CIN : INIMO - 17 - 12 - 043

Project : ZANJERA SALES CIS/RESTO./REHAB./REPAIR OF EXISTING IRRIGATIO


Location : BACARRA, ILOCOS NORTE

ITEM NO. DESCRIPTION OF WORK QTY. UNIT AMOUNT

I. TEMPORARY WORKS
a. Mobilization/Demobilization of Equipment 1.00 l.s 17,131.71
b. Temporary Bunk House 1.00 unit 54,232.75
II. CANALIZATION
a. Common Excavation(Manual) 41.85 cu.m. 10,849.86
b. 170 kg/sqcm. Reinforced Concrete w/o forms 68.55 cu.m. 518,236.33
c. 170 kg/sqcm. Reinforced Concrete w/ forms 87.05 cu.m. 839,961.69
d. Construction of Expansion/Contraction Joints 43.52 cu.m. 4,615.96
e. Embankm't Construct'n. & Compact'n. 146.48 cu.m. 33,723.77
III CANAL STRUCTURES
a. Structure Excavation(Manual) 3.00 cu.m. 408.00
b. 211 kg/sqcm. Reinforced Concrete-others 2.41 cu.m. 26,146.33
c. Structure Backfill(Manual) 2.00 l.m. 326.40

IV . TERMINAL FACILITIES
a. Structure Excavation(Manual) 3.50 cu.m. 476.00
b. 211 kg/sqcm. Reinforced Concrete-others 2.47 cu.m. 26,797.27
c. Fab./Installation of Steelgate for Turn-out 1.00 unit 331,444.63
d. Fab./Installation of Steelgate for Headgate 1.00 unit 24,218.67
e. Structure Backfill(Manual) 1.00 cu.m. 163.20

TOTAL AMOUNT OF CONTRACT: 1,888,732.57

AMOUNT OF ACCOMPLISHMENT PER MONTH


PERCENTAGE OF ACCOMPLISHMENT PER MONTH
ACCUMULATVE AMOUNT OF ACCOMPLISHMENT
ACCUMULATIVE PERCENTAGE OF ACCOMPLISHMENT
CONSTRU
National Irrigation Adminis
Prepared by: Submitted by:

LOGO CHERRY PRUDENCE C.JAO


Project Engineer Authorized Managing Officer

Date: Date:
ISTING IRRIGATION SYSTEM FUND/CY-2018

ACCUMULATIVE DURATION

PERCENT 120 DAYS


WEIGHT
NOV 5 - NOV 18

1%
2.87%

0.57%
27.44%
44.47%
0.24%
1.79%

0.02%
1.38%
0.02%

0.03%
1.42%
17.55%
1.28%
0.01%
0%

SHMENT PER MONTH - - -


SHMENT PER MONTH 0.00% 0.00% 0.00%
F ACCOMPLISHMENT - - #VALUE!
F ACCOMPLISHMENT 0.00% 0.00% 0.00%

CONSTRUCTION SCHEDULE & S-CURVED


gation Administration, Ilocos Norte Irrigation Management Office
Checked by:

DENCE C.JAO JOSELITO C. DE VERA


naging Officer Sr. Engineer A
(INIMO)
Date:
Acc. %age
of
accomplish
ment

100%

90%
95%

80%

85%

80% 518,236.33

70% 839,961.69

65%

60%

55%

50%

45%

40%

30%
20%

15%

10%

5%

0%

-
0.00%
#VALUE!
0.00%

ent Office
Recommended by: Approved by:

JOHN N. MOLANO DANILO V. GOMEZ


Supervising Engineer A Division Manager A
(INIMO) (INIMO)
Date: Date:

LOGO
#REF!
#REF!
A #REF!
B
B
B PERT / CPM
B
B I-b. Temporary
B Bunk House
B B
B 180
B
0 180
B
B
B
B
B
A
C
A
A
II-a.Common A
Excavation
II-b. 170 kg/sqcm. A
II-c. 170 kg/cm2 Reinforced
Reinforced Concrete A Concrete w/o Forms
w/o forms A
I-a.
A
Mobilization/Demobiliz A
ation of Equipment A II-a.Concrete
AA CC
A
a Demolition(Mech.)
D
a 30 30
a 0 30 30 60
C

II-e.
Expansion/Contract

CG
ion Joint
30
90

National Irrigation Administration, Ilocos Norte Irrigation M


Prepared by: Submitted by:

LOGO CHERRY PRUDENCE C. JAO


Project Engineer Project Manager
LOGO

Date: Date:
#REF!
#REF!
#REF!

