

Removal of joints for ball mill area pedestal


8226 Mines RDM MNS/RDM/KZN/201819/117 fan and switch boards

8299 Mines RDM MNS/RDM/KZN/201920/004 welding cable joint

8300 Mines RDM MNS/RDM/KZN/201920/003 LIP plate devlopment at local workshop


8301 Mines RDM MNS/RDM/KZN/201920/002 High boom support

Increasing Cooling Efficiency of Diamec


PHC4 machine to Improve Operational
8313 Mines RDM MNS/RDM/KZN/201819/118 Efficiency

Increased machine availability of U4


Exploration Drill Machine by Replacement of
8408 Mines RDM MNS/RDM/KZN/201920/001 existed Air cooler

Making a provision of cylinder's stand at


8686 Mines RDM MNS/RDM/KZN/201920/014 underground garage to prevent from fall.

Making a provision of turbo charger guard


8687 Mines RDM MNS/RDM/KZN/201920/013 for machine to prevent from fire incident.

Making a provision for safe walking on floor,


when drill power cable is laying in unsafe on
floor and get connected in to get & box for
8688 Mines RDM MNS/RDM/KZN/201920/005 power supply.

Making a provision for safe walking on floor,


when drill power cable is laying in unsafe on
floor and get connected in to get & box for
8689 Mines RDM MNS/RDM/KZN/201920/012 power supply.

ADM location need to be change to avoid


machine starting problem due to water
8692 Mines RDM MNS/RDM/KZN/201920/007 inserted it.

Making Machine reliable to diagnose the


problem easily and to avoid chances of
8693 Mines RDM MNS/RDM/KZN/201920/006 bypassing the fuses.
8695 Mines RDM MNS/RDM/KZN/201920/010 Positive locking of hanging part

8700 Mines RDM MNS/RDM/KZN/201920/009 Extra light arrangement in RBO

8710 Mines RDM MNS/RDM/KZN/201920/008 Pull out testing of new rock bolts.

8800 Mines RDM MNS/RDM/KZN/201920/011 Savings in ordering of VFD Panels

8967 Mines RDM MNS/RDM/KZN/201920/025 New led light provide at Tailing sump tank

8991 Mines RDM MNS/RDM/KZN/201920/024 Arrangement of stracher

Provision of Zabra crossing sinage at bus


8993 Mines RDM MNS/RDM/KZN/201920/023 stop in RD Mill
Provision for tail end side guarding in 1085
8997 Mines RDM MNS/RDM/KZN/201920/022 conveyor
Modification done in Ball mill motor cooling
9001 Mines RDM MNS/RDM/KZN/201920/021 fan net

Modification and replacement of reject


9006 Mines RDM MNS/RDM/KZN/201920/020 bunker chute

Introduction of bluetooth based handy


9009 Mines RDM MNS/RDM/KZN/201920/019 speaker for safety alert discussion

Introductsion of comapct size battery bank


9011 Mines RDM MNS/RDM/KZN/201920/018 for Fill Plant MCC
Modification in chemical pump guard such
9014 Mines RDM MNS/RDM/KZN/201920/017 that shaft covered
Modification in frame of contactor when P-
54 VFD contactor burnt out and spare not
9015 Mines RDM MNS/RDM/KZN/201920/016 one to one fixing

As camera adapter of weigh bridge was


getting burnt frequenlty whenevr rain
occures, Fixing the adapter in Ip protected
9038 Mines RDM MNS/RDM/KZN/201920/015 junction box
Team Leader Name No Of Team Member

