FOUNDATION CALCULATION SHEET

One-Stop Solution for Foundation

TITLE DESCRIPTION
PROJECT/JOB NO. IS456_SI
PROJECT/JOB NAME AFES VERIFICATION
CLIENT NAME AFES
SITE NAME AFES
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME IS456
LOAD COMBINATION GROUP NAME
REV DATE DESCRIPTION PREP'D CHK'D APPR'D APPR'D

Copyright (c) GS E&C. All Rights Reserved


11/3/2019

Project Na. : AFES VERIFICATION


Calculation Sheet
of Project No. : IS456_SI

Foundation Client : AFES Page 1

FOUNDATION LISTS
Group Name No. Description No. Description
ISO 1 F1

Copyright (c) GS E&C. All Rights Reserved


11/3/2019

Project Na. : AFES VERIFICATION


Calculation Sheet
of Project No. : IS456_SI

Foundation Client : AFES Page 2

CONTENTS

1. GENERAL
1.1 CODE & STANDARD
1.2 MATERIALS & UNIT WEIGHT
1.3 SUBSOIL CONDITION & SAFETY FACTORS
1.4 LOAD COMBINATION

2. DRAWING
2.1 LOCATION PLAN & DETAIL SKETCH

3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
3.2 PIER DATA
3.3 LOAD CASE
3.4 LOAD COMBINATION

4. CHECK OF STABILITY
4.1 CHECK OF SLIDING
4.2 CHECK OF OVERTURNING MOMENT
4.3 CHECK OF CONTACT PRESSURE

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 REQUIRED REINFORCEMENT
5.3 ONE WAY SHEAR FORCE
5.4 TWO WAY SHEAR FORCE

Copyright (c) GS E&C. All Rights Reserved


11/3/2019

Project Na. : AFES VERIFICATION


Calculation Sheet
of Project No. : IS456_SI

Foundation Client : AFES Page 3

1. GENERAL
1.1 CODE & STANDARD
Items Description
Design Code Indian Code (IS456)
Horizontal Force for Wind UNIFORM BUILDING CODE (UBC-1997)
Horizontal Force for Seismic UNIFORM BUILDING CODE [UBC-1997]
Unit System Input : SI, Output : SI, Calculation Unit : SI

1.2 MATERIALS & UNIT WEIGHT


Items Value
2
Concrete (fck : compressive strength) 28.000 N/mm
2
Lean Concrete (Lfck : compressive strength) 0.000 N/mm
2
Reinforcement (#6 ~ #18 , yield strength) 400.000 N/mm
2
Reinforcement (#20 ~ , yield strength) 400.000 N/mm
3
Rs (Soil unit weight) 20.000 kN/m
3
Rc (Concrete unit weight) 24.000 kN/m
2
Es (Steel Modulus of Elasticity) 200.000 kN/mm
2
Ec (Concrete Modulus of Elasticity) 25.100 kN/mm

- Soil Capacity
Items Value
Soil Name Unit-01
Footing List F1
2
Qa (Soil Bearing Capacity) 200 kN/m
Buoyancy Not Consider
WL (Water Label from the EL = 0) 0 mm
FD (Frost Depth from the EL = 0) 0 mm
Internal Friction Angle 30
Passive Soil Pressure Not Consider
2
Cu (Undrained cohesion) Clay , 0 kN/m

1.3 SUBSOIL CONDITION & SAFETY FACTORS


Items Description
Allowable Increase of Soil (Wind) 33.33 %
Allowable Increase of Soil (Seismic) 33.33 %
Allowable Increase of Soil (Test) 20 %
Safety factor against overturning for OVM1(FO1) 1.5
Safety factor against overturning for OVM2(FO2) 1.7
Safety factor against overturning for OVM3(FO3) 1.8
Safety factor against overturning for OVM4(FO4) 2.1

Copyright (c) GS E&C. All Rights Reserved


11/3/2019

Project Na. : AFES VERIFICATION


Calculation Sheet
of Project No. : IS456_SI

Foundation Client : AFES Page 4

Safety factor against sliding for the SL1(FS1) 1.5


Safety factor against sliding for the SL2(FS2) 1.6
Safety factor against sliding for the SL3(FS3) 1.7
Safety factor against sliding for the SL4(FS4) 1.8
Friction factor (m) 0.35

