OWNER : SM PRIME HOLDINGS INC. I
PROJECT : HOPE RESIDENCES O
D
LOCATION : TRECE MARTIRES, CAVITE CITY
SUBJECT : PROGRESS BILLING NO. 16 (
CONTRACT PACKAGE : FIRE PROTECTION SYSTEM J
a
DATE Pro. : NOVEMBER 20, 2019 n
Date Printed: NOVEMBER 20, 2019 u
a
r
y
Summary TO DATE (NOVEMBER 20, 2019)
PREVIOUS(OCTOBER 20,2019) THIS PERIOD (OCTOBER 20, 2019 - NOVEMBER 20, 2019)
Item Description 1
6
Unit Qty Material Rates Labor Rates AMOUNT -
% ACCOM %ACCOM AMOUNT % WT % ACCOM AMOUNT % WT % ACCOM AMOUNT % WT
D
e
c
e
1.0 General Requirements lot 1 3,484,999.40 m 82.79% 2,885,397.47 10.57% 2.74% 95,599.040 0.35% 85.54% 2,980,996.51 10.92%
b
e
2.0 Building A lot 1 4,893,510.11 2,180,975.81 7,074,485.92 r 61.52% 4,352,055.77 15.94% 7.70% 544,558.07 1.99% 69.22% 4,896,613.84 17.94%

1
3.0 Building B lot 1 4,558,680.68 1,843,570.04 6,402,250.73 6 63.96% 4,095,194.51 15.00% 5.05% 323,091.73 1.18% 69.01% 4,418,286.24 16.18%

4.0 Building C lot 1 3,661,399.08 1,489,125.35 5,150,525.11 2 79.90% 4,115,257.31 15.07% 4.14% 213,182.82 0.78% 84.04% 4,328,440.13 15.86%
0
1
5.0 Building D lot 1 3,689,582.56 1,497,341.83 5,186,924.39 8 90.75% 4,707,083.62 17.24% 1.04% 54,194.59 0.20% 91.79% 4,761,278.22 17.44%
)

TOTAL : FIRE PROTECTION SYSTEM 27,299,185.55 20,154,988.68 73.83% 1,230,626.26 4.51% 21,385,614.95 78.34%

GRAND TOTAL 27,299,185.55


CONTRACT AMOUNT: 27,299,185.55
17TH BILLING ACCOMPLISHMENT (3.79%): 1,230,626.26
Less 15% Downpayment: 184,593.94
Less 10% Retention: 123,062.63

AMOUNT DUE TO CONTRACTOR: 922,969.70

PREPARED BY : CHECKED BY: NOTED BY:

RAYMUNDO E. CRUZ AR. SERAFIN PALOMIQUE JR. Engr. MARIA LYNETH CABACCAN / Engr. HERBERT ALLAN M. HULLANA

PRESIDENT - SBI ACMC- PM SMDC - APM/PM

CHECKED BY:

JHANNAH JOYCE PAMULARCO


ACMC - QS
OWNER : SM PRIME HOLDINGS INC.
PROJECT : HOPE RESIDENCES
LOCATION : TRECE MARTIRES, CAVITE CITY
SUBJECT : GENERAL REQUIREMENTS
CONTRACT PACKAGE : FIRE PROTECTION WORKS
DATE Pro: NOVEMBER 20, 2019
Date Printed: NOVEMBER 20, 2019

THIS PERIOD (OCTOBER 20,2019 - NOVEMBER 20, TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
2019)
Item Description Unit Qty AMOUNT

% ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

GENERAL REQUIREMENTS

1.1 Mobilization/Demobilization lot 1 150,000.00 87.15% 0.86 130,740.85 3.75% 5.00% 0.05 7,500.00 0.22% 92.15% 0.91 138,240.85 3.97%
1.2 Permits, Taxes and Licenses lot 1 800,000.00 76.66% 0.76 619,198.60 17.77% 0.00% - 0.00% 76.66% 0.76 619,198.60 17.77%
1.2.1 Contractor's Tax lot 1 included
1.2.2 Gov't Permit/License Requirements lot 1 included
1.2.3 CFI - Certificate of Fire Inspection lot 1 included
1.3 Bonds and Insurances
1.3.1 Down Payment Bond lot 1 included
1.3.2 Performance Bond lot 1 42,855.00 100.00% 1.00 42,855.00 1.23% 0.00% - 0.00% 100.00% 1.00 42,855.00 1.23%
1.3.3 Surety Bond lot 1 36,158.00 100.00% 1.00 36,158.00 1.04% 0.00% - 0.00% 100.00% 1.00 36,158.00 1.04%
1.3.4 Retention Bond lot 1 34,256.00 86.66% 0.86 29,688.54 0.85% 5.00% 0.05 1,712.80 0.05% 91.66% 0.91 31,401.34 0.90%
1.3.5 Warranty Bond lot 1 included
1.3.6 CARI-Contractor's All Risk Insurance lot 1 78,766.40 100.00% 1.00 78,766.40 2.26% 0.00% - 0.00% 100.00% 1.00 78,766.40 2.26%
1.4 Temporary Facilities
1.4.1 Staging Area lot 1 65,000.00 90.12% 0.89 58,587.17 1.68% 5.00% 0.05 3,250.00 0.09% 95.12% 0.94 61,837.17 1.77%
1.5 Temporary Utilities .
1.5.1 Power Connections & Consumptions lot 1 289,657.00 86.66% 0.86 248,625.10 7.13% 4.00% 0.04 11,586.28 0.33% 90.66% 0.90 260,211.38 7.47%
1.5.2 Water Connections & Consumptions lot 1 168,458.00 71.66% 0.71 120,728.24 3.46% 0.00% - 0.00% 71.66% 0.71 120,728.24 3.46%

Communication (Telephone, Fax Machine,


1.5.3 115,624.00 86.66% 0.86 100,207.46 2.88% 4.00% 0.04 4,624.96 0.13% 90.66% 0.90 104,832.42 3.01%
Internet, Office Supplies, etc)
lot 1

1.6 Preparation of As-built, Shop Drawings, Fabrication Details lot 1 365,725.00 76.66% 0.76 277,401.56 7.96% 0.00% - 0.00% 76.66% 0.76 277,401.56 7.96%
Drawings & Submittals.
1.7 Materials Testing lot 1 included
1.8 Plant & Equipments, including calibration. lot 1 48,500.00 86.66% 0.86 39,032.64 1.12% 5.00% 0.05 2,425.00 0.07% 91.66% 0.91 41,457.64 1.19%
1.9 Construction Safety & Health lot 1 75,000.00 86.66% 0.86 59,924.39 1.72% 5.00% 0.05 3,750.00 0.11% 91.66% 0.91 63,674.39 1.83%
2.0 Housekeeping & General Cleaning lot 1 65,000.00 85.90% 0.85 46,973.16 1.35% 5.00% 0.05 3,250.00 0.09% 90.90% 0.90 50,223.16 1.44%
2.1 Others (Please Specify):

Allow other items for which the contractor


requires payment to comply with all respect
with the provisions of the relevant lot 1 0.00% - - 0.00% 0.00% - 0.00% 0.00% - - 0.00%
conditions of the contract particular
specifications and drawings which are not in
the Bill of Quantities.

2.2 Supervision lot 1 1,150,000.00 86.54% 0.86 996,510.36 28.59% 5.00% 0.05 57,500.00 1.65% 91.54% 0.91 1,054,010.36 30.24%

TOTAL : General Requirements 2,885,397.47 82.79% 95,599.04 2.74% 2,980,996.51 85.54%


3,484,999.40

PREPARED BY : CHECKED BY: NOTED BY:

RAYMUNDO E. CRUZ AR. SERAFIN PALOMIQUE JR. Engr. MARIA LYNETH CABACCAN / Engr. HERBERT ALLAN M. HULLANA
PRESIDENT - SBI ACMC- PM SMDC - APM/PM

CHECKED BY:

JHANNAH JOYCE PAMULARCO


ACMC - QS
OWNER : SM PRIME HOLDINGS INC.
PROJECT : HOPE RESIDENCES
LOCATION : TRECE MARTIRES, CAVITE CITY
SUBJECT : BILLS OF QUANTITY-BLDG. A
CONTRACT PACKAGE : FIRE PROTECTION SYSTEM
DATE Pro. : NOVEMBER 20, 2019
DATE PRINTED: NOVEMBER 20, 2019

BLDG. A PREVIOUS (O
ITEM
DESCRIPTION
NO. MATERIAL LABOR
UNIT QTY AMOUNT % ACCOM
RATES RATES
II FIRE PROTECTION WORKS
2.01 WET STANDPIPE SYSTEM
(Termination/Connection points from Bldg. Line to
Main Fire Water
2.01.01 BlackLine
Ironat(BI)
Land Devt are included)
Pipes
1.0 150 mmØ Lm/s 145.00 1,400.49 560.20 284,299.47 100.00%
2.0 100 mmØ Lm/s 56.70 775.66 310.26 61,571.57 100.00%
3.0 80 mmØ Lm/s 490.70 509.17 203.67 349,786.86 100.00%
4.0 50 mmØ Lm/s 129.60 239.27 95.71 43,413.87 100.00%
5.0 40 mmØ Lm/s 160.00 184.84 73.94 41,404.61 100.00%
6.0 32 mmØ Lm/s 259.60 145.72 58.29 52,960.11 100.00%
7.0 25 mmØ Lm/s 2,474.00 114.53 45.81 396,699.96 100.00%
- -
2.01.02 B.I. Elbow 90° - -
1.0 150 mmØ pc/s 15.00 1,016.43 406.57 21,344.96 80.00%
2.0 100 mmØ pc/s - -
3.0 80 mmØ pc/s - -
4.0 50 mmØ pc/s - -
5.0 40 mmØ pc/s 44.00 104.99 41.99 6,467.12 100.00%
6.0 32 mmØ pc/s 7.00 78.88 31.55 773.03 100.00%
7.0 25 mmØ pc/s 1,216.00 52.49 21.00 89,363.84 100.00%
- -
2.01.03 B.I. Tee Standard - -
1.0 150 mmØ pc/s - -
2.0 100 mmØ pc/s - -
3.0 80 mmØ pc/s - -
4.0 50 mmØ pc/s 157.00 206.40 82.56 45,366.57 100.00%
5.0 40 mmØ pc/s 20.00 139.97 55.99 3,919.15 100.00%
6.0 32 mmØ pc/s - -
7.0 25 mmØ pc/s 346.00 68.80 27.52 33,326.61 100.00%

2.01.04 B.I. Tee Reducer - -


1.0 150 mmØ x 100 mmØ pc/s - -
2.0 80 mmØ x 50 mmØ pc/s - -
3.0 80 mmØ x 40 mmØ pc/s - -
4.0 80 mmØ x 32 mmØ pc/s - -
5.0 80 mmØ x 25 mmØ pc/s - -
- -
2.01.05 B.I. Reducer - -
1.0 100 mmØ x 80 mmØ pc/s - -
2.0 80 mmØ x 50 mmØ pc/s - -
- -
2.01.06 Mechanical Couplier/Victaulic Coupling - -
1.0 150 mmØ pc/s 46.00 1,098.04 439.22 70,713.88 56.52%
2.0 100 mmØ pc/s 42.00 684.60 273.84 40,254.47 90.48%
3.0 80 mmØ pc/s 112.00 527.42 210.97 82,699.07 100.00%
4.0 50 mmØ pc/s 414.93 165.97
- -
2.01.07 Others - -
2.01.07.01 Victaulic Elbow - -
1.0 150 mmØ pc/s 26.00 1,492.11 596.85 54,312.98 92.31%
2.0 100 mmØ pc/s 14.00 671.94 268.77 13,169.94 100.00%
- -
2.01.07.02 Victaulic Tee - -
1.0 150 mmØ x 100 mmØ pc/s 7.00 6,995.73 2,798.29 68,558.17 100.00%
2.0 80 mmØ x 80 mmØ pc/s 7.00 571.37 228.55 5,599.42 100.00%

2.01.07.03 Victaulic Reducer - -


1.0 100 mmØ x 80 mmØ pc/s 7.00 1,679.84 671.94 16,462.43 100.00%
- -
2.01.07.04 B.I. Tee Reducer - -
1.0 32 mmØ x 25 mmØ pc/s 176.00 127.22 50.89 31,347.86 100.00%
2.0 40 mmØ x 25 mmØ pc/s 27.00 167.85 67.14 6,344.91 100.00%
3.0 50 mmØ x 25 mmØ pc/s 140.00 246.74 98.69 48,360.20 100.00%
4.0 50 mmØ x 32 mmØ pc/s 7.00 246.74 98.69 2,418.01 100.00%
- -
2.01.07.05 B.I. Coupling Reducer - -
1.0 25 mmØ x 15 mmØ pc/s 920.00 43.31 17.32 55,780.01 100.00%
2.0 25 mmØ x 20 mmØ pc/s 135.00 - - - 0.00%
3.0 32 mmØ x 25 mmØ pc/s 186.00 63.75 25.50 16,601.41 100.00%
4.0 40 mmØ x 25 mmØ pc/s 38.00 81.56 32.62 4,338.85 100.00%
5.0 40 mmØ x 32 mmØ pc/s 56.00 81.56 32.62 6,394.09 100.00%
6.0 50 mmØ x 25 mmØ pc/s - -
7.0 50 mmØ x 32 mmØ pc/s 245.00 118.32 47.33 40,584.30 100.00%
8.0 50 mmØ x 40 mmØ pc/s 271.00 118.32 47.33 44,891.20 100.00%
- -
2.01.07.06 Mechanical Tee Threaded - -
1.0 150 mmØ x 100 mmØ pc/s - -
2.0 80 mmØ x 50 mmØ pc/s 148.00 920.75 368.30 190,778.54 100.00%
3.0 80 mmØ x 40 mmØ pc/s 39.00 800.07 320.03 43,683.58 100.00%
4.0 80 mmØ x 32 mmØ pc/s 7.00 800.07 320.03 7,840.64 100.00%
5.0 80 mmØ x 25 mmØ pc/s 7.00 674.17 269.67 6,606.87 100.00%
- -
2.01.07.07 Slip on Flange - -
1.0 80 mmØ pc/s 14.00 334.46 133.78 6,555.45 90.00%
2.0 100 mmØ pc/s - -
3.0 150 mmØ pc/s 23.00 648.65 259.46 20,886.47 8.70%
4.0 200 mmØ pc/s - -
- -
2.01.07.08 Blind Flange - -
1.0 80 mmØ pc/s 19.00 738.43 295.37 19,642.15 100.00%
2.0 100 mmØ pc/s - -
3.0 150 mmØ pc/s 7.00 1,433.41 573.36 14,047.42 28.57%
4.0 200 mmØ pc/s - -
- -
2.01.07.09 Threadolet - -
1.0 25 mmØ pc/s 14.00 130.31 52.12 2,554.04 100.00%
2.0 15 mmØ pc/s 16.00 86.88 34.75 1,946.02 100.00%
- -
2.01.07.10 Plug - -
1.0 25 mmØ pc/s 1,055.00 27.58 11.03 40,734.01 100.00%
2.0 32 mmØ pc/s 7.00 41.99 16.80 411.52 100.00%
- -
2.01.07.11 Union Patente - -
1.0 25 mmØ pc/s 7.00 162.81 65.12 1,595.52 100.00%
2.0 32 mmØ pc/s 7.00 114.48 45.79 1,121.88 100.00%

