Sie sind auf Seite 1von 6

LAKSHMI NARAIN COLLEGE OF TECHNOLOGY,

INDORE

MAJOR PROJECT

ON

Project Title

SUBMITTED AT

RAJIV GANDHI PROUDYOGIKI VISHWAVIDYALAYA, BHOPAL

IN PARTIAL FULFILLMENT OF THE DEGREE

OF

BACHELOR OF ENGINEERING

IN

DEPARTMENT OF INFORMATION TECHNOLOGY/COMPUTER SCIENCE

ENGINEERING

SESSION 2009-2010
MAJOR PROJECT

ON

Project Title

SUBMITTED AT

RAJIV GANDHI PROUDYOGIKI VISHWAVIDYALAYA, BHOPAL

IN PARTIAL FULFILLMENT OF THE DEGREE

OF

BACHELOR OF ENGINEERING

IN

DEPARTMENT OF INFORMATION TECHNOLOGY/COMPUTER SCIENCE

ENGINEERING

SESSION 2009-2010
(Font- Gorgia,size 16)

Guided By Submitted by
……………….. …………………
…………………
LAKSHMI NARAIN COLLEGE OF TECHNOLOGY,
INDORE

CERTIFICATE

The Project Report entitled “EXPERT DISCUSSION BOARD” submitted by


STUDENT NAMES Students of Information Technology Engineering in
year 2009-10, for the partial fulfillment of degree of bachelor of
engineering to Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal.
They have given satisfactory account of there major project work.
(Font- Times New Roman, size 14, bold ,Itelic, line space 1.5)

Head of Department External Examine


Er. Praveen Kr. Gautam
Contents

Chapter 1: Introduction
1.1 Problem Statement
1.2 Objective
1.3 Scope
1.4 Platform Specification
1.4.1 Hardware
1.4.2 Software
1.4.3 Implementation Language
Chapter 2: System Analysis
2.1 Identification of Need
2.2 Preliminary Investigation
Chapter 3: Feasibility Study
3.1 Technical Feasibility
3.2 Economical Feasibility
3.3 Operational Feasibility
Chapter 4: Literature Survey
4.1 Work Done By Others
4.2 Benefits
4.3 Proposed Solution
4.4 Technology Needed
Chapter 5:
5.1External Interface Requirements
5.1.1 User interfaces
5.1.2 Hardware interfaces
5.1.3 Software interfaces
5.2 Other Nonfunctional Requirements
5.2.1 Performance requirements
5.2 .2Safety requirements
5.2.3 Security requirements
5.2.4 Software quality attributes
Chapter 6: Software Engineering Approach
6.1 Software Engineering Paradigm Applied
6.1.1 Description
6.1.2 Advantages & Disadvantages
6.1.3 Why Used For Project
6.2 Requirement Analysis
6.2.1 Requirements Elicitation
6.2.2 Requirements Analysis and Negotiation
6.2.3 Requirements Specification
6.4 Design
6.4.1 Design Concept and Technique
6.4.2 Use Case Diagram
6.4.3 Data Flow Diagrams
6.4.4 Entity/Relationship Diagram
6.4.5 Control Flow Diagram
6.4.6 State Transition Diagram
6.5 Implementation Phase
6.5.1 Characteristics of Language, Platform and Tools Used
6.6 Testing
6.6.1 Testing Objectives
6.6.2 Test Methods & Strategies used along with test cases
Chapter 7 Conclusion
7.1 Limitation of Project
7.2 Difficulties Encountered
7.3 Future Enhancements & Suggestions
Chapter 8 Bibliography & References
8.1 Reference Books
8.2 Other Documentations & Resources

-----------------------------------------X----------------------------------------

Header
Project Title

Footer
Footer
Page Number

Das könnte Ihnen auch gefallen