y ha
PT. PERTAMINA EP
ASSET 2
DOCUMENT TITLE :
DOC. NO
PROJECT NAME
INSPECTION TEST PLAN
+ PSTT-00-LO-ITP-001,
: PEMBANGUNAN JALUR TRUNKLINE SP-SP TALANG JIMAR FIELD
PRABUMULIH PT. PERTAMINA EP ASSET 2
Ten
=
Di revone
fap
ema pe
i
7 bre| Cars| remeron — |p — fp es
Bi | IFA 04 Mar 19) Re-lssued For Approvel EF
B | IFA 21 Feb 19 Issued For Approvel E <=
at [FR | 2tven19 Re-lssued For Review Ze SS
A_[_ ER Tian 18 Issued For Review x &
Rev | Status | Issue Date Reason for Issue Preneted | Ghretet eePUTT-O0-LO-ITP-00T
PEMBANGUNAN JALUR PROSEDUR 20 Maret 2019
“TRUNKLINE SP-SP TALANG PENYAMBUNGAN PIPA Rev. 0
JIMAR FIELD PRABUMULIH PT.
eR opaee ee hasel a MECHANICAL DOC. Page 2 of 5
REVISION MODIFICATION LOG
‘Approved For Construction
Revision | Section Description
A ‘All___| Issued for Review
AL All__| Ressued For Review
B ‘Al | '88ued For Approval
Bt ‘All| Re-lssued For Approval
0 All‘SES882e882 | ozpzeteg
pee
eel eee
a eee Sree ereroa | aoa eed
| ee
ee ee eee es
ae SS Sse os ee ae
— ‘euamg souRKiecoy Pannbey yusuincog
Saree ae
a : Sonam:
na f eeu."
ence fear
NOLLWOILYS9 SYOIN SNMadid SSVIOUSaLs
Nv 1d Sa ONV NOLLOZdSNIPEMBANGUNAN JALUR, PROSEDUR PITT-OO-LOATP-007
‘TRUNKLINE SP-SP TALANG PENYAMBUNGAN PIPA, aoe a
sIMMAR FIELD PRABUMULI PT. Rev.
PERTAMINA EP ASSET 2 TEeuCRtaeee eaaee
DEFINITIONS:
MONITOR (M)
‘Work in-process proceeds but an Inspector may invoke inspection by attributes as necessary.
Also known as “Patrol Inspection’.
WITNESS (W)
Work in process may not proceed beyond this stage without inspection or an authorized waver
from the client. Usually applied to a mandatory production check where third pdrty verification may
be required. A 48 hour notification period will be given and if no attendance by the
Company/Certifying authority within that period, work will continue.
Hold point (H)
‘The stage in the manufacturing process where inspection or test must be undertaken before
work may proceed. Applied to activities such as final test, acceptance tests or mandotary safety
checks. A 48 hour notification period will be given and if no attendance by the Company/Certifying
authority within that period, work will continue.
REVIEW (R)
Review instruction / documentation / comment / approval,
VERIFY (V)
Defined as steps in manufacturing and testing whereby Company's Quality Representative,
through verification, shall confirm by examination and provision of objective evidence that specified
inspections, manufacturing steps, testing or document requirements have been fulfilled.
PERFORM AND PROVIDE (P)
‘The Execution of sscope of work and An activity to create and deliver a document for review and/or
approval
‘SPOT WITNESS (SW)
Spot Witness is a point during construction activities where measurement, witnessing of work or
inspection normally takes places
‘SURVEILLANCE/INSPECTION
The Purpose of inspection to put together a single document that record all inspection and inspection
requirement relevant to a specisific process