SUB-TOTAL FOR WET STANDPIPE SYSTEM 2,397,933.06


2.02 DRY STANDPIPE SYSTEM
2.02.01 Black Iron (BI) Pipes - -
1.0 150 mmØ Lm/s 30.30 1,400.49 560.20 59,408.79 96.20%
- -
2.02.02 B.I. Tee Reducer - -
1.0 100 mmØ x 65 mmØ pc/s - -
- -
2.02.03 Fire Hose Valve - -
1.0 65 mmØ pc/s 7.00 11,039.56 4,415.82 108,187.67 0.00%
- -
2.02.04 Roof Manifold - -
1.0 2-65 x 100mmØ pc/s - -
SUB-TOTAL FOR DRY STANDPIPE SYSTEM 167,596.45
2.03 FIRE DEPARTMENT CONNECTION & TEST HEADER
(Concrete Pedestal are included)
2.03.01 Fire Department Connection - -
1.0 3-65 x 150mmØ set/s 1.00 24,493.52 9,797.41 34,290.92 0.00%
2.0 2-65 x 150mmØ set/s 1.00 16,329.01 6,531.60 22,860.61 0.00%
- -
2.03.02 Test Header - -
1.0 2-65 x 150mmØ set/s - -
- -
2.03.03 Swing Check Valve - -
1.0 150 mmØ pc/s 1.00 21,965.58 8,786.23 30,751.81 0.00%
2.03.04 Alarm Check Valve - -
1.0 150 mmØ pc/s 1.00 70,930.57 28,372.23 99,302.79 100.00%
SUB-TOTAL FOR FIRE DEPARTMENT CONNECTION & TEST HEADER 187,206.14
2.04 DRAINS, VALVES & ACCESSORIES
2.04.01 OS & Y Gate Valve
1.0 100 mmØ pc/s 7.00 12,235.86 4,894.34 119,911.43 100.00%
2.0 150 mmØ pc/s 1.00 19,099.96 7,639.98 26,739.95 100.00%
- -
2.04.02 By-pass Valve - -
1.0 75 mmØ pc/s - -
- -
2.04.03 Flexible Coupling - -
1.0 150 mmØ pc/s - -
- -
2.04.04 Inspector Test Valve - -
1.0 25 mmØ pc/s - -
2.04.05 Drain Valve - -
1.0 32 mmØ pc/s - -
- -
2.04.06 Air Release Valve - -
1.0 25 mmØ pc/s 7.00 5,844.64 2,337.85 57,277.43 100.00%
2.04.07 Supervisory Switch pc/s 7.00 3,903.23 1,561.29 38,251.63 100.00%
2.04.08 Waterflow Switch 100 mm Ø pc/s 7.00 3,945.19 1,578.07 38,662.82 0.00%
2.04.09 Sight Glass 25Ø pc/s 14.00 648.65 259.46 12,713.50 50.00%
2.04.10 Pressure Gauge pc/s 22.00 1,216.78 486.71 37,476.89 0.00%
- -
2.04.11 OTHERS - -
2.04.11.01 Gate Valve 25mmØ pc/s 7.00 539.78 215.91 5,289.88 100.00%
2.04.11.02 Globe Valve 25mmØ pc/s 27.00 1,384.61 553.85 52,338.41 0.00%
2.04.11.03 Globe Valve 32mmØ pc/s 7.00 1,821.20 728.48 17,847.80 100.00%
2.04.11.04 Pig tail 15mmØ pc/s 16.00 252.88 101.15 5,664.56 100.00%
2.04.11.05 Ball Valve 15mmØ pc/s 16.00 580.61 232.24 13,005.62 100.00%
2.04.11.06 Fire Extinguisher Cabinet pc/s - - -
SUB-TOTAL FOR DRAINS, VALVES & ACCESSORIES 425,179.92
2.05 FIRE HOSE CABINET
2.05.01 Recessed Fire Hose Cabinet set/s 15.00 18,132.64 7,253.05 380,785.38 73.33%
SUB-TOTAL FOR FIRE HOSE CABINET 380,785.38
2.06 PORTABLE FIRE EXTINGUISHER
2.06.01 10 Lbs. ABC PFE set/s 22.00 4,151.57 1,660.63 127,868.48 0.00%
2.06.03 10 Lbs. HCFC PFE set/s 12.00 9,213.75 3,685.50 154,791.00 33.33%
SUB-TOTAL FOR PORTABLE FIRE EXTINGUISHER 282,659.48
2.07 SPRINKLER HEADS
2.07.01 Upright Sprinkler Head pc/s 84.00 182.57 151.30 28,045.42 100.00%
2.07.02 Pendent Sprinkler Head pc/s 565.00 212.06 151.30 205,297.27 65.31%
2.07.03 Sidewall Sprinkler Head (ordinary) pc/s 271.00 405.97 151.30 151,020.71 100.00%
2.07.04 Sidewall Sprinkler Head (extended) pc/s 135.00 767.72 151.30 124,067.43 92.59%
2.07.05
Others (Please Specify):
2.0 Spare Heads pc/s
SUB-TOTAL FOR SPRINKLER HEADS 508,430.83
2.08 FIRE PUMPS, MOTORS & CONTROLLERS
(OSM / LABOR ONLY) - -
2.08.01 Fire Pump Bldg. A, B, C and D. set/s 2.00 OSM 62,385.00 124,770.00 0.00%
Electric Drive (Vertical Turbine) -
2.08.02 Jockey Pump Bldg. A, B, C and D set/s 2.00 OSM 35,685.00 71,370.00 0.00%
Electric Drive (Vertical Turbine) - -
2.08.03 Others (Please Specify): - -
2.08.03.01 Bowl Empeller pc/s 2.00 31,399.33 12,559.73 87,918.11 0.00%
2.08.03.02 Flexible Connector 150mmØ pc/s 2.00 10,693.62 4,277.45 29,942.14 0.00%
Flexible Connector 100mmØ pc/s 2.00 7,042.14 2,816.86 19,717.99 0.00%
2.08.03.03 OS&Y Gate Valve 150mmØ pc/s 8.00 19,099.96 7,639.98 213,919.57 0.00%
OS&Y Gate Valve 65mmØ pc/s 2.00 13,085.62 5,234.25 36,639.74 0.00%
2.08.03.04 Concentric Reducer 150mmØ pc/s 2.00 672.46 268.98 1,882.89 0.00%
Concentric Reducer 100mmØ pc/s 2.00 229.07 91.63 641.39 0.00%
2.08.03.05 Pressure Relief Valve 150mmØ pc/s 2.00 242,735.30 97,094.12 679,658.83 0.00%
2.08.03.06 Check Valve 150mmØ pc/s 2.00 24,080.49 9,632.20 67,425.37 0.00%
Check Valve 65mmØ pc/s 2.00 6,972.56 2,789.02 19,523.16 0.00%
2.08.03.07 Flow Meter 150 mmØ pc/s 2.00 31,338.09 12,535.24 87,746.65 0.00%
Slip on Flange 150 mm pc/s 24.00 648.65 259.46 21,794.57 0.00%
- -
SUB-TOTAL FOR FIRE PUMPS, MOTORS & CONTROLLERS 1,462,950.43

2.09 PIPE SLEEVING WORKS Lot 1.00 29,542.50 11,817.00 41,359.50 100.00%

SUB-TOTAL FOR PIPE SLEEVING WORKS 41,359.50

2.10 MISCELLANEOUS & CONSUMABLES Lot 1.00 207,890.33 83,156.13 291,046.46 100.00%

SUB-TOTAL FOR MISCELLANEOUS & CONSUMABLES 291,046.46

2.11 HANGERS & SUPPORTS Lot 1.00 167,143.02 66,857.21 234,000.23 100.00%

SUB-TOTAL FOR HANGERS & SUPPORTS 234,000.23


2.12 ELECTRICAL WORKS Lot 1.00 21,625.00 15,984.00 37,609.00 0.00%
Complete Electrical Works from Fire
Protection Equipments to Power Supply
SUB-TOTAL FOR ELECTRICAL WORKS 37,609.00
2.13 TESTING & COMMISSIONING Lot 1.00 49,237.50 19,695.00 68,932.50 40.00%
2.14 Others - -
2.14.01 Gravel and Sand Lot 1.00 75,998.10 30,399.24 106,397.34 100.00%
2.14.02 Excavation and Backfilling Lot 1.00 86,334.10 34,533.64 120,867.74 100.00%
2.14.03 Post Indicator Valve pc/s 2.00 48,157.58 19,263.03 134,841.22 0.00%
2.14.04 Fire Hydrant pc/s 1.00 161,921.59 64,768.64 226,690.23 0.00%

SUB-TOTAL FOR TESTING & OTHERS 657,729.03

GRAND TOTAL FOR BLDG. A 7,074,485.92

PREPARED BY : CHECKED BY:

AR. SERAFIN PALOM


RAYMUNDO E. CRUZ ACMC- PM
PRESIDENT - SBI
CHECKED BY:

JHANNAH JOYCE PA
ACMC - QS
TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019) THIS PERIOD (OCTOBER 20,2019 - NOVEMBER 20, 2019)

QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT

145.00 284,299.47 4.02% 0.00% - 0.00% 100.00% 145.00 284,299.47


56.70 61,571.57 0.87% 0.00% - 0.00% 100.00% 56.70 61,571.57
490.70 349,786.86 4.94% 0.00% - 0.00% 100.00% 490.70 349,786.86
129.60 43,413.87 0.61% 0.00% - 0.00% 100.00% 129.60 43,413.87
160.00 41,404.61 0.59% 0.00% - 0.00% 100.00% 160.00 41,404.61
259.60 52,960.11 0.75% 0.00% - 0.00% 100.00% 259.60 52,960.11
2,474.00 396,699.96 5.61% 0.00% - 0.00% 100.00% 2,474.00 396,699.96

12.00 17,075.97 0.24% 20.00% 3.00 4,268.99 0.06% 100.00% 15.00 21,344.96

44.00 6,467.12 0.09% 0.00% - 0.00% 100.00% 44.00 6,467.12


7.00 773.03 0.01% 0.00% - 0.00% 100.00% 7.00 773.03
1,216.00 89,363.84 1.26% 0.00% - 0.00% 100.00% 1,216.00 89,363.84
157.00 45,366.57 0.64% 0.00% - 0.00% 100.00% 157.00 45,366.57
20.00 3,919.15 0.06% 0.00% - 0.00% 100.00% 20.00 3,919.15

346.00 33,326.61 0.47% 0.00% - 0.00% 100.00% 346.00 33,326.61

26.00 39,968.71 0.56% 21.74% 10.00 15,372.58 0.22% 78.26% 36.00 55,341.30
38.00 36,420.71 0.51% 9.52% 4.00 3,833.76 0.05% 100.00% 42.00 40,254.47
112.00 82,699.07 1.17% 0.00% - 0.00% 100.00% 112.00 82,699.07

24.00 50,135.06 0.71% 7.69% 2.00 4,177.92 0.06% 100.00% 26.00 54,312.98
14.00 13,169.94 0.19% 0.00% - 0.00% 100.00% 14.00 13,169.94

7.00 68,558.17 0.97% 0.00% - 0.00% 100.00% 7.00 68,558.17


7.00 5,599.42 0.08% 0.00% - 0.00% 100.00% 7.00 5,599.42

7.00 16,462.43 0.23% 0.00% - 0.00% 100.00% 7.00 16,462.43


176.00 31,347.86 0.44% 0.00% - 0.00% 100.00% 176.00 31,347.86
27.00 6,344.91 0.09% 0.00% - 0.00% 100.00% 27.00 6,344.91
140.00 48,360.20 0.68% 0.00% - 0.00% 100.00% 140.00 48,360.20
7.00 2,418.01 0.03% 0.00% - 0.00% 100.00% 7.00 2,418.01
920.00 55,780.01 0.79% 0.00% - 0.00% 100.00% 920.00 55,780.01
- - 0.00% 0.00% - 0.00% 0.00% - -
186.00 16,601.41 0.23% 0.00% - 0.00% 100.00% 186.00 16,601.41
38.00 4,338.85 0.06% 0.00% - 0.00% 100.00% 38.00 4,338.85
56.00 6,394.09 0.09% 0.00% - 0.00% 100.00% 56.00 6,394.09

245.00 40,584.30 0.57% 0.00% - 0.00% 100.00% 245.00 40,584.30


271.00 44,891.20 0.63% 0.00% - 0.00% 100.00% 271.00 44,891.20

148.00 190,778.54 2.70% 0.00% - 0.00% 100.00% 148.00 190,778.54


39.00 43,683.58 0.62% 0.00% - 0.00% 100.00% 39.00 43,683.58
7.00 7,840.64 0.11% 0.00% - 0.00% 100.00% 7.00 7,840.64
7.00 6,606.87 0.09% 0.00% - 0.00% 100.00% 7.00 6,606.87