RT / CPM

CI

II-e. Embankment
Const. &
Compaction

CJ CK
30
120 150

II-c. 170 kg/cm2 I-a.


Reinforced Mobilization/Demobiliz
Concrete w/o ation of Equipment
Forms

II-d. 170 kg/cm2 II-d. 170 kg/cm2


Reinforced Reinforced Concrete w/
D Concrete w/ Forms C
E
Forms
F
30 30
60 90 120 150

II-e.
Expansion/Contract
ion Joint
30
CH
120

ocos Norte Irrigation Management Office


Checked by: Recommended by: Approved by:

DANILO V. GOMEZ VICENTE R. VICMUDO


Chief ,Eng'g. Section Division Manager A Regional Manager
(INIMO) Ilocos Norte - IMO Region I
Date: Date: Date:
Structure Structure
Boulder Fill Backfill Excavation
(Mech.) (Manual)
C C C
5 days 5 days 5 days
160 165 165 170 170
160 165 165 170 170
Rubble
Common 211
Masonry w/
kgs./sq.cm.
211 Backfill -
Structure Structure Reinforced Structure
kgs./sq.cm. Side Barrow Concrete -
Excavation Concrete Excavation Backfill
(Manual) Others
(Manual) Binder (Manual) (Manual)
C C C C C C
5 days 10 days 5 days 5 days 10 days 5 days
175 175 185 185 190 190 195 195 205 205 210
175 175 185 185 190 190 195 195 205 205 210
C
CIN : INIMO - 17 - 12 - 043
Project : ZANJERA SALES CIS/RESTO./REHAB./REPAIR OF EXISTING IRRIGATION SYSTEM FUND/CY-2018
Location #REF!
D U R A
MENFORCES/CREW #REF!
#REF!
Civil Engineer
Construction Foreman
Safety Engineer
Materials Engineer
First Aid Personnel
Skilled(Mason,Carpenter,Steelman)
Laborers
Operator
Driver

MANPOWER SCHEDUL
National Irrigation Administration, Ilocos Norte Irri
Prepared by: Submitted by:

LOGO CHERRY PRUDENCE C. JAO


Project Engineer Project Manager

Date: Date:
D U R A T I O N
#REF! #REF! #REF!
#REF! #REF! #REF!

POWER SCHEDULE
ration, Ilocos Norte Irrigation Management Office
Checked by: Recommended by: Approved by:

EDDIE G. DE LEON DANILO V. GOMEZ VICENTE R. VICMUDO


Chief ,Eng'g. Section Division Manager A Regional Manager
(INIMO) Ilocos Norte - IMO Region I
Date: Date: Date:
CIN : INIMO - 17 - 12 - 043
Project : ZANJERA SALES CIS/RESTO./REHAB./REPAIR OF EXISTING IRRIGATION SYSTEM FUND/CY-2018
Location #REF!
D U R A
EQUIPMENT DESCRIPTION #REF!
#REF!
Backhoe/Excavatory w/ Breaker
Dumptruck/Delivery Truck
Plate Compactor
Bar Cutter
Bar Bender
Concrete Mixer/1 bagger
Water Truck
Wheel Loader
Water Pump

EQUIPMENT UTILIZATION SC
National Irrigation Administration, Ilocos Norte Irr
Prepared by: Submitted by:

LOGO CHERRY PRUDENCE C. JAO


Project Engineer Project Manager

Date: Date:
D U R A T I O N
#REF! #REF! #REF!
#REF! #REF! #REF!

UTILIZATION SCHEDULE
ation, Ilocos Norte Irrigation Management Office
Checked by: Recommended by: Approved by:

EDDIE G. DE LEON DANILO V. GOMEZ VICENTE R. VICMUDO


Chief ,Eng'g. Section Division Manager A Regional Manager
(INIMO) Ilocos Norte - IMO Region I
Date: Date: Date: