Beruflich Dokumente
Kultur Dokumente
(AUTONOMOUS)
M.TECH. I-SEMESTER, I-MID (SVEC-16) TERM EXAMINATIONS, OCTOBER – 2018
SPECIALIZATION: ELECTRICAL POWER SYSTEMS
SUBJECT: POWER SYSTEM SECURITY AND STATE ESTIMATION (16MT10704)
Date: 25.10.2018 (AN) Time: 2 Hrs Max. Marks: 40
b) Analyze and derive the necessary expression for tap changing 5M CO2
transformer with the help of bus admittance matrix.
2 a) Write step-by-step algorithm for formation of Zbus for adding a link 6M CO1
to the partial network.
b) Analyze the following scenarios, when adding a link element in the 4M CO2
power system network for the formation of Zbus.
i) No mutual admittance is associated with added element
ii) The element is connected to reference bus.
3 a) Specify the significance of symmetrical components in a three phase 3M CO1
system.
b) The line to ground voltages of a three phase system are measured 3M CO3
on a high voltage side of a transformer are Va=100KV, Vb=33KV,
Vc=38KV. The voltage of phase a leads voltage of phase b by 100o,
and lags phase c voltage by 176.5o. Compute the symmetrical
component of voltages for the system.
c) Distinguish between rotating and stationary elements of power 4M CO1
system.
4 A synchronous generator and a synchronous motor are connected 10M CO3
through transmission line as shown in the figure below.