This document provides an environmental, health and safety risk assessment for coring works. It identifies potential hazards to personnel from activities like working with power tools. Hazards include excessive noise and dust, ergonomic issues, electrical shocks, and potential for fire or burns. For each hazard, existing controls are identified like training, PPE use, and tool maintenance. Initial and residual risk levels are evaluated. Actions to reduce risk are also outlined, such as full supervision, ensuring defective tools are reported, and continuous monitoring. The assessment references Abu Dhabi environmental, health and safety policies and legal requirements that must be followed.
This document provides an environmental, health and safety risk assessment for coring works. It identifies potential hazards to personnel from activities like working with power tools. Hazards include excessive noise and dust, ergonomic issues, electrical shocks, and potential for fire or burns. For each hazard, existing controls are identified like training, PPE use, and tool maintenance. Initial and residual risk levels are evaluated. Actions to reduce risk are also outlined, such as full supervision, ensuring defective tools are reported, and continuous monitoring. The assessment references Abu Dhabi environmental, health and safety policies and legal requirements that must be followed.
This document provides an environmental, health and safety risk assessment for coring works. It identifies potential hazards to personnel from activities like working with power tools. Hazards include excessive noise and dust, ergonomic issues, electrical shocks, and potential for fire or burns. For each hazard, existing controls are identified like training, PPE use, and tool maintenance. Initial and residual risk levels are evaluated. Actions to reduce risk are also outlined, such as full supervision, ensuring defective tools are reported, and continuous monitoring. The assessment references Abu Dhabi environmental, health and safety policies and legal requirements that must be followed.
Initial Risk Actions to be taken Residual Risk Policy / Legal &
Personnel at Risk / Sig. Sig./ S/N Activity Hazard Existing Controls Evaluation RL (procedures, training, Evaluation RL Other Environmental Impacts / NS NS S P inspections, drills, etc.) S P Requirements 1.Training and Orientation AD EHSMS – Excessive Noise and Operatives or 2.Equipping staff with 1.Full time supervision must be CoP – 3.0 Sig 3 1 3 2 1 2 Dust Supervisor P.P.E (Ear Plugs and available at work area. AD EHSMS – Safety goggles and CoP – 02 Facemask). 1.Training and Orientation 1.Ensuring defective tools are properly labeled and AD EHSMS – 2.Equipping staff with maintained(Report for defects) CoP – 3.1 Ergonomic Operatives P.P.E. Sig 3 1 3 2 1 2 AD EHSMS – 2.Continous monitoring CoP – 02 3.Ensuring staff using the equipment are qualified. Working with Portable AD EHSMS – 1 1.Training and Orientation Power Tools CoP – 35.0 AD EHSMS – 2.Ensuring staff using the 1.Ensuring defective tools are CoP – 02 equipment are qualified properly labeled and reported AD EHSMS – Electrical Shocks Operatives Sig 3 1 3 for repairs or replacement 2 1 2 CoP – 15.0 3.Ensuring tools are in AD EHSMS – good working condition by 2.Equipping staff with P.P.E CoP – 21.0 constant checking and calibration.
1.Training and Orientation AD EHSMS –
CoP – 35.0 1.Ensuring defective tools are Potential Source of Fire 2.Equipping staff with AD EHSMS – Operatives Sig 3 1 3 properly labeled and reported 2 1 2 / Burns P.P.E CoP – 02 for repairs or replacement AD EHSMS – 3.Ensuring staff using the CoP – 21.0
Legend: S – Severity; P – Probability; RL – Risk Level (SxP); Sig – Significant; NS – Non-Significant
Code (alpha-numeric): E – Environmental; OHS – Occupational Health & Safety
Register Title: Environmental, Health and Safety Risk Assessment for Coring Works Version No.: V0.1
Register Ref. No.: HA-RG-RA-007 Page 2/2
Initial Risk Actions to be taken Residual Risk Policy / Legal &
Personnel at Risk / Sig. Sig./ S/N Activity Hazard Existing Controls Evaluation RL (procedures, training, Evaluation RL Other Environmental Impacts / NS NS S P inspections, drills, etc.) S P Requirements equipment are qualified
4.Ensuring tools are in
good working condition by constant checking and calibration 1.Training and Orientation AD EHSMS – CoP – 14.0 2.Equipping staff with AD EHSMS – Manual 2 Body Pain Operatives P.P.E Sig 3 1 3 1.Traing & Supervision 2 1 2 CoP – 02 Handling AD EHSMS – 3.Ensuring heavy load to CoP – 21.0 be carried by two staff . 1.Barricade the area prior to start the coring works
Injury to workers due to 2.Only trained and
experienced operatives 1.Continous monitoring AD EHSMS – 1.Falling of objects sfter are allowed to perform the CoP – 02 coring. coring works. 2.Prestart briefing to be 3 Coring works Operatives/Visitors Sig 3 2 6 completed prior to start the 2 1 2 AD EHSMS – 2.Fingers getting 3.Appropriate P.P.E to be work. CoP – 35 crushed used. 3.Full time supervision. 3.Flying objects 4.Proper barrication and signage to be provided under the coring location with adequate signage.