2.80 5,899.91 0.08% 7.14% 1.00 468.25 0.01% 97.14% 3.80 6,368.16

2.00 1,816.21 0.03% 0.00% - 0.00% 8.70% 2.00 1,816.21

19.00 19,642.15 0.28% 0.00% - 0.00% 100.00% 19.00 19,642.15

2.00 4,013.55 0.06% 0.00% - 0.00% 28.57% 2.00 4,013.55

14.00 2,554.04 0.04% 0.00% - 0.00% 100.00% 14.00 2,554.04


16.00 1,946.02 0.03% 0.00% - 0.00% 100.00% 16.00 1,946.02

1,055.00 40,734.01 0.58% 0.00% - 0.00% 100.00% 1,055.00 40,734.01


7.00 411.52 0.01% 0.00% - 0.00% 100.00% 7.00 411.52

7.00 1,595.52 0.02% 0.00% - 0.00% 100.00% 7.00 1,595.52


7.00 1,121.88 0.02% 0.00% - 0.00% 100.00% 7.00 1,121.88

29.15 57,154.00 0.81% 3.80% 1.15 2,254.79 0.03% 100.00% 30.30 59,408.79

- - 0.00% 0.00% - 0.00% 0.00% - -

- - 0.00% 0.00% - 0.00% 0.00% - -


- - 0.00% 0.00% - 0.00% 0.00% - -

- - 0.00% 0.00% - 0.00% 0.00% - -

1.00 99,302.79 1.40% 0.00% - 0.00% 100.00% 1.00 99,302.79


7.00 119,911.43 1.69% 0.00% - 0.00% 100.00% 7.00 119,911.43
1.00 26,739.95 0.38% 0.00% - 0.00% 100.00% 1.00 26,739.95
7.00 57,277.43 0.81% 0.00% - 0.00% 100.00% 7.00 57,277.43
7.00 38,251.63 0.54% 0.00% - 0.00% 100.00% 7.00 38,251.63
- - 0.00% 0.00% - 0.00% 0.00% - -
7.00 6,356.75 0.09% 50.00% 7.00 6,356.75 0.09% 100.00% 14.00 12,713.50
- - 0.00% 0.00% - 0.00% 0.00% - -

7.00 5,289.88 0.07% 0.00% - 0.00% 100.00% 7.00 5,289.88


- - 0.00% 100.00% 27.00 52,338.41 0.74% 100.00% 27.00 52,338.41
7.00 17,847.80 0.25% 0.00% - 0.00% 100.00% 7.00 17,847.80
16.00 5,664.56 0.08% 0.00% - 0.00% 100.00% 16.00 5,664.56
16.00 13,005.62 0.18% 0.00% - 0.00% 100.00% 16.00 13,005.62

11.00 279,242.61 3.95% 26.67% 4.00 101,542.77 1.44% 100.00% 15.00 380,785.38

- - 0.00% 0.00% - 0.00% 0.00% - -


4.00 51,597.00 0.73% 50.00% 6.00 77,395.50 1.09% 83.33% 10.00 128,992.50

84.00 28,045.42 0.40% 0.00% - 0.00% 100.00% 84.00 28,045.42


369.00 134,079.10 1.90% 34.69% 196.00 71,218.17 1.01% 100.00% 565.00 205,297.27
271.00 151,020.71 2.13% 0.00% - 0.00% 100.00% 271.00 151,020.71
125.00 114,877.25 1.62% 7.41% 10.00 9,190.18 0.13% 100.00% 135.00 124,067.43
- - 0.00% 100.00% 2.00 124,770.00 1.76% 100.00% 2.00 124,770.00

- - 0.00% 100.00% 2.00 71,370.00 1.01% 100.00% 2.00 71,370.00

- - 0.00% 0.00% - 0.00% 0.00% - -


- - 0.00% 0.00% - 0.00% 0.00% - -
- - 0.00% 0.00% - 0.00% 0.00% - -
- - 0.00% 0.00% - 0.00% 0.00% - -
- - 0.00% 0.00% - 0.00% 0.00% - -
- - 0.00% 0.00% - 0.00% 0.00% - -
- - 0.00% 0.00% - 0.00% 0.00% - -
- - 0.00% 0.00% - 0.00% 0.00% - -
- - 0.00% 0.00% - 0.00% 0.00% - -
- - 0.00% 0.00% - 0.00% 0.00% - -
- - 0.00% 0.00% - 0.00% 0.00% - -
- - 0.00% 0.00% - 0.00% 0.00% - -

1.00 41,359.50 0.58% 0.00% - 0.00% 100.00% 1.00 41,359.50

1.00 291,046.46 4.11% 0.00% - 0.00% 100.00% 1.00 291,046.46

1.00 234,000.23 3.31% 0.00% - 0.00% 100.00% 1.00 234,000.23


- - 0.00% 0.00% - 0.00% 0.00% - -
0.40 27,573.00 0.39% 0.00% - 0.00% 40.00% 0.40 27,573.00

1.00 106,397.34 1.50% 0.00% - 0.00% 100.00% 1.00 106,397.34


1.00 120,867.74 1.71% 0.00% - 0.00% 100.00% 1.00 120,867.74
- - 0.00% 0.00% - 0.00% 0.00% - -
- - 0.00% 0.00% - 0.00% 0.00% - -

4,352,055.77 61.52% 544,558.07 7.70% 4,896,613.84

NOTED BY:

AR. SERAFIN PALOMIQUE JR.


ACMC- PM Engr. MARIA LYNETH CABACCAN / Engr. HERBERT ALLAN M. HULLANA
SMDC - APM/PM

JHANNAH JOYCE PAMULARCO


ACMC - QS
019)

% WT

4.02%
0.87%
4.94%
0.61%
0.59%
0.75%
5.61%

0.30%

0.09%
0.01%
1.26%
0.64%
0.06%

0.47%

0.78%
0.57%
1.17%

0.77%
0.19%

0.97%
0.08%

0.23%
0.44%
0.09%
0.68%
0.03%
0.79%
0.00%
0.23%
0.06%
0.09%

0.57%
0.63%

2.70%
0.62%
0.11%
0.09%

0.09%

0.03%

0.28%

0.06%

0.04%
0.03%

0.58%
0.01%

0.02%
0.02%

0.84%

0.00%

0.00%
0.00%

0.00%

1.40%
1.69%
0.38%
0.81%
0.54%
0.00%
0.18%
0.00%

0.07%
0.74%
0.25%
0.08%
0.18%

5.38%

0.00%
1.82%

0.40%
2.90%
2.13%
1.75%
1.76%

1.01%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.58%

4.11%

3.31%
0.00%
0.39%

1.50%
1.71%
0.00%
0.00%

69.22%

NA
OWNER : SM PRIME HOLDINGS INC.
PROJECT : HOPE RESIDENCES
LOCATION : TRECE MARTIRES, CAVITE CITY
SUBJECT : BILLS OF QUANTITY-BLDG. B
CONTRACT PACKAGE : FIRE PROTECTION SYSTEM
DATE Pro. : NOVEMBER 20, 2019
DATE PRINTED: NOVEMBER 20, 2019

BLDG. B PREVIOUS (OCTOBE


ITEM
DESCRIPTION
NO.
MATERIAL LABOR
UNIT QTY AMOUNT % ACCOM QTY
RATES RATES
II FIRE PROTECTION WORKS
2.01 WET STANDPIPE SYSTEM
(Termination/Connection points from Bldg. Line to
Main Fire Water Line at Land Devt are included)

2.01.01 Black Iron (BI) Pipes


1.0 150 mmØ Lm/s 175.00 1,400.49 560.20 343,120.05 100.00% 151.00
2.0 100 mmØ Lm/s 56.70 775.66 310.26 61,571.57 100.00% 56.70
3.0 80 mmØ Lm/s 490.70 509.17 203.67 349,786.86 100.00% 490.70
4.0 50 mmØ Lm/s 129.60 239.27 95.71 43,413.87 100.00% 129.60
5.0 40 mmØ Lm/s 160.00 184.84 73.94 41,404.61 100.00% 160.00
6.0 32 mmØ Lm/s 259.60 145.72 58.29 52,960.11 100.00% 259.60
7.0 25 mmØ Lm/s 2,474.00 114.53 45.81 396,699.96 100.00% 2,474.00
- -
2.01.02 B.I. Elbow 90° - -
1.0 150 mmØ pc/s 17.00 1,016.43 406.57 24,190.96 94.12% 16.00
2.0 100 mmØ pc/s - -
3.0 80 mmØ pc/s - -
4.0 50 mmØ pc/s - -
5.0 40 mmØ pc/s 44.00 104.99 41.99 6,467.12 100.00% 44.00
6.0 32 mmØ pc/s 7.00 78.88 31.55 773.03 100.00% 7.00
7.0 25 mmØ pc/s 1,216.00 52.49 21.00 89,363.84 100.00% 1,216.00
- -
2.01.03 B.I. Tee Standard - -
1.0 150 mmØ pc/s - -
BLDG. B PREVIOUS (OCTOBE
ITEM
DESCRIPTION
NO.
MATERIAL LABOR
UNIT QTY AMOUNT % ACCOM QTY
RATES RATES
2.0 100 mmØ pc/s - -
3.0 80 mmØ pc/s - -
4.0 50 mmØ pc/s 157.00 206.40 82.56 45,366.57 100.00% 157.00
5.0 40 mmØ pc/s 20.00 139.97 55.99 3,919.15 100.00% 20.00
6.0 32 mmØ pc/s -
7.0 25 mmØ pc/s 346.00 68.80 27.52 33,326.61 100.00% 346.00
- -
2.01.04 B.I. Tee Reducer - -
1.0 150 mmØ x 100 mmØ pc/s - -
2.0 80 mmØ x 50 mmØ pc/s - -
3.0 80 mmØ x 40 mmØ pc/s - -
4.0 80 mmØ x 32 mmØ pc/s - -
5.0 80 mmØ x 25 mmØ pc/s - -
- -
2.01.05 B.I. Reducer - -
1.0 100 mmØ x 80 mmØ pc/s - -
2.0 80 mmØ x 50 mmØ pc/s - -
- -
2.01.06 Mechanical Couplier/Victaulic Coupling - -
1.0 150 mmØ pc/s 46.00 1,098.04 439.22 70,713.88 56.52% 26.00
2.0 100 mmØ pc/s 42.00 684.60 273.84 40,254.47 90.48% 38.00
3.0 80 mmØ pc/s 112.00 527.42 210.97 82,699.07 100.00% 112.00
4.0 50 mmØ pc/s 414.93 165.97
- -
2.01.07 Others - -
BLDG. B PREVIOUS (OCTOBE
ITEM
DESCRIPTION
NO.
MATERIAL LABOR
UNIT QTY AMOUNT % ACCOM QTY
RATES RATES
2.01.07.01 Victaulic Elbow - -
1.0 150 mmØ pc/s 12.00 1,492.11 596.85 25,067.53 33.33% 4.00
2.0 100 mmØ pc/s 14.00 671.94 268.77 13,169.94 85.71% 12.00
- -
2.01.07.02 Victaulic Tee - -
1.0 150 mmØ x 100 mmØ pc/s 14.00 6,995.73 2,798.29 137,116.34 100.00% 14.00
2.0 80 mmØ x 80 mmØ pc/s 7.00 571.37 228.55 5,599.42 100.00% 7.00
- -
2.01.07.03 Victaulic Reducer - -
1.0 100 mmØ x 80 mmØ pc/s 7.00 1,679.84 671.94 16,462.43 100.00% 7.00
- -
2.01.07.04 B.I. Tee Reducer - -
1.0 32 mmØ x 25 mmØ pc/s 176.00 127.22 50.89 31,347.86 100.00% 176.00
2.0 40 mmØ x 25 mmØ pc/s 27.00 167.85 67.14 6,344.91 100.00% 27.00
3.0 50 mmØ x 25 mmØ pc/s 140.00 246.74 98.69 48,360.20 100.00% 140.00
4.0 50 mmØ x 32 mmØ pc/s 7.00 246.74 98.69 2,418.01 100.00% 7.00
- -
2.01.07.05 B.I. Coupling Reducer - -
1.0 25 mmØ x 15 mmØ pc/s 920.00 43.31 17.32 55,780.01 100.00% 920.00
2.0 25 mmØ x 20 mmØ pc/s 135.00 - - - 0.00% -
3.0 32 mmØ x 25 mmØ pc/s 186.00 63.75 25.50 16,601.41 100.00% 186.00
4.0 40 mmØ x 25 mmØ pc/s 38.00 81.56 32.62 4,338.85 100.00% 38.00
5.0 40 mmØ x 32 mmØ pc/s 56.00 81.56 32.62 6,394.09 100.00% 56.00
6.0 50 mmØ x 25 mmØ pc/s - -
7.0 50 mmØ x 32 mmØ pc/s 245.00 118.32 47.33 40,584.30 100.00% 245.00
8.0 50 mmØ x 40 mmØ pc/s 271.00 118.32 47.33 44,891.20 100.00% 271.00
- -
2.01.07.06 Mechanical Tee Threaded - -
1.0 150 mmØ x 100 mmØ pc/s - -
2.0 80 mmØ x 50 mmØ pc/s 157.00 920.75 368.30 202,379.94 100.00% 157.00
3.0 80 mmØ x 40 mmØ pc/s 39.00 800.07 320.03 43,683.58 100.00% 39.00
4.0 80 mmØ x 32 mmØ pc/s 7.00 800.07 320.03 7,840.64 100.00% 7.00
5.0 80 mmØ x 25 mmØ pc/s 7.00 674.17 269.67 6,606.87 100.00% 7.00
BLDG. B PREVIOUS (OCTOBE
ITEM
DESCRIPTION
NO.
MATERIAL LABOR
UNIT QTY AMOUNT % ACCOM QTY
RATES RATES
- -
2.01.07.07 Slip on Flange - -
1.0 80 mmØ pc/s 14.00 334.46 133.78 6,555.45 100.00% 14.00
2.0 100 mmØ pc/s - -
3.0 150 mmØ pc/s 23.00 648.65 259.46 20,886.47 8.70% 2.00
4.0 200 mmØ pc/s - -
- -
2.01.07.08 Blind Flange - -
1.0 80 mmØ pc/s 14.00 738.43 295.37 14,473.16 100.00% 14.00
2.0 100 mmØ pc/s - -
3.0 150 mmØ pc/s 7.00 1,433.41 573.36 14,047.42 28.57% 2.00
4.0 200 mmØ pc/s - -
- -
2.01.07.09 Threadolet - -
1.0 25 mmØ pc/s 14.00 130.31 52.12 2,554.04 100.00% 14.00
2.0 15 mmØ pc/s 16.00 86.88 34.75 1,946.02 100.00% 16.00
- -
2.01.07.10 Plug - -
1.0 25 mmØ pc/s 1,055.00 27.58 11.03 40,734.01 100.00% 1,055.00
2.0 32 mmØ pc/s 7.00 41.99 16.80 411.52 100.00% 7.00
- -
2.01.07.11 Union Patente - -
1.0 25 mmØ pc/s 7.00 162.81 65.12 1,595.52 100.00% 7.00
2.0 32 mmØ pc/s 7.00 114.48 45.79 1,121.88 100.00% 7.00