Neha Jain (299390) 1

Kamlesh Bhandari (268169) 4

Kamlesh Bhandari (268169) 8

Pradeep Dhabaria (109118) 5

Sunil Sampla (278311) 3

Balmukund Rathore (311919) 4

Sunil Sampla (278311) 2

Sunil Sampla (278311) 2

Sunil Sampla (278311) 1

Sanjay Kumar Barnwal (311993) 3

Sourav Dutta (288369) 1

Sourav Dutta (288369) 1

Sourav Dutta (288369) 1


Devkishan Sharma (561727) 2

Sujan Kothari (662587) 1

Devkishan Sharma (561727) 1

Sourav Dutta (288369) 1

Alagu Ramkumar (573553) 2

Alagu Ramkumar (573553) 2

Roopesh Mehta (267584) 4

Omprakash Sharma (290991) 2

Sunil Sampla (278311) 3

Sarth Bodawala (564892) 3

Yuvraj Rajput (277820) 2


Yuvraj Rajput (277820) 1

Omprakash Sharma (290991) 2

Sujan Kothari (662587) 3

Omprakash Sharma (290991) 2

Sujan Kothari (662587) 3

Sujan Kothari (662587) 1

Yuvraj Rajput (277820) 1

Shashi Shukla (567721) 3

Kamlesh Bhandari (268169) 1

Rajulal Yadav (601030) 3

Manish Bansal (287014) 1

Nidhi Sharma (578943) 1

Sarth Bodawala (564892) 1

Yuvraj Rajput (277820) 1

Vishvdeep Singh Rao (279860) 2

Vishvdeep Singh Rao (279860) 3


Pradeep Dhabaria (109118) 2

Vishvdeep Singh Rao (279860) 3

Rakesh Khurana (276643) 3

Vishvdeep Singh Rao (279860) 2

Yuvraj Singh (663243) 3

Yuvraj Singh (663243) 5

Yuvraj Singh (663243) 3

Yuvraj Singh (663243) 4

Yuvraj Singh (663243) 3

Yuvraj Singh (663243) 3

Sandeep Singh (299992) 2

Sandeep Singh (299992) 2

Ramji Lal Saini (312002) 1

Anup Kumar Das (568458) 1

Anup Kumar Das (568458) 1

Rajat Jain (581644) 2

Vishvdeep Singh Rao (279860) 1


Roopesh Mehta (267584) 2

Roopesh Mehta (267584) 3

Kamlesh Bhandari (268169) 1

Rajmal Mandowara (356819) 2

Shikhar Gupta (564902) 2

Harshit Srivastava (586582) 2

Rajmal Mandowara (356819) 2

Satish Thakare (564973) 2

Murali Bingi (296348) 2

Devkishan Sharma (561727) 2

Devkishan Sharma (561727) 2


Vishvdeep Singh Rao (279860) 1

Vishvdeep Singh Rao (279860) 1

Kamlesh Bhandari (268169) 2

Vishvdeep Singh Rao (279860) 2

Devkishan Sharma (561727) 2

Roopesh Mehta (267584) 3

Yuvraj Rajput (277820) 1

Yuvraj Rajput (277820) 1

Yuvraj Rajput (277820) 1

Yuvraj Rajput (277820) 1

Yuvraj Rajput (277820) 1


Yuvraj Rajput (277820) 1

Yuvraj Rajput (277820) 1

Vishvdeep Singh Rao (279860) 0

Shashank Shekhar (568746) 2

Sunil Sampla (278311) 3

Devkishan Sharma (561727) 2

Balmukund Rathore (311919) 2

Devkishan Sharma (561727) 1

Devkishan Sharma (561727) 2

Devkishan Sharma (561727) 2


Devkishan Sharma (561727) 2

Sujan Kothari (662587) 2

Sujan Kothari (662587) 2

Kamlesh Bhandari (268169) 1

Kamlesh Bhandari (268169) 1

Kamlesh Bhandari (268169) 1

Kamlesh Bhandari (268169) 1

Kamlesh Bhandari (268169) 1

Kamlesh Bhandari (268169) 1

Anup Kumar Das (568458) 2

Anup Kumar Das (568458) 2

Sujan Kothari (662587) 1

Jai Prakash (581053) 2

Anup Kumar Das (568458) 2

Rajulal Yadav (601030) 1


Sujan Kothari (662587) 1

Sujan Kothari (662587) 1

Devkishan Sharma (561727) 1

Sujan Kothari (662587) 1

Devkishan Sharma (561727) 1

Devkishan Sharma (561727) 2

Sujan Kothari (662587) 2

Devkishan Sharma (561727) 1

Sujan Kothari (662587) 2

Sujan Kothari (662587) 2

Devkishan Sharma (561727) 2

Devkishan Sharma (561727) 1

Devkishan Sharma (561727) 2

Yuvraj Rajput (277820) 1

Yuvraj Rajput (277820) 1


Yuvraj Rajput (277820) 1

Vishvdeep Singh Rao (279860) 3

Shashi Shukla (567721) 4

Yuvraj Rajput (277820) 2

Yuvraj Rajput (277820) 2

Yuvraj Rajput (277820) 2

Yuvraj Rajput (277820) 2

Yuvraj Rajput (277820) 2

Yuvraj Rajput (277820) 2


Yuvraj Rajput (277820) 2

Yuvraj Rajput (277820) 2

Ambareesh Jha (567802) 2

Neha Jain (299390) 1

Sujan Kothari (662587) 2

Devkishan Sharma (561727) 1

Devkishan Sharma (561727) 2

Devkishan Sharma (561727) 2

Sujan Kothari (662587) 2

Ramji Lal Saini (312002) 3

Devkishan Sharma (561727) 2

Devkishan Sharma (561727) 3

Anup Kumar Das (568458) 3


Sujan Kothari (662587) 2

Devkishan Sharma (561727) 2


Problem Statement Why Why Analysis

1. For 2 material codes ARC was there but


amount in ARC got expired so putting ARC
PO was not possible. 2. Offer taken from the
ARC vendor. 3. it was found that for 2
material codes vendor has quoted different
rates than the ARC rates. 4. While going into
deep, we came to know that there are 2
While procurement of HP printer cartridge, types of packing size for the same type of
it was found that for 2 material codes cartridge one is single pack and other is dual
vendor has quoted different rates than the pack and the rates of dual pack is much
ARC rates. lower than taking 2 single cartridges.
ALIGNMENT OUT & BELT CONVEYOR SIDE
EDGE WEARED DUE TO CHENNEL WEARED

HEAD SNUB PULLEY WEARED LAGGING NOT THERE

G-80 flow was not sufficient As spillage is more.

For pump jam removal Pump is jammed

Pump break down frequently pump break downs frequently

Water control vales for cyclones provided at


better position for better control

MCC water pump needs to be started in


manual/MCC water pump starts in
automation with water level

No visibility for tailing lines leakage above


transformer area / Camera view given in
control room for all three tailing lines above
transformer area

SIPX Dozing jam frequently. SIPX sludge is forming


At reticulation bore hole drilling site there Less Illumination due to extended working
was very less illumination hours

Poor illumination after extended hours less illumination


Damage happening due to improper
Damage happening in gate end box mounting
No power at diesel pump and diesel stock
nil, mining operation hampered main cable got puncture at canteen area

While movement of crane no siren blows, no provision as craned are very old

Water accumulates in trench and due to


moisture to this mcc gets tripped as mcc is at lower height

Trolley Cable was damaging frequently at Due to blasting at crusher chamber, small
-35mRL Crane flying stone particles were damaging cable

Pull out testing machine had a limitation for


pull out the exposed rock bolt. It is designed
to test the rock bolts which is properly The machine was not designed for testing
grouted exposed rock bolts

Difficulty in identifying the length of grouted


rock bolt & thus to ascertain whether SSR
has been followed or not. To comply with the SSR norms & guidelines

1. cable getting damaged 2. due to blasting


EOT crain cable is frequently getting in crusher area 3. cable is in the zone of
damaged due to blasting getting hit by particle

Earlier required to shift density meters to


redundant line when it was in operation.
Now both tailing lines from tailing thickner
have own density meters for monitoring
density.
suction line jam as the drain valve muff not
Suction line jam while operating the pump properly operated.

Drilling water connection was only drawn


from 0 MRL to VRM section, incase of
stoppage of 0 MRL pump drilling water was Only drilling water Connection to VRM
not available In VRM Section Section

In running situation, machine lugs(+)(-) are


not covered properly even not insulated
properly which can lead electric shock when
machine is on mode..
poor visibility from operator comportment
at distance 25 metres Position of lights

Screen overflow & Chute jam issue

Isolator switch not working for ball mill -1


,due to this positive isolation not occur
Earlier ampere reading was not seen at
SCADA
Frequent burning of motor of P-7 water
recovery pump due to jamming
belt is stopped due to pull cord for taking
scrap

Time lapses in identification and inspection


of Hammer proper location of hammer is not available

Previously Metal hammer was used to hit on


inner tube to extract the core at each run,
due to this practice inner tube will get bend
and no useful for further operation.

jamming at 1085 discharge chute Gap between chute & pulley

MS LINE WORN OUT FREQUENTLY DUE TO MS BEND


TCS deposited for Royalty is not showing in Due to some error, TCS not shown in return
HZL 26 AS of DMG

Require detail deep drive on every element


of cost To present last 12 month trend of cost

Reserve station was not available at 125


mRL and thus there was a need for extra
development for the preparation of the Reserve station was not in present in
same 125mRL due to space constraint
Parking was done in an haphazard manner,
not much more smooth
Frequent failure of coolant hose and
twisting of Filter housing in MT 436 B Strength of mounting plate is low
DUE TO POSITION IT IS HIT BY BOULDER IN
FREQUENT DMAGE OF AUTOLUBE SYSTEM MUCKDRIVE
Rusting of floor, chemical hazard, poor
housekeeping

frequent damages of parking lights Light mounting are below the differential
There is no space for fast Less awarness of 5S and House keeping in
consumables,manuals & records manforce

Frequently damage by stone hitting position wrong

Two person is require for greasing Manual grease pump


Piston Rod & seal damaged by material
spilage on rod Piston rod are open

Wear out bucket pin and bushing dust enters in grease

Wear out bucket pin and bushing dust enters in grease

Rust on metal pipe due to water in UG

frequent failure of fan Excessive Vibration

Grade/Center line marking was in visible


due to erasing of paint used with jutes
Drill hole marking was disturbed due to
erase of color for marking Marking was disturbed

In ball mill no-4 low volume of water due to LESS PRESSURE REACHING TILL CYCLONES
this Cyclone pump sump jam AS PIPELINE WAS JAMMED

welding machine kept below Zn thickener


was frequently getting short

Frequent leakage of slurry pipeline. welding


or clamping takes time

Previously there was no arrangement for


wire prevention and wire got cut to loading
and unloading of goods.
Drill Jumbo was not able to pass from 100 Drill Jumbo not able to pass --> Height
mrl constraint
huge transformer oil leakage was from
transformer explosion vent bottom, neutral
bushing, conservator tank, and tap changer 1. oil leakage in transformer from many
which is causing regular top-up of places 2. gasket leakage. 3. gasket seal
transformer oil broken or bolt are not fully tight

shaft inset CCTV camera was limited to 1. shaft CCTV camera was limited to winder
winder operator, for monitoring any activity operator 2. it is an OFC cable network. 3.
going over there by section incharge was Auxiliary shaft is not connected by OFC to
not there main shaft. 4. Wi-Fi link is also not there

Pump available & not fitted Fittings are not available

Slower production Rate and shifting of


Shallow drive size in 100mRL of East lode Equipment was not possible

Ventilation problem in lower east lode


section No established Ventilation network
Non value added activities in RDM during
development cycle NVA Activities

To lay extra 500m HDPE Pipe resulting loss


of Man hours and NVA NA

No separate power connection for Jumbo Power cable cant be drawn in ramp due to
running in -65 MRL movement of LPDT

Bolt can rebound from jaw crusher, which


can hit the person in front of that

The Chemical area consists of MIBC storage


and handling which is highly flammable, The
present crane was having non flame proof
electrical panels and crane motors which Retrofitting of non flame proof crane with
are not safe as per the MIBC area. flame proof crane

As the ground level of fill plant transformer


is very low and when heavy rain occurs or
any line leakage occurs the transformer get
submerged and whole plant gets
breakdown. Low ground level of fill plant transformers
MT436B exhaust was directing towards side
wall in mine and thus lot of dust generating
and spreading across haul road. Done.

