PAKISTAN OILFIELD LIMITED

FINAL WELL REPORT


KHAUR NORTH–1

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 1
PetroServices GmbH, Pakistan Branch, Plot No.39, Street No.1, I–10/3, Islamabad, Pakistan, Tel: 0092 51 4102 001–04, Fax: 0092 51 4443 749
PetroServices GmbH, Bahnhofstraβe35, 39104 Magdeburg, Germany, Tel: 0049 391 5353 734, Fax: 0049 391 5353 794

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 2
Table of Contents

GENERAL INFORMATION
1.1 PERTINENT WELL DATA.......................................................................................................................................4
1.2 INTRODUCTION......................................................................................................................................................4
1.3 REGIONAL GEOLOGY............................................................................................................................................5
1.4 SUB STRUCTURE GEOMETRY...............................................................................................................................5
1.5 SOURCE ROCK........................................................................................................................................................11
1.6 RESERVOIR ROCK..................................................................................................................................................11
1.7 CAP ROCK/SEAL...................................................................................................................................................11
1.8 POL SUPERVISOR CREW......................................................................................................................................11
1.9 MUD LOGGING CREW.........................................................................................................................................12
1.10 PETROSERVICES INTRODUCTION....................................................................................................................12
1.11 WELL PROFILE........................................................................................................................................................13
GEOLOGY and SHOWS
2.1 STRATIGRAPHIC TOPS.........................................................................................................................................14
2.2 SAMPLES INTERVAL.............................................................................................................................................15
2.3 GENERAL FORMATION DESCRIPTION...........................................................................................................17
2.4 CUTTINGS DESCRIPTION....................................................................................................................................31
2.5 WIRELINE LOGGING............................................................................................................................................79
2.6 HYDROCARBON and GAS SHOWS....................................................................................................................80
2.7 CORE DATA.............................................................................................................................................................82

PRESSURE SUMMARY
3.1 PRESSURE SUMMARY...........................................................................................................................................83
3.2 51–2017ft (HOLE SIZE 26″).....................................................................................................................................83
3.3 2017–6515ft (HOLE SIZE 17½″)..............................................................................................................................84
3.4 6515–12742ft (HOLE SIZE 12¼ ″)...........................................................................................................................84
3.5 12742–14586ft (HOLE SIZE 8½″)............................................................................................................................84

DRILLING ENGINEERING
4.1 DRILLING HISTORY..............................................................................................................................................86
4.2 26″ HOLE SECTION................................................................................................................................................86
4.3 17½ HOLE SECTION...............................................................................................................................................92
4.4 12¼″ HOLE SECTION.............................................................................................................................................98
4.5 8½″ HOLE SECTION.............................................................................................................................................109
4.6 BIT RECORD...........................................................................................................................................................117
4.7 MUD and BIT HYDRAULICS .............................................................................................................................117
4.8 DEVIATION SURVEY...........................................................................................................................................117
4.9 FLOW LINE DIFFERENTIAL TEMPERATURE...............................................................................................117

DAILY WELL DIARY

5.1 DAILY WELL DIARY............................................................................................................................................118

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 3
TABLE and CHARTS

TABLES:
2.1 STRATIGRAPHIC SUCCESSION.………………………………………….………………………………14
4.1 BIT RECORD ………………… ……………………………….……………….….…………………………117
4.2 BIT HYDRAULICS.………………… ……………………………….…….……….….…………………….117
4.3 DAILY MUD REPORT …….……………………………………………………………….………………..117
4.4 DEVIATION SURVEY ……….……………………………………………………….….………………….117
4.5 MWD SURVEY ……………………………………………………………….………..….…………………117
5.1 RIG TIME ANALYSIS ……………………………………………….………..….….……….……………...118

FIGURES:
1.1 WELL LOCATION ON TOPOGRAPHIC MAP…………………………………….….…………………..07
1.2 DEPTH STRUCTURE MAP.………………………………………………….………..….………………….09
1.3 SEISMIC MAP……….……………………………………………….………..….….……….………………..10
3.1 FLOW LINE DIFFERENTIAL TEMPERATURE ………………………….……….….……………………90
4.1 DAY VS DEPTH ………………………………………………………….…………….….….......... ………...84
4.2 HOLE CONSTRUCTION.……………………………………………….…………….….…...........................86
5.1 RIG TIME BREAKDOWN……….……………………………………….…………….….….......... ………..118

ANNEXURE:
1. DRILLING DATA
2. GAS DATA
3. OIL SHOWS DATA

ENCLOSURES:
1. MUD LOG
2. PRESSURE LOG
3. HYDROCARBON EVALUATION LOG
4. DRILLING LOG

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 4
PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1
Doc. # PSPB–SPR006–F–009 5
Section

1
General Information
1.1 PERTINENT WELL DATA

Well Name : Khaur North–1


Type : Exploratory
Area : District Attock, Punjab
Concession Area : Khaur D and PL
Location : Khaur Oil Field.
Surface Co–ordinates : Latitude: 33° 16′ 09.1600″ N
Longitude: 72° 29′ 26.4139″ E
Seismic Line : Inline: 430 and X line: 350

Ground Elevation : 1556.34ft AMSL


Kelly Bushing Elevation : 1591.34ft AMSL
Date Spud In : 09th November, 2017
Date Reached TD : 11th April, 2018
Total Depth : 14586ft MD, (14572.18 TVD)
Formation at TD : Amb
Completion Status : PNA
Rig Released : ?? 2018
Hole Construction : 20″ Casing from Surface – 2013ft
13 ⅜” Casing from surface – 6509ft
9 ⅝″ Casing from surface – 12738ft
7″ Liner Shoe (TOL 12474ft) – 14586ft
Drilling Contractor : Exalo
Drilling Rig : Exalo –305
Mud Logging Unit : PTPS–9009 Petroservices
Drilling Fluid Services : Halliburton | Baroid
Wireline Logging Services : Weatherford
Cementing Service : Schlumberger
Directional Service : Eastern Drilling Services
Tubing Services : Weatherford (TRS)
Testing : ??

1.2 INTRODUCTION

The Khaur Oil Field is situated in the Attock district of Punjab, about 70 kilometers southwest of
Rawalpindi City (Fig. 1.1). The first well was drilled on surface geological structural feature near a
prominent oil seep. Khaur North–prospect is a thrusted anticline developed along the northern flank of
Khaur Structure in northeastern part, which is separated from main Khaur by a south dipping back thrust.
As there is northward movement along this back thrust, therefore this feature is positioned in the sub
thrust. This fault bounded structure is lying southeast of Dhurnal and south of Pariwali Field. The
structural feature has been identified and mapped with the help of 3D seismic data of Khaur and Dhurnal.
Detailed maps have been generated at the top of Eocene and top of Wargal Formation (Permian). It has dip
closure in north, eastand west, while it is closing against fault in the south. The Paleogene carbonate
reservoirs Chorgali/Sakesar and Patala/Lockhart appear to be juxtaposed against Salt Range Formation,
which would provide excellent seal across the main thrust.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 6
Khaur POL–01 and Dhurnal wells VSP data set was used for the seismic reflectors identification. Khaur
POL–01 is ~7.16 Kms west of the Khaur North structure and Dhurnal field is ~12 Kms northeast of Khaur
North Structure.

1.3 REGIONAL GEOLOGY

The Forel and fold and thrust belt of Potwar is the northern most part of Indus Basin. The basin fill is
Paleozoic, Mesozoic and Paleogene platform sediments and Neogene molasse. Eocene and Paleocene
naturally fractured carbonates form the predominant reservoirs in this Basin. Late Tertiary compression has
thrusted competent platform sequence southwards, along number of thrust faults over ductile Infra–
Cambrian evaporites. The resultant structuring of the basin is a combination of east west trending thrusts
and salt cored folds which provide trap for many petroleum accumulations. Seal is provided by the over
pressured tertiary molasse. Most of the production in this basin is from Eocene–Paleocene naturally
fractured carbonates.
Khaur D and PL is situated broadly in the North Potwar Deformed Zone (NPDZ), which constitute
northern most part of Upper Indus Basin. The Indus Basin is part of Indian Plate which separated from
Madagascar during Cretaceous and collided with Eurasian Plate in Early Eocene. Indus Basin is sub
divided into lower, middle and upper Indus Basins. Lower Indus basin is separated from Middle Indus
Basin by Jacobabad–K and hkot high f where as Sargodha high separated Middle and Upper Indus Basin
respectively. Potwar Basin is bounded in the south by the Salt Range Thrust (SRT), in the north by Main
Boundary Thrust (MBT), in the west by Kalabagh strike slip fault and in the east by Jhelum strike slip fault.
Potwar Basin is further sub divided into five tectonic zones namely Salt Range Thrust, Soan Depression,
Kala Chitta Foldbelt, Gujar Khan Folded zone and North Potwar Deformed Zone. Khaur D and PL falls
within the”Rawalpindi fold belt” tectonic sub zone.
The Forel and fold and thrust belt of Potwar is the northern most part of Indus Basin. The basin fill is
Paleozoic, Mesozoic and Paleogene platform sediments and Neogene molasse. Eocene and Paleocene
naturally fractured carbonates form the predominant reservoirs in this Basin. Late Tertiary compression has
thrusted competent platform sequence southwards, along number of thrust faults over ductile Infra–
Cambrian evaporites. The resultant structuring of the basin is a combination of east west trending thrusts
and salt cored folds which provide trap for many petroleum accumulations. Seal is provided by the over
pressured Tertiary molasse. Most of the production in this basin is from Eocene–Paleocene naturally
fractured carbonates.

1.4 SUB SURFACE GEOMETERY

Khaur–Pariwali 3D Seismic was acquired by BGP in 1996. 3D Seismic data is twenty four (24) fold. Full fold
area of the 3D seismic is 165 Sq.kms. The 3D Seismic data was earlier processed by Paradigm (Post–Stack
Time Migration), Geophysical Research Institute China (Post–Stack Time Migration) and the recently
reprocessing was carried by WesternGeco (PSTM/RTM). Based on the recent reprocessing a better control
was achieved for the improved understand ing of the structure style and geometry Khaur D and PL in
regional context. The Dhurnal 3D Seismic Data acquired by Dhurnal Joint Venture was also incorporated
for the regional mapping of Khaur North structure.
Khaur POL–01 and Dhurnal wells VSP data set was used for the seismic reflectors identification. Khaur
POL–01 is ~7.16 Kms west of the Khaur North structure and Dhurnal field is ~12 Kms northeast of Khaur
North Structure. The understand ing of the deformation style prevailing in the Khaur area is a key factor to
understand the structural fabric of the area. The basement high below Khaur and Dhulian and more
prominently sharp change in basement dip just south of Dhulian played important role in the development
of very shallow surface structures in a an area where most of the anticlinal features are under–thrusted
beneath large surface synclines. The down to north basement faults, and abrupt change in basement dips
provided the necessary buttressing, which gave lift to the developing structures and consequently a long
upward thrusted northern flank of Khaur thrust sheet developed.The core of the Khaur Anticline is further
deformed and uplifted due to flow of salt in the core area. The development of back–thrust on the northern
limb of Khaur Anticline (as a conjugate set to the main fault) further deformed the structure and allowed its
northern flank to ride over its under–thrusted limb. The role of salt flow in the development of this peculiar

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 7
structure is very important, and the same is responsible to provide necessary top and lateral seals. In case of
Khaur North, the most important factor is that it is part of the same thrust sheet along which Dhurnal
Structure has developed farther east, separated by a well defined saddle. The bending of the bounding fault
caused by the development of southern pop–down feature of Dhurnal. The development of this feature
initiated in Khaur area and its width gradually increases towards east in the Dhurnal area. More
importantly this curvature in the bounding fault is responsible for the development of closure. The steeply
dipping structural features or thrusted anticlines (Snake Heads) have been mapped and recommended for
drilling since long in the forel and fold– and –thrust belts and also in the Potwar Plateau (Jalwal, Dossa and
Soghari structures). In Potwar Murree Formation has provided the necessary seals. OGDCL has recently
made discovery in such play at Soghari and they are drilling second well down to Wargal Formation,
where multiple reservoirs are being considered for exploitation. The Khaur/Pariwali and Dhurnal 3D
Seismic data is utilized to identify the Khaur North Structure. Khaur North is an elongated NE–SW
trending elongated fault bounded Structure. Total area of the Khaur North Structure is around 5 Sq. Kms at
Top Eocene level (Chorgali Fm). Seismic data interpretation is carried out to map the Chorgali Formation
(Eocene) and Wargal Formation (Permian). The Khaur North Structure is bounded by the same thrust fault
along which the Dhurnal Structure is bounded and that main bounding fault swings towards the
southwest. This abrupt swing in the major bounding fault generates the Khaur North Structure. This major
bounding fault extends towards the western side of the identified high and dies out towards the West of
Khaur North structure. The abrupt Swing of the major bounding fault generated the structure in NE–SW
orientation. The Seismic Interpretation of the Khaur North Structure is carried out keeping in view the
analogy of Dhurnal Structure. The Dhurnal structure is a fault bounded anticline which is separated from
Khaur Core area by a broad syncline. The regional mapping of Khaur and Dhurnal structure clearly
demonstrates that as we move from the Dhurnal structure towards the Khaur North structure (NE–SW) the
broader and deep syncline gets steeper and shallower towards the identified high. Time structure maps
(Eocene/Permian) are converted into depth structure map on the basis of Velocities encountered in the
surrounding wells of Khaur and Dhurnal.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 8
Figure No. 1.1: Khaur area Location map

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 9
Figure No. 1.2: Geological map of Khaur area

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 10
PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1
Doc. # PSPB–SPR006–F–009 11
Figure No. 1.3: Interpreted R and om Line Passing Through Khaur North Structure To
Dhurnal Pop–Down Area In The East.

Figure No. 1.4: Geoseismic Cross section along the Proposed Khaur North well–1

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 12
1.5 SOURCE ROCK

The vertical and lateral distribution of source rocks in the Potwar Basin is poorly documented. In the Khaur
area, source is most probably Paleocene Patala formation, which is in the oil window in this area,
Preliminary geological analyses indicate that both the Paleocene and Eocene oils are similar. Infracambrian
Rock is considered to be an excellent source with Total Organic Carbon (TOC) ranging from 3.75% to 30%
and HI up to 781mg HC/g TOC. However their thickness and lateral extent have not been established.
Sardhai Formation (Permian) has fair potential for gas and oil with 1.2 to 2.6% TOC (Dhurnal, Kal, and
Turkwal areas) and HI in the range of 7–150 mg HC/g TOC.Amb Formation (Permian) from Dhurnal–2 is
significantly richer at 4.65% TOC and represent very good, present day source for oil and gas with 271mg
HC/g TOC.Patala Formation (Paleocene) is considered the most important source rock in Potwar Basin
with TOC ranges up to 10.73%. Coaly shales have good gas and oil potential, but samples collected from
shale intervals exhiBit lower TOC values. Good source intervals with good organic matter quantity are also
reported in Lockhart Formation (Paleocene). Sakesar Formation (Eocene) has sufficient potential to generate
and expel gas, condensate and light oil.

1.6 RESERVOIR ROCK

Most of the proven reservoirs in the Potwar Basin are naturally fractured Paleogene Carbonates. The Early
Eocene, Chorgali/Sakesar carbonates have been productive in most of the fields, while the Paleocene,
Patala/Lockhart carbonates are productive in several of the more recent discoveries. The carbonates are
generally shallow marine
bioclastic limestone’s, often massive and re–crystallized. Intergranular porosity is low, with the exception of
dolomitic intervals in the Chorgali, and reservoir porosity is almost wholly dependent upon on the
development of fracture porosity in response to the Tertiary structuring. Proven reservoirs, in the Dhurnal,
Meyal, and Pariwali fields are the Eocene, Paleocene, Jurassic and Permian. Well productivity is excellent in
these fields. Excellent interwell communication means the fields are amenable to water flooding, which
results in high recovery factors (over 75% in Dhurnal). In Dhurnal wells, observed primary porosity range
is 4–9% in the upper part of Chorgali Fm, which is mainly dolomitic limestone. While the Sakesar
Formation has 4–8% matrix and about 0.9% fracture porosity. Porosities of Patala/Lockhart range from
4.3% to 8% in Dhurnal wells. While average matrix porosity of Wargal is around 7%. In Dhurnal wells,
observed primary porosity range is 4–9% in the upper part of Chorgali Fm, which is mainly dolomitic
limestone. While the Sakesar Formation has 4–8% matrix and about 0.9% fracture porosity. Porosities of
Patala/Lockhart range from 4.3% to 8% in Dhurnal wells. While average matrix porosity of Wargal is
around 7%

1.7 CAP ROCK/SEAL

The top seal to all accumulations in the basin is provided by the marine shales of the middle Eocene
Kuldana/Mamikhel formation and or continental shales of the Miocene Murree Formation. This seal has
been broken in only one productive field, the Khaur main field, where a very shallow structure is cut by
axial faults which permitted or provided the path to hydrocarbons into the overlying Murree s and s. Khaur
North is a thrusted anticline (Snake Head) underneath the Main Khaur Anticline. Top seal is being
provided by the thick salt beds, accumulated in the core of the Main Khaur. Thick clay stone beds (~2100’)
present in the lower part of Murree Formation, and about
90 feet thick clay beds of Kuldana Formation can provide the top seal to Chorgali Formation. About 15–20
feet thick shale bed at the top of Chorgali can also provide good seal. The shale beds of Hangu Formation
(~50”) are good seal for Lockhart. About 150 feet thick shale beds of Chiddru Formation provide effective
seal for Wargal Formation.

1.8 POL SUPERVISOR CREW

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 13
POL deployed Rig Exalo Exalo –305 to drilled Well Khaur North–1. The following POL personnel
supervised and monitored the well.

1. Fiaz un Nabi Butt Drilling Supervisor


2. Mr. Muhammad Khan Drilling Supervisor
3. Mr. Talha Night Drilling Supervisor
4. Mr. Khizer Ayyub Night Drilling Supervisor
5. Mr. Raja Saqib Wellsite Geologist
6. Mr. Raheel Munawar Wellsite Geologist
7. Mr. Kurram Jadoon Wellsite Geologist
8. Zahid Ramzan Wellsite Geologist
9. Laeeq Ahmed Wellsite Geologist
10. Mr. Tamoor Malik Trainee Wellsite Geologist

1.9 MUD LOGGING CREW

The following professionals worked in mud logging unit during drilling of Well Khaur North–1.

1. Gohar Sharif Pressure Engineer


2. Muhammad Mukhtar Pressure Engineer
3. Usman Ghani Pessure Engineer
4. Muhammad Iqbal Pressure Engineer
5. Muhammad Shahab Mud Logger
6. Zeeshan Mussadiq Mud Logger
7. Usman Ali Paracha Mud Logger
8. Muhammad Nabeel Mud Logger
9. Muhammad Aurangzaib Mud Logger
10. Waqas Ahmed Trainee Mud Logger
11. Hammad Jadoon Trainee Mud Logger
12. Ali Syed Trainee Mud Logger
13. Muhammad Hassan Trainee Mud Logger
14. Tayyab sarwar Trainee Mud Logge

1.10 PETROSERVICES INTRODUCTION

M/S PetroServices GmbH Mud logging Unit # PTPS–9009 was in operation at Well Khaur North–1 from date of
spud to completion of all drilling operations. The drilling, mud and gas parameters were closely monitored and
recorded through sensors, displayed in mud logging unit, as well as in online computers. Intensive care was also
kept on subsurface formation pressure and remedial actions were instantly taken, at any deviation from normal
situation observed. The PetroServices personnel, working in 12 hourly shifts, kept a constant and round the clock
check on all the out puts in order to foresee, point out any potential hazard during drilling. If such problem was
detected, it was immediately communicated to drilling personnel, mud personnel and well site geologist. A
continuous monitoring by the mud logging unit greatly assisted in carrying out drilling operations efficiently and
safely.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 14
1.11 WELL PROFILE

RKB = 1591.34ft AMSL GE = 1556.34ft AMSL

20” CASING /CEMENT PHASE # 01 (26” Hole)


DATA
OD: 20”
ID: 18.73 Spud Date: 09/11/2015
Mud Weight: 8.9-11ppg
Weight: 133 ppf
Bit Used: 03NB, 04RR,
Grade/Threads: K–55
Time Consumed: 18 Days
Cement Job Schlumberger
AVG ROP: 5.76 ft/hr
Spacer: 100 bbl Flow line Temp: 46.20 C
Lead slurry : 930 bbls (15.8 ppg) TD at: 2017 ft
Tail slurry: 100 bbls (15.8 ppg) Formation at Shoe: Murree
Displaced with: 25 bbl
Shoe at: 2013ft

13⅜” CASING/CEMENT DATA


PHASE # 02 (171/2” Hole)

OD: 13⅜”
ID: 12.347” Drilling Commenced on: 02/12/2017
Weight: 72 PPF Mud Weight: 11–12.7ppg
Grade/Threads: C–95 Bit Used: 03NB, 06RR
Cement Job Schlumberger Time Consumed: 38 Days
Spacer: 155 bbl (14.3 ppg) AVG ROP: 13.30ft/hr.
Lead slurry : 1080 bbls (15.8 ppg) Flow line Temp: 68.5º C
TD at: 6515 ft
Tail slurry: 100 bbls (15.8 ppg)
Formation at Shoe: Murree
Displaced with: 952 bbl
Shoe at: 6512m

PHASE # 04 (12¼” Hole)


9 ⅝” CASING/CEMENT DATA

Drilling Commenced on: 10/01/2018


OD: 9 ⅝”
Mud Weight: 12.7-13.6ppg
ID: 8.535”
Bit Used: 06 NB, 07 RR
Weight: 53.5 PPF Time Consumed: 57 Days.
Grade/Threads: C-95 ROP: 6.71ft/hr.
Cement Job stage 1 Flow line Temp: 71.0ºC
Mud Push: 150 bbl TD at: 12742ft
Lead Slurry: 235 bbl (15.8 ppg) Formation at shoe: Chorgali
Tail Slurry: 270 bbl (16.2 ppg)
Displaced with: 892 bbl (14.8 ppg)
Shoe at: 12737ft
Cement Job stage 2
Mud Push: 100 bbl (17.6pg)
Lead Slurry: 290 bbl (18.2 ppg)
Tail Slurry: 100 bbl (18.2 ppg)
Displaced 449 bbl (17.0 ppg) PHASE # 05 (8½” Hole)

7” LINER /CEMENT DATA Drilling Commenced on: 24/03/2018


Mud Weight: 11.0–13.0ppg
Bit Used: 05 NB, RR 07,
OD: 7” Time Consumed: 26 Days.
ID: 6.09” AVG ROP: 7.76m/hr.
Weight: 32 PPF Flow line Temp: 67.0ºC
Grade/Threads: C-95 TD at: 14586m
Cement Job Formation at shoe: Amb
Spacer: 80 bbl (15.0 ppg)
Cement Slurry: 88 bbl (16.4 ppg)
Displaced with: 188 bbl(13.00 ppg Mud)
Shoe at: 14586 (TOL: 12474ft)

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 15
Section

2
Geology and Shows
2.1 STRATIGRAPHIC TOPS

Khaur North–1 was spud on 09th November, 2017. Logging commenced from 51ft to 14586ft MD (TD).
Formation tops quoted are provisional and may be changed after re–evaluation. All depth measured below
Rotary Kelly Bushing (RKB). All thicknesses are based on mud log tops. The Stratigraphic Succession is
shown in Table No.2.1 and Formation Tops table is given below.

FORMATION TOPS
FORMATION
AGE WELL SITE MD THICKNESS E log
ANTICIPATED
(FT) (FT) (FT) (FT)

Murree-1 Surface 9200 9200

Fateh Jang 9200 9240 40


MIOCENE

Murree-2 9240 9710 470


EOCENE Eocene 9710 12270 2560
Murree-3 12270 12553 283
MIOCENE Fateh Jang 12553 12585 32

Kuldana 12585 12700 115


Chorgali 12700 12950 250
EOCENE
Sakesar 12950 13160 210
Nammal 13160 13247 87
Patala 13247 13610 363
PALEOCENE Lockhart 13610 13961 351
Hangu 13961 13996 35
Chhidru 13996 14177 181
PERMIAN Wargal 14177 14540 363
Amb 14540 14586 46
Total Depth (m) Total Depth: MD: 14586FT TVD: 14572.18FT TVDSS: –12980.84

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 16
2.2 SAMPLE INTERVALS

The following ditch samples were collected and packed at Khaur North–1

WASHED AND DRIED SAMPLES


Samples Intervals
Washed / Dried samples 50,10 and 5ft From 10500ft to 14586ft

SET: A ,B and C Each


10 and 5ft Interval Box # 1 From 10500ft to 10700ft
5ft Interval Box # 2 From 10700ft to 10810ft
5ft Interval Box # 3 From 10810ft to 10925ft
5ft Interval Box # 4 From 10925ft to 11015ft
5ft Interval Box # 5 From 11015ft to 11125ft
5ft Interval Box # 6 From 11125ft to 11235ft
5ft Interval Box # 7 From 11235ft to 11340ft
5ft Interval Box # 8 From 11340ft to 11455ft
5ft Interval Box # 9 From 11455ft to 11580ft
5ft Interval Box # 10 From 11580ft to 11680ft
5ft Interval Box # 11 From 11680ft to 11800ft
5ft Interval Box # 12 From 11800ft to 11900ft
5ft Interval Box # 13 From 11900ft to 12030ft
5 and 50ft Interval Box # 14 From 12030ft to 12220ft
5 and 50ft Interval Box # 15 From 12220ft to 12550ft
5 and 50ftft Interval Box # 16 From 12550ft to 12742ft
5ft Interval Box # 17 From 12742ft to 12860ft
5ft Interval Box # 18 From 12860ft to 12960ft
5ft Interval Box # 19 From 12960ft to 13090ft
5ft Interval Box # 20 From 13090ft to 13200ft
5ft Interval Box # 21 From 13200ft to 13290ft

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 17
5ft Interval Box # 22 From 13290ft to 13390ft
5ft Interval Box # 23 From 13390ft to 13500ft
5ft Interval Box # 24 From 13500ft to 13610ft
5ft Interval Box # 25 From 13610ft to 13710ft
5ft Interval Box # 26 From 13710ft to 13800ft
5ft Interval Box # 27 From 13800ft to 13900ft
5ft Interval Box # 28 From 13900ft to 14000ft
5ft Interval Box # 29 From 14000ft to 14100ft
5ft Interval Box # 30 From 14100ft to 14200ft
5ft Interval Box # 31 From 14200ft to 14300ft
5ft Interval Box # 32 From 14300ft to 14400ft
5ft Interval Box # 33 From 14400ft to 14500ft
5ft Interval Box # 34 From 14500ft to 14586ft

UNWASHED AND WET SAMPLES


Samples Intervals
Unwashed and Wet Samples 50, 20,10 and 5ft From 51ft to 14586ft

SET: A ,B and C Each


50ft Interval Gunny Sack # 1 From 51ft to 2017ft
50 ft Interval Gunny Sack # 2 From 2017ft to 3200ft
50ft Interval Gunny Sack # 3 From 3200ft to 4800ft
50ft Interval Gunny Sack # 4 From 4800ft to 6515ft
50ft Interval Gunny Sack # 5 From 6515ft to 7900ft
50ft Interval Gunny Sack # 6 From 7900ft to 8950ft
50ft Interval Gunny Sack # 7 From 8950ft to 10200ft
50,10 and 5 ft Interval Gunny Sack # 8 From 10200ft to 10790ft
5ft Interval Gunny Sack # 9 From 10790ft 11350ft
5ft and 20 Interval Gunny Sack # 10 From 11350ft to 11810ft
20 Interval Gunny Sack # 11 From 11810ft to 12600ft

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 18
20ft Interval Gunny Sack # 12 From 12600ft to 12742ft
10ft Interval Gunny Sack # 13 From 12742ft to 13030ft
10 ft Interval Gunny Sack # 14 From 13055ft to 13330ft
10ft Interval Gunny Sack # 15 From 13330ft 13550ft
10ft Interval Gunny Sack # 16 From 13550ft to 13800ft
10ft Interval Gunny Sack # 17 From 13800ft to 14050ft
10ft Interval Gunny Sack # 18 From 14050ft to 14300ft

10ft Interval Gunny Sack # 19 From 14300ft to 14586ft

Total No of Gunny Sack 19 x 3 (Set A, B and C) = 57

Total No of Dried Samples Boxes 34 x 3 (Set A, B and C) = 102

2.3 GENERAL FORMATION DESCRIPTION

Mud logging and formation evaluation for Khaur North–1 commenced 51ft below Rotary table.

MURREE–1 FORMATION:
Age : Miocene
Interval : Surface to 9200ft MD
Thickness : 9149ft
ROP : Minimum 0.46 ft/hr
Maximum 108.57 ft/hr
Average 19.78 ft/hr
Lithology : Claystone with intercalation of Sandstone and traces of siltstone.
Sandstone: Transparent to translucent, grayish red, brownish gray, brownish black, dusky red, pale reddish
brown, olive gray, reddish gray, Med light to dark grey, grayish olive green, dark greenish grey, light olive
grey, light gray, medium gray, off white, grayish black, grayish brown, yellowish grey, dusky yellowish
green, in parts moderately olive brown, moderately hard to hard, loose to friable, unconsolidated, very fine
to coarse grain, sub angular to sub rounded, poorly to moderately sorted, trace mica, trace pyrite, trace
maficminerals, loose quartz grain, argillaceous matrix, trace calcite crystals and calcite veins, traces
limestone, non to highly calcareous cement, locally siliceous cement.
Claystone: Moderate reddish brown, grayish brown, dark reddish brown, pale reddish brown, moderate
yellowish brown, light to dark brown, brick red, in parts dusky brown, in parts moderate brown,, in parts
white, soft to moderately hard, sticky, pasty, sub blocky to blocky, amorphous, sticky, pasty, slightly to
highly washable, in parts gradded to silt stone, trace calcite veins, non to moderately calcareous.
Siltstone: Moderate brown, dark reddish brown, pale reddish brown, grayish brown, dusky brown, dark
reddish brown, dusky red, moderate reddish brown, moderate brown, firm to hard, blocky to sub blocky,
in parts grading to very fine Sandstone, traces calcite veins, non to slightly calcareous.
Hydrocarbon shows:
The background gas levels detected during this interval is 0.10% to 20.24% ( added 0.1 to 5% crude oil
addition in active system). The major peaks over this interval were;

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 19
Depth Max gas C1 C2 C3 iC4 nC4 iC5 nC5 Remarks
ft % ppm ppm ppm ppm ppm ppm ppm
4473 48.5 190243 50438 26038 4634 7723 2413 5038 TG
5557 24.7 121107 22065 10369 1805 3169 3059 2653 TG
6829 27.5 121213 30450 13847 1812 3536 1877 3168 TG
8885 22.4 161502 4210 2205 2332 1668 2511 3511 TG

FATHE JANG-1 FORMATION:


Age : Miocene
Interval : 9200ft to 9240ft MD
Thickness : 40ft
ROP : Minimum 3.91 ft/hr
Maximum 14.47 ft/hr
Average 7.99 ft/hr
Lithology : Limestone with streaks of Claystone

Limestone: Moderate brown, dark reddish brown, pale reddish brown, grayish brown, dusky brown, dark
reddish brown, dusky red, moderate reddish brown, moderate brown, firm to hard, blocky to sub blocky,
in parts grading to very fine Sandstone, traces calcite veins, non to slightly calcareous.
Claystone: Moderate brown to brown, dark reddish brown, soft to firm, blocky to sub blocky, in parts
grading to siltstone, moderately calcareous.

Hydrocarbon shows:
The background gas levels detected during this interval is 2.55 to 5.8% ( added 5% crude oil addition in
active system). The major peaks over this interval were;

Calcimetry Summary
Fateh Jang–1 Formation
Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry
(ft) (%) (ft) (%) (ft) (%) (ft) (%)
9200 77 9215 76 9230 76 − −
9205 77 9220 76 9235 76 Minimum: 76
9210 76 9225 76 9240 76 Maximum: 77

MURREE–2 FORMATION:
Age : Miocene
Interval : 9240ft to 9710ft MD
Thickness : 470ft
ROP : Minimum 1.50 ft/hr
Maximum 24.87 ft/hr
Average 6.38 ft/hr
Lithology : Claystone with streaks of siltstone and traces of Limestone.

Claystone: Moderate brown to brown, dark reddish brown, dusky brown, grayish red, brownish grey,
Greenish grey, very pale green, pale blue green, Greenish grey, soft to very hard, blocky to sub blocky, in
parts grading to siltstone, trace calcite veins, non to slightly calcareous.