SUB-TOTAL FOR WET STANDPIPE SYSTEM 2,505,344.77


BLDG. B PREVIOUS (OCTOBE
ITEM
DESCRIPTION
NO.
MATERIAL LABOR
UNIT QTY AMOUNT % ACCOM QTY
RATES RATES
2.02 DRY STANDPIPE SYSTEM
2.02.01 Black Iron (BI) Pipes
1.0 150 mmØ Lm/s 30.30 1,400.49 560.20 59,408.79 100.00% 30.30
- -
2.02.02 B.I. Tee Reducer - -
1.0 100 mmØ x 65 mmØ pc/s - -
- -
2.02.03 Fire Hose Valve - -
1.0 65 mmØ pc/s 7.00 11,039.56 4,415.82 108,187.67 0.00% -
- -
2.02.04Roof Manifold - -
1.0 2-65 x 100mmØ pc/s - -
SUB-TOTAL FOR DRY STANDPIPE SYSTEM 167,596.45
2.03 FIRE DEPARTMENT CONNECTION & TEST HEADER
(Concrete Pedestal are included)
2.03.01 Fire Department Connection - -
1.0 3-65 x 150mmØ set/s 1.00 24,493.52 9,797.41 34,290.92 0.00% -
2.0 2-65 x 150mmØ set/s 1.00 16,329.01 6,531.60 22,860.61 0.00% -
- -
2.03.02 Test Header - -
1.0 2-65 x 150mmØ set/s - -
- -
2.03.03
Swing Check Valve - -
1.0 150 mmØ pc/s 1.00 21,965.58 8,786.23 30,751.81 0.00% -
2.03.04 Alarm Check Valve - -
1.0 150 mmØ pc/s 1.00 70,930.57 28,372.23 99,302.79 100.00% 1.00
SUB-TOTAL FOR FIRE DEPARTMENT CONNECTION & TEST HEADER 187,206.14
2.04 DRAINS, VALVES & ACCESSORIES
2.04.01 OS & Y Gate Valve
1.0 100 mmØ pc/s 7.00 12,235.86 4,894.34 119,911.43 100.00% 7.00
2.0 150 mmØ pc/s 1.00 19,099.96 7,639.98 26,739.95 100.00% 1.00
- -
2.04.02 By-pass Valve - -
BLDG. B PREVIOUS (OCTOBE
ITEM
DESCRIPTION
NO.
MATERIAL LABOR
UNIT QTY AMOUNT % ACCOM QTY
RATES RATES
1.0 75 mmØ pc/s - -
- -
2.04.03 Flexible Coupling - -
1.0 150 mmØ pc/s - -
- -
2.04.04 Inspector Test Valve - -
1.0 25 mmØ pc/s - -
2.04.05 Drain Valve - -
1.0 32 mmØ pc/s - -
- -
2.04.06 Air Release Valve - -
1.0 25 mmØ pc/s 7.00 5,844.64 2,337.85 57,277.43 100.00% 7.00
2.04.07 Supervisory Switch pc/s 7.00 3,903.23 1,561.29 38,251.63 100.00% 7.00
2.04.08 Waterflow Switch 100 mm Ø pc/s 7.00 3,945.19 1,578.07 38,662.82 0.00% -
2.04.09 Sight Glass 25Ø pc/s 14.00 648.65 259.46 12,713.50 100.00% 14.00
2.04.10 Pressure Gauge pc/s 16.00 1,216.78 486.71 27,255.92 0.00% -
2.04.11 OTHERS - -
2.04.11.01 Gate Valve 25mmØ pc/s 7.00 539.78 215.91 5,289.88 0.00% -
2.04.11.02 Globe Valve 25mmØ pc/s 22.00 1,384.61 553.85 42,646.11 0.00% -
2.04.11.03 Globe Valve 32mmØ pc/s 7.00 1,821.20 728.48 17,847.80 0.00% -
2.04.11.04 Pig tail 15mmØ pc/s 16.00 252.88 101.15 5,664.56 0.00% -
2.04.11.05 Ball Valve 15mmØ pc/s 16.00 580.61 232.24 13,005.62 100.00% 16.00
2.04.11.06 Fire Extinguisher Cabinet pc/s - - -
BLDG. B PREVIOUS (OCTOBE
ITEM
DESCRIPTION
NO.
MATERIAL LABOR
UNIT QTY AMOUNT % ACCOM QTY
RATES RATES
SUB-TOTAL FOR DRAINS, VALVES & ACCESSORIES 405,266.65
2.05 FIRE HOSE CABINET
2.05.01 Recessed Fire Hose Cabinet set/s 15.00 18,132.64 7,253.05 380,785.38 40.00% 6.00
SUB-TOTAL FOR FIRE HOSE CABINET 380,785.38
2.06 PORTABLE FIRE EXTINGUISHER
2.06.01 10 Lbs. ABC PFE set/s 23.00 4,151.57 1,660.63 133,680.68 0.00% -
2.06.03 10 Lbs. HCFC PFE set/s 12.00 9,213.75 3,685.50 154,791.00 0.00% -
SUB-TOTAL FOR PORTABLE FIRE EXTINGUISHER 288,471.68
2.07 SPRINKLER HEADS
2.07.01 Upright Sprinkler Head pc/s 84.00 182.57 151.30 28,045.42 100.00% 84.00
2.07.02 Pendent Sprinkler Head pc/s 565.00 212.06 151.30 205,297.27 30.44% 172.00
2.07.03 Sidewall Sprinkler Head (ordinary) pc/s 271.00 405.97 151.30 151,020.71 36.16% 98.00
2.07.04 Sidewall Sprinkler Head (extended) pc/s 135.00 767.72 151.30 124,067.43 40.00% 54.00
2.07.05 Others (Please Specify): - -
2.0 Spare Heads pc/s - -
SUB-TOTAL FOR SPRINKLER HEADS 508,430.83

2.09 PIPE SLEEVING WORKS Lot 1.00 29,542.50 11,817.00 41,359.50 100.00% 1.00

SUB-TOTAL FOR PIPE SLEEVING WORKS 41,359.50

2.10 MISCELLANEOUS & CONSUMABLES Lot 1.00 245,904.43 98,361.77 344,266.21 93.00% 0.93

SUB-TOTAL FOR MISCELLANEOUS & CONSUMABLES 344,266.21

2.11 HANGERS & SUPPORTS Lot 1.00 198,675.55 79,470.22 278,145.76 100.00% 1.00

SUB-TOTAL FOR HANGERS & SUPPORTS 278,145.76


2.12 ELECTRICAL WORKS Lot 1.00 74,625.00 29,850.00 104,475.00 0.00% -
Complete Electrical Works from Fire
Protection Equipments to Power Supply
SUB-TOTAL FOR ELECTRICAL WORKS 104,475.00
2.13 TESTING & COMMISSIONING Lot 1.00 49,237.50 19,695.00 68,932.50 40.00% 0.40
BLDG. B PREVIOUS (OCTOBE
ITEM
DESCRIPTION
NO.
MATERIAL LABOR
UNIT QTY AMOUNT % ACCOM QTY
RATES RATES
2.14 Others - - -
2.14.01 Gravel and Sand Lot 1.00 78,503.25 31,401.30 109,904.55 100.00% 1.00
2.14.02 Excavation and Backfilling Lot 1.00 87,862.65 35,145.06 123,007.71 100.00% 1.00
2.14.03 Post Indicator Valve pc/s 2.00 48,157.58 19,263.03 134,841.22 0.00% -
2.14.04 Fire Hydrant pc/s 1.00 161,921.59 64,768.64 226,690.23 0.00% -
2.14.05 By - Pass Gate Valve 200mmØ pc/s 1.00 41,854.81 16,741.92 58,596.73 0.00% -
2.14.06 B.I. Pipes 200mmØ Lm/s 30.00 1,939.14 775.66 81,443.88 0.00% -
2.14.07 Float Valve pc/s 2.00 108,013.50 43,205.40 302,437.80 0.00% -
2.14.08 Foot Valve pc/s 2.00 30,374.19 12,149.68 85,047.73 0.00% -

SUB-TOTAL FOR TESTING & OTHERS 1,190,902.35

GRAND TOTAL FOR BLDG. B 6,402,250.73

PREPARED BY : CHECKED BY:

RAYMUNDO E. CRUZ AR. SERAFIN PALOMIQUE


PRESIDENT - SBI ACMC- PM

CHECKED BY:

JHANNAH JOYCE PAMULA


ACMC - QS
THIS PERIOD (OCTOBER 20,2019 - NOVEMBER TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
20, 2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

343,120.05 5.36% 0.00% - 0.00% 100.00% 151.00 343,120.05 5.36%


61,571.57 0.96% 0.00% - 0.00% 100.00% 56.70 61,571.57 0.96%
349,786.86 5.46% 0.00% - 0.00% 100.00% 490.70 349,786.86 5.46%
43,413.87 0.68% 0.00% - 0.00% 100.00% 129.60 43,413.87 0.68%
41,404.61 0.65% 0.00% - 0.00% 100.00% 160.00 41,404.61 0.65%
52,960.11 0.83% 0.00% - 0.00% 100.00% 259.60 52,960.11 0.83%
396,699.96 6.20% 0.00% - 0.00% 100.00% 2,474.00 396,699.96 6.20%

22,767.96 0.36% 5.88% 1.00 1,423.00 0.02% 100.00% 17.00 24,190.96 0.38%

6,467.12 0.10% 0.00% - 0.00% 100.00% 44.00 6,467.12 0.10%


773.03 0.01% 0.00% - 0.00% 100.00% 7.00 773.03 0.01%
89,363.84 1.40% 0.00% - 0.00% 100.00% 1,216.00 89,363.84 1.40%
THIS PERIOD (OCTOBER 20,2019 - NOVEMBER TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
20, 2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

45,366.57 0.71% 0.00% - 0.00% 100.00% 157.00 45,366.57 0.71%


3,919.15 0.06% 0.00% - 0.00% 100.00% 20.00 3,919.15 0.06%

33,326.61 0.52% 0.00% - 0.00% 100.00% 346.00 33,326.61 0.52%

39,968.71 0.62% 43.48% 20.00 30,745.16 0.48% 100.00% 46.00 70,713.88 1.10%
36,420.71 0.57% 9.52% 4.00 3,833.76 0.06% 100.00% 42.00 40,254.47 0.63%
82,699.07 1.29% 0.00% - 0.00% 100.00% 112.00 82,699.07 1.29%
THIS PERIOD (OCTOBER 20,2019 - NOVEMBER TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
20, 2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

8,355.84 0.13% 66.67% 8.00 16,711.69 0.26% 100.00% 12.00 25,067.53 0.39%
11,288.52 0.18% 14.29% 2.00 1,881.42 0.03% 100.00% 14.00 13,169.94 0.21%

137,116.34 2.14% 0.00% - 0.00% 100.00% 14.00 137,116.34 2.14%


5,599.42 0.09% 0.00% - 0.00% 100.00% 7.00 5,599.42 0.09%

16,462.43 0.26% 0.00% - 0.00% 100.00% 7.00 16,462.43 0.26%

31,347.86 0.49% 0.00% - 0.00% 100.00% 176.00 31,347.86 0.49%


6,344.91 0.10% 0.00% - 0.00% 100.00% 27.00 6,344.91 0.10%
48,360.20 0.76% 0.00% - 0.00% 100.00% 140.00 48,360.20 0.76%
2,418.01 0.04% 0.00% - 0.00% 100.00% 7.00 2,418.01 0.04%

55,780.01 0.87% 0.00% - 0.00% 100.00% 920.00 55,780.01 0.87%


- 0.00% 0.00% - 0.00% 0.00% - - 0.00%
16,601.41 0.26% 0.00% - 0.00% 100.00% 186.00 16,601.41 0.26%
4,338.85 0.07% 0.00% - 0.00% 100.00% 38.00 4,338.85 0.07%
6,394.09 0.10% 0.00% - 0.00% 100.00% 56.00 6,394.09 0.10%

40,584.30 0.63% 0.00% - 0.00% 100.00% 245.00 40,584.30 0.63%


44,891.20 0.70% 0.00% - 0.00% 100.00% 271.00 44,891.20 0.70%

202,379.94 3.16% 0.00% - 0.00% 100.00% 157.00 202,379.94 3.16%


43,683.58 0.68% 0.00% - 0.00% 100.00% 39.00 43,683.58 0.68%
7,840.64 0.12% 0.00% - 0.00% 100.00% 7.00 7,840.64 0.12%
6,606.87 0.10% 0.00% - 0.00% 100.00% 7.00 6,606.87 0.10%
THIS PERIOD (OCTOBER 20,2019 - NOVEMBER TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
20, 2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

6,555.45 0.10% 0.00% - 0.00% 100.00% 14.00 6,555.45 0.10%

1,816.21 0.03% 91.30% 21.00 19,070.25 0.30% 100.00% 23.00 20,886.47 0.33%

14,473.16 0.23% 0.00% - 0.00% 100.00% 14.00 14,473.16 0.23%

4,013.55 0.06% 71.43% 5.00 10,033.87 0.16% 100.00% 7.00 14,047.42 0.22%

2,554.04 0.04% 0.00% - 0.00% 100.00% 14.00 2,554.04 0.04%


1,946.02 0.03% 0.00% - 0.00% 100.00% 16.00 1,946.02 0.03%

40,734.01 0.64% 0.00% - 0.00% 100.00% 1,055.00 40,734.01 0.64%


411.52 0.01% 0.00% - 0.00% 100.00% 7.00 411.52 0.01%

1,595.52 0.02% 0.00% - 0.00% 100.00% 7.00 1,595.52 0.02%


1,121.88 0.02% 0.00% - 0.00% 100.00% 7.00 1,121.88 0.02%
THIS PERIOD (OCTOBER 20,2019 - NOVEMBER TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
20, 2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