After steering hose failure direct oil splash


to engine causing equipment fire hazard. Done

FREQUENTLY DEVELOPING HOLE. IMACT OF MATERIAL


HEMM Environmental Waste transport was
being done in open body directly. Done

The machines were not on stand and while


hosing the water fall on its welding lead
connecting points Low height of machines

Telephone communication was not available


beyond 1900 Grid in NL & all major Adequate no of telephone and telephone
operations of Dev & production is running lines were not available to take extra
beyond 1900 Grid numbers

Radiator mask is not in proper position stand designed not available

Direction of LHD movement from Radiator


side no induction only light and back up alarm
there is always open pit behind the door of
container grating is movable

there is always 440 v supply in equipment Pilot ckt only cover 440 v which can be
after battery switch isolation isolated from equipment

while person working in ug workshop


,equipment take turn in workshop to
provide side to other machines no barricading at workshop
person not able to switch off the engine
while working on platform in emergency
case No switch available at platform
FREQUENT DMAGE OF HOSES AND WHILE LOADING WIRE MESS AND PIPE HIT
ELECTRICAL WIRING THE SYSTEM
Fan hub early play due to unavailability of
grease point Done

Due to 6 inch foot valve and pipeline


installed at the compressor house pumps, it
was becoming very difficult to remove the
pipeline for foot valve replacement. Weight of the valve and the pipeline.

NOT PROVIDING CONTINUOUS FILLING LOW DENSITY

Presently we there is no lead cell for display


of load being lifted by EOT cranes of mill and new installation for safety and better
surface monitoring

Present there is no indication/alarm when


by mistake the dump body remain in up
position, this mat create a incident of
collision with overhead lines/pipe rakes(as NO indication available for dump box
happened in Zawar recently). position

Old Panel were not having gate and water


and dust gets ingress creating more
maintenance and breakdown of crane. The
safety was also issue as panel were having To replace the panels with new panels
openings having proper IP protected doors

Old hooks were not having latch facility as


they were in operation since inception and
earlier no provision available. So to meet
the crane safety guidelines we have
replaced the hooks with wire rope for
enhancing the crane safety and comply the In old hooks no latch fixing facility available
requirement and also hooks and wire rope was damaged

Old LRS was leaking and welding not


possible on body as it was corroded, also
the LRS was conventional type and now a
days Vapromatic type LRS are coming which
have better safety and reliability Old technology and less reliability and safety
Presently operator reported that while
moving towards the tailing battery and
mixing tanks they observed less illumination
and there is chance of slip as slurry spillage less illumination near valves of tailing
being available near r the valaves battery and mixing tanks

The light installed in grease and lubricant


room is not flame and is a safety threat as non flame proof light available in grease and
can be a factor for fire lubricant room
Operator not aware for tank empty, causing
crusher jam Display not available in control room

Structure is week Rusted & corroded

Manual lock is slipping Spring is not there


STONES ARE LAYING BETWEEN PULLEY &
CHUTE CHUTE DESIGN PROBLEM

Anything fall from 1085 conveyor No deck plate

No railing & toe guard Require for Safety

LADDER UNSAFE DESIGN TO BE MODIFY

It was unsafe to drain and area was spilling Area was getting slippery

The stand by zinc conc recirculation pump Leakage in the tech taylor valve, Sharp bend
was jamming frequently due to leakage in in common delivery line due to space
tech taylor valve. constraint.

Crusher crane current caring wheel wear so


supply wire frequently derail from wheel Supply carrying conductor derail from wheel
due to sudden jerk so crane tripped & not start

Improper delivery of lubrication compound.


High Vibration in Ball mill 2 NDE plummer Compound was getting discharged at one
block. side of girth gear.

Frequent leakage of MS feed nipple Tailing slurry wears out MS piping


In ckt -4 cleaner distribution box was over Over flowing of slurry due to slurry
flowing and spilling. deposition.
Belt conveyor 1085 to stop at proper Belt conveyor stop by operator from pull
position when magnet sensor alarm come card so belt stop far from position .

As per conveyor safety standard conveyor Old pull card switch provide at conveyor
guard provide along the belt so pull card not supporting frame & conveyor seal from
operate by person due to guard above pull guard so switch not operate by any person
card switch. due to inside

MCC gate is open inside so as per safety law


it should be open out side & gate must be Old gates not as per safety HZL safety
anti panic standards
If incident occur in cyanide area no
No Hooter alarm in sodium cyanide communication for calling

When sonolied valve operate from cycle for


No auto drainer system in compress air draining the water air was wastage with
storage tank water so energy loss in form of air

IN ISA control room AC out door unit was


installed at 4 mtr height from ground level Out door unit to be shift at ground floor
so it is unsafe for maintance of out door unit plate from
ARC flash dress kept in open so dust deposit
on dress & worn Dress to be kept in close glass Almira
Rescue hook to be kept with clamp in
No proper position of rescue hook in MCC approach area

Three phase supply given to drill m/c at


Drill m/c supply not having ELR system MCC from DOL feeder

Smoke deductor system not available in


No smoke deductor in MCC MCC if fire occur in electrical panel
LED light to be provide in pump area in
Low lux level in vacuum pump area place of HPMV light
Old wooden stand for battery bank was
damage due to wood damage from acid New RCC stand to be made

There were many joints for connection of


ball mill 4 pedestal fan and switch boards at
mill area the joints were unsafe

poor welding joint ,increase Hazard need some insulated joint


GET LIP plate of LH 410 crack ,lip not
available Lead time is to high
person working in line of fire as boom support available is low in height

PHC4 machine was tripping continuously


due to overheating and temperature was Why-why analysis done and found that
going beyond 72 degree centigrade. cooling efficiency of system is not adequate.

: Exploration drilling Machine U4 had got


over heating problems since many days Overeating issue

In this situation ,there was no any


arrangement to keep compressed cylinder
in safe manner in under ground garage and
there is risk of fall which may lead any
incident. Done

In this situation ,there was turbo charger


guard missing which acts as a heat shield
and there is risk of fire in machine which
may lead any incident. Done

In this situation ,when drill power cable is


laying on floor in unsafe manner and
connected in to get & box, for power
supply.then there is a chance, during
walking person leg's get touch with power
cable and may be dis balance and falls on
floor. Done

In this situation, metal plate as a joiner were


using and connect the welding holder lead
through nut & bolt. So there is high risk of
electrocution as well as fire risk Done

In this situation, ADM kept side of the


hydraulic hoses below AC box and due to
moisture and during washing water content
enters in it and makes it hang which lead to
stating problem. Previous location Of ADM
was located Done

In this situation, if 10 Amps fuse got blown


which is situated on ECM, it will be time
taking to replace and rectify the problem.
Here fuse is used for powering the ECM and
used as safety device for ECM. Done
The sudden fall of the scissor frame, in-case
loss of hydraulic pressure in the hydraulic
cylinder Done
Low visibility in U/G during machine
operation Done

We changed our rock bolts to bolt dia of 42


mm but earlier it was 36mm so we had no
setup to do the pull out test, which is a
statutory requirement. Done

M/s Samhita is the only authorized dealer of


ABB. We always take ABB VFD modules from
The vendor has quoted random initial prices this vendor only. We give focus on VFD
of VFD panels module and other high-value items.
presently no proper light provide on tank to
watch the sump level additional light to be provide

Presently no proper facility for shift the If any person slip in field & not move self
injured/ sick person from work site to safe than person wait for ambulance for first aid
palace in safe area

At Mill entrance many vehicle enter in mill


from main road & also bus park at same
Presently bus stop at the enter of mill area place due to drop & pick up of employee
& no signage for parking after duty
No provision for tail end side guarding in provide a new guarding at tail side of
conveyor belt conveyor
Abnormal sound coming in motor due to its new thread to be made/ locking
DE side fan cover bolt thread slip arrangement to be done

Existing bunker was not functioning well and


its structure was fully corroded Old design

As plant noise is there so when alerts being


discussed the voice of safety officer was not No speaker available for addressing mass
audible to all persons people to discuss safety alert

Old battery bank was fully damaged and


leaking also the size of stand was more and
problem comes while doing PMI Old design battery bank and problem in PMI
Shaft was exposed and guarding was Shaft guard not provided by pump
inadequate manufacturer
Spare contactor of one one size not viable
and P-54 urgently require to start spare not one to one fixing

Frequent burning of camera adapter Adapter was covered by only polythene


Root Cause Idea

The LI which have dual pack size identified


(confirmed for deletion), extended for RD
1. Material code not present in all plant mines plant code and the new PR made
code. 2. Less awareness about the packing with material code having dual pack in
size and the profit related to this. description.

CHANNEL WEARED RUBBER LINER FITTED

LAGGING NOT REPLACED TIMELY REPLACE PULLEY


G-80 modified with G-100 casing and
As spillage is more. impeller.
We have used 3/4 inch pipe for jam
Time taken for jam removal is high. removal.

pump running empty Level sensor fitted

Position of the valve was at such a point Valve can be fixed at position which is easily
that person had to go to FST to control it approachable for operator

MCC water pump starts in automation

Camera to be installed in the transformer


No immediate information for any line area crossing lines & view to be given in
leakage in fill plant control room control room

SIPX Dozing pump and reagent line jam To use a spare tank for dozing

absence of high efficient lights Install high efficient LED lights

Poor illumination after extended hours New LED lights to be installed

Improper mounting Proper mounting and hanging to be done


arrangement of new source for diesel pump
cable puncture for providing power to diesel pump
installation of siren by modifying the crane
no siren on crane circuit.

installation of tullu pump in trench with


water accumulation in cable trench level sensor controlled

Due to blasting at crusher chamber, small


flying stone particles were damaging cable Damage prevention of Trolley Cable

The bridge assembly was extended by in


house welding & use of a bigger cylindrical
pipe so that it can be fitted to exposed rock
bolt & start the pull out test of those
Design Competency Issue exposed rock bolts

Different colour coding of 1.8 m & 2.4 m


rock bolting with an identification mark
Difficulties in identifying the length of painted in yellow for 1.8 m & red for 2.4 m
grouted rock bolt at the tip of the rock bolt

cable is in the zone of getting hit by the to reroute the cable in such a way it is being
particle during blasting protected by the particle

Process improvement and safety of


equipment .
Drain valve removed and 3 inch socket and
Suction line jam plug fitted

To install a alternate drilling water


connection for VRM section from Surface to
No alternate means of water connection for have continuous water supply incase of
Shut down of Pumps Pump Maintenance in 0MRL

Machine have not provision to cover this Cover both the point such that no external
lugs. object hit the lug
Height of light position to be improve Height is increased

Screen where Out of view of operator for Monitoring to be done from control cabin
process handling room

Isolator pin sheared Repair/ replace the isolator pin

required for jam condition and tripping ampere observation was required for motor

Thermal relay taking mare time to trip Thermal relay replaced by electronic relay
Local control stop switch to be provided
Belt don't stop at proper place near operator desk

hammers are not been tracked fixing of stand for Hammer

Plastic hammer is now used rather than


metal hammer

More gap Gap between chute & pulley Reduce the gap or modify the chute

MOC NOT GOOD CHANGE THE MOC OF PIPE


For taking benefit of Advance deposit of Tax
Timely updation of Qtrly Return setoff by TCS

Yes, Make detail on 40 slide ppt which


include scrap, norm, COP and Inventory
trends Make HZL wise same format

To develop a reserve station in 125mRL in


Space constraint in 125 mRL the unused X Cut

To stick the reflector strip on surface

Thickness of mounting plate is low Change in thickness and mounting bolt


NEED TO PROTECT OR CHANGE THE
POSITION PROVIDE IT WITH GUARD
spillage of chemical hence corrosion coating with Pidilite floor fill

Rear Parking light mounting modification.

Reshuffling of oil room and container

broken by hitting stone MU antena position change in new ST1030

Two person is require for greasing


MT436B -03 Steering cylinder rod covered
design problem by conveyor belt.

dust seal not available Dust seal fitted in Bucket pin ST1030 -06

dust seal not available Wear out bucket pin and bushing
Painting Done in Brake metal pipe MT436B-
anti rust Painting is require 02

no mounting on upper side of radiator Radiator mounting modification in ST 7

Paint with jutes being used for marking To mark the faces using the spray paints
To use steel peg with the color for marking
Paints used for marking was erased of production drill holes

Cyclone water line reroute in ball mill feed


Cyclone water line jam chute

Water splash on the connectors due to


frequent cleaning of concentrate in the area

thickness of pipe reduced due to wear,


makes it hard to weld. clamping not possible Use of wrap seal which seals the leak with
near flanges. putty and covers the area with hard coating.

Manage the height of drill jumbo by


Less height of existing drive in 100mRL alternate tire size
to arrest the oil leakage by putting the metal
adhesive putty in the area identified to stop
gasket seal broken the leakage

auxiliary shaft is not connected to main to create a Wi-Fi network send the camera
shaft neither by OFC nor by wi-fi signal on mobile phone

Fittings are not available Make new one & modify the fittings

Shallow drive size causing slower production Stripping of 350m in 100mRL Main drive to
Rate facilitate more space in the drive

Installation of Booster Fan in 50mRL East


lode on top of 50 to -87mRL raise to
establish ventilation network resulting flow
No established Ventilation network rate upto 20 Cum/Sec

Attached in the doc Elimination and reduction of NVA

To drill a borehole from 195mRL to 180mRL


and thus used existing pipe of 195 MRL for
Filling in stope 351N-180mRL filling purpose

Power cable cant be drawn in ramp due to Erecting power cable through borehole from
movement of LPDT -65mRL to -87 MRL

To protect the plate in front of plate To install plate in front of the bolt

Unsafe crane and panels Safety improvement

To remove the settled slurry/mud and do


the civil PCC of area making the area fully
Low ground level of fill plant transformers dry during rainy season and any leakages
LPDT exhaust was directing towards side
wall and thus generating dust. Changing direction of exhaust.

Partition is to be provided in between


Engine is directly exposed to steering pumps engine and steering pump system to avoid
system. direct splash to engine.
INHOUSE 20MM PLATE PANEL
FIRST PANEL REQUIRE MORE THICHKNESS REPLACEMENT
To properly pack all waste material and than
Yes transport.

to shift on stand of approx. 6 inch to save


low height water ingress in it

Adequate no of telephone and telephone


lines were not available to take extra Re-use & diversion of existing extra nos at
numbers HEMM Junctions to UG

Stand not available Stand to be fabricated for safely

different light can be used Installation of green light

need to fix grating weld the grating at blind end of door

need to design ckt to check input voltage to


Ckt is not deigned in such manner zero

barricading to be provided so person can


work in safe zone if hemm take turn at
workshop chain barricading to be done
emergency switch to be provided at
control to be provided at lift platform

NEED TO PROVIDE GUARD FOLDABLE GUARD TO BE FITTED

Done Grease point provided in fan hub

Heavier weight was resulting in inability to Replacing the 6 inch foot valve to 4 inch foot
handle it properly. valve by providing a reducer nipple.

NO EXTRA LINE AVAILABLE EXTRA LINE TO BE PROVIDE

Installation of load cell in Mill EOT cranes for


old cranes do not have load cells display of Load being lifted by crane

Installation of proximity switch for providing


Dumper dump body positioning status in
siren to be given in driver cabin for alertness driver cabin by siren to enhance safety

Electrical damaged Panel replacement of 5


Damaged panels ton MCC side Crane

Replacement of 5 Ton MCC side and 5 Ton


Filter side crane lifting hook and wire rope
to enhance safety as latch were not
hooks and wire rope to be replaced available in old look

Replacement of OLD ball Mill 3 conventional


to be replaced by Vapromatic type , this type LRS by Vapromatic type LRS to save
type being first time used in HZL water leakage and enhance safety
Illumination improvement near Tailing
battery and cement mixing tanks to enhance
less illumination at working area safety while opening the manual valve

Installation of flame proof loght in grease


non flame proof light and lubricant room

Oil level indication to be provide New level sensor with indicator to be fitted

Require Strengthen Re strengthen the existing structure

Spring to be fitted New modify spring fitted

CHUTE DESIGN TO BE CHANGE CHUTE TO BE MODIFY

Deck plate Require New deck plate Fixed

Railing & toe guard require Railing & toe guard to be fixed

LADDER TO BE MODIFY LADDER REPAIRED

To change the direction on opposite side Drain plug direction changed

To place a separate line for both the pump.


1.Leakage in the tech taylor valve 2. Sharp Separate HDPE line laid for 7300 pump and
bend in common delivery line due to space existing line connected with 7719 after
constraint replacing the TT valve and bend.