1.4 LOAD COMBINATION


Index Load Case Name Load Case Description
1 SW SELF WEIGHT
3 DL DEAD LOAD
8 WL WIND LOAD

Comb . ID Load Combination for stability


10 1.0 SW + 1.0 DL
20 1.0 SW + 1.0 DL + 1.0 WL
Comb . ID Load Combination for Reinforcement
100 1.4 SW + 1.4 DL
200 1.05 SW + 1.05 DL + 1.275 WL

Copyright (c) GS E&C. All Rights Reserved


11/3/2019 Page 5

2. DRAWING REFERENCE DWGS


NO. DWG NO. DWG TITLE

NOTES
A01 A02 A03 A04 A05 A06 A07 * OUTPUT UNIT : mm

20000 20000 20000


20000 20000 15000

27
14 16 34 28
02 2F2 36
12 18 33 29
F23 4F4 6F6 13 15 F10 32 30
F12
F8 31
20000

19
9 11 26 20 AFES VERIFICATION PROJECT
01 1F1 35 25 21
F22 7
3F3 5F5 8 10 17
F9 24 22
F7 23 F11

FOUNDATION LOCATION PLAN


IS456

SQUAD CHECK
Y PROCESS PIPING VESSELS STRUCT. ELEC. INST.

Z X SCALE JOB NO. MICROFILM NO.

AS SHOWN IS456_SI

Copyright (c) GS E&C. All Rights Reserved


11/3/2019 Page 6

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


11/3/2019 Page 7

REFERENCE DWGS
NO. DWG NO. DWG TITLE

3000 CL FOOTING
1500 TOP BOTTOM

TYP.
50
1500

#16@200

#16@200
3000

NOTES
* OUTPUT UNIT : mm

#16@200
#16@200
FOUNDATION PLAN FOOTING REINF. PLAN

AFES VERIFICATION PROJECT


30 GR.

700
100 75

TOG EL. + 200

50
TYP.
1500

@200
#16
1300

#16 FOUNDATION DETAIL FOR


700

F1
#16

SQUAD CHECK
100
50
500

8-#16
PEDESTAL
80

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

LEAN CONC. 50 THK


CRUSHED STONE 100 THK
SECTION SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKDAPPDAPPDAPPD


AS SHOWN IS456_SI

Copyright (c) GS E&C. All Rights Reserved


11/3/2019

Project Na. : AFES VERIFICATION


Calculation Sheet
of Project No. : IS456_SI

Foundation Client : AFES Page 8

3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
( mm ) Ft. Name F1
Ft. Type ISO
2
3000 Area 9.000 m
Ft. Thickness 500.00 mm
3
Ft. Volume 4.500 m
Ft. Weight 108.000 kN
Soil Height 1300.00 mm
3
Soil Volume 11.063 m
700 700
Soil Weight 221.260 kN
3000

Buoyancy Not Consider


Self Weight (except Pr.SW) 329.260 kN

1500
1300

The Origin coordinate


500

The Center of gravity (0,0) mm

Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
3 3
F1 All Direct 4.500 m 11.063 m 17.640 kN

Sec.Name Section Area Ft. Weight Soil Weight Total Weight


2
S1 9.000 m 108.000 kN 221.260 kN 346.900 kN

3.2 PIER DATA


Off X , Off Y is offset position from the Center of the footing
If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter
Area is pier concrete area
Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape)
2
Unit( Length : mm , Weight : kN , Area : m )
Ft.Name Pr.Name Shape Pl Pw Ph Area Weight Off X Off Y
F1 1 Rectangle 700.000 700.000 1500.000 0.490 17.640 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


11/3/2019

Project Na. : AFES VERIFICATION


Calculation Sheet
of Project No. : IS456_SI

Foundation Client : AFES Page 9

3.3 LOAD CASE


Fz
Fy
Mz
Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch) are
My based on the right hand rule.
Fx
Mx

Index Load Case Name Load Case Description


1 SW SELF WEIGHT
3 DL DEAD LOAD
8 WL WIND LOAD

Unit( kN , kN-m )
Ft.Name Pr.Name Load Case Fx Fy Fz Mx My
1 0 0 -17.64 0 0
1 3 0 0 -490.33 0 0
F1
8 78.45 49.03 0 -98.07 147.1
Footing SW 0.000 0.000 -329.260 0.000 0.000

3.4 LOAD COMBINATION


In Pier Top In Footing Bottom In Footing Bottom Center
without Self Weight with Pier Self Weight, with Pier & Footing Self Weight & Soil Weight,
But without Footing Self Weight, Case PileType
in centroid of Pile Group
Case NonPileType
in centroid of Footing

3.4.1 Load Combination in Pier Top (Without SW)


Unit( kN , kN-m )
Ft.Name Pr.Name L.Comb. SFx SFy SFz SMx SMy
10 0.000 0.000 -490.333 0.000 0.000
20 78.453 49.033 -490.333 -98.067 147.100
F1 1
100 0.000 0.000 -686.466 0.000 0.000
200 100.028 62.517 -514.850 -125.035 187.553

3.4.2 Load Combination in Footing Bottom (With Pier SW)


Unit( kN , kN-m )
Ft.Name Pr.Name L.Comb. SFx SFy SFz SMx SMy
10 0.000 0.000 -507.973 0.000 0.000
20 78.453 49.033 -507.973 -196.133 304.006
F1 1
100 0.000 0.000 -711.162 0.000 0.000
200 100.028 62.517 -533.372 -250.070 387.608

Copyright (c) GS E&C. All Rights Reserved


11/3/2019

Project Na. : AFES VERIFICATION


Calculation Sheet
of Project No. : IS456_SI

Foundation Client : AFES Page 10

3.4.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( kN , kN-m )
Ft.Name L.Comb. SFx SFy SFz SMx SMy C.G. of Loads
10 0.000 0.000 -837.233 0.000 0.000 1500.0 , 1500.0
F1
20 78.453 49.033 -837.233 -196.133 304.006 1500.0 , 1500.0

Load Combination of Ultimate Condition


- C.G. of Load is coordinate from left bottom. Unit : mm Unit( kN , kN-m )
Ft.Name Sec.Na L.Comb. SFx SFy SFz SMx SMy C.G. of Loads
100 0.000 0.000 -711.162 0.000 0.000 1500.0 , 1500.0
F1 S1
200 100.028 62.517 -533.372 -250.070 387.608 1500.0 , 1500.0

Copyright (c) GS E&C. All Rights Reserved


11/3/2019

Project Na. : AFES VERIFICATION


Calculation Sheet
of Project No. : IS456_SI

Foundation Client : AFES Page 11

4. CHECK OF STABILITY
4.1 CHECK OF SLIDING
mSFz + P.F
Formula : > Fs -> OK (Bi-Axial)
SFx2 + SFy2
P.F = Passive Force (apply only in case checked passive force, mark by P ) Unit ( kN )
( mSFz + P.F ) / SFx + SFy
2 2
Ft.Name Dir. L.Comb. Fs(i) Result
F1 Bi-Axial 20 0.35 837.23 / 92.52 = 3.17 1.6 OK

4.2 CHECK OF OVERTURNING MOMENT


Formula : (SMry / SMoy or SMrx / SMox) > OVM(i) -> OK Unit ( kN-m )
Ft.Name Dir. L.Comb. SMry / SMoy = OVM or SMrx / SMox = OVM OVM(i) Result
X 20 1255.85 / 304.01 = 4.13 1.7 OK
F1
Y 20 1255.85 / 196.13 = 6.4 1.7 OK

4.3 CHECK OF CONTACT PRESSURE


4.3.1 Contact Pressure Formula
'Handbook CONCRETE ENGINEERING' Second Edition edited by Mark Fintel

SFz SMy X(i) SMx Y(i)


q1,q2 =
Af Iy Ix
if q1 or q2 < 0 , than q1 and q2 will be recalculated
by following formula
L
q(x) width(x) X dx
Px = 0 L
0
q(x) width(x) dx
L
P= 0
q(x) width(x) dx

4.3.2 Input Data


2 4 4
Ft.Name Af (m ) Fl (m ) Fw (m ) Ix (m ) Iy (m )
F1 9.000 3.000 3.000 6.7500 6.7500

Copyright (c) GS E&C. All Rights Reserved


11/3/2019

Project Na. : AFES VERIFICATION


Calculation Sheet
of Project No. : IS456_SI

Foundation Client : AFES Page 12

4.3.3 Pressure Check


- Qa = Soil bearing capacity
- Uc = Uplift Allowable capacity
- XY-Direction (Bi-Axial) 2
Unit( kN , kN-m , kN/m )
Ft.Name L.Comb. q1 q2 ci cj Qmax Qa Cont.A.R Result
F1 20 0.000 204.532 0.347 4.147 204.5 200.0(gross) 98.53 / 80 % NG