59,408.79 0.93% 0.00% - 0.00% 100.00% 30.30 59,408.79 0.93%

- 0.00% 0.00% - 0.00% 0.00% - - 0.00%

- 0.00% 0.00% - 0.00% 0.00% - - 0.00%


- 0.00% 0.00% - 0.00% 0.00% - - 0.00%

- 0.00% 0.00% - 0.00% 0.00% - - 0.00%

99,302.79 1.55% 0.00% - 0.00% 100.00% 1.00 99,302.79 1.55%

119,911.43 1.87% 0.00% - 0.00% 100.00% 7.00 119,911.43 1.87%


26,739.95 0.42% 0.00% - 0.00% 100.00% 1.00 26,739.95 0.42%
THIS PERIOD (OCTOBER 20,2019 - NOVEMBER TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
20, 2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

57,277.43 0.89% 0.00% - 0.00% 100.00% 7.00 57,277.43 0.89%


38,251.63 0.60% 0.00% - 0.00% 100.00% 7.00 38,251.63 0.60%
- 0.00% 0.00% - 0.00% 0.00% - - 0.00%
12,713.50 0.20% 0.00% - 0.00% 100.00% 14.00 12,713.50 0.20%
- 0.00% 0.00% - 0.00% 0.00% - - 0.00%

- 0.00% 100.00% 7.00 5,289.88 0.08% 100.00% 7.00 5,289.88 0.08%


- 0.00% 100.00% 22.00 42,646.11 0.67% 100.00% 22.00 42,646.11 0.67%
- 0.00% 100.00% 7.00 17,847.80 0.28% 100.00% 7.00 17,847.80 0.28%
- 0.00% 100.00% 16.00 5,664.56 0.09% 100.00% 16.00 5,664.56 0.09%
13,005.62 0.20% 0.00% - 0.00% 100.00% 16.00 13,005.62 0.20%
THIS PERIOD (OCTOBER 20,2019 - NOVEMBER TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
20, 2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

152,314.15 2.38% 13.33% 2.00 50,771.38 0.79% 53.33% 8.00 203,085.54 3.17%

- 0.00% 0.00% - 0.00% 0.00% - - 0.00%


- 0.00% 25.00% 3.00 38,697.75 0.60% 25.00% 3.00 38,697.75 0.60%

28,045.42 0.44% 1.19% 1.00 333.87 0.01% 101.19% 85.00 28,379.29 0.44%
62,497.58 0.98% 10.09% 57.00 20,711.41 0.32% 40.53% 229.00 83,208.98 1.30%
54,612.66 0.85% 19.93% 54.00 30,092.69 0.47% 56.09% 152.00 84,705.34 1.32%
49,626.97 0.78% 19.26% 26.00 23,894.47 0.37% 59.26% 80.00 73,521.44 1.15%

41,359.50 0.65% 0.00% - 0.00% 100.00% 1.00 41,359.50 0.65%

320,167.57 5.00% 1.00% 0.01 3,442.66 0.05% 94.00% 0.94 323,610.23 5.05%

277,828.64 4.34% 0.00% - 0.00% 100.00% 1.00 277,828.64 4.34%

- 0.00% 0.00% - 0.00% 0.00% - - 0.00%

27,573.00 0.43% 0.00% - 0.00% 40.00% 0.40 27,573.00 0.43%


THIS PERIOD (OCTOBER 20,2019 - NOVEMBER TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
20, 2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

109,904.55 1.72% 0.00% - 0.00% 100.00% 1.00 109,904.55 1.72%


123,007.71 1.92% 0.00% - 0.00% 100.00% 1.00 123,007.71 1.92%
- 0.00% 0.00% - 0.00% 0.00% - - 0.00%
- 0.00% 0.00% - 0.00% 0.00% - - 0.00%
- 0.00% 0.00% - 0.00% 0.00% - - 0.00%
- 0.00% 0.00% - 0.00% 0.00% - - 0.00%
- 0.00% 0.00% - 0.00% 0.00% - - 0.00%
- 0.00% 0.00% - 0.00% 0.00% - - 0.00%

4,095,194.51 63.96% 323,091.73 5.05% 4,418,286.24 69.01%

NOTED BY:

AR. SERAFIN PALOMIQUE JR. Engr. MARIA LYNETH CABACCAN / Engr. HERBERT ALLAN M. HULLANA
ACMC- PM SMDC - APM/PM

JHANNAH JOYCE PAMULARCO


ACMC - QS
OWNER : SM PRIME HOLDINGS INC.
PROJECT : HOPE RESIDENCES
LOCATION : TRECE MARTIRES, CAVITE CITY
SUBJECT : BILLS OF QUANTITY-BLDG. C
CONTRACT PACKAGE : FIRE PROTECTION SYSTEM
DATE Pro. : NOVEMBER 20,2019
DATE PRINTED: NOVEMBER 20,2019

BLDG. C PREVIOUS (OCTOBE


ITEM
DESCRIPTION
NO. LABOR
UNIT QTY MATERIAL RATES AMOUNT % ACCOM QTY
RATES
II FIRE PROTECTION WORKS
2.01 WET STANDPIPE SYSTEM
(Termination/Connection points from Bldg. Line to
Main Fire Water Line at Land Devt are included)

2.01.01 Black Iron (BI) Pipes


1.0 150 mmØ Lm/s 131.00 1,400.49 560.20 256,849.87 100.00% 131.00
2.0 100 mmØ Lm/s 56.70 775.66 310.26 61,571.57 100.00% 56.70
3.0 80 mmØ Lm/s 490.70 509.17 203.67 349,786.86 100.00% 490.70
4.0 50 mmØ Lm/s 127.60 239.27 95.71 42,743.91 100.00% 127.60
5.0 40 mmØ Lm/s 148.00 184.84 73.94 38,299.26 100.00% 148.00
6.0 32 mmØ Lm/s 257.60 145.72 58.29 52,552.10 100.00% 257.60
7.0 25 mmØ Lm/s 2,447.00 114.53 45.81 392,370.58 100.00% 2,447.00
- -
2.01.02 B.I. Elbow 90° - -
1.0 150 mmØ pc/s 8.00 1,016.43 406.57 11,383.98 100.00% 8.00
2.0 100 mmØ pc/s - -
3.0 80 mmØ pc/s - -
4.0 50 mmØ pc/s - -
5.0 40 mmØ pc/s 14.00 104.99 41.99 2,057.72 100.00% 14.00
6.0 32 mmØ pc/s 7.00 78.88 31.55 773.03 100.00% 7.00
7.0 25 mmØ pc/s 1,216.00 52.49 21.00 89,363.84 100.00% 1,216.00
- -
2.01.03 B.I. Tee Standard - -
1.0 150 mmØ pc/s - -
BLDG. C PREVIOUS (OCTOBE
ITEM
DESCRIPTION
NO. LABOR
UNIT QTY MATERIAL RATES AMOUNT % ACCOM QTY
RATES
2.0 100 mmØ pc/s - -
3.0 80 mmØ pc/s - -
4.0 50 mmØ pc/s 169.00 206.40 82.56 48,834.08 100.00% 169.00
5.0 40 mmØ pc/s 42.00 139.97 55.99 8,230.21 100.00% 42.00
6.0 32 mmØ pc/s - -
7.0 25 mmØ pc/s 358.00 68.80 27.52 34,482.45 100.00% 358.00
- -
2.01.04 B.I. Tee Reducer - -
1.0 150 mmØ x 100 mmØ pc/s - -
2.0 80 mmØ x 50 mmØ pc/s - -
3.0 80 mmØ x 40 mmØ pc/s - -
4.0 80 mmØ x 32 mmØ pc/s - -
5.0 80 mmØ x 25 mmØ pc/s - -
- -
2.01.05 B.I. Reducer - -
1.0 100 mmØ x 80 mmØ pc/s - -
2.0 80 mmØ x 50 mmØ pc/s - -
- -
2.01.06 Mechanical Couplier/Victaulic Coupling - -
1.0 150 mmØ pc/s 46.00 1,098.04 439.22 70,713.88 100.00% 46.00
2.0 100 mmØ pc/s 42.00 684.60 273.84 40,254.47 100.00% 42.00
3.0 80 mmØ pc/s 112.00 527.42 210.97 82,699.07 100.00% 112.00
4.0 50 mmØ pc/s 414.93 165.97
- -
2.01.07 Others - -
2.01.07.01 Victaulic Elbow - -
BLDG. C PREVIOUS (OCTOBE
ITEM
DESCRIPTION
NO. LABOR
UNIT QTY MATERIAL RATES AMOUNT % ACCOM QTY
RATES
1.0 150 mmØ pc/s 12.00 1,492.11 596.85 25,067.53 66.67% 8.00
2.0 100 mmØ pc/s 14.00 671.94 268.77 13,169.94 71.43% 10.00
- -
2.01.07.02 Victaulic Tee - -
1.0 150 mmØ x 100 mmØ pc/s 7.00 6,995.73 2,798.29 68,558.17 100.00% 7.00
2.0 80 mmØ x 80 mmØ pc/s 7.00 571.37 228.55 5,599.42 100.00% 7.00
- -
2.01.07.03 Victaulic Reducer - -
1.0 100 mmØ x 80 mmØ pc/s 7.00 1,679.84 671.94 16,462.43 100.00% 7.00
- -
2.01.07.04 B.I. Tee Reducer - -
1.0 32 mmØ x 25 mmØ pc/s 194.00 127.22 50.89 34,553.89 100.00% 194.00
2.0 40 mmØ x 25 mmØ pc/s 33.00 167.85 67.14 7,754.89 100.00% 33.00
3.0 50 mmØ x 25 mmØ pc/s 142.00 246.74 98.69 49,051.06 100.00% 142.00
4.0 50 mmØ x 32 mmØ pc/s 7.00 246.74 98.69 2,418.01 100.00% 7.00
- -
2.01.07.05 B.I. Coupling Reducer - -
1.0 25 mmØ x 15 mmØ pc/s 950.00 43.31 17.32 57,598.92 100.00% 950.00
2.0 25 mmØ x 20 mmØ pc/s 148.00 - - - 0.00% -
3.0 32 mmØ x 25 mmØ pc/s 220.00 63.75 25.50 19,636.07 100.00% 220.00
4.0 40 mmØ x 25 mmØ pc/s 20.00 81.56 32.62 2,283.60 100.00% 20.00
5.0 40 mmØ x 32 mmØ pc/s 70.00 81.56 32.62 7,992.61 100.00% 70.00
6.0 50 mmØ x 25 mmØ pc/s - -
7.0 50 mmØ x 32 mmØ pc/s 250.00 118.32 47.33 41,412.55 100.00% 250.00
8.0 50 mmØ x 40 mmØ pc/s 277.00 118.32 47.33 45,885.10 100.00% 277.00
- -
2.01.07.06 Mechanical Tee Threaded - -
1.0 150 mmØ x 100 mmØ pc/s - -
2.0 80 mmØ x 50 mmØ pc/s 163.00 920.75 368.30 210,114.21 100.00% 163.00
3.0 80 mmØ x 40 mmØ pc/s 32.00 800.07 320.03 35,842.94 100.00% 32.00
4.0 80 mmØ x 32 mmØ pc/s 10.00 800.07 320.03 11,200.92 100.00% 10.00
5.0 80 mmØ x 25 mmØ pc/s 10.00 674.17 269.67 9,438.39 100.00% 10.00
- -
BLDG. C PREVIOUS (OCTOBE
ITEM
DESCRIPTION
NO. LABOR
UNIT QTY MATERIAL RATES AMOUNT % ACCOM QTY
RATES
2.01.07.07 Slip on Flange - -
1.0 80 mmØ pc/s 14.00 334.46 133.78 6,555.45 0.00% -
2.0 100 mmØ pc/s - -
3.0 150 mmØ pc/s 23.00 648.65 259.46 20,886.47 8.70% 2.00
4.0 200 mmØ pc/s - -
- -
2.01.07.08 Blind Flange - -
1.0 80 mmØ pc/s 14.00 738.43 295.37 14,473.16 0.00% -
2.0 100 mmØ pc/s - -
3.0 150 mmØ pc/s 7.00 1,433.41 573.36 14,047.42 28.57% 2.00
4.0 200 mmØ pc/s - -
- -
2.01.07.09 Threadolet - -
1.0 25 mmØ pc/s 14.00 130.31 52.12 2,554.04 100.00% 14.00
2.0 15 mmØ pc/s 16.00 86.88 34.75 1,946.02 100.00% 16.00
- -
2.01.07.10 Plug - -
1.0 25 mmØ pc/s 1,098.00 27.58 11.03 42,394.25 100.00% 1,098.00
2.0 32 mmØ pc/s 7.00 41.99 16.80 411.52 100.00% 7.00
- -
2.01.07.11 Union Patente - -
1.0 25 mmØ pc/s 7.00 162.81 65.12 1,595.52 100.00% 7.00
2.0 32 mmØ pc/s 7.00 114.48 45.79 1,121.88 100.00% 7.00

SUB-TOTAL FOR WET STANDPIPE SYSTEM 2,352,993.28


BLDG. C PREVIOUS (OCTOBE
ITEM
DESCRIPTION
NO. LABOR
UNIT QTY MATERIAL RATES AMOUNT % ACCOM QTY
RATES
2.02 DRY STANDPIPE SYSTEM
2.02.01 Black Iron (BI) Pipes
1.0 150 mmØ Lm/s 29.30 1,400.49 560.20 57,448.10 100.00% 29.30
- -
2.02.02 B.I. Tee Reducer - -
1.0 100 mmØ x 65 mmØ pc/s - -
- -
2.02.03 Fire Hose Valve - -
1.0 65 mmØ pc/s 7.00 11,039.56 4,415.82 108,187.67 0.00% -