Siltstone: Moderate brown, dark reddish brown, in parts greenish red, moderate olive brown, hard to very
hard, blocky to sub blocky, in parts grading to very fine Sandstone, slightly to non calcareous.
Limestone: White to off white, dirty gray, dirty brown, soft to moderately hard, microcrystalline to
cryptocrystalline, chalky, blocky, trace calcite crystals.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 20
Hydrocarbon shows:
The background gas levels detected during this interval is 1.84 to 10.77% ( added 5.0% to 5.5% crude oil
addition in active system). The major peaks over this interval was;

Depth Max gas C1 C2 C3 iC4 nC4 iC5 nC5 Remarks


ft % ppm ppm ppm ppm ppm ppm ppm
9365 46.5 281782 22306 4753 377 841 625 938 TG
9691 28.53 188356 19299 5462 460 1013 1710 1489 TG

EOCENE FORMATION:
Age : Eocene
Interval : 9710ft to 12270ft MD, (9698.64–12257.93TVD)
Thickness : 2560ft (2559.29ft)
Lower Contact : Murree-3
Lithology : Limestone with traces of Marl
ROP : Minimum 0.76 ft/hr
Maximum 30.36 ft/hr
Average 7.56 ft/hr
Lithology : Limestone with streaks of Claystone, Marl Shale and thin beds Siltstone
and traces of Anhydrite.

Claystone: Light olive grey, light grey to medium grey, light bluish grey, greenish grey, yellowish grey,
pale yellowish brown, soft to hard, cryptocrystalline to microcrystalline, highly argillaceous, in parts
grading to marl, in parts dolomitic, trace disseminated pyrite, trace anhydrite, trace shale, trace siltstone.
.
Siltstone: Dark reddish brown, moderate brown, in parts greenish red, hard to very hard, blocky to sub
blocky, in parts grading to very fine Sandstone, non to slightly calcareous.

Marl: Light grey to medium light grey, light olive grey, soft, in parts sub blocky, slightly sticky.

Hydrocarbon shows:
The background gas levels detected during this interval is 1.63to 14.43% ( added 6.0% crude oil addition
in active system). The major peaks over this interval was;

Depth Max gas C1 C2 C3 iC4 nC4 iC5 nC5 Remarks


ft % ppm ppm ppm ppm ppm ppm ppm
9827 11.2 47752 6969 4330 494 1149 3062 2888 FG
10024 16.74 75733 11404 6694 783 1802 3704 3980 FG
10121 13.24 56880 8243 5157 1941 2324 1832 2833 FG
10189 24.58 129777 18999 7991 1097 2274 3765 3605 TG
10201 13.07 60340 8856 4280 609 1340 3309 2894 FG
10358 9.9 46061 7926 4139 529 1101 1716 1885 FG
10541 64.6 348295 61025 24975 3953 6080 5257 5695 FG
10557 32.12 88229 47546 6823 4496 4829 4118 3970 TG
10636 20.51 100778 14508 4839 1029 1438 3842 5189 FG
10945 53.37 213040 47765 1384 10818 8236 4871 4568 TG
11381 37.30 279591 21406 3874 693 936 1961 3072 TG
11690 41.42 277515 18770 3496 1269 1422 3046 4183 TG
12200 7.9 50000 2322 970 136 299 1671 2171 TG

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 21
Calcimetry Summary
Eocene Formation
Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry
(ft) (%) (ft) (%) (ft) (%) (ft) (%)
9710 61 10380 60 10990 85 11650 88
9720 65 10390 52 11000 85 11660 66
9730 76 10400 51 11010 88 11670 75
9740 76 10410 50 11020 85 11680 85
9750 76 10420 50 11030 88 11690 79
9760 79 10430 45 11040 91 11700 55
9770 79 10440 90 11050 92 11710 86
9780 79 10450 73 11060 90 11720 76
9790 85 10460 73 11070 89 11730 82
9800 82 10470 86 11080 86 11740 62
9810 80 10480 88 11090 86 11750 74
9820 75 10490 70 11100 90 11760 66
9830 72 10500 60 11110 88 11770 75
9840 76 10510 55 11120 88 11780 68
9850 74 10520 85 11130 91 11790 70
9860 70 10530 90 11140 89 11800 77
9870 77 10540 90 11150 89 11810 74
9880 72 10550 87 11160 89 11820 70
9890 70 10560 75 11170 92 11830 79
9900 73 10570 75 11180 90 11840 79
9910 73 10580 70 11190 86 11850 80
9920 73 10590 83 11200 88 11860 72
9930 75 10600 80 11210 90 11870 44
9940 70 10610 89 11220 87 11880 49
9950 75 10620 83 11230 89 11890 59
9960 65 10610 85 11240 91 11900 46
9970 63 10620 85 11250 90 11910 58
9980 63 10630 88 11260 92 11920 66
9990 63 10640 75 11270 92 11930 85
10000 51 10650 80 11280 94 11940 82
10010 63 10660 89 11290 92 11950 78
10020 74 10670 90 11300 93 11960 45
10030 70 10650 80 11310 94 11970 11
10040 91 10660 89 11320 91 12980 11
10050 91 10670 90 11330 89 12900 8
10060 93 10680 91 11340 90 12000 8
10070 93 10690 93 11350 87 12010 5
10080 91 10700 90 11360 85 12020 5
10090 91 10710 88 11370 82 12030 5
10100 91 10720 91 11380 85 12040 4
10120 92 10730 93 11390 83 12050 4
10120 86 10740 92 11400 82 12060 4
10130 86 10750 90 11410 81 12070 4
10140 73 10760 89 11420 84 12080 2
10150 80 10770 87 11430 92 12090 2
10160 76 10780 89 11440 95 12100 3

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 22
10170 50 10790 90 11450 95 12110 3
10180 81 10800 89 11460 92 12120 2
10190 81 10810 87 11470 92 12130 2
10200 87 10820 89 11480 91 12140 3
10220 85 10830 90 11490 89 12150 3
10230 85 10840 85 11500 92 12160 2
10240 86 10850 85 11510 88 12170 2
10250 83 10860 90 11520 90 12180 4
10260 85 10870 90 11530 91 12190 4
10270 86 10880 90 11540 89 12000 67
10280 87 10890 92 11550 92 12210 57
10290 85 10900 90 11560 93 12220 75
10300 85 10910 88 11570 91 12230 75
10310 85 10920 91 11580 91 12240 85
10320 86 10930 87 11590 91 12250 83
10330 86 10940 91 11600 79 12260 82
10340 80 10950 88 11610 66 12270 83
10350 80 10960 88 11620 82 − −
10360 51 10970 87 11630 88 Minimum 2
10370 60 10980 87 11640 92 Maximum 95

MURREE–3 FORMATION:
Age : Miocene
Interval : 12270ft to 12553ft MD, (1257.93ft–12540.88ftTVD)
Thickness : 283ft (282.95ft)
Lower Contact : Fateh Jang-2
ROP : Minimum 3.72 ft/hr
Maximum 17.5 ft/hr
Average 7.71 ft/hr
Lithology : Claystone with intercalation of sand stone and traces of siltstone.

Claystone: Moderately brown, grayish brown, dusky brown, soft to firm, blocky to sub blocky, in parts
slty, grading to very fine sandstone, trace calcite, slightly washable, slightly–non calcareous.

Sandstone: Light gray, dirty white, off white, occasionally greenish gray, translucent in parts transparent,
friable, moderately hard to hard, fine to very fine grained, poorly sorted, sub angular to sub rounded,
slightly calcareous cement.

Siltstone: Brownish grey, moderately brown, dark reddish brown, light brown, moderately hard to hard,
sub blocky to blocky, slightly calcareous cement

Hydrocarbon shows:
The background gas levels detected during this interval is 1.16 to 6.99% ( added 6.0% crude oil addition
in active system).
FATHE JANG -2 FORMATION:

Age : Miocene
Interval : 12553ft to 12585ft MD (12540.88ft to 12572.87ft TVD )
Thickness : 32ft (31.99ft)
Lower Contact : Kuldana
ROP : Minimum 3.16 ft/hr
Maximum 11.3 ft/hr
Average 5.45 ft/hr
Lithology : Limestone

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 23
Limestone: Dirty brown, off white, yellowish brown, light brownish grey, pale yellowish brown, soft to
firm, blocky to sub blocky, cryptocrystalline, occasionally microcrystalline, argillaceous, rare fossil.

Hydrocarbon shows:
The background gas levels detected during this interval is 1.73% to 4.32% ( added 6.0% crude oil addition in
active system).

Calcimetry Summary
Fateh Jang Formation
Total Calcimetr
Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry
Depth y
(ft) (%) (ft) (%) (ft) (%)
(ft) (%)
12555 78 12585 48 12580 82 Minimum: 48
12560 80 12570 84 − − Maximum: 84

KULDANA FORMATION:
Age : Eocene
Interval : 12585ft to 12700ft MD, (12572.87–12687.86TVD)
Thickness : 115ft (114.99ft)
Lower Contact : Chorgali
ROP : Minimum 2.23 ft/hr
Maximum 29.4 ft/hr
Average 8.15 ft/hr
Lithology : Claystone

Claystone–1: Light grey, light bluish grey, light greenish grey, medium gray, grayish brown, soft to firm,
blocky to sub blocky, in parts silty, slightly washable, highly calcareous.

Claystone-2: Moderate brown, moderate reddish brown, pale reddish brown, brick red, occasionally light
blush grey, soft to firm, blocky to sub blocky, in parts silty, trace calcite, slightly washable, slightly to non
calcareous.
Claystone-3: Light brown, pale brown, pale reddish brown, light blush grey, occasionally light grey, trace
moderately olive grey, soft–firm, blocky to sub blocky, in parts silty, slightly washable, slightly calcareous.

Siltstone: Dark reddish brown, grayish red, dusky brown, hard to very hard, blocky to sub blocky, in parts
mottled, slightly to non calcareous.

Hydrocarbon shows:
The background gas levels detected during this interval is 2.27% to 10.56% ( added 6.0% crude oil
addition in active system). The major peaks over this interval was;

Depth Max gas C1 C2 C3 iC4 nC4 iC5 nC5 Remarks


ft % ppm ppm ppm ppm ppm ppm ppm
12679 51.08 205204 51305 33164 6278 7174 5066 4761 TG

Calcimetry Summary
Kuldana Formation
Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry
(ft) (%) (ft (%) (ft) (%) (ft (%)

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 24
12590 12 12630 7 12670 5 − −
12600 11 12640 6 12680 5 − −
12610 10 12650 6 12690 11 Minimum: 4
12620 8 12660 4 − − Maximum: 12

CHORGALI FORMATION:
Age : Eocene
Interval : 12700ft to 12950MD, (12687.86–12937.83TVD)
Thickness : 250ft (24.95ft)
Lower Contact : Sakesar
ROP : Minimum 1.41ft/hr
Maximum 33.0ft/hr
Average 4.24ft/hr
Lithology : Limestone with intercalation of Shale and Dolomitic Limestone and streaks
of Marl and Argilaceous Limestone, and thin beds of Anhydrate.
Shale1: Greenish grey, light bluish grey, grayish green, moderately olive grey, soft–firm, in parts
moderately hard, blocky–sub blocky, sub platy, splintery, sub fissile, trace anhydrite, trace pyrite, non
calcareous.
Shale 2 : Grayish blue green, greenish grey, moderately reddish brown, moderately dark grey, light bluish
grey, moderately hard to hard, blocky–sub blocky, platy to sub platy, in parts splintery, sub fissile, trace
anhydrite, non calcareous

Limestone: Light grey to medium grey, yellowish grey, light olive grey, soft to firm, sub blocky,
cryptocrystalline, in parts microcrystalline, trace shale, trace anhydrite, argillaceous, in parts grading to
marl, in parts dolomitic, trace fossils.

Hydrocarbon shows:
The background gas levels detected during this interval is 0.027% to 13.43%.
The major peaks over this interval was;

Depth Max gas C1 C2 C3 iC4 nC4 iC5 nC5 Remarks


ft % ppm ppm ppm ppm ppm ppm ppm
12718 13.5 63159 7780 6950 779 1290 2242 2678 FG
12889 4.35 25807 3628 2018 375 42 318 23 TG
12912 2.63 12138 2129 1302 268 519 208 238 FG
12937 7.80 40816 4119 2810 798 1091 390 289 FG

Calcimetry Summary
Chorgali Formation
Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry
(ft) (%) (ft (%) (ft) (%) (ft (%)
12700 4 12780 64 12860 71 12920 96
12710 2 12790 69 12870 72 12930 80
12720 6 12800 80 12880 70 12940 85
12730 14 12810 86 12890 64 12950 90
12740 62 12820 70 12880 70 − −
12750 71 12830 85 12890 64 − −
12760 80 12840 77 12900 75 Minimum: 2
12770 60 12850 70 12910 72 Maximum: 90

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 25
SASAKESAR FORMATION:
Age : Eocene
Interval : 12950ft to 13160MD, (12572.87–13147.81TVD)
Thickness : 210ft (209.97ft)
Lower Contact : Nammal
ROP : Minimum 0.94 ft/hr
Maximum 38.16 ft/hr
Average 12.07 ft/hr
Lithology : Limestone with thin beds of Marl

Limestone: Grayish black, brownish black, brownish gray, medium gray, in parts olive black, moderately
hard-hard, brittle, dense, microcrystalline, abundant forams, Wackstone to Packstone, slightly argillaceous.
UVD: 15% yellowish white direct fluorescence.
UVC: slow-moderate light yellowish diffuse cut, thin yellowish white residual ring.

Marl: Olive gray, medium dark gray, dark gray, soft, sub blocky, amorphous, slightly sticky.

Hydrocarbon shows:
The background gas levels detected during this interval is 0.134% to 8.15%.
The major peaks over this interval was;

Depth Max gas C1 C2 C3 iC4 nC4 iC5 nC5 Remarks


ft % ppm ppm ppm ppm ppm ppm ppm
12959 68.5 187607 67663 68793 18889 1940 9541 1393 TG
12984 84.2 156998 74453 45524 4523 49321 18012 18177 FG
13031 14.4 76611 14021 7116 1445 202 832 120 TG
13056 4.8 29808 2716 1357 264 122 115 110 TG
13129 1.97 6261 1484 827 148 335 138 195 FG

Calcimetry Summary
Sakesar Formation
Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry
(ft) (%) (ft (%) (ft) (%) (ft (%)
12960 91 13020 92 13080 70 13140 84
12970 90 13030 92 13090 87 13150 82
12980 84 13040 89 13100 88 13160 58
12990 89 13050 90 13110 90 – –
13000 92 13060 90 13120 88 Minimum: 58
13010 91 13070 92 13130 86 Maximum: 92

NAMMAL FORMATION:
Age : Eocene
Interval : 13160ft to 13247MD, (13147.80–13234.77TVD)
Thickness : 87ft MD (86.97ft)
Lower Contact : Patala
ROP : Minimum 7.82 ft/hr
Maximum 25.72 ft/hr

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 26
Average 15 ft/hr
Lithology : Limestone with streaks of Marl.

Limestone: olive gray, olive black, greenish black, soft-firm, sub blocky-blocky, in parts amorphous,
cryptocrystalline, in parts grad-marl, moderately argillaceous.
Marl: Medium to dark gray, olive gray, soft, sub blocky, amorphous, slightly sticky.

Hydrocarbon shows:
The background gas levels detected during this interval is 0.47% to 1.71%.

Calcimetry Summary
Nammal Formation
Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry
(ft) (%) (ft (%) (ft) (%) (ft (%)
13170 83 13200 70 13230 70 – –
13180 81 13210 68 13240 69 Minimum: 66
13190 79 13220 66 13247 72 Maximum: 83

PATALA FORMATION:
Age : Paleocene
Interval : 13247ft to 13610ft MD, (13234.77–13597.45TVD)
Thickness : 363ft (362.68ft)
Lower Contact : Lockhart
ROP : Minimum 2.82 ft/hr
Maximum 76.76 ft/hr
Average 15 ft/hr
Lithology : Limestone with streaks of Marl and Shale.

Limestone: dusky yellowish brown, dusky brown, medium-dark gray, in parts off white, firm-moderately
hard, in parts hard, blocky-sub blocky, microcrystalline-cryptocrystalline, massive, brittle, slightly
argillaceous.
UVD: 10-15% yellowish white direct fluorescence
UVC: Moderate white yellowish streaming with thin milky white residual ring
Marl: Grayish black, dark gray, olive black, soft, amorphous, slightly sticky.
Shale: Dark gray, grayish black, olive black, firm- moderately hard, sub fissile- fissile, non calcareous, trace
pyrite.

Hydrocarbon shows:
The background gas levels detected during this interval is 0.30% to 4.15%.
The major peaks over this interval was;

Depth Max gas C1 C2 C3 iC4 nC4 iC5 nC5 Remarks


ft % ppm ppm ppm ppm ppm ppm ppm
13284 4.86 22599 5619 2603 294 608 174 226 FG
13327 9.95 36315 9853 5027 973 696 763 644 CG
13417 32.164 64401 37825 26774 5362 6206 3795 4898 TG

Calcimetry Summary
Patala Formation

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 27
Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry
(ft) (%) (ft (%) (ft) (%) (ft (%)
13250 83 13350 80 13450 83 13550 58
13260 83 13360 82 13460 83 13560 55
13270 84 13370 83 13470 80 13570 35
13280 86 13380 80 13480 82 13580 76
13290 89 13390 82 13490 82 13590 61
13300 88 13400 81 13500 85 13600 68
13310 90 13410 83 13510 74 13610 85
13320 87 13420 85 13520 80 − −
13330 89 13430 87 13530 76 Minimum: 35
13340 80 13440 84 13540 80 Maximum: 91

LOCKHART FORMATION:
Age : Palaeocene
Interval : 13610ft to 13961ft MD , (13597.45–13947.96TVD)
Thickness : 351ft (350.51ft)
Lower Contact : Hangu
ROP : Minimum 2.2 ft/hr
Maximum 21.73 ft/hr
Average 12.64 ft/hr
Lithology : Limestone with thin beds of Dolomitic Limestone, Marl and Shale.

Limestone: Light brownish grey, olive black, medium grey, light grey creamy in parts, firm to moderately
hard, blocky to sub blocky, microcrystalline-cryptocrystalline, slightly to non argillaceous, wackstone,
occasionally Packstone, trace forams.
UVD: Trace-5% pale yellowish direct fluorescence.
UVC: Slow yellowish white diffuse cut with milky light brown residue ring.

Marl: Dark grey, grayish black, brownish black, soft-firm, blocky-sub blocky, in parts amorphous, slightly
sticky.

Dolomitic Limestone: Grayish black, olive black, hard-very hard, blocky-sub blocky, microcrystallinel,
slightly-non argillaceous.
UVD: trace-5% pale yellowish direct fluorescence.

Shale: Dark grey, grayish black, olive black, firm, sub fissile, platy to sub platy, non calcareous.

Hydrocarbon shows:
The background gas levels detected during this interval is 0.21% to 1.78%.
The major peaks over this interval was;

Depth Max gas C1 C2 C3 iC4 nC4 iC5 nC5 Remarks


ft % ppm ppm ppm ppm ppm ppm ppm
13610 2.09 8956 2345 1271 189 270 160 165 CG
13703 8.62 31227 7749 4102 543 1345 371 484 CG
13799 7.822 28275 7906 4431 637 1763 425 581 CG
13896 8.31 31731 8119 4645 674 734 480 267 CG

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 28
Calcimetry Summary
Lochkhart Formation
Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry
(ft) (%) (ft) (%) (ft) (%) (ft) (%)
13620 84 13720 84 13820 86 13920 7
13630 75 13730 81 13830 75 13930 80
13640 82 13740 80 13840 74 13940 89
13650 83 13750 79 13850 73 13950 42
13660 84 13760 86 13860 71 13960 17
13670 86 13770 86 13870 71 − −
13680 88 13780 88 13880 74 − −
13690 90 13790 92 13890 71 − −
13700 91 13800 88 13900 68 Maximum: 91
13710 89 13810 93 13910 45 Maximum: 93

HANGU FORMATION:
Age : Palaeocene
Interval : 13961ft to 13996ft MD, (13947.96–13982.91TVD)
Thickness : 35ft (34.95ft)
Lower Contact : Chhidru
ROP : Minimum 5.63 ft/hr
Maximum 21.73 ft/hr
Average 12.64 ft/hr
Lithology : Sandstone interbedded withClaystone

Sandstone: Medium grey, white, off white, light grey, very fine to fine graind, translucent, loose, sub
angular, poorly sorted, non calcareous.
Claystone: Dusky brown, dusky red, grayish brown, soft, in parts firm, sub blocky- blocky, in parts
amorphous, slightly sticky, non calcareous.

Hydrocarbon shows:
The background gas levels detected during this interval is 0.34% to 2.4%.
The major peaks over this interval was;

Depth Max gas C1 C2 C3 iC4 nC4 iC5 nC5 Remarks


ft % ppm ppm ppm ppm ppm ppm ppm
13987 28.53 93753 30136 14504 4056 8469 2374 3194 TG

Calcimetry Summary
Hangu Formation
Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry
(ft) (%) (ft) (%) (ft) (%) (ft) (%)
1370 4 13990 4 − − Minimum: 4
13980 5 13996 4 − − Maximum: 5

CHHIDRU FORMATION:
Age : Permian
Interval : 13996ft to 14177ft MD, (13982.91–14163.55ft TVD)

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 29
Thickness : 181ft (180.64ft)
Lower Contact : Wargal
ROP : Minimum 7.05 ft/hr
Maximum 28.05 ft/hr
Average 15 ft/hr
Lithology : Sandstone with intercalation of Limestone, streaks of Marl and thin beds of
Shale .

Sandstone: light grey, off white, white, in parts grayish black, occasionally dark grey , greenish grey, loose,
in parts moderately hard to hard, fine grained, in parts medium grained, sub angular, poor sorted, in parts
moderately sorted, loose quartz grained, trace glauconite, slightly calcareous cement, no visible porosity, no
shows.
Limestone: very light grey, medium light grey, creamy, off white, firm, cryptocrystalline, blocky-sub
blocky, slightly-non argillaceous.
Shale: grayish black, olive black, black, moderately hard to hard, fissile to sub fissile, in parts splintery, non
calcareous.
Marl: Dark grey, olive black, grayish black, soft, amorphous, slightly sticky.

Hydrocarbon shows:
The background gas levels detected during this interval is 0.23% to 4.01%.
The major peaks over this interval was;

Depth Max gas C1 C2 C3 iC4 nC4 iC5 nC5 Remarks


ft % ppm ppm ppm ppm ppm ppm ppm
14008 4.80 21721 4944 1723 539 844 305 282 FG
14081 6.58 23392 5929 3443 517 1298 391 490 CG
14176 7.46 27328 6807 3858 564 1408 414 519 CG

Calcimetry Summary
Chhidru Formation
Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry
(ft) (%) (ft) (%) (ft) (%) (ft) (%)
14000 65 14060 55 14120 55 14175 69
14010 25 14070 46 14130 22 − −
14020 64 14080 40 14140 20 − −
14030 32 14090 62 14150 14 − −
14040 42 14100 32 14160 83 Minimum: 14
14050 52 14110 49 14170 71 Maximum: 83

WARGAL FORMATION:
Age : Permian
Interval : 14177ft to 14540MD, (14163.55ft - 14526.20ft TVD)
Thickness : 363ft (362.65ft)
Lower Contact : Amb
ROP : Minimum 1.6 ft/hr
Maximum 35.1 ft/hr
Average 11.1 ft/hr

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 30
Lithology : Limestone with thin beds of dolomitic Limestone, Shale and Marl.

Limestone: Off white, light grey, light brownish grey, creamy, in parts moderately yellowish brown,
yellowish grey, firm to moderately hard, in parts hard, sub blocky, in parts compact, brittle,
microcrystalline to cryptocrystalline, no show.

Dolomitic Limestone: medium dark, dark grey, dusky brown, in parts olive grey, firm to moderately hard,
dense, sub blocky-blocky, microcrystalline to cryptocrystalline, in parts sucrosic, in parts carbonaceous,
brittle, in parts argillaceous.

Shale: dark grey, blackish grey, moderately hard to hard, sub fissile to fissile, splintery, no calcareous
Marl: dark grey, light grey, soft , amorphous, in parts sub blocky, slightly sticky.

Hydrocarbon shows:
The background gas levels detected during this interval is 0.10% to 1.93%.
The major peaks over this interval was;

Depth Max gas C1 C2 C3 iC4 nC4 iC5 nC5 Remarks


ft % ppm ppm ppm ppm ppm ppm ppm
14227 33.70 90523 32357 25681 3927 7321 1900 2692 TG
14234 2.78 5147 1942 1954 495 1210 459 608 FG
14258 0.86 2941 682 411 113 229 98 135 CG
14352 2.33 10441 2511 1273 164 415 125 166 CG
14362 0.64 2843 643 325 47 115 19 36 POG
14403 0.78 3509 815 404 74 135 55 63 POG
14447 3.93 18340 4421 2127 253 629 129 181 CG
14488 0.63 2544 582 289 41 97 27 38 FG
14509 0.78 3601 545 223 38 76 26 34 FG

Calcimetry Summary
Wargal Formation
Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry
(ft) (%) (ft) (%) (ft) (%) (ft) (%)
14180 98 14280 89 14380 90 14480 86
14190 95 14290 88 14390 91 14490 85
14200 91 14300 86 14400 86 14500 90
14210 88 14310 90 14410 88 14510 90
14220 89 14320 92 14420 87 14520 87
14230 87 14330 91 14430 92 14530 79
14240 88 14340 92 14440 89 14540 78
14250 91 14350 88 14450 90 − −
14260 88 14360 89 14460 91 Minimum: 32
14270 85 14370 91 14470 85 Maximum: 98

AMB FORMATION:
Age : Permian
Interval : 14540ft to 14586ft MD, (145236.20-14572.18 TVD)
Thickness : +46ft (+45.95ft)

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 31
ROP : Minimum 4.28 ft/hr
Maximum 22.64 ft/hr
Average 11.97 ft/hr
Lithology : Limestone with intercalation of Sandstone and streaks of Shale

Sandstone: Light grey, brownish grey, transparent-translucent, loose, in parts moderately hard, very fine to
fine grained, in parts medium grained, sub angular-sub rounded, poorly to moderately sorted, in parts
quartz grain, calcareous cement, trace pyrite, no visible porosity, no shows.
Shale: Dark grey, greenish grey, blackish grey, moderately hard-hard, sub fissile-fissile, in parts splintery,
non calcareous.
Limestone: light grey, olive grey, off white, firm- moderately hard, sub blocky, microcrystalline to
cryptocrystalline, slightly argillaceous, no shows.

Hydrocarbon shows:
The background gas levels detected during this interval is 0.32% to 0.89%.
The major peaks over this interval was;

Depth Max gas C1 C2 C3 iC4 nC4 iC5 nC5 Remarks


ft % ppm ppm ppm ppm ppm ppm ppm
14542 3.98 16059 4598 2392 273 687 171 219 CG

Calcimetry Summary
Amb Formation
Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry Total Depth Calcimetry
(ft) (%) (ft) (%) (ft) (%) (ft) (%)
14545 54 14565 65 14582 67 − −
14550 53 14570 64 14584 83 − −
14555 52 14575 73 14586 83 Minimum: 52
14560 68 14580 79 − − Maximum: 83

2.4 CUTTINGS DESCRIPTION

Mud logging and Formation Evaluation for Khaur North–1 commenced 16m below Rotary Table.

MURREE–1 FORMATION:
Age : Miocene
Interval : Surface to 9200ft MD
Thickness : 9200ft
Lower Contact : Fateh Jang
Lithology : Claystone with intercalation of Sandstone and traces of siltstone.

51 60ft. Predominantly Claystone.


Claystone 100%: Moderate reddish brown, dark reddish brown, in parts moderate brown, soft to firm,
sticky, pasty, amorphous, in place sub blocky, moderately to highly washable, in parts gradded to silt stone,
moderately calcareous.

60 70ft. Predominantly Claystone.


Claystone 100%: Moderate reddish brown, dark reddish brown, in parts moderate brown, soft to firm,
sticky, pasty, amorphous, in place subblocky, moderately to highly washable, in parts gradded to silt stone,
moderately calcareous.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 32
70–85ft. Sand stone with thin beds of Claystone.
Claystone 10%: Moderate reddish brown, dark reddish brown, in parts moderate brown, soft to firm,
sticky, pasty, amorphous, in place sub blocky, moderately to highly washable, in parts gradded to silt stone,
moderately calcareous.
Sand stone 90%: Light olive grey, yellowish grey, in parts moderately olive brown, moderately hard, in
parts loose to friable, very fine to fine grained, sub angular to sub rounded, moderately sorted, calcareous
cement.

85–110ft. Sand stone with thin beds and Streaks of Claystone.


Sand stone 90–80%: Light olive grey, yellowish grey, in parts moderately olive brown, moderately hard, in
parts loose to friable, very fine to fine grained in parts medium grain, sub angular to sub rounded,
moderately sorted, calcareous cement.
Claystone 10–20%: Moderate reddish brown, dark reddish brown, in parts moderate brown, soft to firm,
sticky, pasty, amorphous, in place sub blocky, moderately to highly washable, in parts gradded to silt stone,
moderately calcareous.

110–130ft. Predominantly Sand stone.


Sand stone 100%: Light olive grey, yellowish grey, in parts moderately olive brown, moderately hard, in
parts loose to friable, very fine to fine grained in parts medium grain, sub angular to sub rounded,
moderately sorted, calcareous cement.

130–160ft. Claystone with streak of Sand stone and thin beds of siltstone.
Claystone 70%: Moderate reddish brown, dark reddish brown, in parts moderate brown, soft to firm, sub
blocky to blocky, sticky, pasty, slightly washable, in parts gradded to silt stone, non calcareous.
Sand stone 20%: Med dark grey, in parts dark greenish grey, transparent to translucent, medium to coarse
grained, poorly to moderately sorted, loose to friable, in parts hard,, trace mica, trace pyrite calcareous
cement.
Siltstone 10%: Dark reddish brown, in parts pale reddish brown, moderately hard to hard, blocky to sub
blocky, slightly calcareous.

160–180ft. Sand stone with streaks of Claystone.


Sandstone 90%: Med dark grey, in parts dark greenish grey, transparent to translucent, medium to coarse
grained, poorly to moderately sorted, loose to friable, in parts hard, trace mica, calcareous cement.
Claystone 10%: Moderate reddish brown, dark reddish brown, in parts moderate brown, soft to firm, sub
blocky to blocky, sticky, pasty, slightly washable, in parts gradded to silt stone, non calcareous. 180–230ft.
Predominantly Sandstone.
Sandstone 100%: Reddish grey, medium light grey, in part grayish olive green, transparent to translucent,
loose to friable, in part moderately hard, very fine to fine grained, in parts medium grained, sub rounded to
rounded, moderately sorted, traces of pyrite, calcareous cement.

180–260ft. Sand stone with Streaks of Siltstone and Claystone.


Sandstone 60%: Reddish grey, medium light grey, in part grayish olive green, transparent to translucent,
loose to friable, in part moderately hard, very fine to fine grained, in parts medium grained, sub rounded to
rounded, moderately sorted, traces of pyrite, calcareous cement.
Siltstone 20%: Dark reddish brown, in parts pale reddish brown, moderately hard to hard, blocky to sub
blocky, slightly calcareous.
Claystone 20%: Moderate reddish brown, dark reddish brown, in parts moderate brown, soft to firm, sub
blocky to blocky, sticky, pasty, slightly washable, non calcareous.

260–270ft. Sand stone with Thin Beds of Claystone.


Sandstone 90%: Reddish grey, medium light grey, in part grayish olive green, transparent to translucent,
loose to friable, in part moderately hard, very fine to fine grained, in parts medium grained, sub rounded to
rounded, moderately sorted, traces of pyrite, calcareous cement.
Claystone 10%: Moderate reddish brown, dark reddish brown, in parts moderate brown, soft to firm, sub
blocky to blocky, sticky, pasty, slightly washable, non calcareous.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 33
270–300ft. Claystone with streaks of Sand stone.
Claystone 80%: Moderate reddish brown, dark reddish brown, in parts moderate brown, soft to firm, sub
blocky to blocky, sticky, pasty, slightly washable, non calcareous.
Sand stone 20%: Reddish grey, medium light grey, in part grayish olive green, transparent to translucent,
loose to friable, in part moderately hard, very fine to fine grained, in parts medium grained, sub rounded to
rounded, moderately sorted, traces of pyrite, calcareous cement.