Copyright (c) GS E&C. All Rights Reserved


11/3/2019

Project Na. : AFES VERIFICATION


Calculation Sheet
of Project No. : IS456_SI

Foundation Client : AFES Page 13

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
SQ = SFz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width

5.1.1 Data Unit( mm , kN , kN-m )


Ft.Name Sec.Na Dir. L.Comb. Fl or Fw Sl or Sw SFz SM SQ
100 3000.00 3000.00 711.162 0.00 711.162
S1 X
200 3000.00 3000.00 533.372 387.61 533.372
F1
100 3000.00 3000.00 711.162 0.000 711.162
S1 Y
200 3000.00 3000.00 533.372 -250.070 533.372

5.1.2 Design Parameters


Yield Strength - #6 ~ #18 : fy1 , #20 ~ : fy2
f_cl : Clear Cover for edge of footing reinforcement
f_clt : Clear Cover for top of footing reinforcement
f_clb : Clear Cover for bottom of footing reinforcement
Loc. : Location of Critical Point from left side of footing

2
Unit(N/mm ,mm)
fck fy1 fy2 f_cl f_clt f_clb
28.00 400.00 400.00 50.0 50.0 80.0

Copyright (c) GS E&C. All Rights Reserved


11/3/2019

Project Na. : AFES VERIFICATION


Calculation Sheet
of Project No. : IS456_SI

Foundation Client : AFES Page 14

5.2 REQUIRED REINFORCEMENT


5.2.1 Reinforcement Formula
- Shrinkage and temperature reinforcement
2
If temperature reinforcement is less than 415 kN/mm
As1 = 0.0015 b h (for top and bottom bar)
Otherwise,
As1 = 0.0012 b h (for top and bottom bar)
- Required Reinforcement by Analysis
fck Mu
As2 = 0.5
fy (
1 - 1 - 4.6
fck b d
2
) bd

If Selected As < Using As, then OK!!

- Moment resistance
0.0035 d
Maximum depth of netural axis, Xumax =
0.0055 + 0.87 fy/Es
Xumax Xumax
Resisting moment factor, Ru = 0.36
d
1- 0.42( d ) fck
2
Moment of restance, MuLim = Ru b d
If MuLim > SMux or SMuy, then OK!!

The moment for reinforcement design is calculated at face of pier per any section
Where,
Mu(Mux or Muy) = design moment
fy = strength of reinforcement, fcu(fck) = strength of contrete
Es = modulus of elasticity of steel
d = effective depth, b = width of section, h= footing height

5.2.2 Check of Footing Reinforcement


Footing Name : F1 GroupType : Isolated
- X direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

200 top 5 - #16 @ 200 1.500 1.000 442.000 1005.310


S1
200 botom 5 - #16 @ 200 1.850 1.000 412.000 1005.310

Sec.Nam L.Comb. Mu (kN-m) Mu Lim (kN-m) Result


200 top - 758.703 OK
S1
200 bottom 84.609 659.207 OK

Sec.Nam L.Comb. As1(mm )


2
As2(mm )
2
Using As(mm )
2
Select As(mm )
2
Result
200 top 375.000 0.000 1005.310 375.000 OK
S1
200 bottom 375.000 603.024 1005.310 603.024 OK

- Y direction (Unit Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
2

200 top 5 - #16 @ 200 1.500 1.000 426.000 1005.310


S1
200 botom 5 - #16 @ 200 1.850 1.000 396.000 1005.310

Copyright (c) GS E&C. All Rights Reserved


11/3/2019

Project Na. : AFES VERIFICATION


Calculation Sheet
of Project No. : IS456_SI

Foundation Client : AFES Page 15

Sec.Nam L.Comb. Mu (kN-m) Mu Lim (kN-m) Result


200 top - 704.768 OK
S1
200 bottom 66.543 609.000 OK

Sec.Nam L.Comb.
2
As1(mm ) As2(mm )
2
Using As(mm )
2
Select As(mm )
2
Result
200 top 375.000 0.000 1005.310 375.000 OK
S1
200 bottom 375.000 491.836 1005.310 491.836 OK