2.02.04Roof Manifold
1.0 2-65 x 100mmØ pc/s
SUB-TOTAL FOR DRY STANDPIPE SYSTEM 165,635.77
2.03 FIRE DEPARTMENT CONNECTION & TEST HEADER
(Concrete Pedestal are included)
2.03.01 Fire Department Connection
1.0 3-65 x 150mmØ set/s 1.00 24,493.52 9,797.41 34,290.92 0.00% -
2.0 2-65 x 150mmØ set/s 1.00 16,329.01 6,531.60 22,860.61 0.00% -
- -
2.03.02 Test Header - -
1.0 2-65 x 150mmØ set/s - -
- -
2.03.03
Swing Check Valve - -
1.0 150 mmØ pc/s 1.00 21,965.58 8,786.23 30,751.81 0.00% -
2.03.04 Alarm Check Valve - -
1.0 150 mmØ pc/s 1.00 70,930.57 28,372.23 99,302.79 100.00% 1.00
SUB-TOTAL FOR FIRE DEPARTMENT CONNECTION & TEST HEADER 187,206.14
2.04 DRAINS, VALVES & ACCESSORIES
2.04.01 OS & Y Gate Valve - -
1.0 100 mmØ pc/s 7.00 12,235.86 4,894.34 119,911.43 100.00% 7.00
2.0 150 mmØ pc/s 1.00 19,099.96 7,639.98 26,739.95 100.00% 1.00
- -
2.04.02 By-pass Valve - -
BLDG. C PREVIOUS (OCTOBE
ITEM
DESCRIPTION
NO. LABOR
UNIT QTY MATERIAL RATES AMOUNT % ACCOM QTY
RATES
1.0 75 mmØ pc/s - -
- -
2.04.03 Flexible Coupling - -
1.0 150 mmØ pc/s - -
- -
2.04.04 Inspector Test Valve - -
1.0 25 mmØ pc/s - -
2.04.05 Drain Valve - -
1.0 32 mmØ pc/s - -
- -
2.04.06 Air Release Valve - -
1.0 25 mmØ pc/s 7.00 5,844.64 2,337.85 57,277.43 100.00% 7.00
2.04.07 Supervisory Switch pc/s 7.00 3,903.23 1,561.29 38,251.63 100.00% 7.00
2.04.08 Waterflow Switch 100 mm Ø pc/s 7.00 3,945.19 1,578.07 38,662.82 0.00% -
2.04.09 Sight Glass 25Ø pc/s 14.00 648.65 259.46 12,713.50 100.00% 14.00
2.04.10 Pressure Gauge pc/s 16.00 1,216.78 486.71 27,255.92 0.00% -
2.04.11 OTHERS - -
2.04.11.01 Gate Valve 25mmØ pc/s 7.00 539.78 215.91 5,289.88 0.00% -
2.04.11.02 Globe Valve 25mmØ pc/s 23.00 1,384.61 553.85 44,584.57 0.00% -
2.04.11.03 Globe Valve 32mmØ pc/s 7.00 1,821.20 728.48 17,847.80 0.00% -
2.04.11.04 Pig tail 15mmØ pc/s 16.00 252.88 101.15 5,664.56 100.00% 16.00
2.04.11.05 Ball Valve 15mmØ pc/s 16.00 580.61 232.24 13,005.62 100.00% 16.00
2.04.11.06 Fire Extinguisher Cabinet pc/s - - -
SUB-TOTAL FOR DRAINS, VALVES & ACCESSORIES 407,205.11
2.05 FIRE HOSE CABINET
2.05.01 Recessed Fire Hose Cabinet set/s 14.00 18,132.64 7,253.05 355,399.69 85.71% 12.00
SUB-TOTAL FOR FIRE HOSE CABINET 355,399.69
BLDG. C PREVIOUS (OCTOBE
ITEM
DESCRIPTION
NO. LABOR
UNIT QTY MATERIAL RATES AMOUNT % ACCOM QTY
RATES
2.06 PORTABLE FIRE EXTINGUISHER
2.06.01 10 Lbs. ABC PFE set/s 24.00 4,151.57 1,660.63 139,492.89 0.00% -
2.06.03 10 Lbs. HCFC PFE set/s 11.00 9,213.75 3,685.50 141,891.75 0.00% -
SUB-TOTAL FOR PORTABLE FIRE EXTINGUISHER 281,384.64
2.07 SPRINKLER HEADS
2.07.01 Upright Sprinkler Head pc/s 8.00 182.57 151.30 2,670.99 50.00% 4.00
2.07.02 Pendent Sprinkler Head pc/s 646.00 212.06 151.30 234,729.27 35.60% 230.00
2.07.03 Sidewall Sprinkler Head (ordinary) pc/s 296.00 405.97 151.30 164,952.51 100.00% 296.00
2.07.04 Sidewall Sprinkler Head (extended) pc/s 148.00 767.72 151.30 136,014.66 91.22% 135.00
2.07.05 Others (Please Specify): -
2.0 Spare Heads pc/s -
SUB-TOTAL FOR SPRINKLER HEADS 538,367.44

2.09 PIPE SLEEVING WORKS Lot 1.00 29,542.50 11,817.00 41,359.50 100.00% 1.00

SUB-TOTAL FOR PIPE SLEEVING WORKS 41,359.50

2.10 MISCELLANEOUS & CONSUMABLES Lot 1.00 199,458.84 79,783.54 279,242.38 100.00% 1.00

SUB-TOTAL FOR MISCELLANEOUS & CONSUMABLES 279,242.38

2.11 HANGERS & SUPPORTS Lot 1.00 159,937.34 63,974.94 223,912.28 100.00% 1.00

SUB-TOTAL FOR HANGERS & SUPPORTS 223,912.28


2.12 ELECTRICAL WORKS Lot 1.00 21,625.00 15,984.00 37,609.00 0.00% -
Complete Electrical Works from Fire
Protection Equipments to Power Supply
SUB-TOTAL FOR ELECTRICAL WORKS 37,609.00
2.13 TESTING & COMMISSIONING Lot 1.00 49,237.50 19,695.00 68,932.50 50.00% 0.50
2.14 Others
2.14.01 Gravel and Sand Lot 1.00 40,819.60 16,327.84 57,147.44 95.00% 0.95
2.14.02 Excavation and Backfilling Lot 1.00 61,935.25 24,774.10 86,709.35 95.00% 0.95
2.14.03 Post Indicator Valve pc/s 1.00 48,157.58 19,263.03 67,420.61 0.00% -
BLDG. C PREVIOUS (OCTOBE
ITEM
DESCRIPTION
NO. LABOR
UNIT QTY MATERIAL RATES AMOUNT % ACCOM QTY
RATES

SUB-TOTAL FOR TESTING & OTHERS 280,209.90

GRAND TOTAL FOR BLDG. C 5,150,525.11

PREPARED BY : CHECKED BY:

Mr.Raymundo Cruz AR. SERAFIN PALOMIQUE


PRESIDENT - SBI ACMC- PM

CHECKED BY:

JHANNAH JOYCE PAMULA


ACMC - QS
THIS PERIOD (OCTOBER 20,2019 - NOVEMBER TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
20, 2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

256,849.87 4.99% 0.00% - 0.00% 100.00% 131.00 256,849.87 4.99%


61,571.57 1.20% 0.00% - 0.00% 100.00% 56.70 61,571.57 1.20%
349,786.86 6.79% 0.00% - 0.00% 100.00% 490.70 349,786.86 6.79%
42,743.91 0.83% 0.00% - 0.00% 100.00% 127.60 42,743.91 0.83%
38,299.26 0.74% 0.00% - 0.00% 100.00% 148.00 38,299.26 0.74%
52,552.10 1.02% 0.00% - 0.00% 100.00% 257.60 52,552.10 1.02%
392,370.58 7.62% 0.00% - 0.00% 100.00% 2,447.00 392,370.58 7.62%

11,383.98 0.22% 0.00% - 0.00% 100.00% 8.00 11,383.98 0.22%

2,057.72 0.04% 0.00% - 0.00% 100.00% 14.00 2,057.72 0.04%


773.03 0.02% 0.00% - 0.00% 100.00% 7.00 773.03 0.02%
89,363.84 1.74% 0.00% - 0.00% 100.00% 1,216.00 89,363.84 1.74%
THIS PERIOD (OCTOBER 20,2019 - NOVEMBER TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
20, 2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

48,834.08 0.95% 0.00% - 0.00% 100.00% 169.00 48,834.08 0.95%


8,230.21 0.16% 0.00% - 0.00% 100.00% 42.00 8,230.21 0.16%

34,482.45 0.67% 0.00% - 0.00% 100.00% 358.00 34,482.45 0.67%

70,713.88 1.37% 0.00% - 0.00% 100.00% 46.00 70,713.88 1.37%


40,254.47 0.78% 0.00% - 0.00% 100.00% 42.00 40,254.47 0.78%
82,699.07 1.61% 0.00% - 0.00% 100.00% 112.00 82,699.07 1.61%
THIS PERIOD (OCTOBER 20,2019 - NOVEMBER TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
20, 2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

16,711.69 0.32% 33.33% 4.00 8,355.84 0.16% 100.00% 12.00 25,067.53 0.49%
9,407.10 0.18% 28.57% 4.00 3,762.84 0.07% 100.00% 14.00 13,169.94 0.26%

68,558.17 1.33% 0.00% - 0.00% 100.00% 7.00 68,558.17 1.33%


5,599.42 0.11% 0.00% - 0.00% 100.00% 7.00 5,599.42 0.11%

16,462.43 0.32% 0.00% - 0.00% 100.00% 7.00 16,462.43 0.32%

34,553.89 0.67% 0.00% - 0.00% 100.00% 194.00 34,553.89 0.67%


7,754.89 0.15% 0.00% - 0.00% 100.00% 33.00 7,754.89 0.15%
49,051.06 0.95% 0.00% - 0.00% 100.00% 142.00 49,051.06 0.95%
2,418.01 0.05% 0.00% - 0.00% 100.00% 7.00 2,418.01 0.05%

57,598.92 1.12% 0.00% - 0.00% 100.00% 950.00 57,598.92 1.12%


- 0.00% 0.00% - 0.00% 0.00% - - 0.00%
19,636.07 0.38% 0.00% - 0.00% 100.00% 220.00 19,636.07 0.38%
2,283.60 0.04% 0.00% - 0.00% 100.00% 20.00 2,283.60 0.04%
7,992.61 0.16% 0.00% - 0.00% 100.00% 70.00 7,992.61 0.16%

41,412.55 0.80% 0.00% - 0.00% 100.00% 250.00 41,412.55 0.80%


45,885.10 0.89% 0.00% - 0.00% 100.00% 277.00 45,885.10 0.89%

210,114.21 4.08% 0.00% - 0.00% 100.00% 163.00 210,114.21 4.08%


35,842.94 0.70% 0.00% - 0.00% 100.00% 32.00 35,842.94 0.70%
11,200.92 0.22% 0.00% - 0.00% 100.00% 10.00 11,200.92 0.22%
9,438.39 0.18% 0.00% - 0.00% 100.00% 10.00 9,438.39 0.18%
THIS PERIOD (OCTOBER 20,2019 - NOVEMBER TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
20, 2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

- 0.00% 100.00% 14.00 6,555.45 0.13% 100.00% 14.00 6,555.45 0.13%

1,816.21 0.04% 91.30% 21.00 19,070.25 0.37% 100.00% 23.00 20,886.47 0.41%

- 0.00% 100.00% 14.00 14,473.16 0.28% 100.00% 14.00 14,473.16 0.28%

4,013.55 0.08% 71.43% 5.00 10,033.87 0.19% 100.00% 7.00 14,047.42 0.27%

2,554.04 0.05% 0.00% - 0.00% 100.00% 14.00 2,554.04 0.05%


1,946.02 0.04% 0.00% - 0.00% 100.00% 16.00 1,946.02 0.04%

42,394.25 0.82% 0.00% - 0.00% 100.00% 1,098.00 42,394.25 0.82%


411.52 0.01% 0.00% - 0.00% 100.00% 7.00 411.52 0.01%

1,595.52 0.03% 0.00% - 0.00% 100.00% 7.00 1,595.52 0.03%


1,121.88 0.02% 0.00% - 0.00% 100.00% 7.00 1,121.88 0.02%
THIS PERIOD (OCTOBER 20,2019 - NOVEMBER TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
20, 2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

57,448.10 1.12% 0.00% - 0.00% 100.00% 29.30 57,448.10 1.12%

- 0.00% 0.00% - 0.00% 0.00% - - 0.00%

- 0.00% 0.00% - 0.00% 0.00% - - 0.00%


- 0.00% 0.00% - 0.00% 0.00% - - 0.00%

- 0.00% 0.00% - 0.00% 0.00% - - 0.00%

99,302.79 1.93% 0.00% - 0.00% 100.00% 1.00 99,302.79 1.93%

119,911.43 2.33% 0.00% - 0.00% 100.00% 7.00 119,911.43 2.33%


26,739.95 0.52% 0.00% - 0.00% 100.00% 1.00 26,739.95 0.52%
THIS PERIOD (OCTOBER 20,2019 - NOVEMBER TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
20, 2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

57,277.43 1.11% 0.00% - 0.00% 100.00% 7.00 57,277.43 1.11%


38,251.63 0.74% 0.00% - 0.00% 100.00% 7.00 38,251.63 0.74%
- 0.00% 0.00% - 0.00% 0.00% - - 0.00%
12,713.50 0.25% 0.00% - 0.00% 100.00% 14.00 12,713.50 0.25%
- 0.00% 0.00% - 0.00% 0.00% - - 0.00%

- 0.00% 100.00% 7.00 5,289.88 0.10% 100.00% 7.00 5,289.88 0.10%


- 0.00% 100.00% 23.00 44,584.57 0.87% 100.00% 23.00 44,584.57 0.87%
- 0.00% 100.00% 7.00 17,847.80 0.35% 100.00% 7.00 17,847.80 0.35%
5,664.56 0.11% 0.00% - 0.00% 100.00% 16.00 5,664.56 0.11%
13,005.62 0.25% 0.00% - 0.00% 100.00% 16.00 13,005.62 0.25%

304,628.31 5.91% 0.00% - 0.00% 85.71% 12.00 304,628.31 5.91%


THIS PERIOD (OCTOBER 20,2019 - NOVEMBER TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
20, 2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