300–380ft. Predominantly Claystone.


Claystone 100%: Pale reddish brown, Moderate reddish brown, in parts moderate brown, soft to firm, sub
blocky to blocky, sticky, pasty, slightly to moderately washable, moderately calcareous.

380–390ft. Sandstone with intercalation of Claystone and streaks of Siltstone.


Sandstone 50%: Medium grey, dark grey, in part grayish olive green, transparent to translucent, loose to
friable, in part moderately hard, very fine to fine grained, in parts medium grained, sub rounded to
rounded, moderately sorted, calcareous cement.
Claystone 30%: Moderate reddish brown, dark reddish brown, in parts moderate brown, soft to firm, sub
blocky to blocky, sticky, pasty, slightly washable, non calcareous
Siltstone 20%: Dark reddish brown, in parts pale reddish brown, moderately hard to hard, blocky to sub
blocky, slightly calcareous.

390–400ft. Predominantly Sandstone.


Sandstone 100%: Medium grey, dark grey, in part grayish olive green, transparent to translucent, loose to
friable, in part moderately hard, very fine to fine grained, in parts medium grained, sub rounded to
rounded, moderately sorted, calcareous cement.

400–430ft. Sandstone with Streaks of Claystone.


Sandstone 80%: Medium grey, dark grey, in part grayish olive green, transparent to translucent, loose to
friable, in part moderately hard, very fine to fine grained, in parts medium grained, sub rounded to
rounded, moderately sorted, calcareous cement.
Claystone 20%: Moderate reddish brown, dark reddish brown, in parts moderate brown, soft to firm, sub
blocky to blocky, sticky, pasty, slightly washable, non calcareous.

430–440ft. Claystone with Intercalation of Sandstone.


Claystone 70%: Moderate reddish brown, dark brown, in parts moderate brown, soft to firm, sub blocky to
blocky, sticky, pasty, slightly washable, non calcareous.
Sandstone 30%: Medium grey, dark grey, in part greenish black, transparent to translucent, loose to friable,
in part moderately hard, very fine to fine grained, in parts medium grained, sub rounded to rounded,
moderately sorted, calcareous cement.

440–470ft. Sandstone with Intercalation of Claystone.


Sandstone 60%: Medium grey, dark grey, in part greenish black, transparent to translucent, loose to friable,
in part moderately hard, very fine to fine grained, in parts medium grained, sub rounded to rounded,
moderately sorted, calcareous cement.
Claystone 40%: Moderate reddish brown, dark brown, in parts moderate brown, soft to firm, sub blocky to
blocky, sticky, pasty, slightly washable, non calcareous.

470–500ft. Claystone with strikes of Sandstone.


Claystone 80%: Moderate reddish brown, dark reddish brown, in parts moderate brown, soft to firm, sub
blocky to blocky, sticky, pasty, slightly washable, non calcareous.
Sandstone 20%: Medium grey, dark grey, in part olive grey, transparent to translucent, moderately hard, in
part loose to friable, very fine to fine grained, in parts medium grained, sub rounded to rounded,
moderately sorted, calcareous cement.

500–520ft. Claystone with intercalation of Sandstone.


Claystone 60%: Moderate reddish brown, dark reddish brown, in parts moderate brown, soft to firm, sub
blocky to blocky, sticky, pasty, slightly washable, non calcareous.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 34
Sandstone 40%: Medium grey, dark grey, in part olive grey, transparent to translucent, moderately hard, in
part loose to friable, very fine to fine grained, in parts medium grained, sub rounded to rounded,
moderately sorted, calcareous cement.

520–560ft. Sandstone with thin beds of Claystone.


Sandstone 90%: Medium grey, medium dark gray, in parts grayish green, transparent to translucent,
moderately hard to hard, in part loose, fine to medium grained, sub angular to sub rounded, poorly to
moderately sorted, slightly calcareous cement.
Claystone 10%: Moderate reddish brown, dark reddish brown, in parts moderate brown, soft to firm, sub
blocky to blocky, sticky, pasty, slightly washable, non calcareous.

560–580ft. Claystone with intercalation of Sandstone.


Claystone 60%: Moderate reddish brown, dark reddish brown, in parts moderate brown, soft to firm, sub
blocky to blocky, sticky, pasty, slightly washable, in parts gradded to silt stone, non calcareous.
Sandstone 40%: Medium grey, medium dark gray, in parts grayish green, transparent to translucent,
moderately hard to hard, in part loose, fine to medium grained, sub angular to sub rounded, poorly to
moderately sorted, slightly calcareous cement.

580–590ft. Predominantly Claystone.


Claystone 100%: Moderate reddish brown, dark reddish brown, in parts moderate brown, soft to firm, sub
blocky to blocky, sticky, pasty, slightly washable, in parts gradded to silt stone, non calcareous.

590–600ft. Claystone with streaks of Sandstone.


Claystone 80%: Moderate reddish brown, dark reddish brown, in parts moderate brown, soft to firm, sub
blocky to blocky, moderately sticky, pasty, slightly washable, in parts gradded to siltstone, non calcareous.
Sandstone 20%: Medium grey, dark grey, in part olive grey, transparent to translucent, loose to friable,
very fine to fine grained, sub rounded to rounded, moderately sorted, calcareous cement.

600–650ft. Sandstone with Thin beds and streaks of Claystone.


Sandstone 80%: Dark gray, grayish black, greenish gray in parts brownish gray, moderately hard to hard,
in place loose to friable, fine to medium grained, in parts coarse grained, angular to sub rounded, poorly to
moderately sorted, calcareous cement.
Claystone 20%: Moderate reddish brown, dark reddish brown, in parts moderate brown, soft to firm, sub
blocky to blocky, moderately sticky, pasty, slightly washable, in parts gradded to siltstone, non calcareous.

650–680ft. Claystone with intercalation of Sandstone.


Claystone 70%: Moderate reddish brown, dark reddish brown, in parts moderate brown, soft to firm, sub
blocky to blocky, moderately sticky, pasty, slightly washable, in parts gradded to siltstone, non calcareous.
Sandstone 30% : Dark gray, grayish black, greenish gray in parts brownish gray, moderately hard to hard,
in place loose to friable, fine to medium grained, in parts coarse grained, angular to sub rounded, poorly to
moderately sorted, calcareous cement.

680–700ft. Predominantly Sandstone.


Sandstone 100%: Grayish green, dark greenish gray, in parts medium gray, translucent to transparent,
loose in parts friable, unconsolidated, in parts moderately hard, fine to medium grained, sub angular to sub
rounded, poorly to moderately sorted, argillaceous matrix, slightly calcareous cement.

700–790ft. Predominantly Sandstone.


Sandstone 100%: Medium grey, medium light grey, in parts dark greenish grey, loose to friable,
unconsolidated, in parts hard, very fine to fine grain, in parts medium grain, sub angular to sub rounded,
moderately sorted, loose quartz grain, calcareous cement.

790–800ft. Sandstone with Intercalation of Claystone.


Sandstone 60%: Medium grey, medium light grey, in parts dark greenish grey, loose to friable,
unconsolidated, in parts hard, very fine to fine grain, in parts medium grain, sub angular to sub rounded,
moderately sorted, loose quartz grain, calcareous cement.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 35
Claystone 40%: Moderate brown, grayish brown, in parts dark reddish brown, soft to firm, sub blocky, in
parts amorphous, slightly sticky, pasty, washable, slightly calcareous.

800–810ft. Claystone with Thin beds of Sandstone.


Claystone 80%: Moderate brown, grayish brown, in parts dark reddish brown, soft to firm, sub blocky, in
parts amorphous, slightly sticky, pasty, washable, slightly calcareous.
Sandstone 20%: Medium grey, medium light grey, in parts dark greenish grey, loose to friable,
unconsolidated, in parts hard, very fine to fine grain, in parts medium grain, sub angular to sub rounded,
moderately sorted, loose quartz grain, calcareous cement.

810–840ft. Predominantly Claystone.


Claystone 100%: Moderate brown, grayish brown, in parts dark reddish brown, soft to firm, sub blocky, in
parts amorphous, slightly sticky, pasty, washable, slightly calcareous.

840–860ft. Predominantly Claystone.


Claystone 100%: Moderate brown, grayish brown, in parts dark reddish brown, soft to firm, blocky to sub
blocky, in parts amorphous, slightly sticky, pasty, washable, in parts graded to siltstone, slightly calcareous.

860–890ft. Claystone with Intercalation of Sandstone and Thin Beds of Siltstone.


Claystone 60%: Moderate brown, grayish brown, in parts dark reddish brown, soft to firm, blocky to sub
blocky, slightly sticky, pasty, washable, slightly calcareous.
Sandstone 30%: Medium grey, medium light grey, in parts dark greenish grey, loose to friable,
unconsolidated, very fine to fine grain, sub rounded to rounded, in parts sub angular, well to moderately
sorted, in parts loose quartz grain, calcareous cement.
Siltstone 10%: Dark reddish brown, in parts pale reddish brown, moderately hard to hard, blocky to sub
blocky, slightly calcareous.

890–920ft. Claystone with Thin Beds of Sandstone.


Claystone 90%: Moderate brown, grayish brown, in parts dark reddish brown, soft to firm, sub blocky to
blocky, moderately sticky, pasty, moderately washable, slightly calcareous.
Sandstone 10%: Medium grey, medium light grey, in parts dark greenish grey, loose to friable,
unconsolidated, very fine to fine grain, sub rounded to rounded, in parts sub angular, well to moderately
sorted, in parts loose quartz grain, calcareous cement.

920–930ft. Sand stone with Intercalation of Claystone.


Sandstone 70%: Medium grey, medium light grey, in parts dark greenish grey, loose to friable,
unconsolidated, very fine to fine grain, in parts medium grain, sub angular to sub rounded, in parts
rounded, poorly to moderately sorted, calcareous cement.
Claystone 30%: Moderate brown, grayish brown, in parts dark reddish brown, soft to firm, sub blocky to
blocky, moderately sticky, pasty, moderately washable, slightly calcareous.

930–940ft. Sand stone with Intercalation of Claystone and Thin Beds of Siltstone.
Sandstone 70%: Medium gray, medium light gray, in parts dark greenish gray, loose to friable,
unconsolidated, very fine to fine grain, sub rounded to rounded, in parts sub angular, well to moderately
sorted, in parts loose quartz grain, calcareous cement.
Claystone 20%: Moderate brown, grayish brown, in parts dark reddish brown, soft to firm, blocky to sub
blocky, slightly sticky, pasty, washable, slightly calcareous.
Siltstone 10%: Dark reddish brown, in parts pale reddish brown, moderately hard to hard, blocky to sub
blocky, slightly calcareous.

940–960ft. Sand stone with Streaks of Claystone.


Sandstone 80%: Dark greenish gray, greenish gray, in parts medium gray, transparent to translucent, loose
to friable, unconsolidated, in parts hard, very fine to fine grain, in parts medium grain, sub angular to sub
rounded, in parts rounded, poor to moderately sorted, trace maficminerals, loose quartz grain, argillaceous
matrix, slightly calcareous cement.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 36
Claystone 20%: Moderate brown, grayish brown, in parts dark reddish brown, soft to firm, blocky to sub
blocky, slightly sticky, pasty, washable, slightly calcareous.

960–990ft. Claystone with Thin Beds of Sandstone


Claystone 90%: Moderate brown, dark reddish brown, soft to firm, amorphous, sub blocky, in parts blocky,
slightly sticky, pasty, highly washable, non calcareous.
Sandstone10%: Dark greenish gray, greenish gray, in parts medium gray, transparent to translucent, loose
to friable, unconsolidated, in parts hard, very fine to fine grain, in parts medium grain, sub angular to sub
rounded, in parts rounded, poor to moderately sorted, trace maficminerals, loose quartz grain, argillaceous
matrix, slightly calcareous cement.

990–1000ft. Sandstonewith Streaks of Claystone.


Sand stone 80%: Dark greenish gray, greenish gray, in parts medium gray, transparent to translucent, loose
to friable, unconsolidated, in parts hard, very fine to fine grain, in parts medium grain, sub angular to sub
rounded, in parts rounded, poor to moderately sorted, trace maficminerals, loose quartz grain, argillaceous
matrix, slightly calcareous cement.
Claystone 20%: Moderate brown, dark reddish brown, soft to firm, amorphous, sub blocky, in parts blocky,
slightly sticky, pasty, highly washable, non calcareous.

1000–1050ft. Predominantly Sandstone.


Sand stone 100%: Medium dark gray, dark gray, in parts greenish gray, transparent to translucent, loose to
friable, in parts moderately hard, medium to coarse grain, in parts fine grain, sub angular to sub rounded,
moderately sorted, trace maficminerals, argillaceous matrix, slightly calcareous cement.

1050–1070ft. Claystone with Intercalation of Sandstone.


Claystone 80%: Moderate brown, dark reddish brown, soft to firm, in parts moderately hard, sub blocky to
blocky, in parts amorphous, moderately sticky, pasty, highly washable, slightly calcareous.
Sand stone 20%:
Medium dark gray, dark gray, in parts greenish gray, transparent to translucent, loose to friable, in parts
moderately hard, medium to coarse grain, in parts fine grain, sub angular to sub rounded, moderately
sorted, trace maficminerals, argillaceous matrix, slightly calcareous cement.

1070–1090ft. Predominantly Sandstone.


Sandstone100%: Medium dark gray, dark gray, in parts greenish gray, transparent to translucent, loose to
friable, in parts moderately hard, medium to coarse grain, in parts fine grain, sub angular to sub rounded,
moderately sorted, trace maficminerals, argillaceous matrix, slightly calcareous cement.

1090–1150ft. Sandstonewith Thin Beds of Claystone.


Sandstone90%: Medium gray, medium light gray, in parts dark greenish gray, loose to friable,
unconsolidated, very fine to fine grain, sub rounded to rounded, in parts sub angular, well to moderately
sorted, in parts loose quartz grain, calcareous cement.
Claystone 10%:
Moderate brown, grayish brown, in parts dark reddish brown, soft to firm, blocky to sub blocky, slightly
sticky, pasty, washable, slightly calcareous.

1150–1190ft. Predominantly Sandstone.


Sandstone100%: Medium dark gray, medium gray, in parts dark greenish gray, transparent to translucent,
loose to friable, in parts moderately hard, fine to medium grain, in parts coarse grain, sub angular to sub
rounded, in parts rounded, poorly to moderately sorted, loose quartz grain, trace calcite crystals, slightly
calcareous cement.

1190–1219ft. Predominantly Sandstone.


Sandstone100%: Medium dark gray, medium gray, in parts dark greenish gray, transparent to translucent,
loose to friable, in parts moderately hard,very fine to fine grain, in parts medium grain, sub angular to sub
rounded, in parts rounded, poorly to moderately sorted, argillaceous matrix, slightly calcareous cement.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 37
1219–1290ft. Predominantly Sandstone.
Sandstone100%: Medium dark gray, medium gray, in parts dark greenish gray, transparent to translucent,
loose to friable, in parts moderately hard, very fine to fine grain, in parts medium grain, sub angular to sub
rounded, in parts rounded, poorly to moderately sorted, argillaceous matrix, slightly calcareous cement.

1290–1380ft. Predominantly Sandstone.


Sandstone100%: Light gray, medium gray, in parts medium dark gray, transparent to translucent, loose to
friable, in parts moderately hard, very fine to fine grain, in parts medium grain, sub angular to sub
rounded, in parts rounded, poorly to moderately sorted, trace calcite crystals, calcareous cement.

1380–1400ft. Predominantly Sandstone.


Sandstone100%: Medium grey, medium dark grey, in parts dark greenish gray, transparent to translucent,
loose to friable, in parts moderately hard, very fine to fine grain, in parts medium grain, sub angular to sub
rounded, poorly to moderately sorted, calcareous cement, slightly argillaceous matrix.

1400–1420ft. Sandstonewith Intercalation of Siltstone and Thin Beds of Claystone.


Sandstone60%: Medium grey, medium dark grey, in parts dark greenish gray, transparent to translucent,
loose to friable, in parts moderately hard, very fine to fine grain, in parts medium grain, sub angular to sub
rounded, poorly to moderately sorted, calcareous cement, slightly argillaceous matrix.
Siltstone 30%: Grayish brown, dusky brown, in parts dark reddish brown, moderately hard to hard, sub
blocky to blocky, slightly calcareous.
Claystone 10%: Moderate brown, grayish brown, in parts dark reddish brown, firm to moderately hard, in
parts soft, blocky to sub blocky, slightly sticky, slightly calcareous.
1420–1450ft. Claystone with Intercalation of Sandstoneand Thin Beds of Siltstone.
Claystone 60%: Moderate brown, grayish brown, in parts dark reddish brown, soft to firm, blocky to sub
blocky, in place amorphous, slightly sticky, slightly calcareous.
Sandstone30%: Medium grey, medium dark grey, in parts dark greenish gray, transparent to translucent,
loose to friable, in parts moderately hard, very fine to fine grain, in parts medium grain, sub angular to sub
rounded, poorly to moderately sorted, calcareous cement, slightly argillaceous matrix.
Siltstone 10%: Grayish brown, dusky brown, in parts dark reddish brown, moderately hard to hard, sub
blocky to blocky, slightly calcareous.

1450–1470ft. Sandstonewith Intercalation of Siltstone and Streaks of Claystone.


Sandstone50%: Medium grey, medium dark grey, in parts dark greenish gray, transparent to translucent,
loose to friable, in parts moderately hard, very fine to fine grain, in parts medium grain, sub angular to sub
rounded, poorly to moderately sorted, calcareous cement, slightly argillaceous matrix.
Siltstone 30%: Grayish brown, dusky brown, in parts dark reddish brown, moderately hard to hard, sub
blocky to blocky, slightly calcareous.
Claystone 20%: Moderate brown, grayish brown, in parts dark reddish brown, soft to firm, blocky to sub
blocky, in place amorphous, slightly sticky, slightly calcareous.

1470–1520ft. Sandstonewith Thin Beds of Claystone.


Sandstone90%: Dark greenish gray, light olive gray, in parts medium gray, transparent to translucent,
loose to friable, in parts moderately hard, very fine to fine grain, in parts medium grain, sub angular to sub
rounded, poorly to moderately sorted, slightly calcareous cement.
Claystone 10%: Dark reddish brown, moderate brown, in parts grayish brown, soft to firm, in parts
moderately hard, blocky to sub blocky, sticky, pasty, slightly calcareous.

1520–1550ft. Predominantly Sandstone.


Sandstone100%: Medium gray, medium dark gray, in parts dark greenish gray, transparent to translucent,
loose to friable, in parts moderately hard, very fine to fine grain, in parts medium grain, sub angular to sub
rounded, poorly to moderately sorted, traces of calcite crystals and calcite veins, calcareous cement,
slightly argillaceous matrix.

1550–1570ft. Sandstonewith Thin Beds of Claystone.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 38
Sandstone90%: Medium gray, medium dark gray, in parts dark gray, transparent to translucent, loose to
friable, in parts moderately hard, very fine to fine grain, in parts medium grain, sub angular to sub
rounded, poorly to moderately sorted, calcareous cement.
Claystone 10%: Dark reddish brown, moderate brown, in parts grayish brown, soft to firm, in parts
moderately hard, blocky to sub blocky, sticky, pasty, slightly calcareous.

1570–1580ft. Sandstonewith Intercalation of Claystone.


Sandstone 60%: Medium gray, medium dark gray, in parts dark gray, transparent to translucent, loose to
friable, in parts moderately hard, very fine to fine grain, in parts medium grain, sub angular to sub
rounded, poorly to moderately sorted, calcareous cement.
Claystone 40%: Moderate brown, dark reddish brown, in parts moderate yellowish brown, soft to firm,
blocky to sub blocky, sticky, slightly calcareous.

1580–1600ft. Claystone with Streaks of Siltstone and Thin Bed of Sandstone.


Claystone 70%: Moderate brown, dark reddish brown, in parts moderate yellowish brown, soft to firm,
blocky to sub blocky, sticky, slightly calcareous.
Siltstone 20%
Moderate brown, dusky brown, moderately hard, blocky to sub blocky slightly calcareous.
Sandstone 10%: Medium gray, medium dark gray, in parts dark gray, transparent to translucent, loose to
friable, in parts moderately hard, very fine to fine grain, in parts medium grain, sub angular to sub
rounded, poorly to moderately sorted, calcareous cement.

1600–1620ft. Claystone with Intercalation of Siltstone.


Claystone 70%: Moderate brown, dark reddish brown, in parts moderate yellowish brown, soft to firm,
blocky to sub blocky, sticky, slightly calcareous.
Siltstone 30%: Moderate brown, dusky brown, moderately hard, blocky to sub blocky slightly calcareous.

1620–1650ft. Predominantly Claystone.


Claystone 100%: Moderate reddish brown, pale reddish brown, in parts moderate brown, soft to firm, sub
blocky to blocky, in parts amorphous, sticky, pasty, moderately washable, moderately calcareous.

1650–1680ft. Claystone with Thin Bed of Siltstone.


Claystone 90%: Moderate brown, dark reddish brown, in parts moderate yellowish brown, soft to firm,
blocky to sub blocky, sticky, slightly calcareous.
Siltstone 10%: Moderate brown, dusky brown, moderately hard, blocky to sub blocky slightly calcareous.

1680–1720ft. Claystone with Thin Beds of Siltstone.


Claystone 90%: Moderate reddish brown, pale reddish brown, in parts moderate brown, soft to firm, sub
blocky to blocky, in parts amorphous, sticky, pasty, moderately washable, moderately calcareous.
Siltstone 10%: Moderate brown, dusky brown, moderately hard, blocky to sub blocky slightly calcareous.

1720–1760ft. Claystone with Streaks of Siltstone.


Claystone 80%: Dark reddish brown, Moderate brown, in parts moderate reddish brown, soft to firm, sub
blocky to blocky, in parts amorphous, sticky, pasty, moderately washable, highly calcareous.
Siltstone 20%: Moderate brown, dusky brown, moderately hard, blocky to sub blocky slightly calcareous.

1760–1770ft. Sandstone with Streaks of Claystone and Thin Bed of Siltstone.


Sandstone 60%: Medium gray, medium dark gray, in parts dark gray, transparent to translucent, loose to
friable, in parts moderately hard, very fine to fine grain, in parts medium grain, sub angular to sub
rounded, poorly to moderately sorted, calcareous cement.
Claystone 20%: Dark reddish brown, Moderate brown, in parts moderate reddish brown, soft to firm, sub
blocky to blocky, in parts amorphous, sticky, pasty, moderately washable, highly calcareous.
Siltstone 20%: Moderate brown, dusky brown, moderately hard, blocky to sub blocky slightly calcareous.

1770–1810ft. Sandstone with Streaks of Claystone.


Sandstone 80%

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 39
Dark greenish gray, medium dark gray, in parts grayish olive green, transparent to translucent, loose to
friable, in parts moderately hard, very fine to fine grain, in parts medium grain, sub angular to sub
rounded, poorly to moderately sorted, calcareous cement, in part argillaceous matrix.
Claystone 20%: Dark reddish brown, Moderate brown, in parts moderate reddish brown, soft to firm, sub
blocky to blocky, in parts amorphous, sticky, pasty, moderately washable, highly calcareous.

1810–1835ft. Sandstone with Thin Bed of Claystone.


Sandstone 90%: Dark greenish gray, medium dark gray, in parts grayish olive green, transparent to
translucent, loose to friable, in parts moderately hard, very fine to fine grain, in parts medium grain, sub
angular to sub rounded, poorly to moderately sorted, calcareous cement, in part argillaceous matrix.
Claystone 10%: Dark reddish brown, Moderate brown, in parts moderate reddish brown, soft to firm, sub
blocky to blocky, in parts amorphous, sticky, pasty, moderately washable, highly calcareous.

1835–1850ft. Sandstone with Streaks of Claystone.


Sandstone 80%: Dark greenish gray, medium dark gray, in parts grayish olive green, transparent to
translucent, loose to friable, in parts moderately hard, very fine to fine grain, in parts medium grain, sub
angular to sub rounded, poorly to moderately sorted, calcareous cement, in part argillaceous matrix.
Claystone 20%: Moderate reddish brown, pale reddish brown, in parts moderate brown, soft to firm, sub
blocky to blocky, in parts amorphous, sticky, pasty, moderately washable, moderately calcareous.

1850–1860ft. Claystone with Thin beds of Claystone and Siltstone.


Sandstone 80%: Dark greenish gray, medium dark gray, in parts grayish olive green, transparent to
translucent, loose to friable, in parts moderately hard, very fine to fine grain, in parts medium grain, sub
angular to sub rounded, poorly to moderately sorted, calcareous cement, in part argillaceous matrix.
Claystone 10%: Moderate reddish brown, pale reddish brown, in parts moderate brown, soft to firm, sub
blocky to blocky, in parts amorphous, sticky, pasty, moderately washable, moderately calcareous.
Siltstone 10%: Grayish brown, dusky brown, moderately hard to hard, Sub blocky to blocky, non
calcareous.

1860–1900ft. Sandstone with Thin Bed of Claystone.


Sandstone 90%: Dark greenish gray, medium gray in parts dark gray, transparent to translucent,
moderately hard to hard, in parts loose, fine to medium grain, in parts very fine grain, sub angular to sub
rounded, in parts rounded, moderately sorted, slightly calcareous cement.
Claystone 10%: Dark reddish brown, moderate brown, soft to firm, in parts hard, blocky to sub blocky,
slightly washable, slightly sticky, in parts gradded to siltstone, non calcareous.

1900–1910ft. Sandstone with Streaks of Siltstone and Thin Bed of Claystone.


Sandstone 70%: Dark greenish gray, medium gray in parts dark gray, transparent to translucent,
moderately hard to hard, in parts loose, fine to medium grain, in parts very fine grain, sub angular to sub
rounded, in parts rounded, moderately sorted, slightly calcareous cement.
Siltstone 20%: Grayish brown, dusky brown, moderately hard to hard, Sub blocky to blocky, non
calcareous.
Claystone 10%: Dark reddish brown, moderate brown, soft to firm, in parts hard, blocky to sub blocky,
slightly washable, slightly sticky, in parts gradded to siltstone, non calcareous.

1910–1920ft. Sandstone with Intercalation of Claystone and Thin beds of Siltstone.


Sandstone 50%: Grayish olive green, dusky yellowish green, in part greenish gray, transparent to
translucent, loose to friable, in parts hard, very fine to fine grain, in parts medium grain, sub angular to sub
rounded, moderately sorted, traces of calcite crystals, calcite veins, calcareous cement.
Claystone 40%: Moderate reddish brown, pale reddish brown, in parts moderate brown, soft to firm, sub
blocky to blocky, in parts amorphous, sticky, pasty, moderately washable, moderately calcareous.
Siltstone 10%: Dusky brown, dark reddish brown, moderately hard to hard, sub blocky to blocky, non
calcareous.

1920–1950ft. Claystone with Streaks of Sandstone.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 40
Claystone 80%: Dark reddish brown, moderate brown, soft to firm, sub blocky to blocky, in parts
amorphous, sticky, pasty, highly washable, slightly calcareous.
Sandstone 20%: Grayish olive green, dusky yellowish green, in part greenish gray, transparent to
translucent, loose to friable, in parts hard, very fine to fine grain, in parts medium grain, sub angular to sub
rounded, moderately sorted, traces of calcite crystals, calcite veins, calcareous cement.

1950–1960ft. Sandstone with Intercalation of Claystone.


Sandstone 70%: Grayish olive green, dark greenish gray, transparent to translucent, loose to friable, in
parts hard, fine to fine grain, in parts medium grain, sub angular to sub rounded, moderately sorted,
calcareous cement.
Claystone 30%: As above.

1960–1990ft. Claystone with Streaks of Sandstone.


Claystone 80%: Dark reddish brown, moderate brown, soft to firm, sub blocky to blocky, in parts
amorphous, sticky, pasty, highly washable, slightly calcareous.
Sandstone 20%: Grayish olive green, dark greenish gray, transparent to translucent, loose to friable, in
parts hard, fine to fine grain, in parts medium grain, sub angular to sub rounded, moderately sorted,
calcareous cement.

1990–2017ft. Predominantly Claystone.


Claystone 100%: Dark reddish brown, moderate brown, soft to firm, sub blocky to blocky, in parts
amorphous, sticky, pasty, highly washable, slightly calcareous.

2017–2022ft. Claystone with Streaks of Sandstone.


Claystone 80%: Dark reddish brown, moderate brown, soft to firm, sub blocky to blocky, in parts
amorphous, sticky, pasty, highly washable, slightly calcareous.
Sandstone 20% : Grayish olive green, medium gray, in parts greenish gray, transparent to translucent,
loose to friable, in parts hard, very fine to fine grain, in parts medium grain, sub angular to sub rounded,
moderately sorted calcareous cement.
Note: Sample highly contaminated with cement.

2022–2032ft. Sandstone with Intercalation of Claystone.


Sandstone 70%: Grayish olive green, medium gray, in parts greenish gray, transparent to translucent, loose
to friable, in parts hard, very fine to fine grain, in parts medium grain, sub angular to sub rounded,
moderately sorted calcareous cement.
Claystone 30%: Dark reddish brown, moderate brown, soft to firm, sub blocky to blocky, in parts
amorphous, sticky, pasty, highly washable, slightly calcareous.
Note: Sample highly contaminated with cement.

2032–2050ft. Sandstone with thin beds of Claystone.


Sandstone 90%: Grayish olive green, medium gray, in parts greenish gray, loose to friable, in parts hard,
very fine to fine grain, in parts medium grain, transparent to translucent, sub angular to sub rounded,
moderately sorted calcareous cement.
Claystone 10%: Dark reddish brown, moderate brown, soft to firm, sub blocky to blocky, in parts
amorphous, sticky, pasty, highly washable, slightly calcareous.
Note: Sample contaminated with cement.

2050–2100ft. Claystone with thin beds of Sandstone and Siltstone.


Claystone 80%: Moderate brown, dark brown, reddish brown, soft to firm, sub blocky to blocky, in parts
amorphous, sticky, pasty, highly washable, slightly calcareous.
Sandstone 10%: Medium gray, in parts greenish gray, off white, loose to friable, very fine to fine grain,
transparent to translucent, sub angular to sub rounded moderately sorted, calcareous cement.
Siltstone 10%: Grayish brown, grayish red, firm to moderately hard, sub blocky to blocky, slightly
calcareous.

2100–2125ft. Sandstone with intercalation of Claystone.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 41
Sandstone 70%: Transparent to translucent, light gray, medium gray, off white, in parts greenish grey,
loose to friable, in parts hard, very fine to fine grain, in parts medium grain, sub angular to sub rounded,
moderately sorted trace maficminerals, calcareous cement.
Claystone 30%: Moderate brown, dark brown, reddish brown, soft to firm, sub blocky to blocky, in parts
amorphous, sticky, pasty, highly washable, slightly calcareous.

2125–2150ft. Sandstone with thin beds of Claystone.


Sandstone 90%: As above.
Claystone 10%: As above.

2150–2170ft. Predominantly Sandstone.


Sandstone 100%: As above.

2170–2180ft. Sandstone with streaks of Claystone.


Sandstone 80%: Light gray, medium gray, off white, transparent to translucent, in parts greenish grey,
loose to friable, in parts hard, very fine to fine grain, in parts medium grain, sub angular to sub rounded,
moderately sorted trace maficminerals, trace calcite, calcareous cement.
Claystone 20%: Moderate brown, dark brown, reddish brown, soft to firm, sub blocky to blocky, in parts
amorphous, sticky, pasty, highly washable, slightly calcareous.
2180–2200ft. Sandstone with thin beds of Claystone.
Sandstone 90% : As above.
Claystone 10%: As above.

2200–2250ft. Sandstone with streaks of Claystone.


Sandstone 80%: Light gray, off white, transparent to translucent, greenish gray, loose to friable, very fine to
fine grain, sub angular to sub rounded, moderately sorted, trace maficminerals, calcareous cement.
Claystone 20%: Moderate brown, dark brown, brick red, soft to firm, sub blocky to blocky, in parts
amorphous, sticky, pasty, highly washable, slightly calcareous.

2250–2350ft. Claystone with thin bed of Sandstone.


Claystone 90%: As above.
Sandstone 10% : As above.

2350–2400ft. Claystone with intercalation of Sandstone and siltstone.