Copyright (c) GS E&C. All Rights Reserved


11/3/2019

Project Na. : AFES VERIFICATION


Calculation Sheet
of Project No. : IS456_SI

Foundation Client : AFES Page 16

Title

Foundation name
Bending Moment Diagram
Section name Direction L/C ID
3000

F1 S1 X 100
Analysis Method
Conventional Rigid Method with reaction (Method 1)

3000
SFz SMy Moment intia 4
-711.162 kN 0.000 kN-m 6.7500 m
Area 2 Contact Area 2 Critical Point Method
9.000 m 9.000 m (100 %) Critical Max Point
Critical Value
Mubottom = 52.251 kN-m/m , Mutop = 0 kN-m/m

50

50

00
11

18

30
0

[ mm ]

[Loading]

[ kN , kN/m ]

237.05 237.05

[B.M.D] [ kN-m ]

-156.8
-117.6
-78.4
-39.2
0
39.2 64.56 64.56
78.4
117.6
156.75
156.8

[B/L.M.D] [ kN-m / m ]

-52.3
-39.2
-26.1
-13.1
0
13.1 21.52 21.52
26.1
39.2
52.25
52.3

Copyright (c) GS E&C. All Rights Reserved


11/3/2019

Project Na. : AFES VERIFICATION


Calculation Sheet
of Project No. : IS456_SI

Foundation Client : AFES Page 17

Title

Foundation name
Bending Moment Diagram
Section name Direction L/C ID
3000

F1 S1 X 200
Analysis Method
Conventional Rigid Method with reaction (Method 1)

3000
SFz SMy Moment intia 4
-533.372 kN 387.608 kN-m 6.7500 m
Area 2 Contact Area 2 Critical Point Method
9.000 m 6.959 m (77.33 %) Critical Max Point
Critical Value
Mubottom = 84.609 kN-m/m , Mutop = 0 kN-m/m

50

50

00
0
68

11

18

30
0

[ mm ]

[Loading]

[ kN , kN/m ]
93.12
231.88

459.85

[B.M.D] [ kN-m ]

-253.8
-190.4
-126.9
-63.5
0.01 3.43
0
63.5 111.95
126.9
190.4
253.83
253.8

[B/L.M.D] [ kN-m / m ]

-84.6
-63.5
-42.3
-21.2
0 1.14
0
21.2 37.32
42.3
63.5
84.61
84.6

Copyright (c) GS E&C. All Rights Reserved


11/3/2019

Project Na. : AFES VERIFICATION


Calculation Sheet
of Project No. : IS456_SI

Foundation Client : AFES Page 18

Title

Foundation name
Bending Moment Diagram
Section name Direction L/C ID
3000

F1 S1 Y 100
Analysis Method
Conventional Rigid Method with reaction (Method 1)

3000
SFz SMx Moment intia 4
-711.162 kN 0.000 kN-m 6.7500 m
Area 2 Contact Area 2 Critical Point Method
9.000 m 9.000 m (100 %) Critical Max Point
Critical Value
Mubottom = 52.251 kN-m/m , Mutop = 0 kN-m/m

50

50

00
11

18

30
0

[ mm ]

[Loading]

[ kN , kN/m ]

237.05 237.05

[B.M.D] [ kN-m ]

-156.8
-117.6
-78.4
-39.2
0
39.2 64.56 64.56
78.4
117.6
156.75
156.8

[B/L.M.D] [ kN-m / m ]

-52.3
-39.2
-26.1
-13.1
0
13.1 21.52 21.52
26.1
39.2
52.25
52.3

Copyright (c) GS E&C. All Rights Reserved


11/3/2019

Project Na. : AFES VERIFICATION


Calculation Sheet
of Project No. : IS456_SI

Foundation Client : AFES Page 19

Title

Foundation name
Bending Moment Diagram
Section name Direction L/C ID
3000

F1 S1 Y 200
Analysis Method
Conventional Rigid Method with reaction (Method 1)

3000
SFz SMx Moment intia 4
-533.372 kN -250.070 kN-m 6.7500 m
Area 2 Contact Area 2 Critical Point Method
9.000 m 9.000 m (100 %) Critical Max Point
Critical Value
Mubottom = 66.543 kN-m/m , Mutop = 0 kN-m/m

50

50

00
11

18

30
0

[ mm ]