Damage brass stud to be fill from brazing &


Wheel fixing stud damage due to sparking machining to be on stud & New bush to be
between wheel & stud as a gap increase & provide in brass wheel as per stud size so
wheel center is oval so during sudden brake clearance between stud & wheel become
of Long travel its wheel derail from wire so zero & wheel no tilt during sudden brake in
crane motor tripped on singl long travel .

Compound delivery header was displaced We made an arrangement to restrict


from its mean position. header's too and fro motion.

Tailing slurry wears out MS piping Replace feed nipple with HDPE spool piece
Box size was small. Slurry deposition was
more. Box height to be increased.
Belt stop far from position so conveyor take provide stop push button near operator so
more time to restart & production affected when alarm come immediate stop the belt
also some time iron piece go in crusher so by person & remove the foreign material
equipment may be damage. quickly

Shift all pull card switch above guard & re


Pull card switch location to be change routing the cable

Provide new aluminum gate which is open


out side Replacements of MCC gates

No hooter alarm to calling for help Provide a hooter in open area

No auto drainer system to reduce frequent


draining of water Provide auto drainer in storage tank

One stand made above one meter height


Out door unit to be shift at below area from ground & out door kept on this
Dress to be kept with hanger in hanging Procure the long Almira with front clean
position glass
New lamp to be made for rescue hook & clamp to mount on wall near approach area
discharge rod & kept in clamp

Provide the ELR system in DOL supply &


No provision of ELR in drill M/C tripping contact to be taken from ELR relay

Smoke /fire system to be provide at MCC & Provide smoke deductor & its alarm to be
chemical area where MIBC is used provide in control room
165 watt LED light to provide in place of 400
Low lux of HPMV light watt HPMV light

New stand to be made New RCC stand to be made

providing junction box with RCCB for power


supply and laying new armour cable for
more joints switch boards

joint not explore Joint to be explore

Lip failed from side Development of LIP


as boom stand height is low for regular use Need to have stand for working

Higher capacity of cooler is to be fixed in


Cooler efficiency required to be improved. system.

Replacement of existed Air cooler with


Jumbo machine Air cooler to control
Air cooler not functioning properly Hydraulic oil temperature

Sandvik team modify the safe & secure


Proper arrangement was not available at UG stand at HEMM workshop and shifted to
workshop for eliminating this type of risk. under ground garage.

Sandvik team modify the safe & secure


Spare was not available. guard at HEMM workshop .

There is no any cable routing arrangement Sandvik team modify this cover in house &
given to near get & box for power supply place it near GET & BOX.

There was no any provision given for


connect the welding holder at UG
workshop. After that we arranged the male
& female coupler along with aluminium lugs We modified the get end box and fixed at
and fixed in to plastic box, so welder can ea Sandvik UG workshop.

There was always starting problem due to


ADM not responding as it gets wet due to
water or hydraulic. Now it has kept in the
cabin behind the display by extending the We modified the harness & location of
wires. It will make machine mor ADM.

After modify the connector X3221 by


putting the 10 Amps MCB in front box ,
giving power to engine in case of tripping or
overcurrent easy to rectify and checking. We modified the get end box and fixed at
This will make no go chance for by Sandvik UG workshop.
No positive locking for that part provided Positive locking on multi mac

Low Visibility Fix Extra light

We have to procure new setup to do the


testing that would take time,so we modified We modified the old setup to carryout pull
our current setup by making some out testing of new and old rock bolts from
dimensional changes in the same setup. the same setup

We have placed 2 VFD panels order from


Dec'18 to Mar'19 so the BOM of present
We give focus on VFD module and other requirement can be compared with previous
high-value items. 2 BOMs.
New flame & dust proof LED light to be
provide on tank for watching the level

one starchier is kept in control room for


No provision of starchier emergency

Parking area to be shift from mill entrance &


No zebra signage on main Road zebra signage to be provide on main road
Clean the tail end area of conveyor Guarding Fabricated new guard at tail end for 360
to be done degree protection

Locking arrangement to be provide one clamp to weld & lock the fan cover

In house fabrication of New chute bunker


Inefficient chute bunker and installation

Introduction of Bluetooth based handy


portable Speaker not available speaker for safety alert discussion

New Fully compactable type bank mounted


Size was more and stand was not ok. Also in stand to be installed with SS links of
links were damaged battery
For covering the shaft mesh to be installed
manufacturer not provided the shaft gaurd for ensuring the guarding
Change in frame by drilling the new holes
unIdentical spare available and fix as per old bus bar dimesion

Fixing the adapter in Ip protected junction


water ingress of rain box
Result Achieved Counter Measure

For the particular PR by changing the


material code, there is a savings of INR Such type of material codes to be identified
49,605. and awareness to be given to the user.

STOP DAMAGE OF CONVEYOR OTHER AREAS

REPLACED 2-3 EARLY PLANT RUN IN B SHIFT

Spillage was not accumulated. Flow increased

It take less time for pump jam removal Time taken 15min initially it takes 1/2 hour.

Pump Performance increased operation hours minimised

New valve provided near P-47 pump from


where cyclone water can be controlled Water control become easy & extra water
easily injection to FST reduced

MCC water level always remains in control if No plant tripping due to fill plant MCC due
water enters the plant to water issues.

All three lines area clearly visible from All leakages immediately being captured
control room screen from control room itself without any delay.

Production not effected Production


Extra LED lights procured and regular
Improved illumination update to UG Electrical department

Improved illumination 3no LED lights provided


Chain welded to all gate end box and bolted
Less damage occurring in rock bolt
power given and started diesel pump cable joint to be made on cable coming
started from dg set
siren installed and it blows to alert person siren installation on crane for alertness to
working in the area persons working in the area

dry cable trench installation of tullu pump

Trolley Cable rerouting done and laid in


no damage till now in cable platform. mounting arrangement done.

Pull out test of exposed rock bolt


successfully done. The existing machine was
full utilized & enabling not to order a
specific machine for exposed rock bolt &
thus saving cost of a new machine which Extension of bridge assembly & use of
was to be procured bigger cylindrical pipe

Easy in differentiation in a particular face


even after the grouting

breakdown due to cable damage has been


reduced to zero

Process improvement .

suction line not jamming suction line not jamming.

Alternate water connection from the surface


line has been erected so to have continuous Alternate water connection with surface
water availability in VRM Section water line

Done
Checked visibility of operator is not
Range is changed from 25 mtrs to 30 mtrs disturbed .

1.Fast actionable from operator in overflow


and jamming. 2. Safety of chute from jam
and overflow avoiding. which enhances
running hours .

After fitting new pin , isolator switch work Now positive isolation is occurring
1. amperage reading available for record
and tripping
burning of motor of P-7 water recovery
pump is 0 Motor changing is zero

Belt stopped at proper position

Fixing of hammer at its position ,hammer


Easily traceable hammers , identification , stand made in such way that hammer are to
storage ,inspection be kept at its position only

Financial benefit achieved Plastic hammer used

Reduce the gap Less jamming

BALLOW HOSE REPLACED NO LEKAGE


Updation of TCS of Rs 13.26 Crores for RDM Updation of TCS amount, Working capital
in HZL 26AS reduction

Sep-18 BMG presentation made in same


fashion Timely reporting of information

Reserve station developed in 125 mRL Development of reserve station in 125mRL

Smooth parking achieved


change of size of plate and mounting bolt
No failure after modification strength

ZERO DAMGE TO SYSTEM PROVIDED WITH 12 MM PLATE


No accumulation of spillage, fast cleaning of
the floor NA

done 03 TRUCKS

Done in all new ST1030

Done in all new ST1030

only one person is require for greasing

Done 03 MT436B

AWAITED

AWAITED

Completed

successful working

Grade & center line is now clearly indicated

Implemented in -23mRL P5 stope

Now water volume was sufficient & sump Cyclone water line reroute in ball mill feed
jam not occur chute. Now water addition in control

Fast leakage arresting and good reliability

Drill Jumbo crossed the constraint area


without damage NA
complete oil leakage has been arrested regular monitoring

successfully taken the camera monitoring on


mobile phone

Centrifuge installed Oil filtration started

260 m of Stripping has been completed

Fan installation successful and air current is Installation of Booster Fan in 50mRL East
24 Cum/sec lode on top of 50 to -87mRL
Improvement actions identified and in
progress

Filling completed in a shortest time & no To drill a borehole from 195mRL to 180mRL
additional manpower was required and and thus used existing pipe of 195 MRL for
HDPE pipe of 500m length was saved filling purpose

Erecting power cable through borehole from


Commissioning of Jumbo-3rd Dec -65mRL to -87 MRL

Safety achieved MS plate installed

Retrofitting of non flame proof crane y


Safety and reliability flame proof

Civil PCC the area and install the tullu pump


During heavy rain the transformers do not with level sensor to immediately remove the
got submerged/tripped accumulated water.
Exhaust diverted towards back side and thus
less dust generation. Exhaust modified.