Claystone 40%: As above.
Sandstone 30%: Grayish brown, light grey, transparent to translucent, in parts off white, friable to
moderately hard, in parts loose, very fine to fine grain, sub angular to sub rounded, moderately sorted,
trace maficminerals, calcareous cement.
Siltstone 30%: Grayish brown, grayish red, firm to moderately hard, sub blocky to blocky, slightly to non
calcareous.

2400–2450ft. Sandstone with thin beds of Claystone.


Sandstone 90%: Greenish gray, light gray, off white, transparent to translucent,, loose to friable, very fine to
fine grain, sub angular to sub rounded, moderately sorted, trace maficminerals, calcareous cement.
Claystone 10%: Moderate brown, dark brown, soft to firm, sub blocky to blocky, in parts amorphous,
sticky, pasty, highly washable, slightly calcareous.

2450–2500ft. Sandstone with thin beds of Claystone.


Sandstone 90%: Greenish gray, light gray, off white, transparent to translucent,, loose to friable, very fine to
fine grain, sub angular to sub rounded, moderately sorted, trace maficminerals, calcareous cement.
Claystone 10%: Moderate brown, moderately reddish brown, soft to firm, sub blocky to blocky, in parts
amorphous, sticky, pasty, in parts graded to siltstone, moderately calcareous.

2500–2550ft. Claystone.
Claystone 100%: As above.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 42
2550–2600ft. Claystone with intercalation of Sandstone.
Claystone 60%: Moderate brown, moderately reddish brown, soft to firm, sub blocky to blocky, sticky,
pasty, in parts graded to siltstone, washable moderately calcareous.
Sandstone 40%: Medium gray, med dark grey, in parts dark greenish gray transparent to translucent, loose
to friable, fine to medium grain, sub angular to sub rounded, moderately sorted, trace maficminerals,
calcareous cement.

2600–2650ft. Claystone with streaks of Sandstone.


Claystone 80%: Moderate brown, moderately reddish brown, soft to firm, sub blocky to blocky, sticky,
pasty, in parts graded to siltstone, washable moderately calcareous.
Sandstone 20%: Medium gray, med dark grey, in parts dark greenish gray transparent to translucent, loose
to friable, fine to medium grain, sub angular to sub rounded, moderately sorted, trace maficminerals,
calcareous cement.

2650–2750ft. Claystone with intercalation of Sandstone.


Claystone 60%: As above.
Sandstone 30%: Light grey, medium gray, transparent to translucent, grayish brown, in parts off white,
friable to moderately hard, in parts loose, very fine to fine grain, sub angular to sub rounded, moderately
sorted, trace maficminerals, calcareous cement.

2750–2800ft. Sandstone with intercalation of Claystone.


Sandstone 60%: As above.
Claystone 40%: As above.

2800–2850ft. Claystone with intercalation of Sandstone.


Claystone 60%: As above.
Sandstone 40%: As above.

2850–2900ft. Claystone with thin beds of Sandstone.


Claystone 90%: Moderate brown, moderately reddish brown, in parts dark brown, soft, in parts firm, sub
blocky, sticky, pasty, in parts silty, moderately washable, slightly to moderately calcareous.
Sandstone 10%: As above.

2900–3000ft. Sandstone with thin beds of Claystone.


Sandstone 90%: Medium gray, med dark grey, in parts dark greenish gray, transparent to translucent, loose
to friable, fine to medium grain, sub angular to sub rounded, moderately sorted, trace maficminerals,
calcareous cement.
Claystone 10%: As above.

3000–3050ft. Sandstone with streaks of Claystone.


Sandstone 80%: Medium gray, medium dark gray, off white in parts dark greenish gray, transparent to
translucent, loose to friable, fine to medium grain, sub angular to sub rounded, moderately sorted, trace
calcareous cement.
Claystone 20%: Moderately brown, moderately reddish brown, in parts dark brown, soft, in parts firm, sub
blocky, sticky, pasty, in parts silty, moderately washable, slightly to moderately calcareous.

3050–3300ft. Sandstone with thin beds of Claystone.


Sandstone 90%: As above.
Claystone 10%: As above.

3300–3350ft. Sandstone with intercalation of Claystone.


Sandstone 60%: Medium gray, off white, transparent to translucent, in parts dark greenish gray, loose to
friable, in parts hard, fine to medium grain, in parts coarse grain, sub angular to sub rounded, moderately
sorted, trace maficmineral, calcareous cement.
Claystone 40%: Moderately brown, moderately reddish brown, in parts dark brown, soft, in parts firm, sub
blocky, sticky, pasty, in parts silty, moderately washable, slightly to moderately calcareous.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 43
3350–3450ft. Claystone with streaks of Sandstone.
Claystone 80%: As above.
Sandstone 20%: As above.

3450–3500ft. Sandstone with intercalation of Claystone.


Sandstone 70%: As above.
Claystone 30%: As above.

3500–3550ft. Sandstone.
Sandstone 100%: Light gray, medium grey, transparent to translucent, in parts greenish gray, friable to
moderately hard, in parts loose, fine to medium grain, sub angular to sub rounded, moderately sorted,
trace maficmineral, calcareous cement.

3550–3600ft. Claystone with streaks of Sandstone.


Claystone 80%: Moderately brown, moderately reddish brown, soft, in parts firm, sub blocky, sticky,
pasty, in parts silty, slightly washable, slightly to moderately calcareous.
Sandstone 20%: As above.

3600–3650ft. Claystone with streaks of Sandstone.


Claystone 80%: Moderately brown, moderately reddish brown, soft, in parts firm, sub blocky, sticky,
pasty, in parts silty, slightly washable, slightly to moderately calcareous.
Sandstone 20%: Light gray, medium grey, transparent to translucent, in parts greenish gray, friable to
moderately hard, in parts loose, fine to medium grain, sub angular to sub rounded, moderately sorted,
trace maficmineral, calcareous cement.

3650–3700ft. Claystone with thin beds of Sandstone.


Claystone 90%: As above.
Sandstone 10%: As above.

3700–3750ft. Claystone with streaks of Sandstone.


Claystone 80%: Moderately to light brown, moderately reddish brown, soft, in parts firm, sub blocky,
sticky, pasty, in parts silty, washable, slightly to moderately calcareous.
Sandstone 20%: Light gray, medium grey, off white, transparent to translucent, in parts greenish gray,
friable to moderately hard, in parts loose, very fine to fine grain, in parts medium grain, sub angular to sub
rounded, moderately sorted, trace maficmineral, calcareous cement.

3750–3850ft. Sandstone with streaks of Claystone


Sandstone 80%: As above.
Claystone 20%: As above.

3850–3950ft. Sandstone.
Sandstone 100%: Light gray, medium grey, off white, transparent to translucent, loose to friable, very fine
to fine grain, sub angular to sub rounded, moderately sorted, calcareous cement.

3950–4000ft. Claystone with thin beds of Sandstone.


Claystone 90%: Moderately brown, moderately reddish brown, brick red, soft to firm, sub blocky, sticky,
pasty, in parts silty, slightly washable, slightly to moderately calcareous.
Sandstone 10% : As above.

4000–4050ft. Sandstone with thin beds of Claystone.


Sandstone 90%: Light gray, medium grey, off white, transparent to translucent, loose to friable, very fine to
fine grain, sub angular to sub rounded, moderately sorted, calcareous cement.
Claystone 10%: Moderately brown, dark brown, reddish brown, soft, sub blocky, slightly calcareous,
slightly washable.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 44
4050–4100ft. Claystone with intercalation of Sandstone.
Claystone 70%: As above.
Sandstone 30%: As above.

4100–4150ft. Sandstone with thin beds of Claystone.


Sandstone 90%: Transparent to translucent, light gray, greenish gray, moderately hard to hard, in parts
loose, very fine to fine grain, in parts medium grains, sub rounded to sub angular, moderately sorted,
calcareous cement.
Claystone 10%: Moderately brown, reddish brown, soft, sub blocky to blocky, silty, slightly calcareous,
slightly to moderately washable.

4150–4200ft. Claystone with thin beds of Sandstone


Claystone 90%: As above.
Sandstone 10%: As above.

4200–4250ft. Sandstone with thin beds of Claystone.


Sandstone 90%: Light gray, medium grey, in parts transparent to translucent, loose to friable, very fine to
fine grain, sub angular to sub rounded, moderately sorted, calcareous cement.
Claystone 10%: As above.

4250–4300ft. Claystone with intercalation of Sandstone.


Claystone 60%: Moderately brown, moderately reddish brown, soft to firm, sub blocky, sticky, pasty, in
parts silty, slightly to moderately washable, slightly calcareous.
Sandstone 40%: As above.

4300–4315ft. Claystone with thin beds of Sandstone.


Claystone 90%: As above.
Sandstone 10% : As above.

4315–4345ft. Claystone with Thin Beds of Sandstone


Claystone 90%: Moderately brown, moderately reddish brown, in parts dark brown, soft to firm, in parts
moderately hard, sub blocky to blocky, sticky, pasty, in parts silty, slightly to moderately washable,
slightly calcareous.
Sandstone 10%: Light gray, medium grey, greenish gray, in parts transparent to translucent, loose to
friable, very fine to fine grain, in parts medium grain, sub angular to sub rounded, moderately sorted,
calcareous cement.

4345–4360ft. Claystone with Intercalation of Sandstone


Claystone 70%: Moderately brown, moderately reddish brown, dark brown, in parts brick red, soft to firm,
in parts moderately hard to hard, sub blocky to blocky, sticky, pasty, in parts silty grading to siltstone,
slightly washable, slightly calcareous.
Sandstone 30%: Light grey, medium grey, greenish gray, in parts transparent to translucent, friable to
moderately hard, very fine to fine grain, in parts medium grain, sub angular to sub rounded, moderately
sorted, calcareous cement.

4360–4370ft. Claystone with Streaks of Sandstone


Claystone 80%: Moderately brown, moderately reddish brown, dark brown, in parts dusky brown, soft to
firm, in parts moderately hard to hard, sub blocky to blocky, sticky, pasty, in parts silty, grading to
siltstone, slightly washable, slightly calcareous.
Sandstone 20%: Transparent to translucent, Light grey, greenish gray, lose, in parts friable to moderately
hard, fine to medium grain, in parts very fine grain, sub angular to sub rounded, poorly sorted, calcareous
cement.

4370–4390ft. Predominantly Claystone


Claystone 100%: Moderately brown, grayish brown, in parts dark brown, soft to firm, sub blocky to blocky,
at places amorphous, highly sticky, pasty, in parts silty, washable, moderately calcareous.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 45
4390–4410ft. Sandstone with Intercalation of Claystone
Sandstone 70%: Light grey, medium grey, in parts transparent to translucent, friable to moderately hard,
very fine to fine grain, sub angular to sub rounded, moderately sorted, calcareous cement.
Claystone 30%: Moderately brown, moderately reddish brown, dark brown, in parts brick red, soft to firm,
in parts moderately hard to hard, sub blocky to blocky, sticky, pasty, in parts silty grading to siltstone,
slightly washable, slightly calcareous.

4410–4430ft. Claystone with Thin Beds of Sandstone


Claystone 90%: Moderately reddish brown, moderately brown, in parts dark brown, soft to firm, in parts
moderately hard, sub blocky to blocky, sticky, pasty, moderately washable, slightly calcareous.
Sandstone 10%: As above.

4430–4440ft. Predominantly Claystone


Claystone 100%: Moderately reddish brown, moderately brown, in parts dark brown, soft to firm, in parts
moderately hard, sub blocky to blocky, sticky, pasty, moderately washable, slightly calcareous.

4440–4460ft. Sandstone with Intercalation of Claystone


Claystone 80%: As above.
Sandstone 10%: Light grey, medium grey, in parts transparent to translucent, friable to moderately hard,
very fine to fine grain, sub angular to sub rounded, moderately sorted, calcareous cement.
Siltstone 10%: Grayish brown, grayish red, firm to moderately hard, sub blocky to blocky, slightly to non
calcareous.

4460–4472ft. Predominantly Claystone


Claystone 100%: Moderately reddish brown, moderately brown, soft to firm, sub blocky to blocky, sticky,
moderately washable, slightly calcareous.

4472–4500ft. Claystone with Thin Beds of Sandstone and Siltstone.


Claystone 80%: Moderate reddish brown, moderate brown, soft to firm, sub blocky to blocky, sticky,
moderately washable, slightly calcareous.
Sandstone 10%: Light grey, medium grey, in parts transparent to translucent, friable to moderately hard,
very fine to fine grain, sub angular to sub rounded, moderately sorted, calcareous cement.
Siltstone 10%: Grayish brown, grayish red, firm to moderately hard, in part hard, sub blocky to blocky,
slightly to non calcareous.

4500–4650ft. Predominantly Claystone


Claystone 100%: Moderate reddish brown, moderate brown, dark brown, in parts dusky brown, soft to
firm, in part moderately hard to hard, sub blocky to blocky, sticky, moderately washable, in parts silty,
slightly to moderately calcareous.

4650–4675ft. Predominantly Claystone


Claystone 100%: Moderate reddish brown, moderate brown, dark brown, in parts dusky brown, soft to
firm, in part moderately hard to hard, sub blocky to blocky, sticky, moderately washable, in parts silty,
slightly to moderately calcareous.

4675–4850ft. Sandstone with Thin Beds of ClaystoneSandstone


Sandstone 90%: Light grey, medium grey, off white, in parts transparent to translucent, loose to friable,
very fine to fine grain, sub angular to sub rounded, moderately sorted, calcareous cement.
Claystone 10%: Moderate reddish brown, moderate brown, dark brown, in parts dusky brown, soft to firm,
in part moderately hard, sub blocky to blocky, sticky, pasty, in parts amorphous, moderately washable, in
parts silty, slightly to moderately calcareous.

4850–4865ft. Sandstone with Streaks of Claystone


Sandstone 80%: As above.
Claystone 20%: As above.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 46
4865–4925ft. Claystone with Intercalation of Sandstone.
Claystone 60%: Moderate reddish brown, moderate brown, dark brown, in parts dusky brown, soft to firm,
in part moderately hard, sub blocky to blocky, sticky, pasty, in parts amorphous, moderately washable, in
parts silty, slightly to moderately calcareous.
Sandstone 40%: Light grey, medium grey, off white, in parts transparent to translucent, loose to friable,
very fine to fine grain, sub angular to sub rounded, moderately sorted, calcareous cement.

4925–4970ft. Claystone with Thin Beds of Sandstone.


Claystone 90%: Moderate brown, dark reddish brown, in parts dusky brown, soft to firm, sub blocky to
blocky, sticky, moderately washable, in parts silty, slightly to moderately calcareous.
Sandstone 10%: As above.

4970–5040ft. Predominantly Claystone


Claystone 100%: As above.

5040–5100ft. Claystone with thin beds of Sandstone.


Claystone 90%: Moderate brown, moderate reddish brown, in parts dusky brown, soft to firm, sub blocky
to blocky, sticky, moderately to highly washable, in parts silty, slightly calcareous.
Sandstone 10%: Light grey, medium grey, in parts transparent to translucent, loose to friable, very fine to
fine grain, sub angular to sub rounded, moderately sorted, calcareous cement.

5100–5210ft. Predominantly Claystone.


Claystone 100%: Moderate brown, moderate reddish brown, soft to firm, sub blocky to blocky, sticky,
moderately to highly washable, slightly calcareous.

5210–5380ft. Predominantly Claystone


Claystone 100%: Moderate brown, moderate reddish brown, brick red, soft to firm, sub blocky to blocky,
sticky, moderately to highly washable, non to slightly calcareous.

5380–5395ft. Predominantly Claystone


Claystone 100%: Moderate brown, moderate reddish brown, brick red, soft to firm, sub blocky to blocky,
sticky, moderately to highly washable, non to slightly calcareous.

5395–5450ft. Claystone with thin beds of Sandstone.


Claystone 90%: Moderate brown, moderate reddish brown, brick red, soft to firm, sub blocky to blocky,
sticky, moderately to highly washable, slightly calcareous.
Sandstone 10%: Translucent, light gray, grayish brown, moderately hard, in parts loose, very fine to fine
grain, sub angular to sub round, poorly sorted, calcareous cement.

5450–5520ft. Predominantly Claystone


Claystone 100%: As above.

5520–5556ft. Claystone with streak of Siltstone.


Claystone 80%: Moderate brown, moderate reddish brown, brick red, soft to firm, sub blocky to blocky,
sticky, moderately to highly washable, slightly calcareous.
Siltstone 20%: Grayish brown, grayish red, moderately hard to hard, sub blocky to blocky, slightly to non
calcareous.

5556–5600ft. Claystone with Streak of Siltstone


Claystone 80%: Moderate brown, moderate reddish brown, brick red, soft to firm, sub blocky to blocky,
sticky, moderately to highly washable, slightly calcareous.
Siltstone 20%: Grayish brown, grayish red, moderately hard to hard, sub blocky to blocky, slightly to non
calcareous.

5600–5650ft. Claystone with Thin Beds of Siltstone

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 47
Claystone 90%: As above.
Siltstone 10%: As above.

5650–5770ft. Predominantly Claystone


Claystone 100%: Moderate brown, moderate reddish brown, brick red, soft to firm, sub blocky to blocky,
sticky, moderately to highly washable, slightly calcareous.

5770–5800ft. Claystone with Intercalation of Sandstone


Claystone 60%: As above.
Sandstone 40%: Light gray, medium gray, off white, transparent to translucent, in parts, grayish brown,
loose to friable, very fine to fine grained, in parts, medium grained, sub angular to sub rounded, poor
sorted, calcareous cement.
Remark: Weak fluorescence due to crude oil addition in active system.

5800–5820ft. Claystone with Streaks of Sandstone


Claystone 80%: Moderate brown, moderate reddish brown, brick red, in parts dark reddish brown, soft to
firm, in parts moderately hard, sub blocky to blocky, sticky, in parts pasty, highly washable, slightly
calcareous.
Sandstone 20%: As above.

5820–5850ft. Claystone with Thin Beds of Sandstone


Claystone 90%: As above.
Sandstone 10%: As above.

5850–5875ft. Claystone with Thin Beds of Sandstone


Claystone 90%: Moderate brown, moderate reddish brown, brick red, in parts dark reddish brown, soft to
firm, in parts moderately hard, sub blocky to blocky, sticky, in parts pasty, highly washable, slightly
calcareous
Sandstone 10%: Light gray, medium gray, off white, transparent to translucent, in parts, grayish brown,
loose to friable, very fine to fine grained, in parts, medium grained, sub angular to sub rounded, poor
sorted, calcareous cement.

5875–6090ft. Predominantly Claystone


Claystone 100%: Moderate brown, moderate reddish brown, brick red, soft to firm, sub blocky to blocky,
sticky, in parts pasty, highly washable, non to slightly calcareous.

6090–6200ft. Claystone with Thin Beds of Siltstone.


Claystone 90%: Moderate brown, moderate reddish brown, brick red, soft to firm, sub blocky to blocky,
sticky, in parts pasty, highly washable, non to slightly calcareous.
Siltstone 10%: Grayish brown, grayish red, moderately hard to hard, sub blocky to blocky, slightly to non
calcareous.

6200–6220ft. Claystone with Streak of Siltstone and Thin Beds of Sandstone


Claystone 70%: As above.
Siltstone 20%: As above.
Sandstone 10%: Light gray, medium gray, off white, transparent to translucent, loose to friable, very fine to
fine grained, in parts, medium grained, sub angular to sub rounded, poor sorted, calcareous cement.

6220–6300ft. Claystone with Intercalation of Sandstone


Claystone 60%: Moderate reddish brown, moderate brown, in parts pale reddish brown, soft to firm, sub
blocky, sticky, in parts amorphous, pasty, highly washable, slightly calcareous.
Sandstone 40%: Light gray, medium gray, off white, translucent, loose to friable, very fine to fine grained,
sub angular to sub rounded, poor to moderately sorted, calcareous cement.

6300–6390ft. Claystone with Thin Beds of Sandstone


Claystone 90%: As above.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 48
Sandstone 10%: As above.

6390–6490ft. Predominantly Claystone


Claystone 100%: Moderate brown, moderate reddish brown, brick red, soft to firm, sub blocky to blocky,
sticky, in parts pasty, highly washable, non to slightly calcareous.

6490–6500ft. Claystone with streak of Sandstone.


Claystone 80%: Moderate brown, moderate reddish brown, brick red, soft to firm, sub blocky to blocky,
sticky, in parts pasty, highly washable, non to slightly calcareous.
Sandstone 20%: Light gray, medium gray, transparent to translucent, loose to friable, very fine to fine
grained, in parts, medium grained, sub angular to sub rounded, poorly sorted, calcareous cement.

6500–6510ft. Sandstone with Intercalation of Claystone.


Sandstone 60%: As above.
Claystone 40%: As above.

6510–6515ft. Claystone with Intercalation of Sandstone.


Claystone 60%: Moderate brown, moderate reddish brown, brick red, soft to firm, sub blocky to blocky,
sticky, highly washable, non to slightly calcareous.
Sandstone 40%: Light gray, medium gray, transparent to translucent, in parts greenish grey, loose to
friable, very fine to fine grained, sub angular to sub rounded, poorly sorted, calcareous cement.

6515–6540ft. Predominantly Sandstone.


Sandstone 100%: Brownish gray, Brownish black, olive gray, translucent, loose, in parts friable, very fine to
fine grained, in parts medium grained, sub angular, in parts sub rounded, poorly sorted, argillaceous
matrix, moderately to highly calcareous cement.

6540–6560ft. Claystone with Thin Beds of Sandstone.


Claystone 90%: Reddish brown, Moderate brown, brick red, soft to firm, sub blocky to blocky, slightly to
moderately sticky, moderately washable, slightly to moderately calcareous.
Sandstone 10%: As above.

6560–6580ft. Sandstone with Thin Beds of Claystone


Sandstone 90%: Brownish gray, olive gray, translucent, loose, in parts friable, very fine to fine grained, in
parts medium grained, sub angular to sub rounded, poorly sorted, argillaceous matrix, traces limestone,
moderately to highly calcareous.
Claystone 10%: As above.

6580–6590ft. Sandstone with Thin Beds of Claystone


Sandstone 90%: Dark greenish gray, light gray, olive black, brownish gray, translucent, in parts
transparent, loose, friable, in parts abrasive, fine to medium grained, in parts coarse grained, sub angular to
sub rounded, poorly sorted, traces calcite veins, argillaceous matrix, calcareous cement.
Claystone 10%: As above.

6590–6615ft. Predominantly Sandstone


Sandstone 100%: Dark greenish gray, light gray, olive black, brownish gray, translucent, loose, very fine to
fine grained, in parts medium grained, sub rounded to sub angular, moderately sorted, argillaceous
matrix, calcareous cement.

6540–6560ft. Claystone with Thin Beds of Sandstone.


Claystone 90%: Reddish brown, Moderate brown, brick red, soft to firm, sub blocky to blocky, slightly to
moderately sticky, moderately washable, slightly to moderately calcareous.
Sandstone 10%: As above.

6560–6580ft. Sandstone with Thin Beds of Claystone

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 49
Sandstone 90%: Brownish gray, olive gray, translucent, loose, in parts friable, very fine to fine grained, in
parts medium grained, sub angular to sub rounded, poorly sorted, argillaceous matrix, traces limestone,
moderately to highly calcareous.
Claystone 10%: As above.

6580–6590ft. Sandstone with Thin Beds of Claystone


Sandstone 90%: Dark greenish gray, light gray, olive black, brownish gray, translucent, in parts
transparent, loose, friable, in parts abrasive, fine to medium grained, in parts coarse grained, sub angular to
sub rounded, poorly sorted, traces calcite veins, argillaceous matrix, calcareous cement.
Claystone 10%: As above.

Possible Fault @ 6585ft

6590–6615ft. Predominantly Sandstone


Sandstone 100%: Dark greenish gray, light gray, olive black, brownish gray, translucent, loose, very fine to
fine grained, in parts medium grained, sub rounded to sub angular, moderately sorted, argillaceous
matrix, calcareous cement.

6615–6650ft. Sandstone with Thin Beds of Claystone


Sandstone 90%: Brownish gray, Brownish black, olive gray, translucent, loose, in parts friable, very fine to
fine grained, in parts medium grained, sub angular to sub rounded, poorly sorted, argillaceous matrix,
moderately to highly calcareous cement.
Claystone 10%: Reddish brown, moderate brown, brick red, soft to firm, sub blocky to blocky, slightly to
moderately sticky, moderately washable, slightly to moderately calcareous.

6650–6670ft. Sandstone with Intercalation of Claystone


Sandstone 70%: As above.
Claystone 30%: As above.

6670–6700ft. Claystone with Streaks of Sandstone


Claystone 80%: Reddish brown, moderate brown, brick red, soft to firm, sub blocky to blocky, moderately
sticky, pasty, moderately washable, slightly to moderately calcareous.
Sandstone 20%: As above.

6700–6770ft. Claystone with Thin Beds of Sandstone


Claystone 90%: Reddish brown, moderate brown, brick red, soft to firm, sub blocky to blocky, slightly to
moderately sticky, in parts grading to siltstone, moderately washable, slightly to moderately calcareous.
Sandstone 10%: Light gray, medium gray, brownish gray, translucent, loose to friable, very fine to fine
grained, sub angular to sub rounded, poor sorted, calcareous cement.

6770–6800ft. Predominantly Claystone


Claystone 100%: As above.

6800–6820ft. Claystone with Streaks of Siltstone


Claystone 80%: Reddish brown, moderate brown, brick red, soft to firm, sub blocky to blocky, slightly to
moderately sticky, in parts grading to siltstone, moderately washable, slightly to moderately calcareous.
Siltstone 20%: Dark reddish brown, moderate reddish brown, moderate brown, firm to moderately hard,
sub blocky to blocky, non calcareous.

6820–6828ft. Claystone with Streaks of Siltstone


Claystone 80%:
Reddish brown, moderate brown, brick red, soft to firm, sub blocky to blocky, slightly to moderately sticky,
in parts grading to siltstone, moderately washable, slightly to moderately calcareous.
Siltstone 20%: Dark reddish brown, moderate reddish brown, moderate brown, firm to moderately hard,
sub blocky to blocky, non calcareous.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 50
6828–6900ft. Claystone with Thin beds of Siltstone
Claystone 90%: Reddish brown, moderate brown, brick red, soft to firm, sub blocky to blocky, slightly to
moderately sticky, in parts grading to siltstone, moderately washable, slightly to moderately calcareous.
Siltstone 10%: Dark reddish brown, moderate reddish brown, moderate brown, firm to moderately hard,
sub blocky to blocky, non calcareous.

6900–7100ft. Predominantly Claystone


Claystone 100%: Moderate brown, reddish brown, pale reddish brown, soft to firm, sub blocky to blocky,
slightly to moderately sticky, in parts grading to siltstone, moderately washable, slightly to moderately
calcareous.

7100–7275ft. Predominantly Claystone


Claystone 100%: Moderate brown, reddish brown, pale reddish brown, soft to firm, sub blocky to blocky,
slightly to moderately sticky, in parts grading to siltstone, moderately washable, trace calcite veins,
moderately calcareous.

7275–7300ft. Claystone with Streaks of Siltstone


Claystone 80%: Moderate brown, reddish brown, pale reddish brown, soft to firm, sub blocky to blocky,
slightly to moderately sticky, in parts pasty, moderately washable, trace calcite veins, moderately
calcareous.
Siltstone 20%: Dark reddish brown, moderate reddish brown, moderate brown, firm to moderately hard,
sub blocky to blocky, non calcareous.

7300–7320ft. Claystone with Intercalation of Sandstone


Claystone 70%: As above.
Sandstone 30%: Brownish gray, light gray, medium gray, translucent, loose to friable, very fine to fine
grained, sub angular to sub rounded, poorly sorted, calcareous cement.

7320–7386ft. Claystone with Thin Beds of Sandstone


Claystone 90%: As above.
Sandstone 10%: As above.

7386–7390ft. Claystone with Thin Beds of Sandstone


Claystone 90%: Moderate brown, reddish brown, pale reddish brown, soft to firm, sub blocky to blocky,
slightly to moderately sticky, in parts grading to siltstone, moderately washable, trace calcite veins,
moderately calcareous.
Sandstone 10%: Medium gray, medium dark gray, light gray, off white, translucent, in parts moderate
brown, pale brown, loose, friable, very fine to fine grained, sub rounded to sub angular, moderately sorted,
trace argillaceous matrix, calcareous cement.

7390–7420ft. Claystone with Intercalation of Sandstone


Claystone 70%: As above.
Sandstone 30%: As above.

7420–7450ft. Claystone with Streaks of Sandstone


Claystone 80%: Moderate brown, reddish brown, pale reddish brown, soft to firm, sub blocky to blocky,
slightly to moderately sticky, in parts grading to siltstone, moderately washable, trace calcite veins,
moderately calcareous.
Sandstone 20%: Medium gray, medium dark gray, light gray, off white, translucent, in parts moderate
brown, pale brown, loose, friable, very fine to fine, calcareous cement.

7450–7525ft. Claystone with Thin Beds of Sandstone


Claystone 90%: As above.
Sandstone 10%: As above.

7525–7570ft. Predominantly Claystone with Traces of Sandstone

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 51
Claystone 100%: Moderate brown, reddish brown, pale reddish brown, brick red, in parts white, off white,
soft to firm, sub blocky to blocky, moderately sticky, in parts pasty, moderately washable, trace calcite
veins, moderately to highly calcareous.
Sandstone Tr : As above.

7570–7625ft. Predominantly Claystone


Claystone 100%: Moderate brown, reddish brown, pale reddish brown, in parts brick red, soft to firm, sub
blocky to blocky, moderately sticky, in parts pasty, moderately washable, trace calcite veins, in parts silty,
moderately to highly calcareous.

7625–7675ft. Predominantly Claystone


Claystone 100%: Dark reddish brown, moderate brown, in parts moderate reddish brown, soft to firm, sub
blocky to blocky, slightly sticky, pasty, moderately washable, in parts silty, slightly calcareous.

7675–7700ft. Claystone with Streaks of Sandstone


Claystone 80%: As above.
Sandstone 20%: Medium gray, medium dark gray, light gray, off white, translucent, in parts moderate
brown, pale brown, loose, friable, very fine to fine grained, sub rounded to sub angular, moderately sorted,
trace argillaceous matrix, calcareous cement.

7700–7755ft. Claystone with Intercalation and Streaks of Sandstone


Claystone 60–80%: As above.
Sandstone 40–20%: As above.

7755–7760ft. Claystone with Streaks of Limestone


Claystone 80%: Moderate reddish brown, dark reddish brown, brick red in parts pale reddish brown, soft
to firm, sub blocky to blocky, slightly sticky, pasty, moderately washable, slightly calcareous.
Limestone 20%: Off white, dirty white, in parts yellowish grey, soft, sub blocky to blocky, cryptocrystalline,
argillaceous, in parts chalky.

7760–7775ft. Claystone with Thin Beds of Limestone and Sandstone


Claystone 80%: As above.
Limestone 10%: As above.
Sandstone 10%: As above.

7775–7790ft. Predominantly Claystone with Traces of Limestone


Claystone 100%: Moderate reddish brown, dark reddish brown, moderate brown, in parts pale reddish
brown, soft to firm, sub blocky to blocky, slightly sticky, pasty, moderately washable, in parts silty,
moderately calcareous.
Limestone Traces : As above.

7790–7830ft. Predominantly Claystone.


Claystone 100%: Moderate reddish brown, dark reddish brown, moderate brown, in parts pale reddish
brown, soft to firm, sub blocky to blocky, slightly sticky, pasty, moderately washable, moderately
calcareous.

7830–7880ft. Predominantly Claystone.


Claystone 100%: Moderate reddish brown, dark reddish brown, moderate brown, soft to firm, sub blocky
to blocky, slightly sticky, moderately washable, in parts grading to siltstone, trace calcite veins, moderately
calcareous.

Possible Fault–3 @ 7840ft.

7880–7925ft. Claystone with Intercalation and Streaks of Sandstone.


Claystone 70%: Dark reddish brown, moderate reddish brown, moderate brown, soft to firm, sub blocky to
blocky, slightly sticky, moderately washable, in parts grading to siltstone, moderately calcareous.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 52
Sandstone: 30%: Medium gray, light greenish gray, in parts light brown, translucent, loose, friable, in parts
moderately hard, fine to very fine grained, in parts medium grained, sub angular to sub rounded, poor to
moderately sorted, trace argillaceous matrix, calcareous cement.

7925–7960ft. Claystone with Streaks of Sandstone


Claystone 80%: Dark reddish brown, moderate brown, in parts moderate reddish brown, soft to firm, sub
blocky to blocky, slightly sticky, moderately washable, in parts silty, slightly calcareous.
Sandstone 20%: Medium gray, medium dark gray, light gray, off white, translucent, in parts moderate
brown, pale brown, friable, very fine to fine grained, sub rounded to sub angular, moderately sorted,
calcareous cement.