- 0.00% 0.00% - 0.00% 0.00% - - 0.00%


- 0.00% 36.36% 4.00 51,597.00 1.00% 36.36% 4.00 51,597.00 1.00%

1,335.50 0.03% 0.00% - 0.00% 50.00% 4.00 1,335.50 0.03%


83,572.34 1.62% 13.47% 87.00 31,612.15 0.61% 49.07% 317.00 115,184.49 2.24%
164,952.51 3.20% 0.00% - 0.00% 100.00% 296.00 164,952.51 3.20%
124,067.43 2.41% 0.00% - 0.00% 91.22% 135.00 124,067.43 2.41%

41,359.50 0.80% 0.00% - 0.00% 100.00% 1.00 41,359.50 0.80%

279,242.38 5.42% 0.00% - 0.00% 100.00% 1.00 279,242.38 5.42%

223,912.28 4.35% 0.00% - 0.00% 100.00% 1.00 223,912.28 4.35%

- 0.00% 0.00% - 0.00% 0.00% - - 0.00%

34,466.25 0.67% 0.00% - 0.00% 50.00% 0.50 34,466.25 0.67%

54,290.07 1.05% 0.00% - 0.00% 95.00% 0.95 54,290.07 1.05%


82,373.88 1.60% 0.00% - 0.00% 95.00% 0.95 82,373.88 1.60%
- 0.00% 0.00% - 0.00% 0.00% - - 0.00%
THIS PERIOD (OCTOBER 20,2019 - NOVEMBER TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
20, 2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

4,115,257.31 79.90% 213,182.82 4.14% 4,328,440.13 84.04%

NOTED BY:

AR. SERAFIN PALOMIQUE JR. Engr. MARIA LYNETH CABACCAN / Engr. HERBERT ALLAN M. HULLANA
ACMC- PM SMDC - APM/PM

JHANNAH JOYCE PAMULARCO


ACMC - QS
OWNER : SM PRIME HOLDINGS INC.
PROJECT : HOPE RESIDENCES
LOCATION : TRECE MARTIRES, CAVITE CITY
SUBJECT : BILLS OF QUANTITY-BLDG. D
CONTRACT PACKAGE : FIRE PROTECTION SYSTEM
DATE Pro. : NOVEMBER 20,2019
DATE PRINTED: NOVEMBER 20,2019

BLDG. D PREVIOUS (OCTOBE


ITEM
DESCRIPTION
NO. MATERIAL LABOR
UNIT QTY AMOUNT % ACCOM QTY
RATES RATES
II FIRE PROTECTION WORKS

2.01 WET STANDPIPE SYSTEM

(Termination/Connection points from Bldg. Line to


Main Fire Water Line at Land Devt are included)
2.01.01 Black Iron (BI) Pipes
1.0 150 mmØ Lm/s 143.00 1,400.49 560.20 280,378.10 92.45% 132.20
2.0 100 mmØ Lm/s 56.70 775.66 310.26 61,571.57 100.00% 56.70
3.0 80 mmØ Lm/s 490.70 509.17 203.67 349,786.86 100.00% 490.70
4.0 50 mmØ Lm/s 139.20 239.27 95.71 46,629.72 100.00% 139.20
5.0 40 mmØ Lm/s 154.90 184.84 73.94 40,084.84 100.00% 154.90
6.0 32 mmØ Lm/s 298.10 145.72 58.29 60,814.37 100.00% 298.10
7.0 25 mmØ Lm/s 2,727.00 114.53 45.81 437,267.91 100.00% 2,727.00
- -
2.01.02 B.I. Elbow 90° - -
1.0 150 mmØ pc/s 6.00 1,016.43 406.57 8,537.99 100.00% 6.00
2.0 100 mmØ pc/s - -
3.0 80 mmØ pc/s - -
4.0 50 mmØ pc/s - -
5.0 40 mmØ pc/s 14.00 104.99 41.99 2,057.72 100.00% 14.00
6.0 32 mmØ pc/s 7.00 78.88 31.55 773.03 100.00% 7.00
7.0 25 mmØ pc/s 1,281.00 52.49 21.00 94,140.70 100.00% 1,281.00
- -
BLDG. D PREVIOUS (OCTOBE
ITEM
DESCRIPTION
NO. MATERIAL LABOR
UNIT QTY AMOUNT % ACCOM QTY
RATES RATES
2.01.03 B.I. Tee Standard - -
1.0 150 mmØ pc/s - -
2.0 100 mmØ pc/s - -
3.0 80 mmØ pc/s - -
4.0 50 mmØ pc/s 180.00 206.40 82.56 52,012.63 100.00% 180.00
5.0 40 mmØ pc/s 35.00 139.97 55.99 6,858.51 100.00% 35.00
6.0 32 mmØ pc/s - -
7.0 25 mmØ pc/s 361.00 68.80 27.52 34,771.41 100.00% 361.00
- -
2.01.04 B.I. Tee Reducer - -
1.0 150 mmØ x 100 mmØ pc/s - -
2.0 80 mmØ x 50 mmØ pc/s - -
3.0 80 mmØ x 40 mmØ pc/s - -
4.0 80 mmØ x 32 mmØ pc/s - -
5.0 80 mmØ x 25 mmØ pc/s - -
- -
2.01.05 B.I. Reducer - -
1.0 100 mmØ x 80 mmØ pc/s - -
2.0 80 mmØ x 50 mmØ pc/s - -
- -
2.01.06 Mechanical Couplier/Victaulic Coupling - -
1.0 150 mmØ pc/s 46.00 1,098.04 439.22 70,713.88 82.61% 38.00
2.0 100 mmØ pc/s 42.00 684.60 273.84 40,254.47 88.10% 37.00
3.0 80 mmØ pc/s 112.00 527.42 210.97 82,699.07 100.00% 112.00
4.0 50 mmØ pc/s 414.93 165.97
- -
2.01.07 Others - -
2.01.07.01 Victaulic Elbow - -
1.0 150 mmØ pc/s 12.00 1,492.11 596.85 25,067.53 91.67% 11.00
2.0 100 mmØ pc/s 14.00 671.94 268.77 13,169.94 92.86% 13.00
- -
2.01.07.02 Victaulic Tee - -
BLDG. D PREVIOUS (OCTOBE
ITEM
DESCRIPTION
NO. MATERIAL LABOR
UNIT QTY AMOUNT % ACCOM QTY
RATES RATES
1.0 150 mmØ x 100 mmØ pc/s 7.00 6,995.73 2,798.29 68,558.17 100.00% 7.00
2.0 80 mmØ x 80 mmØ pc/s 7.00 571.37 228.55 5,599.42 100.00% 7.00
- -
2.01.07.03 Victaulic Reducer - -
1.0 100 mmØ x 80 mmØ pc/s 7.00 1,679.84 671.94 16,462.43 100.00% 7.00
- -
2.01.07.04 B.I. Tee Reducer - -
1.0 32 mmØ x 25 mmØ pc/s 203.00 127.22 50.89 36,156.91 100.00% 203.00
2.0 40 mmØ x 25 mmØ pc/s 27.00 167.85 67.14 6,344.91 100.00% 27.00
3.0 50 mmØ x 25 mmØ pc/s 163.00 246.74 98.69 56,305.09 100.00% 163.00
4.0 50 mmØ x 32 mmØ pc/s 7.00 246.74 98.69 2,418.01 100.00% 7.00
- -
2.01.07.05 B.I. Coupling Reducer - -
1.0 25 mmØ x 15 mmØ pc/s 965.00 43.31 17.32 58,508.38 100.00% 965.00
2.0 25 mmØ x 20 mmØ pc/s 161.00 - - - 0.00% -
3.0 32 mmØ x 25 mmØ pc/s 218.00 63.75 25.50 19,457.56 100.00% 218.00
4.0 40 mmØ x 25 mmØ pc/s 81.56 32.62 -
5.0 40 mmØ x 32 mmØ pc/s 56.00 81.56 32.62 6,394.09 100.00% 56.00
6.0 50 mmØ x 25 mmØ pc/s - -
7.0 50 mmØ x 32 mmØ pc/s 294.00 118.32 47.33 48,701.15 100.00% 294.00
8.0 50 mmØ x 40 mmØ pc/s 314.00 118.32 47.33 52,014.16 100.00% 314.00
- -
2.01.07.06 Mechanical Tee Threaded - -
1.0 150 mmØ x 100 mmØ pc/s - - -
2.0 80 mmØ x 50 mmØ pc/s 185.00 920.75 368.30 238,473.18 100.00% 185.00
3.0 80 mmØ x 40 mmØ pc/s 21.00 800.07 320.03 23,521.93 100.00% 21.00
4.0 80 mmØ x 32 mmØ pc/s 6.00 800.07 320.03 6,720.55 100.00% 6.00
5.0 80 mmØ x 25 mmØ pc/s 6.00 674.17 269.67 5,663.03 100.00% 6.00
- -
2.01.07.07 Slip on Flange - -
1.0 80 mmØ pc/s 14.00 334.46 133.78 6,555.45 100.00% 14.00
2.0 100 mmØ pc/s - -
BLDG. D PREVIOUS (OCTOBE
ITEM
DESCRIPTION
NO. MATERIAL LABOR
UNIT QTY AMOUNT % ACCOM QTY
RATES RATES
3.0 150 mmØ pc/s 23.00 648.65 259.46 20,886.47 100.00% 23.00
4.0 200 mmØ pc/s - -
- -
2.01.07.08 Blind Flange - -
1.0 80 mmØ pc/s 14.00 738.43 295.37 14,473.16 100.00% 14.00
2.0 100 mmØ pc/s - -
3.0 150 mmØ pc/s 7.00 1,433.41 573.36 14,047.42 100.00% 7.00
4.0 200 mmØ pc/s - -
- -
2.01.07.09 Threadolet - -
1.0 25 mmØ pc/s 14.00 130.31 52.12 2,554.04 100.00% 14.00
2.0 15 mmØ pc/s 16.00 86.88 34.75 1,946.02 100.00% 16.00
- -
2.01.07.10 Plug - -
1.0 25 mmØ pc/s 1,126.00 27.58 11.03 43,475.35 100.00% 1,126.00
2.0 32 mmØ pc/s 7.00 41.99 16.80 411.52 100.00% 7.00
- -
2.01.07.11 Union Patente - -
1.0 25 mmØ pc/s 7.00 162.81 65.12 1,595.52 100.00% 7.00
2.0 32 mmØ pc/s 7.00 114.48 45.79 1,121.88 100.00% 7.00

SUB-TOTAL FOR WET STANDPIPE SYSTEM 2,465,956.03


2.02 DRY STANDPIPE SYSTEM
2.02.01 Black Iron (BI) Pipes - -
1.0 150 mmØ Lm/s 28.90 1,400.49 560.20 56,663.83 100.00% 28.90
- -
2.02.02 B.I. Tee Reducer - -
1.0 100 mmØ x 65 mmØ pc/s - -
- -
2.02.03 Fire Hose Valve - -
1.0 65 mmØ pc/s 7.00 11,039.56 4,415.82 108,187.67 14.29% 1.00
- -
BLDG. D PREVIOUS (OCTOBE
ITEM
DESCRIPTION
NO. MATERIAL LABOR
UNIT QTY AMOUNT % ACCOM QTY
RATES RATES
2.02.04 Roof Manifold - -
1.0 2-65 x 100mmØ pc/s -
SUB-TOTAL FOR DRY STANDPIPE SYSTEM 164,851.49
2.03 FIRE DEPARTMENT CONNECTION & TEST HEADER
(Concrete Pedestal are included)
2.03.01 Fire Department Connection - -
1.0 3-65 x 150mmØ set/s 1.00 24,493.52 9,797.41 34,290.92 0.00% -
2.0 2-65 x 150mmØ set/s 1.00 16,329.01 6,531.60 22,860.61 0.00% -
- -
2.03.02 Test Header - -
1.0 2-65 x 150mmØ set/s - -
- -
2.03.03 Swing Check Valve - -
1.0 150 mmØ pc/s 1.00 21,965.58 8,786.23 30,751.81 0.00% -
2.03.04 Alarm Check Valve - -
1.0 150 mmØ pc/s 1.00 70,930.57 28,372.23 99,302.79 100.00% 1.00
SUB-TOTAL FOR FIRE DEPARTMENT CONNECTION & TEST HEADER 187,206.14
2.04 DRAINS, VALVES & ACCESSORIES
2.04.01 OS & Y Gate Valve - -
1.0 100 mmØ pc/s 7.00 12,235.86 4,894.34 119,911.43 100.00% 7.00
2.0 150 mmØ pc/s 1.00 19,099.96 7,639.98 26,739.95 100.00% 1.00
- -
2.04.02 By-pass Valve - -
1.0 75 mmØ pc/s - -
- -
2.04.03 Flexible Coupling - -
1.0 150 mmØ pc/s - -
- -
2.04.04 Inspector Test Valve - -
1.0 25 mmØ pc/s - -
2.04.05 Drain Valve - -
1.0 32 mmØ pc/s - -
BLDG. D PREVIOUS (OCTOBE
ITEM
DESCRIPTION
NO. MATERIAL LABOR
UNIT QTY AMOUNT % ACCOM QTY
RATES RATES
- -
2.04.06 Air Release Valve - -
1.0 25 mmØ pc/s 7.00 5,844.64 2,337.85 57,277.43 100.00% 7.00
2.04.07 Supervisory Switch pc/s 7.00 3,903.23 1,561.29 38,251.63 100.00% 7.00
2.04.08 Waterflow Switch 100 mm Ø pc/s 7.00 3,945.19 1,578.07 38,662.82 0.00% -
2.04.09 Sight Glass 25Ø pc/s 14.00 648.65 259.46 12,713.50 100.00% 14.00
2.04.10 Pressure Gauge pc/s 16.00 1,216.78 486.71 27,255.92 0.00% -
2.04.11 OTHERS - -
2.04.11.01 Gate Valve 25mmØ pc/s 7.00 539.78 215.91 5,289.88 100.00% 7.00
2.04.11.02 Globe Valve 25mmØ pc/s 24.00 1,384.61 553.85 46,523.03 100.00% 24.00
2.04.11.03 Globe Valve 32mmØ pc/s 7.00 1,821.20 728.48 17,847.80 100.00% 7.00
2.04.11.04 Pig tail 15mmØ pc/s 16.00 252.88 101.15 5,664.56 100.00% 16.00
2.04.11.05 Ball Valve 15mmØ pc/s 16.00 580.61 232.24 13,005.62 100.00% 16.00
2.04.11.06 Fire Extinguisher Cabinet pc/s 2,020.20 808.08 -
SUB-TOTAL FOR DRAINS, VALVES & ACCESSORIES 409,143.57
2.05 FIRE HOSE CABINET
2.05.01 Recessed Fire Hose Cabinet set/s 15.00 18,132.64 7,253.05 380,785.38 100.00% 15.00
SUB-TOTAL FOR FIRE HOSE CABINET 380,785.38
2.06 PORTABLE FIRE EXTINGUISHER
2.06.01 10 Lbs. ABC PFE set/s 8.00 4,151.57 1,660.63 46,497.63 0.00% -
2.06.03 10 Lbs. HCFC PFE set/s 9.00 9,213.75 3,685.50 116,093.25 88.89% 8.00
SUB-TOTAL FOR PORTABLE FIRE EXTINGUISHER 162,590.88
2.07 SPRINKLER HEADS
2.07.01 Upright Sprinkler Head pc/s 7.00 182.57 151.30 2,337.12 100.00% 7.00
2.07.02 Pendent Sprinkler Head pc/s 636.00 212.06 151.30 231,095.69 100.00% 636.00
2.07.03 Sidewall Sprinkler Head (ordinary) pc/s 322.00 405.97 151.30 179,441.58 100.00% 322.00
2.07.04 Sidewall Sprinkler Head (extended) pc/s 161.00 767.72 151.30 147,961.90 100.00% 161.00
2.07.05 Others (Please Specify):
2.0 Spare Heads pc/s
SUB-TOTAL FOR SPRINKLER HEADS 560,836.29