Oil is not coming directly to engine and


hazard of equipment fire eliminated.

OK LIFE OF FIRST PANEL

Yes PP Bags started using for waste collection.

machines shifted and water while hosing


will not ingress

1.Use of Old line to transfer numbers into


UG & laying of new 20 pair cable from
HEMM junction box to shaft inset 2. Taking
of these extra numbers to 250 mRL inset 3.
Laying of new cable from 250 mRL inset to
1900 Grid & distribution to 300, 269,285,
236 mRL with new telephone cables 4.
Fixing of IP65 weather proof telephone
5 New numbers been given in NL handset at all levels of NL

safe and proper stand no wooden support

When machine move in front away from


person green light will work ,allow person to
move in direction .when machine move in
backside it become complete red stop
person to move in direction To be checked in maintenance

grating is fixed at door step need to check for grating always

achieved implementation of new pilot ckt

person working inside the chain new passing bay to be create


able to switch off engine from platform in
case of emergency need to check ckt in fix interval

ZERO DAMAGE AFTER FITMENT --

Yes --

Now it became very easy to handle and


maintain the foot valve , as 4 inch foot valve
is a standard valve present at the mine.

CONTINUOUS FILLING PROVIDED FII RUNNINH HR TO BE INCREASE

installation of load cell completed NA

Installed on reject handling dumper NA

New panel for MCC side 5 ton crane


installed and checked running success fully NA

hooks and wire rope replaced NA

LRS replaced NA
Illumination improved and better working
atmosphere NA

Installation of flame proof light in in grease


and lubricant room done NA

Oil display visible to operator desk. display is showing

ok having higher strength

ok Not slipping

DONE NO JAMMING

Ok ok

done ok

OK OK

Area became safe to work Area clean

No jamming and leakage from the pump

After modify in wheel & stud crane running Current carrying wheel new brass bush fixed
smoothly from last 15 days without tripped as per stud size .

Uniform greasing throughout the girth gear


and hence reduced vibration in plummer
block.

No leakage in last 2 months

NO spillage No leakage
After provision of emergency stop belt stop Restart time reduce after magnet alarm &
near field operator production increase

New switch provide above guard post &


cable rerouting done New pull card with indication provide

MCC gate replace which is open out side NA

Now hooter in working in emergency NA

Now when drainer is full from water than


valve operate & no wastage of air frequently NA

stand made & shift out door unit now work


at height job eliminated NA
All type of dress ( 100k , 40k , 8 K ) is kept in
glass Almira NA

both rod fixed in clap with tagging NA

New wiring done & tripping taken in line NA

Smoke deductor sensor provide in MCC &


chemical area its control panel & hooter
provide at control room. All MCC of mill area

Lux improve from 36 to 127 NA


New RCC plate form was very safe for
maintance work NA

electrical safety enhancement of mill area NA

zero cable joint need to check periodically

LIP received Checking as per Stand


no work under machine use as per requirement

Temperature difference increased from 8


degree to 14 degree. Higher capacity of cooler installed in system

drilling increased replacement of cooler

Falling risk eliminated. Modify the safe & secure stand

Fire risk eliminated. Modify the safe & secure guard

1. Slip/trip risk eliminated. 2. 5'S


improvement. Modify this cover in house

Modified the get end box and fixed at


Electrocution & fire risk eliminated. Sandvik UG

It will make machine more productive. Modified the harness & location of ADM

1. The modified circuit will make the


machine reliable by making easy to trace
the problem and rectify. 2. This will make no
go chance for bypassing the fuse as fuse will Making easy to trace the problem and
be eliminated from the circuit. rectify
Positive locking system prevents the sudden
fall of the scissor frame, in-case loss of
hydraulic pressure in the hydraulic cylinder --

Improved Visibility Fix extra light

The change in setup will help us meet the


statutory requirement for pull testing.(10 % Modified current setup by making some
of installed rock bolts to be tested). dimensional changes in the same setup.

After comparing the BOM and negotiating


with the vendor 33% savings achieved from Panels BOM to be compared before
the initial quoted price. negotiating with the vendor.
Light provide at sump tank so better level to
be measure

Procure fordable starchier & kept in each


control room

Bus parking area shift from mill entrance


gate to avoid incident

360 degree guarding done in conveyor belt

Abnormal sound stopped

better efficiency of chute with minimal


spillage NA

better communication between workforce


while alert discussion NA

in less area installed and easy ness in


checking the voltage and easy PMI NA
Guarding of shaft done and safety increased
up NA
P-54 panel made ready for operation NA

stoppage of burning of camera adapter NA


Scope for Horizontal Deployment Registration Date Kaizen Initiated Kaizen Completed

