FABRICATION YARD
1.0. PURPOSE
2.0. SCOPE
3.0. DEFINITIONS
5.0 RESPONSIBILITIES
6.0 PROCEDURE
7.0 APPENDIX
NIPPON STEEL BATAM PAGE 2 of 7 16-11-19
FABRICATION YARD
1.0. PURPOSE
The purpose of this document is to develop ways of calibration and testing of all
instrumentation equipment in standardize format.
2.0. SCOPE
The scope of this document covers the calibration and testing of all instruments for
each specific project.
3.0. DEFINITIONS
5.0. RESPONSIBILITIES
The following personnel are responsible for instrument calibration and testing for
every specific project:
POSITIONS RESPONSIBILITIES
6.0. PROCEDURE
5.1. Prior to commence instrument calibration and testing, ensure that all
preparations required are available and read. Such as test sheets;
testing equipment with valid test certificates from the third party; testing
consumables; test rigs; list of all instruments that will required type of
testing (status index); and the Client's issued instrument data sheets
are available.
5.2. The Instrument Status Index will contents all the information such as,
instrument tag number, description, reference drawing number,
subsystem, require calibration or not, calibration range, set point, rack
or stand mounted, location, require hook up, require installation,
NIPPON STEEL BATAM PAGE 5 of 7 16-11-19
FABRICATION YARD
require pressure testing, test medium, test pressure, require loop check
and remarks. For more details, see the document form in the appendix.
5.4. Upon receipt of every instrument in the calibration shop, check for any
mechanical damages. As well, check if the port sizes, rating, set points,
model, etc. are as per Clients issued AFC instrument data
specifications.
Record on the test sheets all the information from the instrument
nameplate and including the manufacturer.
5.5. Refer to the appendix, for the detail procedure of each Individual
instrument for calibration and other testing procedures. The individual
instrument test procedure is a part or a portion that constitutes this
procedure as in general.
5.6. Instrument Technician will set up the test rig and the test equipment.
After setting up, do the pre-calibration check, function checking and
testing as per individual test procedure as shown in the appendix.
5.7. Pre-calibration check shall be done with yard QA/QC E/I inspector.
After all checking is completed, the yard QA/QC E/I Inspector will issue
a test notification to the Clients for witnessing and acceptance of the
calibration. The notification shall include the time / date and location of
the test intended. A note shall be added in the notification that, in the
event the Clients will not be present during the time / date of the test,
the contractor has the full right to start & complete the aforementioned
test. Client shall accept the test without re-testing.
5.8. Final calibration checking and testing will be done for Clients
acceptance. At this stage, no necessary adjustment is required. All
required adjustments have already been done during pre-calibration
check.
NIPPON STEEL BATAM PAGE 6 of 7 16-11-19
FABRICATION YARD
Record all the calibration point, set point and the observation point on
the test sheets as shown in the appendix. If there is no comment and
no further checking is requested, then the test is completed. The test
sheet shall be signed by the person who did the test.
5.9. All the activities for calibration and testing shall be witnessed and
accepted by the Yard QA/QC E/I Inspector; the Clients' representative
and/or the Third Party Inspector. Acceptance signature shall be affixed
on every test sheets, as a proof of acceptance and the test completion.
5.10. The QA/QC E/I Inspector will collect all the signed test sheets, keep all
the signed test sheets for final compilation of dossiers at the end of the
project.
6. APPENDIX