Beruflich Dokumente
Kultur Dokumente
BILL OF QUANTITIES
Sl.No Description Unit Quantity Rate (Rs) Amount(Rs)
1 EARHWORK EXCAVATION
Earthwork excavtion in foundation trenches or drains in all
kinds of soils, Inclusive of shoring, strutting and refilling the
sides of foundation,depositing the surplus earth with in the
compound in places shown by the engineers incharge with an Cu.m 22.90 240
initial lead and levelling the asame etc.,complete with standard
specifications,drawings and including de-watering and Back
filling of excavated earth
2 SAND FILLING