In all location and to the persons who make


PR of cartridges. 17-May-18 11-May-18 17-May-18

ALL OTHER AREAS 10-Jul-18 28-Jun-18 28-Jun-18

OTHER AREAS 10-Jul-18 4-Jul-18 4-Jul-18

In pump area 18-Jul-18 18-Jul-18 18-Jul-18

Other pumps 18-Jul-18 13-Jul-18 13-Jul-18

Dewatering areas 24-Jul-18 21-Jul-18 22-Jul-18

NA 24-Jul-18 2-Jun-18 6-Jun-18

NA 24-Jul-18 19-Jun-18 23-Jun-18

NA 24-Jul-18 14-Jul-18 17-Jul-18

For another reagents. 24-Jul-18 18-Jul-18 19-Jul-18

Less illuminated sites 26-Jul-18 26-Jul-18 26-Jul-18

Any area with less illumination 26-Jul-18 24-Jul-18 24-Jul-18

All gate end box 26-Jul-18 10-Jun-18 10-Jul-18


NA 27-Jul-18 13-Jul-18 13-Jul-18

on other cranes 27-Jul-18 18-Jul-18 18-Jul-18

na 27-Jul-18 2-Jul-18 2-Jul-18

Any Crane with such problem 1-Aug-18 15-Jul-18 22-Jul-18

Can be deployed in all the units of HZL &


other UG Mines across Vedanta 7-Aug-18 25-Jul-18 30-Jul-18

Can be deployed in any UG Mines across


Vedanta 7-Aug-18 13-Jun-18 28-Jul-18

NA 18-Aug-18 1-Aug-18 4-Aug-18

Already have density in both lines. 20-Aug-18 14-Aug-18 17-Aug-18

P-53 pump 23-Aug-18 3-Aug-18 3-Aug-18

All UG Mines Across Vedanta 27-Aug-18 21-Aug-18 24-Aug-18

Across HZL welding equipment 9-Sep-18 2-Sep-18 2-Sep-18


Yes 17-Sep-18 10-Sep-18 10-Sep-18

Can be done for other conveyor chute. 17-Sep-18 11-Sep-18 11-Sep-18

Ball Mill-3 17-Sep-18 6-Sep-18 6-Sep-18

Already done for other motor 17-Sep-18 7-Sep-18 7-Sep-18

All dewatering pumps 17-Sep-18 3-Sep-18 3-Sep-18

Every conveyor where magnet is placed 17-Sep-18 6-Sep-18 6-Sep-18

at all hemm 19-Sep-18 17-Sep-18 19-Sep-18

In each mine 22-Sep-18 17-Sep-18 21-Sep-18

All other discharge chute 24-Sep-18 19-Sep-18 19-Sep-18

IN ALL OTHER CIRCUIT 24-Sep-18 6-Sep-18 6-Sep-18

Continuous updation for next period 26-Sep-18 1-Jun-18 28-Aug-18

Another cost elements 26-Sep-18 1-Sep-18 6-Sep-18

Applicable to all UG Mines across Vedanta 27-Sep-18 26-Sep-18 26-Sep-18

All mines 28-Sep-18 20-Aug-18 23-Aug-18

All MT436 B with Cummins engine 28-Sep-18 12-Aug-18 12-Aug-18

IN ALL NEW st1030 28-Sep-18 19-Jul-18 19-Jul-18


Oil room 28-Sep-18 15-Sep-18 20-Sep-18

All Mines across HZL 28-Sep-18 18-Jul-18 19-Jul-18

All the Mines Across HZL 28-Sep-18 20-Aug-18 1-Sep-18

All the Mines Across HZL 28-Sep-18 25-Jul-18 25-Jul-18

All the Mines across HZL 28-Sep-18 25-Aug-18 25-Aug-18

All Mines across HZL 28-Sep-18 26-Sep-18 26-Sep-18

All the Mines across HZL 28-Sep-18 27-Sep-18 28-Sep-18

All the Mines across HZL 28-Sep-18 27-Sep-18 27-Sep-18

All the Mines across HZL 28-Sep-18 26-Sep-18 26-Sep-18

All the Mines across HZL 28-Sep-18 12-Aug-18 12-Aug-18

All the Mines across HZL 29-Sep-18 1-Aug-18 27-Sep-18

All the UG mines across Vedanta 29-Sep-18 22-Aug-18 26-Sep-18

NO 29-Sep-18 5-Sep-18 15-Sep-18

Welding machine at flotation 30-Sep-18 1-Sep-18 5-Sep-18

All slurry pipelines 30-Sep-18 1-Sep-18 3-Sep-18

yes 4-Oct-18 4-Oct-18 4-Oct-18

Depend up on particular case 25-Oct-18 2-Sep-18 4-Sep-18


may be applied very similar leakage in oil
from transformer 26-Oct-18 18-Oct-18 21-Oct-18

may be used as per requirement 26-Oct-18 1-Oct-18 10-Oct-18

In all Crusher 28-Oct-18 15-Oct-18 15-Oct-18

All the Shallow drives in UG Mines across


Vedanta 20-Nov-18 25-Sep-18 4-Oct-18

All the UG Mines in Vedanta 20-Nov-18 17-Oct-18 23-Oct-18

All the Mines of HZL 23-Nov-18 17-Aug-18 22-Nov-18

All the Mines of HZL 24-Nov-18 10-Nov-18 24-Nov-18

All the Mines Across HZL 5-Dec-18 20-Nov-18 3-Dec-18

All MINES 12-Dec-18 9-Dec-18 11-Dec-18

SKM reagent area 24-Dec-18 15-Dec-18 18-Dec-18

NA 24-Dec-18 17-Dec-18 24-Dec-18


Can be implemented in same model at
other mine site. 4-Jan-19 7-Sep-18 20-Nov-18

Can be implemented in other MT436. 4-Jan-19 20-Dec-18 22-Dec-18

OTHER SCREEN 7-Jan-19 20-Dec-18 20-Dec-18

Yes. 19-Jan-19 14-Jan-19 17-Jan-19

all areas of mill 22-Jan-19 21-Jan-19 22-Jan-19

South _East Lode 28-Jan-19 1-Jan-19 20-Jan-19

For all radiator mask 29-Jan-19 27-Jan-19 28-Jan-19

in all LHD /LPDT 29-Jan-19 18-Jan-19 19-Jan-19

no 29-Jan-19 20-Jan-19 20-Jan-19

all jumbo across HZL 29-Jan-19 8-Jan-19 9-Jan-19

all such location 29-Jan-19 21-Jan-19 21-Jan-19


in all multimech 30-Jan-19 8-Jan-19 9-Jan-19

IN ALL SL 30-Jan-19 17-Jan-19 18-Jan-19

Yes 30-Jan-19 28-Jan-19 29-Jan-19

at the 100 North Pump House 31-Jan-19 8-Jan-19 15-Jan-19

NA 10-Feb-19 4-Feb-19 6-Feb-19

All Mill EOT cranes already covered 18-Feb-19 1-Jan-19 17-Feb-19

All Mill Dumpers 18-Feb-19 14-Feb-19 15-Feb-19

Filter side 5 ton crane 18-Feb-19 1-Dec-18 1-Feb-19

NA 18-Feb-19 1-Dec-18 10-Jan-19

Ball Mill 2 & 1 18-Feb-19 15-Dec-18 16-Dec-18


NA 18-Feb-19 7-Feb-19 10-Feb-19

all flammable liquid rooms/area 18-Feb-19 10-Feb-19 11-Feb-19

ok 19-Feb-19 8-Feb-19 8-Feb-19

Other structure 19-Feb-19 1-Feb-19 5-Feb-19

Other crushers 19-Feb-19 11-Feb-19 11-Feb-19

OTHER CHUTES 24-Feb-19 22-Feb-19 22-Feb-19

In Other Conveyors 24-Feb-19 19-Feb-19 19-Feb-19

In Other areas 24-Feb-19 20-Feb-19 20-Feb-19

IN OTHER AREAS 24-Feb-19 21-Feb-19 21-Feb-19

in other mixing tank 8-Mar-19 1-Mar-19 1-Mar-19

NA 8-Mar-19 20-Feb-19 21-Feb-19

All Without DSL system crane . 9-Mar-19 22-Feb-19 23-Feb-19

Ball mill 1,3,4 9-Mar-19 8-Mar-19 8-Mar-19

None 9-Mar-19 1-Feb-19 5-Feb-19

In other distribution box 11-Mar-19 1-Mar-19 2-Mar-19


where metallic sensor installed in belt
conveyor 13-Mar-19 22-Nov-18 22-Nov-18

All conveyor in mill area 13-Mar-19 14-Dec-18 14-Dec-18

DG set MCC 13-Mar-19 12-Oct-18 13-Oct-18


Remote critical area where person not
available 14-Mar-19 16-Oct-18 18-Oct-18

All compress air storage tank 14-Mar-19 4-Dec-18 5-Dec-18

Out door unit to be shift above one meter


height in Mill office & PDO control room 14-Mar-19 30-Oct-18 30-Oct-18

DG set sub station 14-Mar-19 20-Nov-18 20-Nov-18

DG set sub station 14-Mar-19 24-Oct-18 24-Oct-18

portable equipment in mill area welding m/c 14-Mar-19 4-Dec-18 4-Dec-18

All MCC 17-Mar-19 26-Oct-18 2-Nov-18

All plant area 17-Mar-19 7-Dec-18 7-Dec-18

MCC room Battery bank 17-Mar-19 18-Dec-18 20-Dec-18

NA 18-Mar-19 28-Dec-18 29-Dec-18

all workshop 28-Mar-19 13-Mar-19 15-Mar-19

All GET Buckets 28-Mar-19 6-Mar-19 27-Mar-19


at all sites 28-Mar-19 26-Mar-19 27-Mar-19

Yes as per requirement. 28-Mar-19 26-Mar-19 28-Mar-19

In all mines 1-Apr-19 27-Mar-19 28-Mar-19

Can be implemented in same model at


other mine site. 30-May-19 12-Apr-19 14-Apr-19

Can be implemented in same model at


other mine site. 30-May-19 15-Apr-19 17-Apr-19

Yes 30-May-19 5-May-19 7-May-19

Yes 30-May-19 21-Apr-19 24-Apr-19

Yes 30-May-19 21-Apr-19 24-Apr-19

Yes 30-May-19 3-May-19 5-May-19


Yes 30-May-19 16-May-19 18-May-19

Yes 31-May-19 2-May-19 4-May-19

Yes 31-May-19 28-May-19 30-May-19

Yes 15-Jun-19 31-May-19 10-Jun-19


LED light to be provide on all sump to check
the level 28-Jun-19 22-Jun-19 23-Jun-19

all control room in plant 29-Jun-19 15-May-19 15-Jun-19

Zebra signage to provide on all bus pick up


& dropped out area 29-Jun-19 28-May-19 30-May-19
all conveyor belt at tail end pulley , tack up
pulley & feed side pulley 29-Jun-19 25-Apr-19 26-Apr-19
where approach not available clap may be
provide for stopping the vibration 29-Jun-19 21-May-19 21-May-19

