1. GENERAL...........................................................................................................................2
1.1. Scope.........................................................................................................................2
1.2. Terminology...............................................................................................................2
4. REPORTING.....................................................................................................................10
4.1. General...................................................................................................................10
4.2. Weekly Cost Report ..................................................................................................11
4.3. Weekly Status Report................................................................................................11
4.4. Monthly Report ........................................................................................................11
1. GENERAL
This document is a guidance to prepare a project control and reporting system required by
COMPANY.
1.1. Scope
The Project Planning and Control process is a two step procedure:
?? Planning stage and;
?? Control and monitoring stage.
Resulting from the Planning stage, a Project Baseline shall be developed. This Baseline
shall be used as a benchmark to monitor and control Project’s updated progress schedule. If
required by COMPANY, such baseline shall be submitted to COMPANY for approval.
1.2. Terminology
In this specification, the following words and terms shall have the meanings hereby
assigned to them, unless noted otherwise.
1.2.1. COMPANY
Refers to PT. CALTEX PACIFIC INDONESIA, as the ultimate user and owner,
the authorized representative of COMPANY or COMPANY third party
inspection.
1.2.2. CONTRACTOR
Refers to company selected by COMPANY, which may be responsible for the
detailed engineering design, material and equipment procurement, and
construction as specified by Contract, Scope of Work, or Work order.
1.2.3. Vendor
Refers to the company selected by COMPANY or CONTRACTOR, which is
responsible for the purchase agreement or purchase order of the goods/services
specified in this specification
Note:
?? For EPC (Engineering, Procurement and Construction) project purposes:
The terminology shall have the meanings as above.
?? For “ Direct Procurement” by COMPANY purposes:
Vendor shall also be responsible as CONTRACTOR.
2.5. Scheduling
2.5.1. Schedule Structure
Schedule shall be organized in accordance to the approved work breakdown
structure (WBS) and will consists of:
2.5.1.1 Project Schedule is Contract Master Schedule (CMS) Level I.
CONTRACTOR will prepare a Master Schedule within 1 month from
the Commencement Date as set forth in project schedule in a manner and
level of detail as approved in writing by COMPANY. Total number logic
relationships shall be limited to a manageable level of detail as agreed
with COMPANY. The Master Schedule will be based on the schedule
submitted with CONTRACTOR’s proposal. Critical and sub-critical
paths will be highlighted. Planned subcontract work will be identified
and included in the network CONTRACTOR shall submit this schedule
with the Monthly Status Report. CONTRACTOR shall use MS-Project
as the scheduling program.
Plan of Early Activities – Within 1 month from the Commencement
Date, CONTRACTOR will prepare the following early activity and
submit to COMPANY:
?? Front End Schedule – summarizing the first three months’ activities
in greater detail than the Contract Master Schedule. This schedule
shall be update with the Actual progress and issued ad required and
will be discontinued when Level II and detail engineering programs
are available.
Actual physical progress measurement is based on the percent complete of each activity
and/or deliverable. Actual activity and deliverable measurement will be formulated and
mutually agreed during planning stage. The percentages complete for activities/deliverables
are translated into work package and overall project percentages complete by means of
weighting factors.
The weighting factors within each work package Engineering and Construction are
determined based on the amount of manhours estimated for each activity divided by the
total amount of manhours for that work package. Especially for Procurement, the weighting
factor are determined based on estimated value for each procurement item, which divided
by total value of procurement.
The weighting factors for each work package comprising overall project will be
predetermined by COMPANY in the contract and / or bid document.
Inspection, Transportation.
?? Construction and Commissioning Schedule Control
4. REPORTING
CONTRACTOR will consult and coordinate with COMPANY’s / Project Task Force to meet the
requirements in setting up an efficient and effective Reporting. System frame work that will enable
COMPANY and CONTRACTOR to achieve the most effective communication both internally and
externally.
4.1. General
CONTRACTOR shall provide COMPANY with accurate and complete information with
respect to the WORK already performed, in progress and planned; and the events affecting
the performance of the WORK and shall make available to COMPANY all relevant
planning and reporting documents, including electronic access to project data.
CONTRACTOR may propose his standard forms for such reports, subject to approval by
COMPANY. Consolidation of several reports on a single form is permitted provided
identification is not affected.
It is preferred for speed and accuracy that reports be set up for computer printout.
CONTRACTOR, however, may use other methods subject to approval by COMPANY
provided reports are delivered to COMPANY in a legible and timely manner.
Project reports are vehicles for project monitoring and consist of among others the
following periodic:
?? Weekly Status Reports
?? Monthly Reports
The type and frequency of project periodic report will be modified to suit particular need of
individual project.