[Loading]

[ kN , kN/m ]
11.08
138.89
216.69
344.5

[B.M.D] [ kN-m ]

-199.6
-149.7
-99.8
-49.9
0 10.46
35.5
49.9 86.38
99.8
149.7
199.63
199.6

[B/L.M.D] [ kN-m / m ]

-66.5
-49.9
-33.3
-16.6
0 3.49
11.83
16.6 28.79
33.3
49.9
66.54
66.5

Copyright (c) GS E&C. All Rights Reserved


11/3/2019

Project Na. : AFES VERIFICATION


Calculation Sheet
of Project No. : IS456_SI

Foundation Client : AFES Page 20

5.3 ONE WAY SHEAR FORCE


5.3.1 One-Way Shear Formula
The nominal shear tv, is calculated by the following equation.
Vu
tv = (N/mm )
2

b d
Where, Vu is shear force at the section due to the design (factored) loads.
In the case of beams of varying depth the equation shall be modified ad :
Vu ( Mu / d ) tan b
tv =
b d
0.85 0.8 fck ( 1 + 5 b -1 )
tc = 2
(N/mm )
6b
Where, tc is the design shear strength
0.8 fck
b=
6.89 pt
100 Ast
pt =
b d
Use Ast = max[Astop,Asbottom] is the area of steel used in the section.
d(Effective Depth) = Ft - Tclb (Bottom Clear Cover ) - ( X_Axis Bott. Bar Size/2 ) , b = Width of Footing
tcmax = Maximum Shear Stress

tv < tc tcmax , then OK!! ..........Refer. Code IS456(2000), Clause 40, Table 19 & Table 20

5.3.2 Check of One-Way Shear


Footing Name : F1 GroupType : Isolated PileType : False

Unit : mm
3000
3000

2262

2262

- X direction One-Way Shear (Unit Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) b (mm) As (mm )
2
Pt
S1 200 2262 412 1000 1005.31 0.24401

Copyright (c) GS E&C. All Rights Reserved


11/3/2019

Project Na. : AFES VERIFICATION


Calculation Sheet
of Project No. : IS456_SI

Foundation Client : AFES Page 21

Sec.Nam tc (N/mm ) tv (N/mm ) tcmax (N/mm )


2 2 2
L.Comb. Result
S1 200 0.363 0.231 3.1 OK
- Y direction One-Way Shear (Unit Width)
Sec.Nam L.Comb. Loc. (mm) d (mm) b (mm)
2
As (mm ) Pt
S1 200 2262 396 1000 1005.31 0.25387

Sec.Nam tc (N/mm ) tv (N/mm ) tcmax (N/mm )


2 2 2
L.Comb. Result
S1 200 0.37 0.189 3.1 OK

Copyright (c) GS E&C. All Rights Reserved


11/3/2019

Project Na. : AFES VERIFICATION


Calculation Sheet
of Project No. : IS456_SI

Foundation Client : AFES Page 22

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
3000

F1 S1 X 100
Analysis Method
Conventional Rigid Method with reaction (Method 1)

3000
SFz SMy Moment intia 4
-711.162 kN 0.000 kN-m 6.7500 m
Area 2 Contact Area 2 Critical Point Method
9.000 m 9.000 m (100 %) Critical Max Point
Critical Value
Vu = -58.315 kN/m

50

50

62

00
11

18

22

30
0

[ mm ]

[Loading]

[ kN , kN/m ]

237.05 237.05

[S.F.D] [ kN ]
272.61
272.6
204.5 174.95
136.3
68.2
0
-68.2
-136.3 -174.95
-204.5
-272.6

[S/L.F.D] [ kN / m ]
90.87
90.9
68.2 58.31
45.4
22.7
0
-22.7
-45.4 -58.31
-68.2
-90.9

Copyright (c) GS E&C. All Rights Reserved


11/3/2019

Project Na. : AFES VERIFICATION


Calculation Sheet
of Project No. : IS456_SI

Foundation Client : AFES Page 23

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
3000

F1 S1 X 200
Analysis Method
Conventional Rigid Method with reaction (Method 1)

3000
SFz SMy Moment intia 4
-533.372 kN 387.608 kN-m 6.7500 m
Area 2 Contact Area 2 Critical Point Method
9.000 m 6.959 m (77.33 %) Critical Max Point
Critical Value
Vu = -95.127 kN/m