7960–7980ft. Claystone with Streaks to Thin Beds of Limestone and Thin Beds of Sandstone.
Claystone 80%: As above.
Limestone 20%: White, off white, in parts light brownish gray, soft, blocky, cryptocrystalline, chalky.
Sandstone 10%: As above.

7980–8000ft. Predominantly Claystone


Claystone 100%: As above.

8000–8020ft. Sandstone with Streaks of Claystone and Siltstone.


Sandstone 60%: Light brownish gray, pale brown, in parts greenish gray, translucent, loose, in parts friable,
very fine to fine grained, sub rounded to sub angular, moderately sorted, calcareous cement.
Claystone 20%: As above.
Siltstone 20%: Dark reddish brown, moderate brown, firm to moderately hard, sub blocky to blocky,
moderately calcareous.

8020–8030ft. Sandstone with Intercalation of Claystone.


Sandstone 60%: As above.
Claystone 40%: As above.

8030–8050ft. Claystone with Intercalation of Sandstone.


Claystone 70%: Moderate brown, moderate reddish brown, soft to firm, sub blocky to blocky, slightly
sticky, highly washable, moderately to highly calcareous, traces of calcite veins.
Sandstone 30%: As above.

8050–8070ft. Claystone with Intercalation of Sandstone.


Claystone 70%: Moderate brown, moderate reddish brown, in parts light brown, soft to firm, sub blocky to
blocky, slightly sticky, highly washable, moderately to highly calcareous.
Sandstone 30%: As above.

8070–8130ft. Predominantly Claystone.


Claystone 100%: As above.

8130–8180ft. Predominantly Claystone.


Claystone 100%: Moderate brown, dark reddish brown,, in parts moderate reddish brown, soft to firm, sub
blocky to blocky, moderately washable, in parts silty, highly calcareous.

8180–8280ft. Claystone with Streaks and Thin Beds of Sandstone.


Claystone 80%: As above.
Sandstone 20%: Brownish gray, medium gray, light brown, off white, translucent, loose to friable, very fine
to fine grained, sub angular to sub rounded, poorly sorted, calcareous cement.

8280–8320ft. Claystone with Intercalation and Thin Beds of Siltstone.


Claystone 60%: As above.
Siltstone 40%: Dark reddish brown, moderate brown, firm to moderately hard, in parts hard, sub blocky to
blocky, in parts grading to very fine Sandstone, traces calcite veins, moderately calcareous.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 53
8320–8360ft. Predominantly Claystone.
Claystone 100%: Moderate brown, moderate reddish brown, in parts light brown, soft to firm, sub blocky
to blocky, slightly sticky, highly washable, moderately to highly calcareous.

8360–8370ft. Claystone with Streaks of Sandstone.


Claystone 80%: Moderate brown, moderate reddish brown, in parts light brown, soft to firm, sub blocky to
blocky, slightly sticky, highly washable, moderately to highly calcareous.
Sandstone 20%: Brownish gray, medium gray, light brown, off white, translucent, loose friable, very fine to
fine grained, sub angular to sub rounded, poorly sorted, calcareous cement.

8370–8380ft. Claystone with Intercalation of Sandstone and Thin Beds of Siltstone.


Claystone 50%: As above.
Sandstone 40%: Grayish red, brownish gray, medium gray, light brown, translucent, firm to moderately
hard, in parts loose, friable, fine to medium grained, sub rounded to sub angular, moderately sorted,
calcareous cement.
Siltstone 10%: Dark reddish brown, moderate brown, firm to moderately hard, in parts hard, sub blocky to
blocky, traces calcite veins, moderately calcareous.

8380–8425ft. Sandstone with Intercalation of Claystone.


Sandstone 70%: Brownish gray, light gray, off white, translucent, loose, very fine to fine grained, sub
angular to sub rounded, poorly sorted, slightly calcareous cement, argillaceous matrix.
Claystone 30%: Moderate brown, dark reddish brown, light brown, soft to firm, sub blocky to blocky,
moderately washable, in parts silty, highly calcareous.

8425–8525ft. Claystone with Intercalation and Streaks of Sandstone.


Claystone 60%: Moderate brown, dark reddish brown, in parts light brown, soft, sub blocky to blocky,
sticky, pasty, highly washable, slightly to non calcareous.
Sandstone 40%: As above.

8525–8620ft. Predominantly Claystone.


Claystone 100%: Moderate brown, dark reddish brown, in parts light brown, soft, sub blocky to blocky,
sticky, pasty, highly washable, in parts grading to siltstone, moderately calcareous, traces calcite veins.

8620–8775ft. Claystone with Thin Beds of Siltstone.


Claystone 90%: Moderate brown, dark reddish brown, brown, soft to firm, sub blocky to blocky, slightly
washable, in parts grading to siltstone, slightly to non calcareous.
Siltstone 10 %: Dark brown, moderate brown, firm to moderately hard, in parts very hard, in parts grading
to very fine Sandstone, traces calcite veins, slightly to non calcareous.

8775–8800ft. Claystone with Intercalation and Streaks of Siltstone.


Claystone 70%: As above.
Siltstone 30%: Dark reddish brown, grayish brown, dusky brown, in parts dusky red, firm to moderately
hard, in parts hard, in parts grading to very fine Sandstone, traces calcite veins, slightly to non calcareous.

8800–8870ft. Claystone with Streaks and Thin Beds of Sandstone.


Claystone 80%: Moderate brown, moderate reddish brown, in parts light brown, soft to firm, sub blocky to
blocky, sticky, highly washable, slightly to moderately calcareous.
Sandstone 20%: Medium gray, light gray, light brown, translucent, loose, in parts friable, very fine to fine
grained, sub angular to sub rounded, poorly sorted, calcareous cement.

8870–8884ft. Claystone with Thin Beds of Sandstone.


Claystone 90%: Moderate brown, moderate reddish brown, in parts light brown, soft to firm, sub blocky to
blocky, sticky, highly washable, slightly to moderately calcareous.
Sandstone 10%: Medium gray, light gray, light brown, translucent, loose, in parts friable, very fine to fine
grained, sub angular to sub rounded, poorly sorted, calcareous cement.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 54
8884–8895ft. Claystone with Thin Beds of Sandstone.
Claystone 90%: Moderate brown, moderate reddish brown, in parts light brown, soft to firm, sub blocky to
blocky, sticky, highly washable, slightly to moderately calcareous.
Sandstone 10%: Medium gray, light gray, light brown, translucent, loose, in parts friable, very fine to fine
grained, sub angular to sub rounded, poorly sorted, calcareous cement.

8895–8900ft. Sandstone with Intercalation of Claystone and streaks of Siltstone.


Sandstone 50%: Grayish red, dusky red, pale reddish brown, light brown, translucent, in parts transparent,
hard to firm, in parts friable, fine to medium grained, sub angular to sub rounded, poorly to moderately
sorted, at places calcareous cement, locally siliceous cement.
Claystone 30%: Moderate brown, moderate reddish brown, in parts light brown, soft to firm, sub blocky to
blocky, sticky, washable, slightly to moderately calcareous.
Siltstone 20%: Dark reddish brown, moderate brown, firm to hard, sub blocky to blocky, moderately
calcareous.

8900–8905ft. Claystone with Streaks of Sandstone and Siltstone.


Claystone 60%: As above.
Sandstone 20%: As above.
Siltstone 20%: As above.

8905–8951ft. Sandstone with intercalation of Claystone.


Sandstone 60–70%: Medium dark gray to light gray, translucent, friable, in parts consolidated, very fine to
medium grained, sub angular to angular, poorly to moderately sorted, calcareous cement.
Claystone 40–30%: Moderate brown, in parts dark reddish brown, soft to firm, sub blocky to blocky, sticky,
moderately washable, in parts grading to siltstone, slightly calcareous.

8951–8970ft. Claystone with Streaks of Sandstone .


Claystone 80%: Moderate brown, in parts dark reddish brown, soft to firm, sub blocky to blocky, sticky,
moderately washable, in parts grading to siltstone, slightly calcareous.
Sandstone 20%: Medium dark gray to light gray, translucent, friable, in parts consolidated, very fine to
medium grained, subangular to angular, poorly to moderately sorted, calcareous cement.

8970–9000ft. Sandstone with Intercalation of Claystone.


Sandstone 60%: Translucent, light greenish gray to greenish gray, off white, dark brown, in parts olive
gray, very fine to medium gained, moderately hard to hard, in parts very hard, sub angular to sub
rounded, poorly sorted, slightly calcareous cement.
Claystone 40%: Light brown, in parts reddish brown, soft, sticky, pasty, blocky to sub blocky, in parts
grading siltstone, non to slightly calcareous.

9000–9025ft. Sandstone with Thin Beds of Claystone.


Sandstone 90%: As above.
Claystone 10%: As above.

9025–9050ft. Claystone with Intercalation of Sandstone .


Claystone 60%: Grayish brown, Brownish gray, in parts light brown, soft, sub blocky to blocky, sticky,
pasty, moderately washable, non to slightly calcareous.
Sandstone 40% : As above.

9050–9095ft. Predominantly Sandstone .


Sand stone 100%: Translucent, medium light gray, medium gray, light bluish gray, in parts medium dark
gray, loose to firm, in parts hard, very fine to fine grained, sub angular to sub rounded, poorly sorted,
argillaceous matrix, trace calcareous cement.

9095–9125ft. Predominantly Sand stone.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 55
Sandstone 100%: Transparent to translucent, light greenish gray to greenish gray, in parts dark greenish
gray, medium bluish gray, hard to very hard, medium to coarse grains, sub angular to sub rounded,
moderately sorted, trace limestone, siliceous cement, non calcareous.

9125–9150ft. Sand stone with Intercalation of Claystone.


Sand stone 60%: Transparent to translucent, light gray to medium gray, off white, moderately hard, very
fine to medium grain, sub angular to sub rounded, poorly to moderately sorted, argillaceous cement,
calcareous.
Claystone 40%: Moderate brown to brown, dark reddish brown, soft to firm, blocky to sub blocky, in parts
grading to siltstone, moderately calcareous.

9150–9185ft. Claytone with Thin Beds of Sandstone .


Claystone 90%: As above.
Sandstone 10%: As above.
9185–9200ft. Claystone with Thin Beds of Sandstone
Claystone 90%: Moderate brown to brown, dark reddish brown, soft to firm, blocky to sub blocky, in parts
grading to siltstone, moderately calcareous.
Sandstone 10%: Transparent to translucent, light greenish gray to greenish gray, in parts dark greenish
gray, medium bluish gray, hard to very hard, medium to coarse grains, sub angular to sub rounded,
moderately sorted, trace limestone, siliceous cement, non calcareous.

9185-9200ft: Claystone with Thin Beds of Sandstone


Claystone 90%: Moderate brown to brown, dark reddish brown, soft to firm, blocky to sub blocky, in parts
grading to siltstone, moderately calcareous.
Sandstone 10%: Transparent to translucent, light greenish gray to greenish gray, in parts dark greenish
gray, medium bluish gray, hard to very hard, medium to coarse grains, sub angular to sub rounded,
moderately sorted, trace limestone, siliceous cement, non calcareous.

FATEH JANG FORMATION:

Age : Eocene
Interval : 9200ft to 9240ft MD, (9189.0–9229.48TVD)
Thickness : 40ft (40.48ft)
Lower Contact : Murree–2
Lithology : Limestone with streaks of Claystone

9200–9240ft. Limestone with Intercalation of Claystone.


Limestone 40–100%: White to off white, dirty white, cream white, light brown, dirty brown, greenish grey,
in parts greenish black soft to firm, cryptocrystalline, calcite crystals.
Claystone Tr– 60%: Moderate brown to brown, dark reddish brown, soft to firm, blocky to sub blocky, in
parts grading to siltstone, moderately calcareous.

MURREE–2 FORMATION:
Age : Miocene
Interval : 9240ft to 9710ft MD, (9229.48–9698.64TVD)
Thickness : 470ft (469.16ft)
Lower Contact : Eocene
Lithology : Claystone with streaks of siltstone and traces of Limestone.

9240–9290ft. Predominantly Claystone.


Claystone 100%: Moderate brown to brown, dark reddish brown, soft to firm, blocky to sub blocky, in parts
grading to siltstone, slightly calcareous.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 56
9290–9350ft. Predominantly Claystone.
Claystone 100%: Moderate brown to brown, dark reddish brown, dusky brown, soft to firm, in parts hard
to very hard, blocky to sub blocky, in parts grading to siltstone, slightly calcareous.

9350–9364ft. Predominantly Claystone


Claystone 100%: Dark reddish brown, dusky brown, moderate brown, hard to very hard in parts firm,
blocky to sub blocky, silty, grading to siltstone, slightly calcareous.

9364–9410ft. Claystone with Intercalation of Siltstone.


Claystone 60%: Moderate brown to brown, reddish brown, soft to firm, in parts hard, blocky to sub blocky,
in parts grading to siltstone, slightly calcareous.
Siltstone 40%: Moderate brown, dark reddish brown, in parts greenish red, hard to very hard, blocky to
sub blocky, in parts grading to very fine Sandstone, slightly to non calcareous.

9410–9430ft. Siltstone with Intercalation of Claystone.


Siltstone 60%: As above.
Claystone 40%: As above.

9430–9448ft. Siltstone with Intercalation of Claystone.


Siltstone 60%: Moderate brown, dark reddish brown, in parts greenish red, hard to very hard, blocky to
sub blocky, in parts grading to very fine Sandstone, slightly to non calcareous
Claystone 40%: Moderate brown to brown, reddish brown, soft to firm, in parts hard, blocky to sub blocky,
in parts grading to siltstone, slightly calcareous.

9448–9453ft. Limestone with Streaks of Siltstone.


Limestone 80%: White to off white, dirty gray, dirty brown, soft to moderately hard, microcrystalline to
cryptocrystalline, chalky, blocky, trace calcite crystals.
Siltstone 20%: Moderate brown, dark reddish brown, in parts greenish red, hard to very hard, blocky to
sub blocky, in parts grading to very fine Sandstone, slightly to non calcareous.

453–9480ft. Claystone with Intercalation of Siltstone.


Claystone 60%: Moderate brown to brown, reddish brown, grayish red, in parts brownish grey, soft to
firm, in parts hard, blocky to sub blocky, in parts grading to siltstone, slightly calcareous.
Siltstone 40%: Dark reddish brown, moderate brown, in parts greenish red, hard to very hard, blocky to
sub blocky, in parts grading to very fine Sandstone, slightly to non calcareous.

9480–9485ft. Limestone with Intercalation of Siltstone.


Limestone 70%: White to off white, dirty gray, dirty brown, soft to moderately hard, microcrystalline to
cryptocrystalline, chalky, blocky, trace calcite crystals.
Siltstone 30%: As above.

9485–9520ft. Claystone with streaks of Siltstone.


Claystone 80%: As above.
Siltstone 20%: As above.

9520–9525ft. Siltstone with streaks of Claystone.


Siltstone 80%: Dark reddish brown, moderate brown, in parts greenish red, moderate olive brown, hard to
very hard, blocky to sub blocky, in parts grading to very fine Sandstone, slightly to non calcareous.
Claystone 20%: As above.

9525–9540ft. Siltstone with Intercalation of Claystone.


Siltstone 60%: Dark reddish brown, moderate brown, in parts greenish red, hard to very hard, blocky to
sub blocky, in parts grading to very fine Sandstone, slightly to non calcareous.
Claystone 40%: Greenish grey, very pale green, in parts pale blue green, moderate brown to brown, soft to
firm, blocky to sub blocky, in parts grading to siltstone, slightly calcareous, trace calcite veins.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 57
9540–9550ft. Siltstone with Streaks of Claystone.
Siltstone 80%: As above.
Claystone 20%: As above.

9550–9600ft. Claystone with thin beds of Siltstone.


Claystone 90%: Greenish grey, very pale green, in parts pale blue green, soft to firm, blocky to sub blocky,
in parts grading to siltstone, slightly calcareous, trace calcite veins.
Siltstone 10%: As above.

9600–9670ft. Predominantly Claystone


Claystone 100%: Greenish grey, very pale green, in parts pale blue green, soft to firm, blocky to sub blocky,
in parts grading to siltstone, non to slightly calcareous.

9670–9690ft. Predominantly Claystone


Claystone 100%: Greenish grey, very pale green, in parts pale blue green, soft to firm, blocky to sub blocky,
in parts grading to siltstone, non to slightly calcareous.

9690–9710ft. Predominantly Claystone.


Claystone 100%: Greenish grey, very pale green, in parts pale blue green, soft to firm, blocky to sub blocky,
in parts grading to siltstone, non to slightly calcareous.

EOCENE FORMATION:

Age : Eocene
Interval : 9710ft to 12270ft MD, (9698.64–12257.93TVD)
Thickness : 2560ft (2559.29ft)
Lower Contact : Murree-3
Lithology : Limestone with streaks of Marl, Shale, thin beds of Claystone and traces of
Siltstone and Anhydrite.

9710–9720ft Limestone with streaks of Siltstone.


Limestone 80%: Light olive grey, yellowish grey, pale yellowish brown, soft to firm, cryptocrystalline,
argillaceous, trace anhydrite, tr shale.
Siltstone 20%: Dark reddish brown, moderate brown, in parts greenish red, hard to very hard, blocky to
sub blocky, in parts grading to very fine Sandstone, non to slightly calcareous.

9720–9800ft Predominantly Limestone.


Limestone 100%: Light olive grey, light grey, yellowish grey, pale yellowish brown, soft to firm, in parts
moderately hard to hard, cryptocrystalline, in parts microcrystalline, argillaceous, in parts grading to marl,
in parts dolomitic, trace disseminated pyrite, trace anhydrite, trace shale, trace siltstone.
Remark: Weak fluorescence due to crude oil addition in active system.

9800–9830ft. Predominantly Limestone.


Limestone 100%: Light olive grey, light grey, yellowish grey, pale yellowish brown, soft to firm, in parts
moderately hard to hard, cryptocrystalline, in parts microcrystalline, argillaceous, in parts dolomitic.
Remark: Weak fluorescence due to crude oil addition in active system

9830–9950ft. Predominantly Limestone.


Limestone 100%: Light grey to medium grey, light bluish grey, greenish grey, soft – firm, blocky,
cryptocrystalline, argillaceous, in parts grading to marl, trace dolomitic.
Remark: Weak fluorescence due to crude oil addition in active system

9950–9990ft. Predominantly Limestone.


Limestone 100%: Medium light grey, light bluish grey, in parts light olive grey, soft to firm, blocky,
cryptocrystalline, highly argillaceous, grading to marl.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 58
9990–10010ft. Marl with intercalation of Limestone.
Marl 70%: Light grey to medium light grey, light olive grey, soft, in parts sub blocky, slightly sticky.
Limestone 30%: As above.

9950–9990ft. Predominantly Limestone.


Limestone 100%: Medium light grey, light bluish grey, in parts light olive grey, soft to firm, blocky,
cryptocrystalline, highly argillaceous, grading to marl.

9990–10010ft. Marl with intercalation of Limestone.


Marl 70%: Light grey to medium light grey, light olive grey, soft, in parts sub blocky, slightly sticky.
Limestone 30%: As above.

10010–10045ft. Predominantly Limestone.


Limestone 100%: Brownish grey, light grey, dark grey, in parts grayish black, brownish black, soft to firm,
in parts moderately hard to hard, blocky, cryptocrystalline, in parts microcrystalline, trace forams, trace
micro fracture filled with calcite.

10010–10045ft. Predominantly Limestone.


Limestone 100%: Brownish grey, light grey, dark grey, in parts grayish black, brownish black, soft to firm,
in parts moderately hard to hard, blocky, cryptocrystalline, in parts microcrystalline, trace forams, trace
micro fracture filled with calcite

10045–10135ft. Predominantly Limestone.


Limestone 100%: Brownish grey, light grey, dark grey, in parts grayish black, brownish black, moderately
hard to hard, blocky, cryptocrystalline, in parts microcrystalline, trace forams, trace micro fracture filled
with calcite.

10135–10144ft. Predominantly Limestone.


Limestone 100%: Light olive grey, olive grey, greenish grey, in parts off white, brownish black, soft to firm,
in parts hard, blocky to sub blocky, cryptocrystalline, in parts microcrystalline, argillaceous.

10144–10150ft.Predominantly Limestone.
Limestone 100%: Light olive grey, olive grey, greenish grey, soft to firm, in parts moderately hard, blocky
to sub blocky, cryptocrystalline, in parts microcrystalline, slightly argillaceous.
Remark: Very weak fluorescence due to crude oil addition in active system.

10150–10165ft.Predominantly Limestone.
Limestone 100%: Brownish grey, light grey to dark grey, in parts grayish black, in parts brownish black,
moderately hard to hard, in parts very hard blocky, cryptocrystalline to microcrystalline, trace micro
fracture.
Remark: Weak fluorescence due to crude oil addition in active system.

10165–10170ft.Predominantly Marl.
Marl 100%: Light olive grey, greenish grey, soft to firm, blocky to sub blocky.

10170–10235ft. Predominantly Limestone.


Limestone 100%: Brownish grey, light grey to dark grey, in parts brownish black, moderately hard to hard,
in parts very hard blocky, cryptocrystalline, in parts microcrystalline, trace micro fracture.
Remark: Weak fluorescence due to crude oil addition in active system

10235–10356ft. Predominantly Limestone.


Limestone 100%: Brownish grey, dark grey, in parts brownish black, moderately hard to hard, in parts very
hard blocky, cryptocrystalline, in parts microcrystalline, trace micro fracture. Remark: Weak fluorescence
due to crude oil addition in active system.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 59
10356–10380ft. Marl with streaks of Limestone.
Marl 80%: Light bluish grey, medium light grey to medium grey, olive grey, soft to firm, in parts
amorphous, blocky.
Limestone 20%: Light grey, white, dirty white, medium light grey, soft to firm, sub blocky,
cryptocrystalline, highly argillaceous, trace shale.

10380–10390ft. Predominantly Marl


Marl 100%: As above.

10390–10430ft. Predominantly Marl


Marl 100%: Light bluish grey, medium light grey to medium grey, olive grey, soft to firm, in parts
amorphous, blocky.

10430–10480ft. Limestone with intercalation of Marl.


Limestone 70%: Dark grey, brownish grey, light grey, in parts brownish black, firm to moderately hard, in
part hard, cryptocrystalline, in parts microcrystalline.
Marl 30%: As above.

10480–10510ft. Marl with intercalation of Limestone.


Marl 70%: Olive grey, light olive grey, very light grey to light grey, soft to firm, in parts amorphous, blocky,
trace anhydrite.
Limestone 30%: As above.

10510–10540ft. Predominantly Limestone.


Limestone 100%: White, off white, dirty white, very light grey, soft to firm, in parts hard, blocky to sub
blocky, cryptocrystalline to microcrystalline, chalky.

10540–10556ft. Predominantly Limestone.


Limestone 100%: Pale yellowish brown, off white, dirty white, very light grey, yellowish grey, in parts
brownish grey, soft to firm, in parts hard, blocky to sub blocky, cryptocrystalline to microcrystalline,
chalky, in parts anhydrite.

10556–10605ft. Predominantly Limestone.


Limestone 100%: Off white, dirty white, very light grey, in parts brownish grey, olive grey, soft to firm, in
parts hard, blocky to sub blocky, cryptocrystalline in parts microcrystalline, chalky, in parts argillaceous, in
parts anhydrite.
Remark: Weak fluorescence due to crude oil addition in active system

10605–10715ft. Predominantly Limestone.


Limestone100%: Brownish grey, light brownish grey, olive grey in parts brownish black, off white,
occasionally dusky yellowish brown, soft to firm, in parts moderately hard, blocky to sub blocky,
cryptocrystalline, in parts microcrystalline, in parts argillaceous.
Remark: Weak fluorescence due to crude oil addition in active system

10605–10715ft. Predominantly Limestone.


Limestone 100% : Brownish grey, light brownish grey, olive grey in parts brownish black, off white,
occasionally dusky yellowish brown, soft to firm, in parts moderately hard, blocky to sub blocky,
cryptocrystalline, in parts microcrystalline, in parts argillaceous.
Remark: Weak fluorescence due to crude oil addition in active system

10715–10825ft. Predominantly Limestone.


Limestone 100%: Brownish grey, light brownish grey, olive grey, in parts brownish black, off white, soft to
firm, in parts hard, blocky to sub blocky, cryptocrystalline, in parts microcrystalline, chalky, trace
anhydrite, trace fossils.
Remark: Weak fluorescence due to crude oil addition in active system

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 60
10825–10930ft. Predominantly Limestone.
Limestone 100%: Pale yellowish brown, brownish grey, light brownish grey, in parts brownish black, soft
to firm, in parts hard, blocky to sub blocky, cryptocrystalline, in parts microcrystalline, chalky, trace fossils.
Remark: Weak fluorescence due to crude oil addition in active system

10930–10960ft. Predominantly Limestone.


Limestone 100%:
Medium grey, medium light grey, light olive grey, brownish grey, Pale yellowish brown, soft to firm, in
parts moderately hard, blocky to sub blocky, cryptocrystalline, chalky.
Remark: Weak fluorescence due to crude oil addition in active system

10960–11065ft. Predominantly Limestone.


Limestone 100%: Medium grey, medium light grey, light olive grey, brownish grey, Pale yellowish brown,
soft to firm, in parts hard, blocky to sub blocky, cryptocrystalline to microcrystalline, chalky, trace fossil.
Remark: Weak fluorescence due to crude oil addition in active system

11065–11170ft. Predominantly Limestone.


Limestone 100%: Brownish grey, medium grey, medium light grey, light olive grey, Pale yellowish brown,
soft to firm, in parts hard, blocky to sub blocky, cryptocrystalline, in parts microcrystalline, chalky, trace
fossil.
Remark: Weak fluorescence due to crude oil addition in active system.

11170–11250ft. Predominantly Limestone.


Limestone 100%: Brownish grey, medium grey, medium light grey, light olive grey, Pale yellowish brown,
soft to firm, in parts hard, blocky to sub blocky, cryptocrystalline, in parts microcrystalline, chalky, trace
fossil.
Remark: Weak fluorescence due to crude oil addition in active system.

11250–11350ft. Predominantly Limestone.


Limestone 100%: Brownish grey, medium grey, medium light grey, light olive grey, Pale yellowish brown,
soft to firm, in parts moderately hard, blocky to sub blocky, cryptocrystalline, in parts microcrystalline,
chalky, trace fossil.
Remark: Weak fluorescence due to crude oil addition in active system.

11350–11380ft. Predominantly Limestone.


Limestone 100%: Dark yellowish brown, light brownish grey, medium light grey, in parts brownish grey,
soft to firm, in parts moderately hard, blocky to sub blocky, cryptocrystalline, in parts microcrystalline,
chalky.
Remark: Weak fluorescence due to crude oil addition in active system.
Limestone 100%: Brownish gray, medium gray, medium light gray, light olive gray, soft to firm, in parts
moderately hard, blocky to sub blocky, cryptocrystalline, in parts microcrystalline.
Remark: Weak fluorescence due to crude oil addition in active system.

11380–11430ft. Predominantly Limestone.


Limestone 100%: Brownish gray, medium gray, medium light gray, light olive gray, soft to firm, in parts
moderately hard, blocky to sub blocky, cryptocrystalline, in parts microcrystalline.
Remark: Weak fluorescence due to crude oil addition in active system.

11430–11485ft. Predominantly Limestone.


Limestone 100%: Pale yellowish brown, medium gray to medium light gray, in parts brownish grey,
occasionally off white, soft to firm, in parts hard, blocky to sub blocky, cryptocrystalline, in parts
microcrystalline.
Remark: Weak fluorescence due to crude oil addition in active system.

11485–11565ft. Predominantly Limestone.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 61
Limestone 100%: Brownish gray, medium gray, medium light gray, in parts light brownish gray,
occasionally off white, soft to firm, in parts hard, blocky to sub blocky, cryptocrystalline, in parts
microcrystalline, occasionally chalky.
Remark: Weak fluorescence due to crude oil addition in active system.

11565–11595ft. Predominantly Limestone.


Limestone 100%: Brownish grey, medium grey, medium light grey, in parts light brownish grey,
occasionally off white, soft to firm, in parts hard, blocky to sub blocky, cryptocrystalline, in parts
microcrystalline, occasionally chalky.
Remark: Weak fluorescence due to crude oil addition in active system.

11595–11610ft. Marl with streaks of Anhydrite and Limestone.


Marl 60%: Medium light grey, very light grey, light brownish grey, in parts off dirty white, medium dark
grey, soft to firm, in parts amorphous, sub blocky.
Anhydrite 20%: Dirty white, white, soft to firm, sub blocky to blocky.
Limestone 20%: As above.

11610–11620ft. Limestone with streak of Marl.


Limestone 80%: Light brownish grey, olive grey, medium grey to medium light grey, soft to firm, blocky to
sub blocky, cryptocrystalline, in parts argillaceous.
Marl 20%: As above.

11620–11650ft. Predominantly Limestone.


Limestone 100%
Light brownish grey, olive grey, medium grey to medium light grey, soft to firm, blocky to sub blocky,
cryptocrystalline, in parts argillaceous.

11650–11670ft. Marl with intercalation of Limestone and streaks of Anhydrite.


Marl 50%: Light bluish grey, light greenish grey, in parts light grey of white, soft, in parts amorphous, sub
blocky.
Limestone: 30%: White, off white, very light grey, in parts medium grey, soft to firm, blocky – sub blocky,
cryptocrystalline, chalky, in parts argillaceous.
Anhydrite: 20%: White, dirty white, of white, soft to firm, sub blocky to blocky.

11670–11678ft. Predominantly Limestone.


Limestone 100%: White, off white, very light grey, in parts medium grey, soft to firm, blocky to sub blocky,
cryptocrystalline, chalky, occasionally argillaceous.
Remark: Weak fluorescence due to crude oil addition in active system.

11678–11690ft. Predominantly Limestone.


Limestone 100%: Off white, dirty white, very light grey, in parts medium grey, soft to firm, blocky to sub
blocky, cryptocrystalline, grading to marl, in parts dolomitic, occasionally argillaceous.
Remark: Weak fluorescence due to crude oil addition in active system.

11690–11700ft. Marl with streaks of Limestone.


Marl 80%: Light gray, very light gray, light bluish gray, soft, in parts amorphous, sub blocky, in parts
grading to argillaceous Limestone.
Limestone 20%: As above.

11700–11720ft. Predominantly Limestone.


Limestone 100%: Brownish grey, yellowish grey, dirty white, very light grey, soft to firm, blocky to sub
blocky, cryptocrystalline, argillaceous.
Remark: Weak fluorescence due to crude oil addition in active system.

11720–11760ft. Limestone with Thin beds of Anhydrite.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 62
Limestone 90%: Brownish grey, yellowish grey, dirty white, very light grey, soft to firm, blocky to sub
blocky, cryptocrystalline argillaceous.
Anhydrite 10%: white, of white, in parts dirty white, soft – firm, sub blocky to blocky.

11760–11805ft. Limestone with Intercalation of Marl.


Limestone 60%: Brownish grey, yellowish grey, dirty white, light grey, occasionally grey, soft to firm,
blocky to sub blocky, cryptocrystalline, in parts argillaceous.
Marl 40%: Light olive gray, light greenish gray, in parts light gray, of white, occasionally bluish gray, soft,
in parts amorphous, sub blocky.

11805–11820ft. Limestone with Intercalation of Marl.


Limestone 60%: Brownish gray, yellowish gray, dirty white, light gray, occasionally gray, soft to firm,
blocky to sub blocky, cryptocrystalline, in parts argillaceous.
Marl 40%: Light olive gray, light greenish gray, in parts light gray, of white, occasionally bluish gray, soft,
in parts amorphous, sub blocky.

11820–11855ft. Predominantly Limestone


Limestone 100%: Brownish gray, dark yellowish brown, in parts brownish black, medium dark gray, soft to
firm, in parts hard, blocky to sub blocky, cryptocrystalline, in parts microcrystalline, argillaceous.

11855–11915ft. Marl.
Marl 100%: Med gray, med lt gray, light bluish gray, very light gray, soft, in parts amorphous, sub blocky,
trace shale.

11915–11920ft. Limestone with Intercalation of Marl.


Limestone 70%: White, off white, dirty white, very light gray, in blocky to sub blocky, cryptocrystalline,
argillaceous.
Marl 30%: As above.