NA 29-Jun-19 2-Jun-19 5-Jun-19

provided one no. to mines also 29-Jun-19 8-May-19 10-May-19

NA 29-Jun-19 15-Jun-19 17-Jun-19

in all chemical pumps 29-Jun-19 18-Jun-19 19-Jun-19


NA 29-Jun-19 5-Jun-19 6-Jun-19

where cameras are installed in open 30-Jun-19 13-Jun-19 13-Jun-19


Production Quality Cost Safety Delivery Morale Financial Benefit

NO NO Yes NO NO NO 0.5

Yes NO NO Yes NO NO 0

Yes Yes NO Yes NO NO 200000

NO Yes NO Yes NO NO 0

NO Yes NO Yes NO NO 0

Yes Yes NO Yes NO NO 0

Yes NO NO Yes NO NO 0

Yes NO NO Yes NO NO 0

Yes NO NO Yes NO NO 0

Yes Yes NO NO NO NO 0

NO Yes NO Yes NO Yes 0

NO Yes NO Yes NO NO 0

NO Yes NO Yes NO Yes 0


Yes NO Yes NO NO NO 10

NO NO NO Yes NO NO 0

NO NO Yes Yes NO NO 0

NO Yes NO Yes NO NO 0

NO NO Yes Yes NO NO 1

NO NO NO Yes Yes NO 0

NO Yes NO NO NO NO 0

Yes NO NO Yes NO NO 200000

NO Yes NO Yes NO NO 0

Yes NO Yes NO NO Yes 0

NO NO NO Yes NO NO 0
Yes Yes NO Yes Yes Yes 0

Yes NO NO Yes NO NO 90000

NO NO NO Yes NO NO 0

Yes NO NO Yes NO NO 0

NO Yes NO Yes NO NO 100000

Yes NO NO Yes NO NO 0

Yes Yes Yes Yes Yes Yes 0

NO Yes Yes Yes NO NO 0.96

NO Yes NO Yes NO NO 50000

NO Yes NO Yes NO NO 0

NO Yes Yes NO NO Yes 0

NO Yes NO NO Yes Yes 0

Yes NO Yes NO NO NO 5

NO Yes NO NO NO NO 0

Yes Yes Yes Yes Yes Yes 1.86

Yes Yes Yes NO NO NO 6.3


NO Yes NO Yes NO NO 0

NO NO Yes NO NO Yes 11.16

NO NO NO NO NO Yes 0

NO NO Yes NO NO NO 1.5

NO NO Yes NO NO NO 3

Yes NO Yes NO NO NO 12

Yes NO NO NO NO Yes 0

Yes NO NO NO NO Yes 0

NO NO Yes NO NO Yes 3

NO NO Yes NO NO NO 2

NO Yes NO NO NO NO 0

Yes NO NO NO NO NO 0

NO NO Yes NO NO NO 1

NO NO NO Yes NO Yes 0

Yes Yes NO Yes NO NO 0

Yes Yes Yes Yes NO Yes 0

NO Yes NO Yes Yes Yes 0


Yes Yes Yes Yes NO NO 3

NO Yes NO Yes NO NO 0

NO Yes NO Yes NO NO 0

Yes NO Yes Yes NO Yes 0

Yes NO Yes Yes Yes Yes 0

Yes Yes Yes NO Yes Yes 0

Yes Yes Yes NO Yes Yes 0

Yes NO Yes NO NO NO 520000

NO NO NO Yes NO NO 0

NO NO NO Yes NO NO 0

Yes NO Yes Yes NO NO 110


NO Yes NO Yes NO NO 0

NO NO NO Yes NO NO 0

NO Yes Yes NO NO NO 0

NO Yes NO Yes NO NO 0

NO NO NO Yes NO NO 0

Yes NO NO NO Yes Yes 0

NO NO NO Yes NO NO 0

NO NO NO Yes NO NO 0

NO NO NO Yes NO NO 0

NO NO NO Yes NO NO 0

NO NO NO Yes NO NO 0
NO NO NO Yes NO NO 0

Yes NO Yes Yes NO NO 2

NO Yes NO NO NO NO 0

NO Yes NO Yes NO NO 0.2

Yes Yes NO Yes NO NO 0

NO NO NO Yes NO NO 0

NO NO NO Yes NO NO 0

NO NO NO Yes NO NO 0

NO NO NO Yes NO NO 0

NO Yes NO Yes NO NO 0
NO NO NO Yes NO NO 0

NO NO NO Yes NO NO 0

NO Yes NO Yes NO NO 0

NO Yes NO Yes NO NO 0

Yes Yes NO Yes NO NO 0

Yes Yes NO Yes NO NO 0

NO Yes NO Yes NO NO 0

NO Yes NO Yes NO NO 0

NO Yes NO Yes NO NO 0

NO Yes NO Yes NO NO 0

Yes Yes NO Yes NO NO 0

Yes Yes NO Yes NO NO 0

Yes NO NO Yes NO NO 0

Yes NO NO Yes NO NO 0

NO Yes NO Yes NO NO 0
Yes Yes NO Yes NO NO 0

NO Yes NO Yes NO NO 0

NO NO NO Yes NO NO 0

NO NO NO Yes NO NO 0

NO Yes NO Yes NO NO 0

NO NO NO Yes NO NO 0

NO Yes NO Yes NO NO 0

NO Yes NO Yes NO NO 0

NO NO NO Yes NO NO 0

NO Yes NO Yes NO NO 0

NO Yes NO Yes NO NO 0

NO Yes NO Yes NO NO 0

NO NO NO Yes NO NO 0

NO NO NO Yes NO NO 0

NO NO Yes NO Yes NO 2
NO Yes NO Yes Yes Yes 0

NO Yes NO Yes NO Yes 0

NO NO Yes Yes Yes NO 0

NO NO NO Yes NO Yes 0

NO NO NO Yes NO Yes 0

NO NO NO Yes NO Yes 0

NO NO NO Yes NO Yes 0

Yes Yes NO NO Yes NO 0

Yes NO NO Yes NO Yes 0


NO NO NO Yes NO Yes 0

NO NO NO Yes NO NO 0

NO Yes NO Yes Yes NO 0

NO NO Yes NO NO NO 4.76

NO NO NO Yes NO NO 0

NO NO NO Yes NO NO 0

NO NO NO Yes NO NO 0

NO NO NO Yes NO NO 0

NO NO NO NO NO Yes 0

NO NO NO Yes NO NO 0

NO NO NO Yes NO NO 0

NO NO NO Yes NO NO 0

NO NO NO Yes NO NO 0
NO NO NO Yes NO NO 0

NO NO NO Yes NO NO 0
ViewKaizen

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=6329
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=6938
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=6939
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=6994
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=6995
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7018

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7020

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7021

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7022
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7023
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7028
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7034
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7035
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7054
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7055

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7056

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7133

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7163

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7164

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7211

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7213
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7234

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7253

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7360
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7416

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7417

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7419
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7420
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7421
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7422

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7441

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7505
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7529
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7530
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7555

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7556

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7589
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7598
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7600
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7601
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7602
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7603
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7604
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7605
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7606
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7607
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7608
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7609
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7610
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7611

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7615
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7616

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7633

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7647

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7649

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7702
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7911
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7923

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7924
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=7936

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=8100

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=8101
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=8130

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=8144

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=8285

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=8372

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=8538

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=8540
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=8703

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=8705
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=8733
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=8833

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=8845

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=8919
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=8923

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=8926
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=8928

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=8930

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=8931
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=8943
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=8944
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=8955

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=8961
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9070

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9109

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9110

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9111

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9112

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9113
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9114

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9115
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9118
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9119
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9120
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9184
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9185
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9186
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9187
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9354

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9355

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9367

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9369
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9371
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9377
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9400

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9401

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9402
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9404

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9405

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9407
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9408
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9409

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9410

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9421
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9422
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9423

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9424
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9511
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9512
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9514

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=9529

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=10602

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=11913

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=11914

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=11915

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=11916

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=11919

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=11920
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=11922
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=11929

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=11940

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=12037
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=13059

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=13085

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=13087
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=13091
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=13095

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=13100

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=13103

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=13106
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=13110
https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=13111

https://ziep.hzlmetals.com/Pages/ViewKAIZ
EN.aspx?kaizen_Id=13138

Das könnte Ihnen auch gefallen