Sie sind auf Seite 1von 3

Name of Staff: Adil Khursheed

Date of Birth: July 30, 1984

Nationality: Pakistani

Phones: +92-345-9182307

Contact Address: Near Byco Pump opposite to Allied Bank, Bara Gate, Peshawar, KP

E-mail: leo.heart@yahoo.com

Education:

 M.S. (Civil Engineering) (2011 – 2014)


CECOS University of IT and Emerging Sciences, Peshawar , Pakistan

 B.Sc. (Civil Engineering) (2004 – 2008)


UET Peshawar, Bannu Campus, Pakistan

Key Qualifications:

Mr. Adil Khursheed has 12+ years’ experience of working on Infrastructure, Roads, Water,
Education, Building and utilities construction projects of National Highway Authority (Islamabad),
ERRA (Kashmir), Private Universities, Govt. Technical Colleges and USAID in Pakistan. He holds
proven record in managing and monitoring large scale projects. Key skills include project management,
educating, Monitoring, evaluation and quality assurance.

Consultancy and Employment Record:

Quality Assurance Monitor, AID Pvt. Ltd. and Halcrow (June 30, 2015 to September 30, 2019)
Project: FIP and KPRP (Station: DI Khan, Peshawar)

Duties included;
 Monitoring Construction of Dhana Irrigation and Water supply project, South Waziristan
Agency, Fata
 Monitoring the Construction of Wireless communication Building DI khan, Irrigation
Department
 PCR’s base visit on DWSS and IWSS Schemes to be solarized and Rehabilitated in FATA and
FR’s, Flood damaged and Militancy damaged schools in Settle, FATA and FR’s
 Monitoring DNT, Yield Tests on and IWSS Schemes to be solarized and Rehabilitated in FATA
and FR’s.
 Pre-Bid meetings, Bid openings, technical and financial evaluations of Flood damaged schools
and Water supply schemes.
 Monitoring Quality control and reporting execution of FD damaged schools. Make sure that
civil works are undertaken in accordance with the approved procedures/specifications and that
construction is made in accordance with the approved construction drawings.
 Preparation of FVR, Backup sheets, Weekly, Sector wise and monthly progress reports.
 Completion of Milestone Monitoring & Reporting Performa for each milestone.
 Verification of Predetermined Milestone in PILs.

Page 1 of 3
Field Monitor, AID Pvt. Ltd. (December 21, 2012 to February 28, 2015)
Project: QIP and KPRP (Station: Wana, DI Khan)

Duties included:
 Monitoring Construction of Dhana Irrigation and Water supply project, South Waziristan
Agency, fata.
 Monitoring the Construction of Wireless communication Building DI khan, Irrigation
Department
 Verification of Predetermined millstones as per drawing and Specifications.

Lab Engineer, CECOS University Phase-6, Hayatabad, Peshawar, Pakistan (November 01, 2012 to
December 20, 2012)

Duties included;
 Soil Mechanics (lab) I & II

Field Engineer, AID Pvt. Ltd. (March 01, 2011 to July 31, 2011)
Project: FATA Development program by GIZ and GTZ (Station: Peshawar)

Duties included;
 Pre-feasibility studies of Infrastructure schemes.

Lab Engineer, SARHAD University of Engineering & Technology Peshawar, Pakistan (January 01,
2011 to February 01, 2011)

Duties included;
 Soil Mechanics (lab) I & II

Lecturer, Kandaro Technical College, Nowshera, Pakistan (September 01, 2010 to December 01, 2010)

Duties included;
 Transportation, Foundation and Pavement Design, Traffic Engineering.

Junior Engineer, NESPAK, ERRA Division, Hajira, Azad Kashmir, Pakistan (September 08, 2009 to
August 20, 2010)

Project: ERRA (Station: Hajira)

Duties included;
 Supervised construction of Educational buildings. Supervision/Inspection of Site selection,
Propping, demolition, excavation, backfilling, water proofing, embedded items, steel
reinforcement, form work, finishing works etc.
 Verifications of Bar Bending schedules, Bills from Contractors
 Daily office and Site works, like submission of progress reports monthly progress reports.
 Team management
 Quality checking of works and reporting to Resident Engineer.

Junior Engineer, Zeeruk International, Islamabad, Pakistan (September 01, 2009 to September 07,
2010)
Project: National Highway Authority, Roads (Station: Islamabad)

Duties included;
 Road Data Collection and Surveys for Annual Maintenance Plan FY 2009-10 of NHA road
networks all over Pakistan. Performing Calibration of the BI unit and Digitrips for surveys.
 Supervised Topographic, Leveling, Traverse, Traffic Survey, Traffic Signals, Soil Testing, spt
and uds of soil specimen of project of flyover between Rawalpindi and Rawat.
 Worked on M-9 CAD and Excel files (designing of culverts, curves) drawings and Eagle point
2006. Reviewed Draft tender drawings for M-9.

Page 2 of 3
 Worked on designing, planning, layout in projects RRRP, 22 no. Chowk, Chris Graveyard
Chowk, DHA Phase-1 Main Express Way.
 Designing of dualization of Benazirabad - Sakrand road alignment, interchanges and
roundabout, Y- Junctions.

Page 3 of 3

Das könnte Ihnen auch gefallen