11920–11950ft. Predominantly Limestone


Limestone 100%: White, off white, dirty white, very light gray, brownish gray, occasionally medium gray,
soft to firm, blocky to sub blocky, cryptocrystalline, dolomitic in parts, argillaceous.
Remarks: Weak fluorescence due to crude oil addition in active system.

11950–12010ft. Predominantly Shale


Shale: 100%: Light bluish gray, greenish gray, medium dark gray, firm to moderately hard, soft in parts,
blocky to sub blocky, sub fissile, sub platy, silty, trace anhydrite, grading to Silty Claystone at places,
slightly to non calcareous.

12010–12030ft. Predominantly Claystone


Claystone 100%: Moderately reddish brown, reddish brown, dusky brown, pale yellowish orange,
moderately yellow, occasionally light bluish grey, soft–firm, moderately hard in parts, blocky to sub blocky,
silty, grading to Siltstone, trace disseminated pyrite non to slightly calcareous.

12030–12070ft. Predominantly Claystone


Claystone 100%: Moderately brown, pale brown, dusky brown, occasionally light bluish grey, pale
yellowish orange, soft–firm, in parts moderately hard, blocky to sub blocky, silty, grading to Siltstone, trace
shale, occasionally limestone, non to slightly calcareous.

12070–12110ft. Predominantly Claystone


Claystone 100%: Moderately brown, pale reddish brown, in parts grayish red, soft–firm, in parts
moderately hard, blocky to sub blocky, silty, in parts grading to siltstone, trace Shale, trace limestone, trace
calcite, non to slightly calcareous.

12110–12180ft. Claystone with intercalation of Siltstone

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 63
Claystone 60%: Moderately brown, pale reddish brown, in parts grayish red, occasionally greenish grey,
soft to firm, in parts hard, blocky to sub blocky, grading to siltstone, trace shale, non to slightly calcareous.
Siltstone 40%:
Dark reddish brown, grayish red, dusky brown, hard–very hard, blocky–sub blocky, in parts mottled,
slightly to non calc.

12180–12190ft. Claystone with thin bed of Limestone


Claystone 90%: Moderate brown, pale reddish brown, in parts grayish red, occasionally greenish grey, soft
to firm, in parts hard, blocky to sub blocky, grading to siltstone, trace shale, trace calcite, non to slightly
calcareous.
Limestone 10%: Dirty white, white, off white, very light grey, soft to firm, blocky to sub blocky,
cryptocrystalline.

12190–12200ft. Marl with thin bed of Limestone


Marl 90%: Light gray to very light grey, light brownish gray, in parts light bluish gray, soft to firm, in parts
amorphous, sub blocky.
Limestone 10%:
Dirty white, white, off white, very light grey, soft to firm, blocky to sub blocky, cryptocrystalline.

12200–12205ft. Claystone with streaks of Limestone.


Claystone 80%: Moderately brown, grayish brown, in parts grayish red, soft to firm, in parts hard, blocky
to sub blocky, grading to siltstone, trace shale, non to slightly calcareous.
Limestone 20%: Dirty white, white, off white, very light grey, soft to firm, blocky to sub blocky,
cryptocrystalline.

12205–12235ft. Predominantly Limestone


Limestone 100%: Dirty white, off white, yellowish gray, brownish gray, pale yellowish brown, light grey,
olive gray, soft to firm, blocky to sub blocky, cryptocrystalline to microcrystalline, in parts argillaceous, rare
fossil.

12235–12270ft. Predominantly Limestone


Limestone 100%: Yellowish brown, light olive brown, moderate yellowish brown, pale yellowish organic,
pale yellowish brown, off white, soft to firm, blocky to sub blocky, microcrystalline, in parts argillaceous,
fossiliferous.

MURREE–3 FORMATION:
Age : Miocene
Interval : (12270ft to 12553) MD, (1257.93–12540.88TVD)
Thickness : 283ft (282.95ft)
Lower Contact : Fateh Jang
Lithology : Claystone with intercalation of Sandstone and traces of siltstone.

12270–12290ft. Predominantly Claystone


Claystone 100%: Moderately brown, grayish brown, dusky brown, soft to firm, blocky to sub blocky, in
parts silty, grading to very fine sandstone, trace calcite, slightly washable, slightly–non calcareous.

12290–12340ft. Predominantly Claystone


Claystone 100%: Moderately brown, grayish brown, dusky brown, soft to firm, blocky to sub blocky, in
parts silty, grading to very fine sandstone, trace calcite, slightly washable, slightly to non calcareous.

12340–12390ft. Claystone with thin beds of Sandstone


Claystone 90%: Moderately brown, grayish brown, dusky brown, soft to firm, blocky to sub blocky, in
parts silty, trace calcite, slightly washable, slightly to non calcareous.
Sandstone 10%: Light gray, dirty white, off white, occasionally greenish gray, translucent in parts
transparent, friable, moderately hard to hard, fine to very fine grained, poorly sorted, sub angular to sub
rounded, slightly calcareous cement.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 64
12390–12420ft. Sandstone with intercalation of claystone.
Sandstone 70%: Light gray, dirty white, of white, occasionally greenish gray, translucent in parts
transparent, friable, moderately hard to hard, fine to very fine grained, poorly sorted, sub angular to sub
rounded, slightly calcareous cement.
Claystone 30%: As above.

12420– 12440ft. Sandstone with intercalation of claystone and streaks of siltstone.


Sandstone 50%: As above.
Claystone 30%: As above.
Siltstone 20%: Brownish grey, moderately brown, dark reddish brown, light brown, moderately hard to
hard, sub blocky to blocky, slightly calcareous cement.

12440–12460ft: Claystone with intercalation of Sandstone and Siltstone.


Claystone 40%: Moderate brown, grayish brown, dusky brown, soft to firm, blocky to sub blocky, in parts
silty, grading to very fine sandstone, trace calcite, slightly washable, slightly to non calcareous.
Sandstone 30%: Light gray, dirty white, off white, occasionally greenish gray, translucent in parts
transparent, friable, moderately hard to hard, fine to very fine grained, sub angular to sub rounded, poor to
moderately sorted, slightly calcareous cement.
Siltstone 30%: Brownish gray, moderately brown, dark reddish brown, light brown, moderately hard to
hard, sub blocky to blocky, slightly calcareous cement.

12460–12495ft: Claystone with intercalation of Sandstone.


Claystone 70%:
Moderate brown, grayish brown, dusky brown, soft to firm, blocky to sub blocky, in parts silty, trace
calcite, slightly washable, slightly to non calcareous.
Sandstone 30%: As above.

12495–12505ft: Predominantly Sandstone.


Sandstone 100%: Light gray, dirty white, greenish gray, off white, translucent to transparent, moderately
hard, in parts loose to friable, fine to very fine grained, sub angular to sub rounded, moderately sorted,
slightly calcareous cement.

12505–12553ft: Claystone with intercalation of Sandstone and Streaks of Siltstone.


Claystone 50%: As above.
Sandstone 40%: Light gray, dirty white, off white, occasionally greenish gray, translucent in parts
transparent, friable, moderately hard to hard, fine to very fine grained, sub angular to sub rounded, poor to
moderately sorted, calcareous cement.
Siltstone 10%: Brownish gray, moderate brown, dark reddish brown, light brown, moderately hard to
hard, sub blocky to blocky, slightly calcareous cement.

FATEH JANG FORMATION:

Age : Miocene
Interval : (12553ft to 12585ft MD) (12540.88ft to 12572.87ft TVD )
Thickness : 32ft (31.99ft)
Lower Contact : Kuldana Formation
Lithology : Limestone.

12553–12575ft: Predominantly Limestone.


Limestone100%: Dirty brown, off white, yellowish brown, light brownish grey, pale yellowish brown, soft
to firm, blocky to sub blocky, cryptocrystalline, occasionally microcrystalline, argillaceous, rare fossil.

12575–12585ft: Predominantly Limestone.


Limestone 100%: Dirty brown, off white, yellowish brown, light brownish grey, pale yellowish brown, soft
to firm, blocky to sub blocky, cryptocrystalline, occasionally microcrystalline, argillaceous, fossiliferous.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 65
KULDANA FORMATION:
Age : Eocene
Interval : (12585ft to 12700ft) MD, (12572.87–12687.86TVD)
Thickness : 115ft (114.99ft)
Lower Contact : Chorgali
Lithology : Claystone with intercalation of siltstone.

12585–12588ft: Predominantly Claystone.


Claystone 100%: Light grey, light bluish grey, light greenish grey, medium gray, grayish brown, soft to
firm, blocky to sub blocky, in parts silty, slightly washable, highly calcareous.

12588–12645ft: Predominantly Claystone.


Claystone 100%: Moderate brown, moderate reddish brown, pale reddish brown, brick red, occasionally
light blush grey, soft to firm, blocky to sub blocky, in parts silty, trace calcite, slightly washable, slightly to
non calcareous.

12645–12678ft: Claystone with Streaks of Siltstone.


Claystone 80%: As above.
Siltstone 20%: Dark reddish brown, grayish red, dusky brown, hard to very hard, blocky to sub blocky, in
parts mottled, slightly to non calcareous.

12678–12700ft: Predominantly Claystone.


Claystone 80%: Light brown, pale brown, pale reddish brown, light blush grey, occasionally light grey,
trace moderately olive grey, soft–firm, blocky to sub blocky, in parts silty, slightly washable, slightly
calcareous.
Siltstone 20%: Dark reddish brown, grayish red, dusky brown, hard to very hard, blocky to sub blocky, in
parts mottled, slightly to non calcareous.

CHORGALI FORMATION:
Age : Eocene
Interval : 12700ft to 12950MD, (12687.86–12937.83TVD)
Thickness : 250ft (24.95ft)
Lower Contact : Sakesar
Lithology : Limestone with intercalation of Shale and Dolomitic Limestone and streaks
of Marl and Argilaceous Limestone, and thin beds of Anhydrate.

12700–12724Ft: Predominantly Shale:


Shale 100%: Greenish grey, light bluish grey, grayish green, moderately olive grey, soft–firm, in parts
moderately hard, blocky–sub blocky, sub platy, splintery, sub fissile, trace anhydrite, trace pyrite, non
calcareous.

12724–12730Ft: Predominantly Shale:


Shale 100%: Grayish blue green, greenish grey, moderately reddish brown, moderately dark grey, light
bluish grey, moderately hard to hard, blocky–sub blocky, platy to sub platy, in parts splintery, sub fissile,
trace anhydrite, non calcareous.

12730–12733Ft: Predominantly Shale:


Shale 100%: Grayish blue green, greenish grey, moderately reddish brown, moderately dark grey, light
bluish grey, moderately hard to hard, blocky–sub blocky, platy to sub platy, in parts splintery, sub fissile,
trace anhydrite, non calcareous.

12733–12742Ft: Limestone with Streaks of Shale:


Limestone 80–90%: Light grey to medium grey, yellowish grey, light olive grey, soft to firm, sub blocky,
cryptocrystalline, in parts microcrystalline, trace shale, trace anhydrite, argillaceous, in parts grading to
marl, in parts dolomitic, trace fossils

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 66
Shale 20–10%: As above.

12742-12750: Dolomitic Limestone interbedded with shale and Thin bands of Limestone
Dolomitic Limestone 50%: Light grey to medium grey, light olive grey, grayish black, dark grey, hard, in
parts moderately hard, blocky to sub blocky, cryptocrystalline, in parts microcrystalline, argillaceous, trace
anhydrite, no shows
Shale 40%: Grayish green, Turquoise, dusky purple, moderately hard to hard, platy, sub fissile, non
calcareous.
Limestone 10%: White, off white, creamy, soft, sub blocky to blocky, cryptocrystalline, slightly argillaceous,
no shows.

12750-12760: Dolomitic Limestone with Thin bands of Limestone


Dolomitic Limestone 90%: As above.
Limestone 10%: As above.

12760-12770: Argillaceous Limestone with Thin bands of Dolomitic Limestone


Argillaceous Limestone 90%:
Medium dark grey, medium grey, soft, in parts firm, sub blocky to blocky, cryptocrystalline, in parts
grading to marl, , no shows
Dolomitic Limestone 10%: As above.

12770-12780: Argillaceous Limestone with Intercalations of Dolomitic Limestone


Argillaceous Limestone 70%: As above.
Dolomitic Limestone 30%: As above.

12780-12790: Argillaceous Limestone with Thin Bands of Dolomitic Limestone


Argillaceous Limestone 90%: As above.
Dolomitic Limestone 10%: As above.

12790-12800: Dolomitic Limestone with Thin Bands of Limestone


Dolomitic Limestone 90%:
As above.
Limestone 10%: Olive Grey, Olive Black, Grayish Black, firm to moderately hard, compact, in parts soft,
blocky to sub blocky, microcrystalline, in parts cryptocrystalline, highly argillaceous.

12800-12810: Limestone with Thin Bands of Dolomitic Limestone


Limestone 90%: As above.
Dolomitic Limestone 10%: As above.

12810-12820: Dolomitic Limestone with intercalation of Argillaceous Limestone and Thin bands of Shale
Dolomitic Limestone 50%: Grayish black, olive black, dark grey, moderately hard to hard, sub blocky to
blocky, cryptocrystalline, moderately to highly argillaceous, trace anhydrite, no shows.
Argillaceous Limestone 40%: Medium dark grey, grayish, white, soft, in parts amorphous,
cryptocrystalline, in parts chalky, no shows.
Shale 10%: Dark grey, medium dark grey, firm to moderately hard, fissile, splintery, non calcareous.

12820-12825: Dolomitic Limestone with Thin bands of Shale


Dolomitic Limestone 90%: As above.
Shale 10%: As above.

12825-12830: Predominantly Limestone


Limestone 100%: Brownish black, grayish black, moderately hard to hard, compact, microcrystalline, in
parts sub blocky, in parts platy, highly argillaceous, no shows.

12830-12840: Limestone with Streaks of Argillaceous Limestone.


Limestone 80%: Brownish black, grayish black, moderately hard to hard, compact, microcrystalline, in
parts sub blocky, in parts platy, highly argillaceous, traces pyrite, traces anhydrite, no shows.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 67
Argillaceous Limestone 20%: As above.

12840-12845: Limestone with Intercalation of Marl


Limestone 70%: As above.
Marl 30%: Olive grey, dark grey, soft, sub blocky, amorphous, slightly sticky, in parts graded to
argillaceous limestone, no shows.

12845-12850: Limestone with Intercalation of Dolomitic Limestone and Streaks of Marl.


Limestone 50%: As above.
Dolomitic Limestone 30%: As above.
Marl 20%: As above.

12850-12855: Dolomite with Streaks of Limestone and Marl with Thin Bands of Anhydrite
Dolomite 50%: Greyish black, olive black, dark grey, moderately hard to hard, compact, sub blocky to
blocky, cryptocrystalline, moderate to highly argillaceous, trace anhydrite, no shows
Limestone 20%: As above.
Marl 20%: As above.
Anhydrite 10%: White, off white, soft, blocky to sub blocky, soapy, non calcareous.

12855-12860: Limestone with Streaks of Dolomite and Thin Bands of Anhydrite


Limestone 60%: As above.
Dolomite 30%: As above.
Marl 10%: As above.

12860-12865: Limestone with Streaks of Dolomite and


Thin Bands of Marl and Anhydrite
Limestone 60%: As above.
Dolomite 20%: As above.
Anhydrite 10%: As above.
Marl 10%: As above.

12865-12870: Limestone with Streaks of Dolomite, Shale and Anhydrite


Limestone 40%: As above.
Dolomite 20%: As above.
Shale 20%: As above.
Anhydrite 20% As above.

12870-12880: Limestone with Streaks of Dolomitic Limestone and Marl


Limestone 60%: As above.
Dolomite Limestone 20%: As above.
Marl 20%: As above.

12880-12885: Dolomite with intercalation of Limestone and thin beds of Anhydrite


Dolomite 60%: Medium grey, medium light grey, light grey, creamy, hard, compact, microcrystalline,
dense, blocky to sub blocky, in parts platy, slightly argillaceous
Limestone 30%: As above.
Anhydrite 10% As above.

12885-12890: Dolomite with Intercalation of Limestone and Thin bands of Dolomitic Limestone
Dolomite 50%: Medium grey, medium light grey, light grey, creamy, hard, compact, microcrystalline,
dense, blocky to sub blocky, in parts platy, slightly argillaceous
Limestone 40%: Brownish black, grayish black, moderately hard to hard, compact, microcrystalline, in
parts sub blocky, in parts platy, highly argillaceous, no shows.
Dolomitic Limestone 10%: Olive black, grayish black, dark grey, moderately hard to hard, sub blocky to
blocky, cryptocrystalline, moderately to highly argillaceous, trace anhydrite, no shows.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 68
12890-12895: Dolomite with Intercalation of Limestone and Streaks of Marl
Dolomite 40%: As above.
Limestone 40%: As above.
Marl 20%: Olive grey, dark grey, soft, sub blocky, amorphous, slightly sticky, in parts graded to
argillaceous limestone, no shows.

12895-12900: Marl with Intercalation of Limestone, streaks of Dolomitic Limestone and Thin Bands of
Anhydrite.
Marl 40%: As above.
Limestone 30%: As above.
Dolomitic Limestone 20% As above.
Anhydrite 10%: White, off white, soft, blocky to sub blocky, soapy, non calcareous.

12900-12905: Dolomite with Intercalation of Anhydrite, Streaks of Limestone and Thin Bands of Marl.
Dolomite 40%: As above.
Anhydrite 30%: As above.
Limestone 20%: As above.
Marl 10%: As above.

12905-12910: Limestone with Streaks of Dolomite and Marl.


Limestone 60%: As above.
Dolomite 20%: As above.
Marl 20%: As above.

12910-12920: Limestone with Intercalation of Dolomitic Limestone and Thin Bands of Marl.
Limestone 60%: Olive grey, brownish black, grayish black, firm to moderately hard, in parts soft, blocky to
sub blocky, cryptocrystalline, highly argillaceous,
UVD: Trace yellowish white direct fluorescence,
UVC: Slow yellowish white diffuse cut, milky white residual ring.
Dolomitic Limestone 30%: As above.
Marl 10%: As above.

12920-12930: Argillaceous Limestone with Thin bands of Dolomitic Limestone


Argillaceous Limestone 90%: Light grey, olive grey, soft, sub blocky, amorphous, slightly sticky, in parts
graded to marl, no shows.
Dolomitic Limestone10%: Dark grey, grayish black, Olive black, moderately hard to hard, sub blocky to
blocky, cryptocrystalline, moderately to highly argillaceous, no shows.

12930-12940: Limestone with Streaks of Dolomite


Limestone 80%: As above.
Dolomite 20%: Olive black, grayish black, brownish black, moderately hard to hard, cryptocrystalline,
sucrosic, traces pyrite, moderately argillaceous.
UVD: Traces yellowish white direct fluorescence.
UVC: Slow Pale yellowish white diffuse cut

12940-12950: Limestone with Thin Bands of Dolomite


Limestone 90%: Brownish black, olive black, in parts white, moderately hard to hard, in parts soft,
cryptocrystalline, in parts
chalky, moderately argillaceous.
UVD: Traces Yellowish white Direct Fluorescence
Dolomite 10%: As above.

SAKESAR FORMATION:
Age : Eocene
Interval : 12950ft to 13160MD, (12572.87–13147.81TVD)
Thickness : 210ft (209.97ft)

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 69
Lower Contact : Nammal
Lithology : Limestone with traces of Marl.

12950-12958: Predominantly Limestone


Limestone 100%: Grayish black, Brownish black, Brownish gray, medium gray, in parts olive black,
moderately hard to hard, brittle, dense, microcrystalline, abundant forams, wackstone-packstone, slightly
argillaceous.
UVD: 15% Yellowish white Direct Fluorescence
UVC: Slow to moderate light yellowish diffuse cut, thin yellowish white residual ring.

12958-12985: Predominantly Limestone


Limestone 100%: Grayish black, medium gray, Brownish black , in parts olive black, moderately hard to
hard, in parts firm, brittle, massive, microcrystalline, wackstone-packstone, slightly argillaceous.
UVD: 15% Pale Yellowish Direct Fluorescence,
UVC: Slow to moderate yellowish white diffuse cut, thin yellowish white residual ring.

12985-13000: Predominantly Limestone


Limestone 100%: Grayish black, medium gray, Brownish black , in parts olive black, moderately hard to
hard, in parts firm, brittle, massive, microcrystalline, wackstone, slightly argillaceous.
UVD: 15% Pale Yellowish Direct Fluorescence,
UVC: Slow to moderate yellowish white diffuse cut, thin yellowish white residual ring.

13000-13030: Predominantly Limestone


Limestone 100%: Dark grey, brownish black, olive black, firm, occasionally moderately hard, blocky to sub
blocky, massive, cryptocrystalline to microcrystalline, traces forams, wackstone, slightly-non argillaceous.
UVD: 5-10% Pale Yellowish Direct Fluorescence,
UVC: Slow to moderate yellowish white diffuse cut, thin yellowish white residual ring.

13030-13055: Predominantly Limestone


Limestone 100%: Medium to dark grey, brownish grey, in parts light grey, firm to moderately hard, sub
blocky to blocky, in parts brittle, dense, microcrystalline to cryptocrystalline, wack stone, in parts slightly
argillaceous, traces of forams.
UVD: 5% Pale Yellowish Direct Fluorescenc,
UVC: Slow to moderate yellowish white diffuse cut, thin yellowish white residual ring.

13055-13070: Predominantly Limestone


Limestone 100%: Medium gray, olive black, dark gray, firm to moderately hard, cryptocrystalline, in parts
microcrystalline, blocky to sub blocky, wackstone, traces forams, slightly argillaceous.
UVD: Traces-5% Pale Yellowish Direct Fluorescence,
UVC: Slow White Yellowish Diffuse cut with milky white residual ring

13070-13080: Limestone with intercalations of Marl


Limestone 70%: As above.
Marl 30%: Olive black, dark grey, soft, sub blocky, amorphous, slightly sticky, in parts graded to
argillaceous limestone.

13080-13150: Predominantly Limestone


Limestone 100%: As above.

13150-13160: Marl with intercalations of Limestone


Marl 70%: Olive gray, medium dark gray, dark gray, soft, sub blocky, amorphous, slightly sticky.
Limestone 30%: As above.

NAMMAL FORMATION:
Age : Eocene
Interval : 13160ft to 13247MD, (13147.80–13234.77TVD)

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 70
Thickness : 87ft MD (86.97ft)
Lower Contact : Patala
Lithology : Limestone with traces of Marl.

13160-13195: Predominantly Limestone


Limestone 100%: Olive gray, olive black, greenish black, soft to firm, sub blocky to blocky, in parts
amorphous, cryptocrystalline, in parts graded to marl, moderately argillaceous.

13195-13247: Limestone with Intercalations of Marl


Limestone 70%: As above.
Marl 30%: Medium to dark gray, Olive gray, soft, sub blocky, amorphous, slightly sticky.

PATALA FORMATION:
Age : Paleocene
Interval : 13247ft to 13610ft MD, (13234.77–13597.45TVD)
Thickness : 363ft (362.68ft)
Lower Contact : Lockhart Formation
Lithology : Limestone with streaks of Marl and Shale.

13247-13315: Predominantly Limestone


Limestone 100%: Dusky Yellowish brown, dusky brown, Medium to Dark gray, in parts off white, firm to
moderately hard, in parts hard, blocky to Sub blocky, microcrystalline to cryptocrystalline, massive, brittle,
slightly argillaceous.
UVD: 10-15% Yellowish white Direct Fluorescence,
UVC: Moderate White Yellowish streaming with thin milky white residual ring.

13315-13330: Predominantly Limestone


Limestone 100%: Dusky yellowish brown, dusky brown, medium to dark gray, In parts off white, firm to
moderately hard, blocky to sub blocky, microcrystalline to cryptocrystalline, massive, brittle, slightly
argillaceous. UVD: 5% Yellowish white direct fluorescence

13315-13380: Predominantly Limestone


Limestone 100%:
Dusky yellowish brown, dusky brown, medium to dark gray, In parts off white, firm to moderately hard,
blocky to sub blocky, microcrystalline to cryptocrystalline, massive, brittle, slightly argillaceous, traces
direct fluorescence.

13380-13430: Predominantly Limestone


Limestone 100%: Pale yellowish brown, Olive gray, medium to dark gray, grayish black, firm, brittle,
blocky to sub blocky, microcrystalline to cryptocrystalline, wackstone, slightly argillaceous.

13430-13485: Predominantly Limestone


Limestone 100%: Dusky yellowish brown, dusky brown, firm, blocky to sub blocky, cryptocrystalline,
slightly argillaceous, in parts moderately argillaceous.

13485-13505: Predominantly Limestone


Limestone 100%: As above.
UVD: Traces-5% Pale yellowish fluorescence,
UVC: Slow yellowish white diffuse cut with milky white residual ring.

13505-13515: Limestone with streaks of Marl


Limestone 80%: Pale yellowish brown, Olive gray, medium to dark gray, in parts off white, firm, in parts
soft, sub blocky to blocky, cryptocrystalline, slightly to moderately argillaceous, in parts highly
argillaceous.
Marl 20%: Grayish black, dark grey, olive black, soft, amorphous, slightly sticky.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 71
13515-13525: Predominantly Limestone
Limestone 100%: As above.

13525-13540: Limestone with Thin Bands of Marl.


Limestone 90%: As above.
Marl 10%: As above.

13540-13545: Shale with Streaks of Marl and Thin bands of limestone


Shale 70%: Dark gray, grayish black, olive black, firm to moderately hard, sub fissile to fissile, non
calcareous, traces pyrite.
Marl 20%: Grayish black, dark gray, olive black, soft, amorphous, slightly sticky.
Limestone 10%: As above.

13545-13550: Shale with Intercalations of Marl and Limestone

Shale 40%: Dark gray, grayish black, olive black, firm to moderately hard, in parts soft, sub fissile to fissile,
splintery, non calcareous, traces pyrite
Marl 30%: As above.
Limestone 30%: As above.

13550-13560: Marl with streaks of marl and limestone


Marl 60%: As above.
Shale 20%: As above.
Limestone 20%: As above.

13560-13565: Limestone with Intercalations of marl and streaks of shale


Limestone 50%: As above.
Marl 30%: Olive black, Grayish black, dark gray , soft, amorphous, slightly sticky.
Shale 20%: As above.

13565-13575: Shale with Intercalations of Limestone.


Shale 70%: As above.
Limestone 30%: Pale yellowish brown, Olive gray, medium to dark gray, in parts off white, firm, in parts
soft, sub blocky to blocky, cryptocrystalline, slightly to moderately argillaceous, in parts highly
argillaceous.

13575-13585: Limestone with streaks of shale an Marl


Limestone 60%: As above.
Marl 20%: As above.
Shale 20%: As above.

13585-13600: Marl with Intercalations of Limestone and thin bands of shale


Marl 60%: As above.
Limestone 30%: As above.
Shale 10%: As above.

13600-13610: Limestone with Intercalations of Marl


Limestone 70%: As above.
Marl 30%: As above.

LOCKHART FORMATION:
Age : Paleocene
Interval : 13610ft to 13961ft MD , (13597.45–13947.96TVD)
Thickness : 351ft (350.51ft)
Lower Contact : Hangu
Lithology : Limestone with thin beds of Dolomitic Limestone, Marl and Shale.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 72
13610-13625: Predominantly Limestone
Limestone 100%: Pale brown, yellowish brown, light olive gray, firm, sub blocky to blocky,
cryptocrystalline, occasionally microcrystalline, slightly to moderately argillaceous.
UVD: Traces-5% Pale Yellowish Direct fluorescence
UVC: Slow yellowish white diffuse cut with milky white residual ring.

13625-13635: Limestone with streaks of Marl


Limestone 80%: As above.
Marl 20%: Grayish olive green, grayish olive, olive gray, soft, amorphous, slightly sticky.

13635-13655: Predominantly Limestone


Limestone 100%: As above.

13655-13670: Predominantly Limestone


Limestone 100%: Pale brown, yellowish brown, light olive gray, firm, sub blocky to blocky,
cryptocrystalline, occasionally microcrystalline, slightly to moderately argillaceous.
UVD: Traces-5% Pale Yellowish Direct fluorescence.
UVC: Slow yellowish white diffuse cut with milky white residual ring.

13670-13715: Predominantly Limestone


Limestone 100%: Light brownish grey, medium grey, creamy in parts olive black, firm to medium hard,
blocky to sub blocky, microcrystalline to cryptocrystalline, wackstone, occasionally Packstone, slightly to
non argillaceous, trace of forams.
UVD: Traces-5% Pale Yellowish Direct fluorescence.
UVC: Slow yellowish white diffuse cut with milky white residual ring.

13715-13750: Predominantly Limestone


Limestone 100%: Pale brown, yellowish brown, light olive gray, firm, sub blocky to blocky,
cryptocrystalline, occasionally microcrystalline, slightly to moderately argillaceous, in parts highly
argillaceous.

13750-13815: Predominantly Limestone


Limestone 100%: Light brownish grey, olive black, medium grey, creamy in parts , firm to moderately
hard, blocky to sub blocky, microcrystalline to cryptocrystalline, slightly to non argillaceous, wackstone,
occasionally Packstone, trace of forams.
UVD: Traces-5% Pale Yellowish Direct fluorescence.
UVC: Slow yellowish white diffuse cut with milky white residual ring.

13815-13845 Predominantly Limestone


Limestone 100%: Grayish black, dark gray, olive gray, firm to soft, sub blocky to blocky, cryptocrystalline,
moderately to highly argillaceous, in parts graded to marl.

13845-13875: Predominantly Limestone.


Limestone 100%: Grayish black, dark gray, olive gray, firm to soft, sub blocky to blocky, cryptocrystalline,
moderately to highly argillaceous, in parts graded to marl.

13875-13885: Limestone with intercalation of Dolomitic Limestone.


Limestone 70%: Greenish black, Grayish black, olive gray, firm, in parts soft, blocky to blocky,
cryptocrystalline, highly argillaceous.
Dolomitic Limestone 30%: Grayish black, olive black, hard to very hard, blocky to blocky, microcrystalline,
argillaceous.
UVD: Traces-5% Pale Yellowish Direct fluorescence.
UVC: Slow yellowish white diffuse cut with milky white residual ring.

13885-13905: Predominantly Limestone

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 73
Limestone 100%: As above.

13905-13910: Marl with streaks of shale and thin beds of limestone.


Marl 70%: Dark grey, grayish black, brownish black, soft to firm, blocky to sub blocky, in parts amorphous,
slightly sticky.
Shale 20%
Dark grey, grayish black, olive black, firm, sub fissile, platy to sub platy, non cal.
Limestone 10%: As above.

13910-13915: Marl with streaks of shale and limestone.


Marl 60%: As above.
Shale 20%: As above.
Limestone 20%: As above.

13915-13920: Shale with thin bands of marl.


Shale 90%: As above.
Marl 10%: As above.

13920-13945: Predominantly Limestone.


Limestone 100%: Medium grey, creamy, grayish olive green, in parts off white, firm, in parts moderately
hard, brittle, microcrystalline to cryptocrystalline, slightly argillaceous.

13945-13955: Marl with thin bands of shale.


Marl 90%: As above.
Shale 10% As above.

13955-13960: shale with intercalations of marl.


Shale 70%: As above.
Marl 30%: As above.

HANGU FORMATION:

Age : Paleocene
Interval : 13961ft to 13996ft MD, (13947.96–13982.91TVD)
Thickness : 35ft (34.95ft)
Lower Contact : Chhidru formation unconfirmable
Lithology : Sandstone interbedded with claystone.

13960-13965: Sandstone interbedded with claystone.


Sandstone 60%: Medium grey, white, off white, light grey, very fine to fine grain, translucent, loose, sub
angular, poorly sorted, slightly to non calcareous.
Claystone 40%: Dusky brown, dusky red, grayish brown, soft, in parts firm, sub blocky to blocky, in parts
amorphous, slightly sticky, slightly to non calcareous.

13965-13975: Claystone interbedded with sand.


Claystone 60%: As above.
Sandstone 40%: As above.

13975-13995: Claystone with streaks of sand.


Claystone 80%: As above.
Sandstone 20%: As above.

CHHIDRU FORMATION:

Age : Permian

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 74
Interval : 13996ft to 14177ft MD, (13982.91–14163.55ft TVD)
Thickness : 181ft (180.64ft)
Lower Contact : Wargal
Lithology : Sandstone with intercalation of Limestone, streaks of Marl and thin beds of
Shale .

13995-14000: Limestone with intercalation of sandstone and thin bands of shale.