2.09 PIPE SLEEVING WORKS Lot 1.00 29,542.50 11,817.00 41,359.50 100.00% 1.00
BLDG. D PREVIOUS (OCTOBE
ITEM
DESCRIPTION
NO. MATERIAL LABOR
UNIT QTY AMOUNT % ACCOM QTY
RATES RATES
0.00% -
SUB-TOTAL FOR PIPE SLEEVING WORKS 41,359.50 0.00% -
0.00% -
2.10 MISCELLANEOUS & CONSUMABLES Lot 1.00 194,200.78 77,680.31 271,881.10 100.00% 1.00

SUB-TOTAL FOR MISCELLANEOUS & CONSUMABLES 271,881.10

2.11 HANGERS & SUPPORTS Lot 1.00 155,881.05 62,352.42 218,233.47 100.00% 1.00

SUB-TOTAL FOR HANGERS & SUPPORTS 218,233.47


2.12 ELECTRICAL WORKS Lot 1.00 21,625.00 15,984.00 37,609.00 0.00% -
Complete Electrical Works from Fire
Protection Equipments to Power Supply
SUB-TOTAL FOR ELECTRICAL WORKS 37,609.00
2.13 TESTING & COMMISSIONING Lot 1.00 49,237.50 19,695.00 68,932.50 60.00% 0.60
2.14 Others - - -
2.14.01 Gravel and Sand Lot 1.00 42,393.75 16,957.50 59,351.25 100.00% 1.00
2.14.02 Excavation and Backfilling Lot 1.00 64,833.70 25,933.48 90,767.18 100.00% 1.00
2.14.03 Post Indicator Valve pc/s 1.00 48,157.58 19,263.03 67,420.61 0.00% -

SUB-TOTAL FOR TESTING & OTHERS 286,471.54

GRAND TOTAL FOR BLDG. D 5,186,924.39

PREPARED BY : CHECKED BY:


BLDG. D PREVIOUS (OCTOBE
ITEM
DESCRIPTION
NO. MATERIAL LABOR
UNIT QTY AMOUNT % ACCOM QTY
RATES RATES
RAYMUNDO E. CRUZ AR. SERAFIN PALOMIQUE
PRESIDENT - SBI ACMC- PM

CHECKED BY:

JHANNAH JOYCE PAMULAR


ACMC - QS
THIS PERIOD (OCTOBER 20,2019 - NOVEMBER 20, TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

259,211.12 5.00% 7.55% 10.80 21,175.41 0.41% 100.00% 143.00 280,386.53 5.41%
61,571.57 1.19% 0.00% - 0.00% 100.00% 56.70 61,571.57 1.19%
349,786.86 6.74% 0.00% - 0.00% 100.00% 490.70 349,786.86 6.74%
46,629.72 0.90% 0.00% - 0.00% 100.00% 139.20 46,629.72 0.90%
40,084.84 0.77% 0.00% - 0.00% 100.00% 154.90 40,084.84 0.77%
60,814.37 1.17% 0.00% - 0.00% 100.00% 298.10 60,814.37 1.17%
437,267.91 8.43% 0.00% - 0.00% 100.00% 2,727.00 437,267.91 8.43%

8,537.99 0.16% 0.00% - 0.00% 100.00% 6.00 8,537.99 0.16%

2,057.72 0.04% 0.00% - 0.00% 100.00% 14.00 2,057.72 0.04%


773.03 0.01% 0.00% - 0.00% 100.00% 7.00 773.03 0.01%
94,140.70 1.81% 0.00% - 0.00% 100.00% 1,281.00 94,140.70 1.81%
THIS PERIOD (OCTOBER 20,2019 - NOVEMBER 20, TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

52,012.63 1.00% 0.00% - 0.00% 100.00% 180.00 52,012.63 1.00%


6,858.51 0.13% 0.00% - 0.00% 100.00% 35.00 6,858.51 0.13%

34,771.41 0.67% 0.00% - 0.00% 100.00% 361.00 34,771.41 0.67%

58,415.81 1.13% 17.39% 8.00 12,298.07 0.24% 100.00% 46.00 70,713.88 1.36%
35,462.27 0.68% 11.90% 5.00 4,792.20 0.09% 100.00% 42.00 40,254.47 0.78%
82,699.07 1.59% 0.00% - 0.00% 100.00% 112.00 82,699.07 1.59%

22,978.57 0.44% 8.33% 1.00 2,088.96 0.04% 100.00% 12.00 25,067.53 0.48%
12,229.23 0.24% 7.14% 1.00 940.71 0.02% 100.00% 14.00 13,169.94 0.25%
THIS PERIOD (OCTOBER 20,2019 - NOVEMBER 20, TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

68,558.17 1.32% 0.00% - 0.00% 100.00% 7.00 68,558.17 1.32%


5,599.42 0.11% 0.00% - 0.00% 100.00% 7.00 5,599.42 0.11%

16,462.43 0.32% 0.00% - 0.00% 100.00% 7.00 16,462.43 0.32%

36,156.91 0.70% 0.00% - 0.00% 100.00% 203.00 36,156.91 0.70%


6,344.91 0.12% 0.00% - 0.00% 100.00% 27.00 6,344.91 0.12%
56,305.09 1.09% 0.00% - 0.00% 100.00% 163.00 56,305.09 1.09%
2,418.01 0.05% 0.00% - 0.00% 100.00% 7.00 2,418.01 0.05%

58,508.38 1.13% 0.00% - 0.00% 100.00% 965.00 58,508.38 1.13%


- 0.00% 0.00% - 0.00% 0.00% - - 0.00%
19,457.56 0.38% 0.00% - 0.00% 100.00% 218.00 19,457.56 0.38%

6,394.09 0.12% 0.00% - 0.00% 100.00% 56.00 6,394.09 0.12%

48,701.15 0.94% 0.00% - 0.00% 100.00% 294.00 48,701.15 0.94%


52,014.16 1.00% 0.00% - 0.00% 100.00% 314.00 52,014.16 1.00%

238,473.18 4.60% 0.00% - 0.00% 100.00% 185.00 238,473.18 4.60%


23,521.93 0.45% 0.00% - 0.00% 100.00% 21.00 23,521.93 0.45%
6,720.55 0.13% 0.00% - 0.00% 100.00% 6.00 6,720.55 0.13%
5,663.03 0.11% 0.00% - 0.00% 100.00% 6.00 5,663.03 0.11%

6,555.45 0.13% 0.00% - 0.00% 100.00% 14.00 6,555.45 0.13%


THIS PERIOD (OCTOBER 20,2019 - NOVEMBER 20, TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

20,886.47 0.40% 0.00% - 0.00% 100.00% 23.00 20,886.47 0.40%

14,473.16 0.28% 0.00% - 0.00% 100.00% 14.00 14,473.16 0.28%

14,047.42 0.27% 0.00% - 0.00% 100.00% 7.00 14,047.42 0.27%

2,554.04 0.05% 0.00% - 0.00% 100.00% 14.00 2,554.04 0.05%


1,946.02 0.04% 0.00% - 0.00% 100.00% 16.00 1,946.02 0.04%

43,475.35 0.84% 0.00% - 0.00% 100.00% 1,126.00 43,475.35 0.84%


411.52 0.01% 0.00% - 0.00% 100.00% 7.00 411.52 0.01%

1,595.52 0.03% 0.00% - 0.00% 100.00% 7.00 1,595.52 0.03%


1,121.88 0.02% 0.00% - 0.00% 100.00% 7.00 1,121.88 0.02%

56,663.83 1.09% 0.00% - 0.00% 100.00% 28.90 56,663.83 1.09%

15,455.38 0.30% 0.00% - 0.00% 14.29% 1.00 15,455.38 0.30%


THIS PERIOD (OCTOBER 20,2019 - NOVEMBER 20, TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

- 0.00% 0.00% - 0.00% 0.00% - - 0.00%


- 0.00% 0.00% - 0.00% 0.00% - - 0.00%

- 0.00% 0.00% - 0.00% 0.00% - - 0.00%

99,302.79 1.91% 0.00% - 0.00% 100.00% 1.00 99,302.79 1.91%

119,911.43 2.31% 0.00% - 0.00% 100.00% 7.00 119,911.43 2.31%


26,739.95 0.52% 0.00% - 0.00% 100.00% 1.00 26,739.95 0.52%
THIS PERIOD (OCTOBER 20,2019 - NOVEMBER 20, TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

57,277.43 1.10% 0.00% - 0.00% 100.00% 7.00 57,277.43 1.10%


38,251.63 0.74% 0.00% - 0.00% 100.00% 7.00 38,251.63 0.74%
- 0.00% 0.00% - 0.00% 0.00% - - 0.00%
12,713.50 0.25% 0.00% - 0.00% 100.00% 14.00 12,713.50 0.25%
- 0.00% 0.00% - 0.00% 0.00% - - 0.00%

5,289.88 0.10% 0.00% - 0.00% 100.00% 7.00 5,289.88 0.10%


46,523.03 0.90% 0.00% - 0.00% 100.00% 24.00 46,523.03 0.90%
17,847.80 0.34% 0.00% - 0.00% 100.00% 7.00 17,847.80 0.34%
5,664.56 0.11% 0.00% - 0.00% 100.00% 16.00 5,664.56 0.11%
13,005.62 0.25% 0.00% - 0.00% 100.00% 16.00 13,005.62 0.25%

380,785.38 7.34% 0.00% - 0.00% 100.00% 15.00 380,785.38 7.34%

- 0.00% 0.00% - 0.00% 0.00% - - 0.00%


103,194.00 1.99% 11.11% 1.00 12,899.25 0.25% 100.00% 9.00 116,093.25 2.24%

2,337.12 0.05% 0.00% - 0.00% 100.00% 7.00 2,337.12 0.05%


231,095.69 4.46% 0.00% - 0.00% 100.00% 636.00 231,095.69 4.46%
179,441.58 3.46% 0.00% - 0.00% 100.00% 322.00 179,441.58 3.46%
147,961.90 2.85% 0.00% - 0.00% 100.00% 161.00 147,961.90 2.85%

41,359.50 0.80% 0.00% - 0.00% 100.00% 1.00 41,359.50 0.80%


THIS PERIOD (OCTOBER 20,2019 - NOVEMBER 20, TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

- 0.00%
- 0.00%
- 0.00%
271,881.10 5.24% 0.00% - 0.00% 100.00% 1.00 271,881.10 5.24%

218,233.47 4.21% 0.00% - 0.00% 100.00% 1.00 218,233.47 4.21%

- 0.00% 0.00% - 0.00% 0.00% - - 0.00%

41,359.50 0.80% 0.00% - 0.00% 60.00% 0.60 41,359.50 0.80%

59,351.25 1.14% 0.00% - 0.00% 100.00% 1.00 59,351.25 1.14%


90,767.18 1.75% 0.00% - 0.00% 100.00% 1.00 90,767.18 1.75%
- 0.00% 0.00% - 0.00% 0.00% - - 0.00%

4,707,083.62 90.75% 54,194.59 1.04% 4,761,278.22 91.79%

NOTED BY:
THIS PERIOD (OCTOBER 20,2019 - NOVEMBER 20, TO DATE (NOVEMBER 20, 2019)
PREVIOUS (OCTOBER 20,2019)
2019)

AMOUNT % WT % ACCOM QTY AMOUNT % WT % ACCOM QTY AMOUNT % WT

AR. SERAFIN PALOMIQUE JR. Engr. MARIA LYNETH CABACCAN / Engr. HERBERT ALLAN M. HULLANA
ACMC- PM SMDC - APM/PM

JHANNAH JOYCE PAMULARCO


ACMC - QS
2.01.01 Black Iron (BI) Pipes A B C D
1.0 150 mmØ 145.00 175.00 131.00 143.00 594.00
2.0 100 mmØ 56.70 56.70 56.70 56.70 226.80
3.0 80 mmØ 490.70 490.70 490.70 490.70 1,962.80
4.0 50 mmØ 129.60 129.60 127.60 139.20 526.00
5.0 40 mmØ 160.00 160.00 148.00 154.90 622.90
6.0 32 mmØ 259.60 259.60 257.60 298.10 1,074.90
7.0 25 mmØ 2,474.00 2,474.00 2,447.00 2,727.00 10,122.00
99.00
37.80
327.13
87.67
103.82
179.15
1,687.00