50

50

62

00
0
68

11

18

22

30
0

[ mm ]

[Loading]

[ kN , kN/m ]
93.12
231.88

459.85

[S.F.D] [ kN ]

397.7
298.3
198.9
99.4 21.88
0.34
0
-99.4
-198.9
-285.38
-298.3
-397.7

[S/L.F.D] [ kN / m ]

132.6
99.4
66.3
33.1 7.3
0.11
0
-33.1
-66.3
-95.13
-99.4
-132.6

Copyright (c) GS E&C. All Rights Reserved


11/3/2019

Project Na. : AFES VERIFICATION


Calculation Sheet
of Project No. : IS456_SI

Foundation Client : AFES Page 24

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
3000

F1 S1 Y 100
Analysis Method
Conventional Rigid Method with reaction (Method 1)

3000
SFz SMx Moment intia 4
-711.162 kN 0.000 kN-m 6.7500 m
Area 2 Contact Area 2 Critical Point Method
9.000 m 9.000 m (100 %) Critical Max Point
Critical Value
Vu = -58.315 kN/m

50

50

62

00
11

18

22

30
0

[ mm ]

[Loading]

[ kN , kN/m ]

237.05 237.05

[S.F.D] [ kN ]
272.61
272.6
204.5 174.95
136.3
68.2
0
-68.2
-136.3 -174.95
-204.5
-272.6

[S/L.F.D] [ kN / m ]
90.87
90.9
68.2 58.31
45.4
22.7
0
-22.7
-45.4 -58.31
-68.2
-90.9

Copyright (c) GS E&C. All Rights Reserved


11/3/2019

Project Na. : AFES VERIFICATION


Calculation Sheet
of Project No. : IS456_SI

Foundation Client : AFES Page 25

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
3000

F1 S1 Y 200
Analysis Method
Conventional Rigid Method with reaction (Method 1)

3000
SFz SMx Moment intia 4
-533.372 kN -250.070 kN-m 6.7500 m
Area 2 Contact Area 2 Critical Point Method
9.000 m 9.000 m (100 %) Critical Max Point
Critical Value
Vu = -74.658 kN/m

50

50

62

00
11

18

22

30
0

[ mm ]

[Loading]

[ kN , kN/m ]
11.08
138.89
216.69
344.5

[S.F.D] [ kN ]

322.7
242
161.3
86.23
80.7 38.44
0
-80.7
-161.3 -223.98
-242
-322.7

[S/L.F.D] [ kN / m ]

107.6
80.7
53.8
28.74
26.9 12.81
0
-26.9
-53.8 -74.66
-80.7
-107.6

Copyright (c) GS E&C. All Rights Reserved


11/3/2019

Project Na. : AFES VERIFICATION


Calculation Sheet
of Project No. : IS456_SI

Foundation Client : AFES Page 26

5.4 TWO WAY SHEAR FORCE


5.4.1 Two-Way Shear Formula
Qz(Vu) = External Vertical Load(SFz) + Pedestal Selfweight(Wp)
The critical section in two way shear is taken as at a distance of d/2 from edge of pier.
Qz Shade Ratio
tv =
bo d
tc = 0.25 fck
t a = Ks t c
ta tv, then OK!! ..........Refer. Code IS456(2000), Clause 40, Table 19
Where,
Ks = Min[ 0.5 + bc , 1 ]
Long side of pier
bc =
Short side of pier
d(Effective Depth) = Ft - Tclb (Bottom Clear Cover ) - ( X_Axis Bott. Bar Size/2 ) , b = Width of Footing
bo = Critical Section Perimeter Length, b o = ( Pl + d ) 2 sides + ( Pw + 2d ) 2 sides
Footing Area - Punching Area
Shade Ratio =
Footing Area

5.4.2 Check of Two-WayShear

1.237 106 mm
2
Ft.Name F1 Punching Area

3000 Pr.Name 1 Ratio Shade 0.863

Rectangle tc
2
Shape 1.323 N/mm
2
L.Comb. 100 Ks 1.000 N/mm
3000

700 mm ta
2
Pl 1.323 N/mm
1
Pw 700 mm Vu 711.162 kN

4448 / 412 mm tv
2
bo / d 0.335 N/mm

bc 1 Result OK

Copyright (c) GS E&C. All Rights Reserved