Limestone 50%:
Very light grey, medium light grey, creamy, off white, firm, cryptocrystalline, blocky to sub blocky, slightly
to non argillaceous.
Sandstone 40%: Light grey, off white, white, in parts grayish black, loose, in parts moderately hard to hard,
fine grain, in parts medium grain, sub angular, poorly sorted, in parts moderately sorted, loose quarts
grain, traces of glauconitic, slightly calcareous cement.
Shale 10%: Grayish black, olive black, black, moderately hard to hard, fissile to sub fissile, in parts
splintery, non calcareous.

14000-14010: Sandstone with intercalation of limestone, marl and thin bands of shale.
Sandstone 50%: As above.
Limestone 20%: As above.
Marl 20%: Dark grey, olive black, grayish black, soft, amorphous, slightly sticky.
Shale 10%: As above.

14010-14015: Limestone with intercalation of sandstone, marl and thin bands of shale.
Limestone 50%: As above.
Sandstone 20%: As above.
Marl 20%: As above.
Shale 10%: As above.

14015-14020: Limestone with intercalation of sandstone and thin bands of shale.


Limestone 50%: As above.
Sandstone 40%: As above.
Shale 10%: As above.

14020-14040: Sandstone with intercalation of limestone and thin bands of shale.


Sandstone 70%: As above.
Limestone 20%: As above.
Shale 10%: As above.

14040-14045: Sandstone with intercalation of limestone.


Sandstone 80%: As above.
Limestone 20%: As above.

14045-14055: Limestone with intercalation of sandstone.


Limestone 60%: As above.
Sandstone 40%: As above.

14055-14060: Sandstone with intercalation of limestone.


Sandstone 80%: As above.
Limestone 20%: As above.

14060-14075: Sandstone with thin bands of limestone.


Sandstone 90%: Dark grey , greenish black, medium dark grey, in parts off white, transparent to
translucent, loose, in parts moderately hard to hard, fine to very fine grained, in parts coarse grained, sub
angular, highly calcareous cement, trace pyrite, no shows, no visual porosity.
Limestone 10%: As above.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 75
14075-14080: Predominantly Sandstone.
Sandstone 100%: As above.

14080-14085: Limestone with intercalation of Sandstone.


Limestone 80%: As above.
Sandstone 20%: As above.

14085-14090: Limestone with intercalation of Sandstone.


Limestone 80%: As above.

Sandstone 20%: As above.


14090-14095: Sandstone Intercalation with Limestone.
Sandstone 80%: As above.
Limestone 20%: As above.

14095-14100: Marl with Intercalation of Limestone and Sand stone.


Marl 60%: As above.
Limestone 20%: As above.
Sandstone 20%: As above.

14100-14105: Marl with Intercalation of Limestone and Sand stone.


Marl 40%: As above.
Limestone 30%: As above.
Sandstone 30%: As above.

14105-14110: Limestone with Intercalation of Marl and Streak of Sandstone.


Limestone 50%: As above.
Marl 30%: As above.
Sandstone 20%: As above.

14110-14115: Limestone with Intercalation of Sandstone and Streak of Marl.


Limestone 40%: As above.
Sandstone 40%: As above.
Marl 20%: : As above.

14115-14120: Limestone with Intercalation of Sandstone and Marl.


Limestone 60%: As above.
Sandstone 20%: As above.
Marl 20%: As above.

14120-14135: Marl with Intercalation of Sandstone.


Marl 70%: As above.
Sandstone30%: As above.

14135-14140: Sandstone with Intercalation of Marl.


Sandstone 60% : As above.
Marl 40%: As above.

14140-14145: Marl with Intercalation of Sandstone.


Marl 60%: As above.
Sandstone 40%: As above.

14145-14150: Sandstone with Intercalation of Marl.


Sandstone 70%: As above.
Marl 30%: As above.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 76
14150-14155: Limestone with Intercalation of Marl and Thin Bands of Sandstone.
Limestone 70%: As above.
Marl 20%: As above.
Sandstone 10%: As above.

14155-14160: Limestone with Streaks of Marl and Sandstone


Limestone 80%: As above.
Marl 10%: As above.
Sandstone 10%: As above.

14160-14177: Limestone with Intercalation of Sandstone and Streaks of Marl.


Limestone 50%: As above.
Sandstone 30%: As above.
Marl 20%: As above.

WARGAL FORMATION:
Age : Permian
Interval : 14177ft to 14540MD, (14163.55ft - 14526.20ft TVD)
Thickness : 363ft (362.65ft)
Lower Contact : Amb
Lithology : Limestone with thin beds of dolomitic Limestone, Shale and Marl.

14177-14210: Predominantly Limestone.


Limestone 100%: Yellowish gray, light brownish gray, creamy, off white, firm to moderately hard, massive,
compact, brittle, microcrystalline non argillaceous, no shows.

14210-14226: Predominantly Limestone.


Limestone 100%: Yellowish gray, light brownish gray, creamy, off white, firm to moderately hard, massive,
compact, brittle, microcrystalline non argillaceous, no shows.

14226-14245: Predominantly Limestone.


Limestone 100%: Yellowish grey, very pale orange, off white , creamy , in parts moderately yellowish
brown, firm to moderately hard, in parts hard, sub blocky, in parts compact, brittle, microcrystalline to
cryptocrystalline, no shows.

14245-14270: Predominantly Limestone.


Limestone 100%: Yellowish grey, very pale orange, off white , creamy , in parts moderately yellowish
brown, firm to moderately hard, in parts hard, sub blocky, in parts compact, brittle, microcrystalline to
cryptocrystalline, no shows.

14270-14330: Predominantly Limestone


Limestone 100%: Off white, light grey, light brownish grey, creamy , in parts moderately yellowish brown,
firm to moderately hard, in parts hard, sub blocky, in parts compact, brittle, microcrystalline to
cryptocrystalline, no shows.

14330-14360Predominantly Limestone.
Limestone 100%: Yellowish grey, very pale orange, creamy, off white, in parts light grey, firm to
moderately hard, in parts hard, sub blocky, chalky, micro to crypto crystalline, no shows.

14360-14420 Predominantly Limestone.


Limestone 100%: Yellowish grey, very pale orange, creamy, off white, light grey, in parts brownish grey,
firm to moderately hard, in parts hard, sub blocky, micro to crypto crystalline, no shows.
14420-14500 Predominantly Limestone.
Limestone 100%: Yellowish grey, very pale orange, creamy, off white, in parts light grey, firm to
moderately hard, in parts hard, chalky, sub blocky, micro to crypto crystalline, no shows.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 77
14500-14505 Limestone with intercalation of Dolomitic limestone.
Limestone 70%: As above.

Dolomitic Limestone 30%: Medium Dark, Dark grey, dusky brown, in parts olive grey, firm to moderately
hard, dense, sub blocky to blocky, microcrystalline to cryptocrystalline, in parts sucrosic, in parts
carbonaceous, brittle, in parts argillaceous.

14505-14510 Limestone with intercalation of Dolomitic limestone.


Limestone 60%: As above.
Dolomitic Limestone 40%: As above.

14510-14515 Dolomitic limestone with intercalation of limestone.


Dolomitic Limestone 60%: As above.
Limestone 40%: As above.

14515-14520 Limestone with intercalation of Dolomitic limestone and Thin Bands of Marl.
Limestone 50%: As above.
Dolomitic Limestone 40%: As above.
Marl 10%: Dark grey, light grey, soft, amorphous, in parts sub blocky, slightly sticky.

14520-14525 Dolomitic Limestone with intercalation of Marl and Streaks of Marl.


Dolomitic Limestone 50%: As above.
Marl 30%: As above.
Limestone 20%: As above.

14525-14530 Marl with Intercalation of Limestone and Streaks of Dolomitic Limestone and Shale.
Marl 40%: As above.
Limestone 30%: As above.
Dolomitic Limestone 20%: As above.
Shale 10%: Dark grey, blackish grey, moderately hard to hard, sub fissile to fissile, splintery, non
calcareous.

14530-14540 Limestone with intercalation of Dolomitic Limestone and Streak of Shale and Marl.
Limestone 40%: As above.
Dolomitic Limestone 30%: As above.
Shale 20%: As above.
Marl 10%: As above.

AMB FORMATION:

Age : Permian
Interval : 14540ft to 14586ft MD, (145236.20-14572.18 TVD)
Thickness : +46ft (+45.95ft)
Lithology : Limestone with intercalation of Sandstone and streaks of Dolomitic Lime
stone and Shale

14540-14545ft. Limestone with intercalation of Sandstone and Streak of Shale and Dolomitic
Limestone.
Limestone 50%: As above.
Sandstone 20%: Light grey, brownish grey, transparent to translucent, loose, in parts moderately hard, very
fine to fine grain, in parts medium grain, sub angular to sub rounded, poorly to moderately sorted, in parts
loose quartz grain, calcareous cement, traces of pyrite.
Shale 20%: Dark grey, greenish grey, blackish grey, moderately hard to hard, sub fissile to fissile, in parts
splintery, non calc.
Dolomitic Limestone 10%: As above.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 78
14545-14550 Limestone with intercalation of Sandstone.
Limestone 60%: As above.
Sandstone 40%: As above.

14550-14555ft.Sandstone with alteration of Limestone.


Sandstone 50%: As above.
Limestone 50%: As above.

14555-14560 Sandstone with intercalation of Dolomitic Limestone and Streaks of Limestone and Shale.
Sandstone 30%: As above.
Dolomitic Limestone 30%: As above.
Limestone 20%: As above.
Shale 20%: As above.

14560-14565 Sandstone with intercalation of Dolomitic Limestone and Streaks of Shale.


Sandstone 50%: As above.
Dolomitic Limestone 30%: As above.
Shale 20%: As above.

14565-14570 Dolomitic Limestone with streaks of sandstone and shale.


Dolomitic Limestone 60%: As above.
Sand 20%: As above.
Shale 20%: As above.

14570-14575 Dolomitic Limestone with intercalation of shale and Streaks of sand stone and limestone.
Dolomitic Limestone 30%: As above.
Shale 30%: As above.
Sand 20%: As above.
Limestone 20%: As above.

2.5 WIRELINE LOGGING

The following Wireline logs were run at Khaur North–1.

DEPTH HOLE
DATE RUN LOGS INTERVALS SIZE COMPANY
FROM TO (FT) (inch)
27/11/17 1 MBN – BGL – GR Surface – 2017 26″ WEATHERFORD
03/01/18 1 HMI – BHC – GR 2013–6515 17½″ WEATHERFORD
09/03/18 1 HMI–BHC–GR 6511–12742 12¼″ WEATHERFORD
10/03/18 2 SPED–CNT–GR 9600–12742 12¼″ WEATHERFORD
11/03/18 3 HRLA-GR-MSLA 9600–12742 12¼″ WEATHERFORD
24/03/18 1 CBL-VDL-CCL-GR 150- 12738 12¼″ WEATHERFORD
13/04/18 1 HRLA-GR-SP 12742-14586 8½″ WEATHERFORD
13/04/18 2 SPED-CNT-GR 12742-14586 8½″ WEATHERFORD
14/04/18 3 CXD- CMI-GR 12742-14586 8½″ WEATHERFORD
22/04/18 1 SBT-CBL-VDL-GR 12738-14588 8½″ WEATHERFORD
23/04/18 2 VSP-GR Surface-14588 8½″ WEATHERFORD

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 79
2.6 HYDROCARBON and GAS SHOWS

Hydrocarbons shows Observed at Khaur North-1. Details are given below.

HYDROCARBON SHOWS

Hydrocarbon shows are Observed in the following Formations.

Chorgali Formation:

12910-12920ft:
UVD: Trace yellowish white direct fluorescence,
UVC: Slow yellowish white diffuse cut, milky white residual ring.

12930-12940ft:
UVD: Traces yellowish white direct fluorescence.
UVC: Slow Pale yellowish white diffuse cut

12940-12950ft:
UVD: Traces Yellowish white Direct Fluorescence

Sakesar Formation:

12950-12958ft:
UVD: 15% Yellowish white Direct Fluorescence
UVC: Slow to moderate light yellowish diffuse cut, thin yellowish white residual ring.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 80
12958-12985ft:
UVD: 15% Pale Yellowish Direct Fluorescence
UVC: Slow to moderate yellowish white diffuse cut, thin yellowish white residual ring.

12985-13000ft:
UVD: 15% Pale Yellowish Direct Fluorescence
UVC: Slow to moderate yellowish white diffuse cut, thin yellowish white residual ring.

13000-13030ft:
UVD: 5-10% Pale Yellowish Direct Fluorescence
UVC: Slow to moderate yellowish white diffuse cut, thin yellowish white residual ring.

13030-13053ft:
UVD: 5% Pale Yellowish Direct Fluorescence
UVC: Slow to moderate yellowish white diffuse cut, thin yellowish white residual ring.

13055-13070ft:
UVD: Traces-5% Pale Yellowish Direct Fluorescence
UVC: Slow White Yellowish Diffuse cut with milky white residual ring

Patala Formation:

13247-13315ft
UVD: 10-15% Yellowish white Direct Fluorescence
UVC: Moderate White Yellowish streaming with thin milky white residual ring.

13315-13330ft:
UVD: 5% Yellowish white direct fluorescence

13485-13505ft
UVD: Traces-5% Pale yellowish fluorescence
UVC: Slow yellowish white diffuse cut with milky white residual ring.

Lockhart Formation:

13610-13625ft:
UVD: Traces-5% Pale Yellowish Direct fluorescence
UVC: Slow yellowish white diffuse cut with milky white residual ring.

13655-13670ft:
UVD: Traces-5% Pale Yellowish Direct fluorescence.
UVC: Slow yellowish white diffuse cut with milky white residual ring.

13670-13715ft:
UVD: Traces-5% Pale Yellowish Direct fluorescence.
UVC: Slow yellowish white diffuse cut with milky white residual ring.

13750-13815ft:
UVD: Traces-5% Pale Yellowish Direct fluorescence.
UVC: Slow yellowish white diffuse cut with milky white residual ring.

13875-13886ft:
UVD: Traces-5% Pale Yellowish Direct fluorescence.
UVC: Slow yellowish white diffuse cut with milky white residual ring.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 81
GAS SHOWS
Gas detection system was operated from surface to end of well testing. Gas shows were Observed while
drilling. See Annexure No. 02. Ditch Gas Analysis for complete gas record.

2.7 CORE DATA

Core was cut in Sakesar Formation in Khaur North-1 from 13030ft to 13055ft. Total length of core was 25ft. The
recovered core is 21.5ft having recovery of 86%.

Khaur North–1
DESCRIPTION FORMATION: (Sakesar (Eocene)
CORE # 1 (13030–13055ft) RECOVERY: 21.5m (86%)
Fluorescence Oil
Chip No. Porosity Residu
Description Odor/S Calc
Depth (ft) Type FLD FLC al
tain
Chip# 1 Limestone: 5% Pale Slow to Thin 91
13030-13033 Olive Black, Medium to dark Yellowis moderate yello
grey, brownish grey, light h Direct yellowish wish
grey, hard to moderately - Fluoresce white white -
hard, sub blocky to blocky, nce diffuse cut, residu
brittle, dense, Wackstone, al
traces of forams . ring.
Chip # 2 Limestone: 5% Pale Slow to thin 91%
13033-13036 Dark grey, light grey, Yellowis moderate yello
grayish black, hard to h Direct yellowish wish
moderately hard, sub blocky - Fluoresce white diffuse white -
to blocky, brittle, dense, nce cut residu
Wackstone, traces of forams. al ring

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 82
Chip # 3 Limestone: 5% Pale Slow to thin 89%
13036-13039 Brownish grey, Dark grey, Yellowis moderate yello
olive black, hard to h Direct yellowish wish
moderately hard, sub blocky - Fluoresce white diffuse white -
to blocky, brittle, dense, nce cut residu
wackstone, traces of forams. al
ring.
Chip # 4 Limestone: 5% Pale Slow to thin 93%
13039-13042 Grayish black, Dark to Yellowis moderate yellow
medium grey, brownish h Direct yellowish ish
grey, hard to moderately Fluoresce white white
- diffuse cut residu -
hard, sub blocky to blocky, nce
brittle, dense, wackstone, al
traces of forams. ring.

Chip # 5 Limestone: 5% Pale Slow to thin 93%


13042-13045 Olive black, dark to medium Yellowis moderate yello
grey, brownish grey, hard to h Direct yellowish wish
moderately hard, sub blocky - Fluoresce white diffuse white -
to blocky, brittle, dense, nce cut residu
wackstone, traces of forams. al ring
Chip # 6 Limestone: No No cut 90%
13048-13051.5 Brownish grey, medium to Fluoresce
dark grey, light grey, hard to nce
moderately hard, sub blocky - -
to blocky, brittle, dense,
Wackstone, traces of forams

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 83
PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1
Doc. # PSPB–SPR006–F–009 84
Section

3
Pressure Summary
3.1 PRESSURE SUMMARY

At well Khaur North–1, a vigilant and constant watch was kept on subsurface formation pressure gradients
and differential pressures (hydrostatic pressureminus pore pressure) to predict and explicate any potential
drilling hazard, which may obstruct drilling progress. D–exponent corrected was being used as the basic
application for estimation of pore pressure with the help of Eaton Method. Raw data like ROP, WOB, RPM,
MW, Bit size and its dullness were used as inputs and net ROP or drilled ability was calculated out after
normalizing the effects of above mentioned parameters on ROP. This normalized ROP reflected variations
in normal compaction of sediments with increasing depth and was used to establish NCT (Normal
Compaction Trend). Any departure from normal trend was indicative of under or over compaction. Further
observations were also made, like excessive cuttings due to pressure caving, mechanical caving, normal
cuttings, variations in flow line temperature, pit volumes, drag and erratic torque etc. Any anomaly if noted
and estimated formation pressures were communicated to the well site Geologist, Mud Engineer on site
and the relevant officials in head office, Islamabad through daily morning reports. After assimilating
relevant data, a formation pressure evaluation log, known as Pressure Log was prepared on 1: 500 scale
(Enclosure No.2) in which D–exponent corrected values plotted along with interpreted lithology, mud
temperature in and out, formation pressure and overburden gradients etc. During drilling the estimated
pore pressure ranged between 8.49ppg–13.66ppg as shown in Pressure Log. The well was drilled a little bit
over balanced to get maximum hydrocarbon shows in the reservoir zone. For the purpose of discussion on
pressure regimes, the well Khaur North–1 is sub divided in to four sections on the basis of hole size.

Section I.1 51–2017ft (HOLE SIZE 26″)

This section was drilled with 34″ Bit from 51ft down to 2017ft in 343.62 on bottom drilling hours. In this
phase average rate of penetration was 5.76ft/hr. (03) three new Bit and (4) four re run Bits was used to drill
this section. The well was spud in with Mud weight of 8.6–11PPG. This phase was drilled smoothly without
any complications. Murree Formation was drilled in this phase.

3.2.1 D–exponent Corrected

In this section, the D–exponent corrected values for this phase ranged between 0.78–1.55, while estimated
pore pressure ranged from 7.52–10.71PPG.

3.2.2 Flow–line Temperature

The maximum flow line temperature in this section recorded was 67.9ºC. Flow line temperature plot is
given in Figure No. 3.1.

3.2.3 Background, Trip and Connection Gas

Gas detection system remained operative in this section. Observed gases due to crude oil addition in active
system.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 85
Section I.2 2017–6515ft (HOLE SIZE 17½″)

This section was drilled with 17½″ Bit from 2017ft down to 6515ft in 314.76 on bottom drilling hours. In this
phase average rate of penetration was 28.69ft/hr. (03) three new and (6) six RR Bit ware used to drill this
section. The well was drilled in with Mud weight of 11.00–12.50ppg. This phase was drilled smoothly
without any complications. Murree Formation was drilled in this phase.

3.3.1 D–exponent Corrected

In this section, the D–exponent corrected values for this phase ranged between 0.39–1.57, while estimated
pore pressure ranged from 8.33–12.49PPG.

3.3.2 Flow–line Temperature

The maximum flow line temperature in this section recorded was 68.5ºC. Flow line temperature plot is
given in Figure No. 3.1.

3.3.3 Background, Trip and Connection Gas

Gas detection system remained operative in this section. Observed gases due to crude oil addition in active
system.

Section I.3 6515ft–12742ft (HOLE SIZE 12


¼″)

This section was drilled with 12¼″ Bit from 6515ft down to 12742ft in 929.4 hrs on bottom drilling hours. In
this phase average rate of penetration was 6.71ft/hr. (06) six new Bits and (7) seven RR Bits were used to
drill this section. Drilling of this phase was commenced with KCL Polymer Mud. Initially Mud weight was
12.7ppg and raised to 13.6ppg to acquire hole stability. Murree-1, Fateh Jang-1, Murree -2, Chorgali -1,
Sakesar-1 , Murree -3, Fateh Jang -2, Kuldana and Chorgali -2 Formations were drilled in this phase.

3.1 D–exponent Corrected

In this section, the D–exponent corrected values for this phase ranged between 0.30–1.60, while estimated
pore pressure ranged from 9.04ppg–13.66ppg.

3.2 Flow–line Temperature

The maximum flow line temperature in this section recorded was 87ºC. Flow line temperature plot is given
in Figure No. 3.1.

3.3 Background, Trip and Connection Gas

Gas detection system remained operative in this section. The background gases were Observed due to
crude oil addition in active system. and summarized in Annexure No.2.

3.5 12742ft–14586ft (HOLE SIZE 8½″)

This section was drilled with 8½″ Bit from 12742ft down to 14586ft in 237.40 on bottom drilling hours. In
this phase average rate of penetration was 7.77ft/hr. (05) Five new Bits and (7) seven RR bits and coring Bit
were used to drill this section. Drilling of this phase was commenced with WBM mud. Initially Mud weight
was 11ppg and Then incrcreased to 13ppg. due to gas influx. Chorgsli, Sakesar, Nammal, Patala, Lockhart,
Hangu, Chhidru, Wargal, Amb Formations were drilled in this phase.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 86
3.6.1 D–exponent Corrected

In this section, the D–exponent corrected values for this phase ranged between 0.46–1.83, while estimated
pore pressure ranged from 10.09-13.43ppg.

3.6.2 Flow–line Temperature

The maximum flow line temperature in this section recorded was 89 ºC. Flow line temperature plot is given
in Figure No. 3.1.

3.6.3 Background, Trip and Connection Gas

Gas detection system remained operative in this section. Formation, Connection, trip and back ground
gases were Observed in this section and summarized in Annexure No.2.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 87
PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1
Doc. # PSPB–SPR006–F–009 88
Section

4
Drilling Engineering
4.1 DRILLING HISTORY

Well Khaur North–1 was spud in on 09th November 2017 and was drilled down to total depth of 14586ft MD
(14572.18ft TVD) on April11, 2016 in 154 days (1848.51 on bottom drilling hours) in Four drilling phases.
POL deployed Rig EXLO–305 to carryout drilling operations. Drilling Progress curve of Days Vs Depth is
shown in Figure No. 4.1. The hole construction is shown in Figure No.4.2. The drilling data is given in
Annexure No. 01.

4.2 26″ HOLE SECTION

Section Drilled : 51ft to 2017ft


Section Length : 1966ft
Number of Bits : 3 NB, 4RR
20″ Casing Shoe : 2013ft

MUD SUMMARY OF SECTION

Type : 3% KCl Gel Mud


Density : 8.9–11PPG.

RUN # 01
ON
BHA BIT BIT JETS SERIAL DEPTH (ft) DRIL ROP
TYPE MADE IADC BTM GRADING
NO. NO. SIZE SIZE NO.
IN OUT FT HR FT/HR
1–1–NO– A–1– I–NO–
1 1 SB115CPS Smith 26″ 3x20,1x18 115 RG4130 51 100 49 50.2 0.98
BHA

DRILLING PARAMETERS

FLOW RATE
WOB RPM SPP
(GPM)
2 61 140 3351

RUN SUMMARY
Tested and accepted Exalo rig 305 as per POL check list. Checked center with block and top drive with
single of 9½" dc. Made up and rack back 22 x 5" Drill pipes stands and 4 x 5" HWDrill pipes stands. Held
pre–spud meeting, recited holy quran and sacrificed two goats prior to spud in. Picked uo and run run in
hole 26" Bit + Bit sub + 2 x 9½" dc + X–Over + 1 x 5" HWDrill pipes and tagged bottom @ 51ft. Spud in well
@ 1200hrs. Broke Bit. Drilled 26" hole from 51ft to 64ft. WOB = 1–2klbs, RPM = 25–40, GPM = 200–350, SPP:
50–110psi, TRQ = 0.9–1.2ft.klbs. Drilled 26" hole from 64ft to 100ft WOB = 1–2klbs, RPM = 50–70, GPM =
350–410, SPP: 150–170psi, TRQ = 1–2ft.klbs. Conducted totco survey @ 94ft, Incl: 0°. Pulled out of hole26"

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 89
Bit to surface.

RUN # 02

ON
BHA BIT BIT JETS SERIAL DEPTH (ft) DRIL ROP
TYPE MADE IADC BTM GRADING
NO. NO. SIZE SIZE NO.
IN OUT FT HR FT/HR
2–2–WT –A– E–I–NO–
02 1RR1 SB115CPS Smith 26″ 3x20,1x18 115 RG4130 100 511 411 92.23 4.46
HR

DRILLING PARAMETERS

FLOW RATE
WOB RPM SPP
(GPM)
12 105 390 546

RUN SUMMARY
Ran in hole 26" Tricon Bit down to 100ft. Drilled 26" hole from 100ft to 101ft, WOB = 1–2klbs, RPM = 50–70,
GPM = 400, SPP: 170psi, TRQ = 1–3ft.klbs. Observed leakage in hydraulic pipe of tds,Pulled out of hole26"
Bit to 43ft. Welded and fixed the same. Ran in hole 26" Bit from 43ft to bottom. Drilled 26" hole from 101ft to
109ft, WOB = 4–6klbs, RPM = 50–70, GPM = 400–425, SPP: 190–210psi, TRQ = 1–2ft.klbs, ROP = 1.5ft/hr.
Picked up 9½" dc and resumed drilling from 109 to 186ft. WOB = 6–10klbs, RPM = 80–105, GPM = 350–450,
SPP: 190–230psi, TRQ = 2–3ft.klbs, ROP = 3.6ft/hr. Drilled 26" hole from186ft to 208ft, WOB = 8–10klbs,
RPM = 90–100, GPM = 420–450, SPP: 210–230psi, TRQ = 2–3ft.klbs, ROP = 4.23ft/hr. Conducted totco
survey @ 201ft. Incl: 0.9°. Picked up and made up 8" dc and drilled from 208ft to 280ft. WOB = 10–12klbs,
RPM = 90–105, GPM = 420–450, SPP: 210–260psi, TRQ = 2–3.5ft.klbs, ROP = 6.85ft/hr. Drilled 26" hole
from280ft to 299ft, WOB = 10–12klbs, RPM = 90–105, GPM = 450, SPP: 230–260psi, TRQ = 3–4ft.klbs, ROP =
5.8ft/hr. Conducted totco survey @ 291ft. Incl: 0°. Drilled 26" hole fron 299 from to 388ft. WOB = 12–15klbs,
RPM = 90–120, GPM = 600, SPP: 450–470psi, TRQ = 3–4ft.klbs, ROP = 5ft/hr. Conducted totco survey @
380ft. Incl: 0.25°. Drilled 26" hole from388ft to 432ft. WOB = 20–24klbs, RPM = 90–120, GPM = 700, SPP:
600–650psi, TRQ = 3–4ft.klbs, ROP = 4.6ft/hr. Observed malfunctioning of junction box on tds, contd fixing
the same. Fixed and repaired TDS blower juction box. TDS electrical/mechanical inspection, drop object
mastand TDS inspection, Ok. Drilled 26" hole from 432ft to 478ft. WOB = 10–15klbs, RPM = 90–120, GPM =
700, SPP: 600–650psi, TRQ = 3–4ft.klbs, ROP = 5.5ft/hr. Conducted totco survey @ 471ft. Incl: 0.8°. Drilled
26" hole from 478ft to to 511ft. WOB = 12–15klbs, RPM = 90–115, GPM = 700, SPP: 650–700psi, TRQ = 3–
4ft.klbs, ROP = 5ft/hr. Circulated to clean hole prior to pull out hole. Pulled out of hole26" Tricon Bit from
511ft to surface. Laid down Bit. Found Bit + stabs in gauged and 1st s.stab 10% balled up.

