Opoko Benjamin 5 Oceon Office Sunday 3 February 2019 Department: Engineering Level: Contract
MANHOURS PER DAY Lead Lead
Project No - Name OCEON CTR # Activity Client Ref # TOTAL
MON TUES WED THU FRI SAT SUN Name Signature
P140017 - IDOHO BP-QIT CRA Pipeline 2.00 1.00 1.00 1.00 1.00 Standard 6.00
50 ENG-Drafts-hours EI07EADD
Repacement Project Overtime
P140017 - IDOHO BP-QIT CRA Pipeline 1.00 1.00 2.00 1.00 1.00 Standard 6.00
63 Engineering OSO QIT Drafting Hours(NCD) E125 EADD
Repacement Project Overtime
P140017 - IDOHO BP-QIT CRA Pipeline 5.00 6.00 5.00 6.00 6.00 Standard 28.00
64 ASABO Flareline Drafting Hours(NCD) E126 EADD
Repacement Project Overtime
Standard
Overtime
Standard
Overtime
Standard
Overtime
Standard
Overtime
Standard
Overtime
Standard
Overtime
Standard
Overtime
Standard
Overtime
Standard
Overtime
Standard
Overtime
Standard
Overtime
Standard
Overtime
Standard
Overtime
Standard
Overtime
Standard
Overtime
Standard
Overtime
Standard
Overtime
Standard
Overtime
Standard
Overtime
Standard
Overtime
Standard
Overtime
Standard
Overtime
Standard
Overtime
TOTAL STD HRS 8.00 8.00 8.00 8.00 8.00 40.00 Total Hours
TOTAL OT HRS 40.0
Notes to Project Controls:
Process to issue Timesheet WEEK
Step 1 : Your timesheet needs to be signed by yourself
Step 2 : Your timesheet needs to be signed by your Lead
Step 3 : The Timesheet needs to be signed by OCEON Engineering Manager
Step 4 : Your timesheet must be submitted every Friday before 3.30PM
Opoko Benjamin Engineering Manager Client Approval: Year
Name: 2019
Signature : Signature Signature INITIAL
Date Date Date: INPUT CHECK
COS -TMP-004 Up-dated February 26, 2018 JOK