RUN # 03

ON
BHA BIT BIT JETS SERIAL DEPTH (ft) DRIL ROP
TYPE MADE IADC BTM GRADING
NO. NO. SIZE SIZE NO.
IN OUT FT HR FT/HR

03 2 XR+C Smith 26″ 3x20,1x18 115 RG4758 511 707 196 27.11 7.23 1–1–NO–A–0–I–NO–RIG

DRILLING PARAMETERS

FLOW RATE
WOB RPM SPP
(GPM)

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 90
18 118 873 749

RUN SUMMARY
Made up and ran in hole new 26" Tricon Bit to 511ft (hole free). Drilled 26" hole from 511ft to 568ft.
Parameters: WOB = 15–20klbs, RPM = 90–115, GPM = 700, SPP: 650–750psi, TRQ = 3–4ft.klbs, ROP =
4.75ft/hr. Conducted totco survey @ 561ft: Inclination 0.25°. Drilled 26" hole from 568ft to 598ft.
Parameters: WOB = 15–20klbs, RPM = 90 –115, GPM = 700, SPP: 650–750psi, TRQ = 3–4ft.klbs, ROP =
10ft/hr. Drilled 26" hole from 598ft to 707ft. Parameters: WOB = 15–20klbs, RPM = 110–130, GPM = 800,
SPP: 1020–1040psi, TRQ = 4–5ft.klbs, ROP = 7.8ft/hr. Conducted totco survey @ 701ft. Incl: 0.25°. After
visually inspected TDS, observed bolts of blower motor lossened, removed the same for fixing. Pulled out
of hole26" Tricon Bit to surface prior to fix the blower motor.
.
RUN # 04

ON
BHA BIT BIT JETS SERIAL DEPTH (ft) DRIL ROP
TYPE MADE IADC BTM GRADING
NO. NO. SIZE SIZE NO.
IN OUT FT HR FT/HR
2–2–WT–A–2–I–NO–
04 2RR1 XR+C Smith 26″ 3x20,1x18 115 RG4758 707 1219 512 77.23 6.63
HR

DRILLING PARAMETERS

FLOW RATE
WOB RPM SPP
(GPM)
24 116 1506 882

RUN SUMMARY
Fixed the bolts of blower motor, re–installed blower motor on TDS and function tested the same, Ok. Ran in
hole 26" Tricon Bit From 521ft down to 707ft. Drilled 26" hole From 707ft to 799ft. Parameters: WOB = 15–
20klbs, RPM = 110–130, GPM = 850, SPP: 1230–1270psi, TRQ = 2–4ft.klbs, ROP = 7.25ft/hr. Conducted totco
survey @ 794ft: Inclination 0.90°.Drilled 26" hole From 799ft to 844ft and is in progress. Parameters: WOB =
15–20klbs, RPM = 110–130, GPM = 850, SPP: 1300–1350psi, TRQ = 2–4ft.klbs, ROP = 4.125ft/hr. Drilled 26"
hole from 844ft to 893ft. Parameters: WOB = 15–20klbs, RPM = 110–130, GPM = 900, SPP: 1540–1570psi,
TRQ = 3–4ft.klbs, ROP = 6.3ft/hr. Conducted totco survey @ 888ft. Incl: 1.0°.visually inspected TDS,
observed bolts of junction box lossened and broken, fixed the same. (meanwhile string rotated and
circulated). Drilled 26" hole from 893ft to 939ft.parameters: wob = 15–20klbs, RPM = 110–140, GPM = 900,
SPP: 1570–1610psi, TRQ = 3–4ft.klbs, ROP = 5ft/hr. Drilled 26" hole from 939ft to 986ft. Parameters: WOB =
25–35klbs, RPM = 110–140, GPM = 900, SPP: 1620–1640psi, TRQ = 3–4ft.klbs, ROP = 7.2ft/hr. Conducted
totco survey @ 978ft: Inclination 1.0°. Drilled 26" hole from 986ft to 1016ft. Parameters: WOB = 25–35klbs,
RPM = 110–140, GPM = 900, SPP: 1620–1640psi, TRQ = 3–4ft.klbs, ROP = 10ft/hr. Observed manual tong
counterweight sheave pin loosened. Secured the same. Drilled 26" hole from 1016ft to 1078ft.parameters:
WOB = 25–35klbs, RPM = 110–140, GPM = 900, SPP: 1620–1640psi, TRQ = 3–4ft.klbs, ROP = 7.2ft/hr.
Conducted totco survey @ 1069ft: Inclination 1.0°. Visually inspected TDS.drilled 26" hole from 1078ft to
1102ft and is in progress. Parameters: WOB = 25–35klbs, RPM = 110–140, GPM = 900, SPP: 1620–1650psi,
TRQ = 3–5ft.klbs, ROP = 6ft/hr. Drilled 26" hole from 1102ft to 1172ft. Parameters: WOB = 25–35klbs, RPM
= 110–140, GPM = 900, SPP: 1620–1650psi, TRQ = 3–5ft.klbs, ROP = 8.5ft/hr. Conducted totco survey @
1164ft: Inclination 2.0°.Visually inspected TDS. Drilled 26" hole from 1172ft to 1219ft. Parameters: WOB =
25–35klbs, RPM = 110–140, GPM = 900, SPP: 1620–1650psi, TRQ = 3–5ft.klbs, ROP = 5.75ft/hr Circulated to
clean hole withGPM: 900 and SPP: 1620–1650psi. Conducted totco survey @ 1200ft: Inclination 1.0°. Pulled
out of hole26" Bit to surface (hole free). Laid down Bit + Bit sub + 02 x 9½" Drill collars + 02 x X–Over + 01 x
5" Heavey drill pipes. Found Bit + 02 x s.stabs in gauged.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 91
RUN # 05

ON
BHA BIT BIT JETS SERIAL DEPTH (ft) DRIL ROP
TYPE MADE IADC BTM GRADING
NO. NO. SIZE SIZE NO.
IN OUT FT HR FT/hr
1–1–NO–A–1–I–NO–
05 3 SB115CPS Smith 26″ 3x20,1x18 115 RG4129 1219 1835 616 58.70 10.49
RIG

DRILLING PARAMETERS

FLOW RATE
WOB RPM SPP
(g/min)
34 117 2024 955

RUN SUMMARY
Made up new 26" Bit # 03 (with float valve) on same bha and ran in hole down to 1219ft (bottom). Hole
free. Precautionary washed down last stand. Broke Bit with low parameters and drilled 26" hole from 1219ft
to 1269ft. Parameters: WOB = 30–35klbs, RPM = 110–130, GPM = 950, SPP: 1920psi, TRQ = 3–5ft.klbs, ROP
= 9ft/hr. Conducted totco survey @ 1260ft. Incl: 1.5°. Visually inspected TDS. Drilled 26" hole from 1269ft to
1362ft.Parameters: WOB = 30–35klbs, RPM = 100–130, GPM = 950–1050, SPP: 1900–2275psi, TRQ = 3–
9ft.klbs, ROP = 16.9ft/hr. Conducted totco survey @ 1357ft. Incl: 1°. Visually inspected TDS. Drilled 26" hole
from 1362ft to 1457ft. Parameters: WOB = 30–35klbs, RPM = 100–120, GPM = 950, SPP: 1930–1950psi, TRQ =
3–8ft.klbs, ROP = 12.6ft/hr. Conducted totco survey @1450ft. Incl: 1.5°. Visually inspected TDS. Drilled 26"
hole from 1457ft to 1489ft. Parameters: WOB = 30–35klbs, RPM = 110–120, GPM = 950, SPP: 1950–1970psi,
TRQ = 3–7ft.klbs, ROP = 13.3ft/hr. Drilled 26" hole from 1489ft to 1552ft. Parameters: WOB = 35–40klbs,
RPM = 100–120, GPM = 950, SPP: 1930–1950psi, TRQ = 3–8ft.klbs, ROP = 9.6ft/hr. Conducted totco survey
@ 1548ft. Incl: 2.0°. Visually inspected TDS. Drilled 26" hole from 1552ft to 1646ft. Parameters: WOB = 35–
40klbs, RPM = 100–120, GPM = 950, SPP: 2020–2050psi, TRQ = 3–8ft.klbs, ROP = 9.5ft/hr. Conducted totco
survey @ 1640ft. Incl: 2.50°. Visually inspected TDS. Drilled 26" hole From 1646ft to 1699ft. Parameters:
WOB = 25–30klbs, RPM = 130, GPM = 950, SPP: 2050–2100psi, TRQ = 3–8ft.klbs, ROP = 9.5ft/hr. Drilled 26"
hole from 1699ft to 1741ft. Parameters: WOB = 25–30klbs, RPM = 130, GPM = 950, SPP: 2140–2170psi, TRQ
= 3–8ft.klbs, ROP = 7.5ft/hr. Conducted totco survey @ 1736ft. Incl: 2.25°. Visually inspected TDS. Drilled
26" hole from 1741ft to 1835ft. Parameters: WOB = 25–30klbs, RPM = 130, GPM = 950, SPP: 2170–2210psi,
TRQ = 3–8ft.klbs, ROP = 9.5ft/hr. Conducted totco survey @ 1830ft. Incl: 2.8°. Visuallyly inspected TDS,
observed bolts of junction box loosened and broken, tried to fix the same but no success. (meanwhile string
rotated and circulated). Pulled out of hole26" Tricon Bit # 03 to surface (hole free) prior to repair junction
box of TDS. Found Bit and both stabs in gauged. Work on junction box of TDS for fixing bolts. Laid down
03 x 9½" Drill collars + 02 x 26" s.stabs. Inspected 02 x 26" s.stabs.

RUN # 06

ON
BHA BIT BIT JETS SERIAL DEPTH (ft) DRIL ROP
TYPE MADE IADC BTM GRADING
NO. NO. SIZE SIZE NO.
IN OUT FT HR FT/HR

06 3RRI SB115CPS Smith 26″ 3x20,1x18 115 RG4129 1835 2017 182 38.15 4.7 3–3–WT–A–4–I–NO–LOG

DRILLING PARAMETERS

WOB RPM SPP FLOW RATE

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 92
(GPM)
31 107 2351 955

RUN SUMMARY
Made up 03 x 9½" Drill collars + 02 x 26" s.stabs on 26" Bit # 03 (RR) and ran in hole down to 180ft. Ran in
hole 26" Bit with same BHA from 180ft to 1835ft (bottom). hole free. Precautionary washed down last stand.
Drilled 26" hole from 1835ft to 1912ft. Parameters: WOB = 20–25klbs, RPM = 110–130, GPM = 950, SPP:
2330–2370psi, TRQ = 3–8ft.klbs, ROP = 4.7ft/hr. Drilled 26" hole from 1912ft to 1929ft. Prameters: wob20–
25klbs, RPM = 110 130, GPM = 950, SPP: 2370–2390psi, TRQ = 3–8ft.klbs, ROP = 3.0ft/hr. Conducted totco
survey @ 1925ft: Inclination 2.75°. Visually inspected TDS. Drilled 26" hole from 1929ft to 2017ft (20" casing
td). Parameters: WOB = 30–40klbs RPM = 80–130, GPM = 950, SPP: 2370–2440psi, TRQ = 3–8ft.klbs, ROP =
5.75ft/hr. Conducted totco survey @ 2010ft. Incl: 2.90°. Visually inspected TDS. Swept 100bbls Hi-Vis pill
and circulated out to clean hole. Circulated out 100bbls Hi-Vis pill to clean hole. Performed wiper trip from
2017ft to 1645ft. (hole free) circulated to clean hole prior to pull out of hole. Pulled out of hole26" Tricon Bit
# 3 (RR) from 2017ft to surface. (hole free). Laid down 26" Tricon Bit. Found Bit and both stabs in gauged.

CONDITION TRIP

RUN # 07

ON
BHA BIT BIT JETS SERIAL DEPTH (ft) DRIL ROP
TYPE MADE IADC BTM GRADING
NO. NO. SIZE SIZE NO.
IN OUT FT HR FT/HR

07 1RR2 SB115CPS Smith 26″ 3x20,1x18 115 RG4130 Condition Trip -

RUN SUMMARY
Made up 26" Tricon Bit # 1 (RR2) and ran in hole with same BHA to 2017ft (Bottom) hole free.
Precautionary washed down last stand. Circulated for bottoms up prior to pull out of hole for 20" casing.
Pulled out of hole26" Tricon Bit # 1 (RR2) from 2017ft to surface. (hole free). Laid down 26" Tricon Bit + 02 x
s.stabs. Slipped 23ft Drillline.

WIRELINE LOGGING

Rigged up Weatherford Wireline. Conducted Wireline logs (cal–nav–gr). average hole size: 27.84".
Maximum Incl: 2.841°. Rigged down Weatherford Wireline.

20″ CASING
Rigged up Weatherford TRS. Held pre job safety meeting. Made up and ran in hole shoe track ( float shoe
2.16' + 1x 20"casing (133 ppf, k 55, btc) 37.99' + float collar 2.57'') down to 42.72ft. Applied baker seal lock to
shoe track and tag welded. Checked Integrity of float shoe and float collar, found Ok. Continued to run in
hole 20" Casing from42.72ft to 232ft and is in progress. Continued ran in hole 20" csg, (133 ppf, k 55, btc)
from 232ft to 2017ft (Bottom) total 53 joints. Confirmed td at 2017ft with circulation. Picked up 4ft with shoe
at 2013ft.

CEMENTING
Circulated to condition mud (reduced Yp as per plan) prior to run cement stinger. Meanwhile prepared
140bbl of 13.0ppg spacer in rig tank. Rigged up slb Dowel equipment. Made up and ran in hole cement
stinger (with 20" x 5" centralizer) on 5" HWDrill pipes +Drill pipes and stabbed into 20" float collar (with
circulation) at 1969ft. Circulation to clean hole is in progress. Meanwhile preparing mix fluid of lead + tail
slurries. Circulated to clean hole prior to conduct cement job. Meanwhile prepared mix fluid for lead slurry .

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 93
Held pre job safety meeting. Pressure tested Dowel cementing lines at LP 500psi and HP 3000psi. Held for
10min, Ok. Pumped 100bbl 13.0ppg spacer with rig pump. Switched to schlumberger pumping unit and
pumped 930bbl of 15.8ppg fly mixed lead slurry followed by 100bbl of 15.8ppg batch mixed tail slurry with
100% returns at surface. Displaced cement with 5bbl of 13ppg spacer and 20bbl of 11.0ppg mud. Observed
no back flow. Floats holded. Received and dumped 72bbl of contaminated spacer (11.9ppg), 28bbl
contaminated cement (12.5–13.0ppg), 180bbl neat cement (15.4ppg). Laid down pup joint andPulled out of
hole4 x 5" Drill pipes stands. Flushed string with 25bbl (string volume) of 11ppg mud. WOC.
MeanwhilePulled out of holecement stinger to surface.

WORKED ON WELL HEAD and BOP


Cut 30" conductor and conducted top job. Recovered 30" conductor. Rough cut 20" Casing stub. Pulled and
laid down 20" Landing joint. Fine cut and dressed 20" Casing stub. Placed and leveled 21¼” 5k casing head
housing on 20" Casing stub. Welded well head. Waited to cool down welding prior to pressure test Casing
stub welding. Attempted to pressure test Casing stub weld, found pin hole leakage in welding of inner side
of well head. Conducted welding job on well head several time and pressure tested casing head housing @
500psi. Held for 30mint.OK. Nippled up 21¼” 5k x 20–3/4" 3k dsa, 20–3/4" 3k spacer, 20–3/4"–3k mud
cross, 20–3/4" 3k ram bop and annular bop 21¼” x 2k. Made up Bop pressure test assembly: 1 stand of 5"
HWDrill pipes + test plug + 1 x 5" Drill pipes + 2 x pup joint 5" Drill pipes (10ft and 5ft) + side entry
sub.seated test plug in section A. Function tested koomey unit, driller control panel,tool pusher control
panel and function test bop –found.OK. Pressure tested bop: 1 st test: tested pipe ram 5" against co–flex hose,
kill line and TDS ibop valve @ HP 500psi for 5min. and HP 2000psi for 10min. found Ok. 2 nd test: tested pipe
ram 5" against TDS manual valve and hcr of kill line and hcr of chOke line @ LP 500psi for 5min and HP
2000psi for 10min, found Ok. 3rd test: tested pipe ram 5" against safety valve and kill line and chOke line
manual valve @ LP 500psi for 5min. and HP 2000psi for 10min. 4 th test: tested annular bop @ LP 500psi for
5min. and HP 1500psi for 10min. found Ok. 5th test: tested blind ram against NRV valve and chOke
manifold coflex hose @ HP 500psi for 5min and HP 2000psi for 10min, found Ok. Retrieved testing plug and
installed wear bushing. Laid down pressure test assembly.

4.3 17½″ HOLE SECTION

Section Drilled : 2017ft to 6515ft


Section Length : 4498ft
Number of Bits : 3 NB and 6RR
13 ⅜” Casing Shoe : 6512ft

MUD SUMMARY OF SECTION

Type : 7% KCl Polymer


Density : 11–12.7

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 94
RUN # 08
DEPTH ON
BHA BIT BIT JETS IAD SERIAL DRIL ROP
TYPE MADE (FT) BTM GRADING
NO. NO. SIZE SIZE C NO.
IN OUT FT HR FT/HR
3x20,1x18 1–1– NO–A– E –I– NO–
8 4 SB135 SMITH 17½″ 115 RH7502 2017 2032 15 2.22 6.76
BHA

DRILLING PARAMETERS

FLOW RATE
WOB RPM SPP
(GPM)
14 118 1157 655

RUN SUMMARY
Madeup 17½” Tricon Bit and ran in hole down to 1870ft. Washed down and tagged hard cement @ 1959ft.
(ran in hole 5" Drill pipes g–105 single by single). Circulated to homogenize 11ppg mud. Pressure tested
casing with rig pumps at 2000psi with increments of 500psi, hold pressure @ 2000psi for 15minutes, Ok.
Cleaned out cement from 1959ft to 1976ft. (tagged float collar at 1968.5ft). Drilled out cement from 1976ft to
2003ft (10ft above shoe). Parameters: WOB = 18–20klbs, RPM = 100–110, GPM = 650, SPP: 1170–1180psi,
TRQ = 3000ft.klbs, average ROP = 13.5ft/hr. Circulated to homogenize mud prior to pressure test casing.
Pressure tested 20" casing at 2000psi for 15min, Ok. Drilled out cement from 2003ft to 2017ft and drilled 5ft
of new formation down to 2022ft. Parameters: WOB = 16–20klbs, RPM = 100–110, GPM = 650, SPP: 1170–
1180psi, TRQ = 3500ft.klbs, average ROP = 10ft/hr. (casing shoe @ 2013ft). Circulated out to homogenize
mud prior to conduct shoe bond test. Rigged up Dowel cementing lines. Flushed and pressure tested
cementing lines @ 2000psi for 10min, Ok. Attempted to conduct shoe bond test as follows: 100psi for 3–
5min, Ok. 200psi for 3–5min, Ok. At 300psi pressure dropped to 70psi, pumped 4.6bbl and attempted
several times to hold pressure, no success. Drilled from 2022ft to 2032ft. Parameters: WOB = 10–14klbs,
RPM = 110–130, GPM = 650, SPP: 1170–1180psi, TRQ = 3000ft.klbs, average ROP = 6ft/hr. Circulated out to
homogenize mud till shaker clean. Pulled out of hole17½” Bit to surface.

CEMENT PLUG # 1

Madeup 5" mule shoe and Bit and ran in hole on 5" Drill pipes (single by single) down to 2032ft. Circulated
to homogenize 11ppg mud prior to place cement plug. Held pre job safety meeting. Flushed lines and
presure tested lines @ LP 500psi/5min and HP 3000psi/10min, Ok. Pumped 35bbl of 13ppg spacer
followed by 40bbl of 15.8ppg of cement slurry followed by 5bbl of 13ppg spacer and displaced with 34bbl
of 11ppg mud with 0.6bbl under displacment. Pulled out of holecement string to 1728ft and reverse
circulated out 2 string volumes. Pulled out of hole to 1665ft and closed Rams and squeeze cement
equivalent to 380psi by pumping 1.6bbl of mud. Increased pressure to 480psi till cement slurry achieve
compressive strength. WOC. Dumped 50bbl of spacer contaminated mud. WOC. Meanwhile held 480psi till
cement slurry achieve some compressive strength. Bled off pressure, observed 0.5bbl return. WOC.
MeanwhilePulled out of holecement string to surface.

RUN # 09
ON
BHA BIT BIT JETS IAD SERIAL DEPTH (FT) DRIL BTM ROP
TYPE MADE GRADING
NO. NO. SIZE SIZE C NO.
IN OUT FT HR FT/HR
3x20,1x18 Drill cmt from 1–1– NO–A– E –I– NO–
9 4RR1 SB135 SMITH 17½″ 135 RH7502 5.42 19.92
1919–2027ft BHA

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 95
DRILLING PARAMETERS

FLOW RATE
WOB RPM SPP
(GPM)
12–16 60–85 850–900 550

RUN SUMMARY
Made up 17½” Tricon Bit and Bit and ran in hole down to 1613ft., washed down and tagged top of cement
at 1919ft with 5klbs. Parameters: GPM = 350, SPP: 400–420psi. Drilled hard cement from1919ft to 2017ft.
Parameters: WOB = 12–16klbs, RPM = 60–85, GPM = 550, SPP: 850–900psi, average ROP = 22.5ft/hr.
Circulated out to homognize mud. Held pre job safety meeting. Rigged up Dowel cementing lines. Flushed
and pressure tested cementing lines LP 300psi/5min and HP 2000psi/10min, Ok. Attempted to conduct
shoe bond test as follows: 100psi for 3–5min, Ok. 200psi for 3–5min, Ok. 300psi for 3–5min, Ok. At 410psi
pressure dropped to 160psi (volume pumped = 1.3bbl). Bled off pressure, observed 0.5bbl return. Drilled
hard cement from 2017ft to 2027ft. Parameters: WOB = 12–16klbs, RPM = 60–85, GPM = 550, SPP: 850–
900psi, average ROP = 6.7ft/hr. Circulated out to homogenize mud. Pulled out of hole17½” Bit to surface.
Laid down 6 x 8" Dc

CEMENT PLUG # 2
Ran in hole mule shoe + cement string down to 1948ft, washed down from1948ft to 2027ft and tagged
cement. Circulated to homogenize mud. Pumped 35bbl of 13ppg spacer followed by 40bbl of 15.8ppg of
cement slurry followed by 5bbl of 13ppg spacer and displaced with 28.4bbl of 11ppg mud. Pulled out of
holecement string to 1760ft and reverse circulated out 2 string volumes. Pulled out of hole to 1665ft and
closed Rams and squeeze cement equivalent to 630psi by pumping 10bbl of mud and observed Maximum
pressure 370psi but pressure didnot hold, WOC.Dumped 40bbl of spacer contaminated mud.

RUN # 10
ON
BHA BIT BIT JETS IAD SERIAL DEPTH (FT) DRIL BTM ROP
TYPE MADE GRADING
NO. NO. SIZE SIZE C NO.
IN OUT FT HR FT/HR
3x20,1x18 Drill cmt from 1–1– NO–A– E –I– NO–
10 4RR2 SB135 SMITH 17½″ 135 RH7502 3.03 28.71
1935–2022ft HP

DRILLING PARAMETERS

FLOW RATE
WOB RPM SPP
(GPM)
10 70 900 550

RUN SUMMARY
Made up 17½” Tricon Bit and ran in hole down to 1615ft. Break circulated intermittently. Ran in hole 17½”
Bit from 1615ft, washed down and tagged TOC at 1935ft with 10klbs. Drilled hard cement from 1935ft to
2015ft.parameters: wob = 10–12klbs, RPM = 70, GPM = 550, SPP: 900–920psi. Circulated out to homognize
mud.Held pre job safety meeting. Rigged up Dowel cementing lines. flushed and pressure tested cementing
lines LP 300psi/5min and HP 2000psi/10min, Ok. Conducted shoe bond test as follows: 0.3bbl pumped,
pressure 25psi for 5min, Ok. 0.6bbl pumped, pressure 84psi for 5min, Ok. 0.9bbl pumped, pressure 190psi

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 96
for 5min, Ok. 1.2bbl pumped, pressure 300psi dropped to 280psi in 4min. 1.7bbl pumped, pressure 340psi
dropped to 130psi in 2 hours.Bleed off pressure and observed 0.7bbl return.Drilled hard cement from 2015ft
to 2022ft.parameters: wob = 10–12klbs, RPM = 70, GPM = 550, SPP: 900–920psi.Circulated to homognize
mud. Pulled out of hole17½” Bit to surface.Laid down Bit.

CEMENT PLUG # 3

Ran in hole mule shoe + cement string down to 2022ft, circulated to homognize mud. Held pre job safety
meeting. Flushed lines and pressure tested lines @ LP 500psi/5min and HP 3000psi/10min, Ok. Pumped
35bbl of 13ppg spacer followed by 80bbl of 15.8ppg of cement slurry followed by 5bbl of 13ppg spacer and
displaced with 23bbl of 11ppg mud. Pulled out of holecement string to 1600ft and reverse circulated out 2
string volumes. Pulled out of hole to 1485ft and closed Rams and squeeze cement equivalent to 17ppg and
630psi by pumping 9.3bbl of mud, Ok. held pressure at 630psi. WOC.Dumped 9bbl of contaminated mud
and total dumped volume = 35bbl. WOC. Bled off pressure and observed 0.5bbl return (total pumped
volume = 10bbl).

RUN # 11

ON
BHA BIT BIT JETS IAD SERIAL DEPTH (FT) DRIL BTM ROP
TYPE MADE GRADING
NO. NO. SIZE SIZE C NO.
IN OUT FT HR FT/HR
3x20,1x18 2–2–WT–A–2–I–NO–
11 4RR3 SB135 SMITH 17½″ 135 RH7502 2032 2170 138 26.52 5.20
BHA

DRILLING PARAMETERS

FLOW RATE
WOB RPM SPP
(GPM)
12 113 890 471

RUN SUMMARY
Made up 17½” Tricon Bit and ran in hole 17½” Bit to 1600ft. Waited on cement. Washed down to 1818ft and
tagged TOC at 1818ft. Drilled mod hard to hard cement from 1818ft to 2003ft. Meanwhile pressure tested
20’’ Casing at 1816ft, 1895ft, 1933ft and 1959ft at 700psi – Ok. Circulated to homogenize mud is in progress
prior to pressure test Casing at 2003ft. Circulated hole for bottom up. Pressure tested casing at 2003ft
@700psi. Drilled out cement down to 2015ft, circulated to homogenize mud, conducted shoe bond testand
applied 415psi pressure equivalent to 15ppg and hold for 10min, Ok. Drilled cement from 2015ft to 2033ft,
circulated to clean hole, Drilled 17 ½" hole from 2033ft to 2111ft in Murree Formation and further drilling is
in progress. Drilled From 2111ft to 2170ft, Circulated to clean hole,Pulled out of hole17½” Bit to surface,
Ran in hole 17½” PDC Bit on directional assembly.

RUN # 12

ON
BHA BIT BIT JETS IAD SERIAL DEPTH (FT) DRIL BTM ROP
TYPE MADE GRADING
NO. NO. SIZE SIZE C NO.
IN OUT FT HR FT/HR
SDi519M 1–2–WT–A–X–I–BT–
12 5 SMITH 17½″ 7x14 535 JN1731 2170 4315 2145 70.48 30.43
HBP BHA

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 97
DRILLING PARAMETERS

FLOW RATE
WOB RPM SPP
(GPM)
5.2 35/121 2663 759

RUN SUMMARY
Ran in hole 17½” PDC Bit inside casing shoe, slipped Drillline, inspected tds, changed wash pipe, reamed
down to 2087, conducted MWD survey, Remamed down to 2167ft, conducted MWD survey and drilled
down to 2500ft. Drilled 17½″ hole in Rotary/Slide Mode down to 2677ft, Conducted directional survey,
circulated out to homogenize mud, performed wiper trip, hole free. Drilled 17½” hole in Rotary/Slide Mode
down from 2677ft to 3070ft. Drilled 17½” hole in Rotary/Slide Mode down to 3200ft, conducted directional
survey, circulated out to homogenize mud, performed wiper trip, hole free. Drilled 17½" hole in
Rotary/Slide Mode down to from 3200ft to 3640ft. Drilled 17½” hole in Rotary/Slide Mode down to 3758ft,
Conducted directional survey, circulated out to homogenize mud, performed wiper trip, hole free. Drilled
17½” hole in Rotary/Slide Mode down to from 3758ft to 4040ft. Drilled 17½” hole in Rotary/Slide Mode
from 4040ft to 4315ft. Conducted directional survey. Pumped 40bbl Hi-Vis pill and circulating out to clean
hole prior to pull out of hole to surface.

RUN # 13
ON
BHA BIT BIT JETS IAD SERIAL DEPTH (FT) DRIL BTM ROP
TYPE MADE GRADING
NO. NO. SIZE SIZE C NO.
IN OUT FT HR FT/HR

13 6 SB535 SMITH 17½″ 3x20, 1x18 535 RA1482 4315 4472 157 44.31 2.11 2–7–BT–A–3– I–LT–PR

DRILLING PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
26 50/139 2838 792

RUN SUMMARY
Made up new 17½" Tricon Bit # 6, on same BHA and scribed MWD tool. Performed shallow function test
Mud Motor and MWD tool @ 600GPM, 800psi, Ok. Ran in hole 17½” Tricon Bit to 693ft. Cut and slipped
Drillline at casing shoe. Ran in hole to 3761ft. Reamed from 3761ft to 4315ft. Drilled from 4315ft to 4345ft.
Increased MW during drilling from 11.5ppg to 12ppg in steps. Drilled 17 ½" Hole with sliding mode from
4345ft to 4444ft.Drilled 17½" hole in Rotary Mode from 4444ft to 4472ft. Pulled out of holefrom 4472ft to
3740ft to surface, Laid down BHA.

RUN # 14
ON
BHA BIT BIT JETS IAD SERIAL DEPTH (FT) DRIL BTM ROP
TYPE MADE GRADING
NO. NO. SIZE SIZE C NO.
IN OUT FT HR FT/HR
SDi519M
14 5RR1 SMITH 17½″ 7x14 535 JN1731 4472 556 1084 115 9.43 2–2–WT–A–X–I–BT–PR
HBP

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 98
DRILLING PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
7.9 41/185 3122 709

RUN SUMMARY
Ran in hole 17½” PDC Bit (RR) on directional BHA down to 4406ft. Drilled 17½” hole from 4472ft to 4683ft.
While drilling at 4476ft observed trip gas 48.5%. Conducted MWD survey @ 4546ft, Incl: 2.6, AZM: 126.2.
Drilled 17½" hole in Slide Mode from 4683ft to 4875ft. Conducted MWD survey. Last survey depth 4824ft.
Incl: 1.7°, AZM: 138.48°.
Drilled 17½" hole in Slide Mode from 4875ft to 4961ft. Conducted MWD survey. Survey depth 4919ft. Incl:
1.5°, AZM: 146.2°. Cirulated out 40bbl Hi-Vis pill till shakers clean. Performed wiper trip from 4961ft to
4434ft. while pulled out of hole, observed Maximum over pull of 15–20klbs. Drilled 17½" hole in Slide Mode
from 4961ft to 5230ft. Conducted MWD survey. Survey depth 5104ft. Incl: 2.0°, AZM: 170.8°. Drilled 17½"
hole from 5230 to 5392ft. Conducted MWD survey. Survey depth 5287ft. Incl: 1.8°, AZM: 179.98°. Drilled
17½” hole from 5392ft to 5516ft. MWD survey. Circulated out Hi-Vis pill till shakers clean, recorded SCR
and conducted flow check. Conducted wiper trip from 5516 to 4872ft. While pulled out of hole, observed
Maximum over pull of 20klbs. Pumped out from 5336ft to 5144ft and back reamed from 5144ft to 4962ft.
Drilled 17½” hole from 5516ft to 5529ft. Drilled 17½" hole in Slide Mode from 5529ft to 5532ft. Drilled 17½"
hole in Rotary Mode from 5532ft to 5556ft. (Due to low ROP and abnormal differential pressure, decided to
pull out of hole). Circulated out Hi-Vis pill till shakers clean prior to pull out of hole. Flow checkedOK.
Pulled out of hole17½” Bit from 5556ft to 1991ft (inside 20" Casing shoe). Flow checked – well static.Pumped
slug. Pulled out of hole17½” Bit from 1991ft to surface. Observed String Stab = 25% balled up and in gauged.
Laid down Bit, broke out Mud Motor and laid down the same.

RUN # 15
ON
BHA BIT BIT JETS IAD SERIAL DEPTH (FT) DRIL BTM ROP
TYPE MADE GRADING
NO. NO. SIZE SIZE C NO.
IN OUT FT HR FT/HR
SDi519M 2– 3– WT– G– X– 1– BT–
15 5RR2 SMITH 17½″ 3x14, 4x16 535 JN1731 5556 6515 959 49.6 19.33
HBP TD

DRILLING PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
8.1 41/138 3270 705

RUN SUMMARY
Made up 17½” PDC Bit (5RR2) and ran in hole on directional BHA down to bottom. Drilled 17½” hole from
5556ft to 5860ft. Conducted MWD survey. Drilled 17½” hole from 5860ft to 6090ft. Conducted MWD survey.
Pumped Hi-Vis pill. Flow check. Conducted wiper trip,Pulled out of hole to shoe, Serviced TDS braking
system and changing with new calipers. Repairing and maintenance of TDS braking system, function tested,
Ran in hole 17½” Bit from shoe down to 5529ft. (washed down from 5355ft to 5529ft) and ran in hole to
bottom. Drilled 17½” hole in Rotary Mode from 6090ft to 6427ft, Conducted MWD survey. Drilled 17½” hole
from 6427ft to 6515ft. Circulated out Hi-Vis till shaker clean. Pulled out of hole17½” Bit to Casing shoe
(while pulled out of hole, observed over pull of 20klbs, reamed back from 5932ft to 5155ft and pumped out
from 5155ft to 5061ft). Ran in hole again to bottom, while Ran in hole observed 20klbs compression @ 6066ft,
hard reamed from 6066ft to 6183ft and washed down from 6295ft to 6370ft. Circulated out Hi–Vis. Increased
mud weight from 12.5ppg to 12.7ppg, circulated to homogenize mud. Took SCR. Flow checked – well static.
Pulled out of hole17½” Bit to surface. Laid down Bit, NMDC, motor and flow sub. Observed stab = 17–5/16"

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 99
and 70% balled up. Bit: 60% balled up and observed 3 nozzles plugged with rubber element. Took SLM and
difference is 2.65ft. Drill pipes length: 5577.83ft Drill pipe, length with SLM: 5580.48ft.

WIRELINE LOGGING
Rigged up WDI Wireline. Rigged up shooting nipple and Wireline BOP and pressure tested BOP at 300psi
for 5min, Ok. Ran in hole Wireline logging suite (HMI–BHC–GR) and conducted Wireline logging. Pulled
out of holeWireline logging suit to surface.

RUN # 16
ON
BHA BIT BIT JETS SERIAL DEPTH (FT) DRIL BTM ROP
TYPE MADE IADC GRADING
NO. NO. SIZE SIZE NO.
IN OUT FT HR FT/HR
SDi519M 2– 3– WT– G– X– 1– BT–
16 5RR3 SMITH 17½″ 3x14, 4x16 535 JN1731 Condition Trip
HBP TD

RUN SUMMARY
Ran in hole 17½” PDC Bit with directional BHA (bent sub zero and without MWD) down to 1970ft (inside
20" CSG). Slipped 29.5ft of Drillline. Ran in hole 17½” Bit from 1970ft to 6515ft and tagged section TD.
Observed 15–20klbs compression at 6333ft, clear the same. Reamed and washed till bottom. Pumped 70bbl
Hi-Vis and circulated out to homogenize mud. Meanwhile reciprocating and rotating the string. Took SCR,
checked rig pump efficiency– 97%. Flow checked – well static. Pulled out of hole17½” Bit from 6515ft to
5494ft. Observed 15–20klbs over pull at intervals of 6342–6296ft, 6250–6245ft. Cleared the same with
reciprocation the string. Pulled out of hole to surface.

13 ⅜” CASING
Held Pre job safety meeting. Rigged up Weatherford TRS equipment and ran in hole 13⅜” (72 ppf, BTC, C–
95) Casing to 6515ft. Confirmed td @ 6515ft with circulation. Spaced out casing with shoe at 6512ft.
Recorded casing weight: Upward weight 470klbs.Downward weight 415klbs. Break circulated at 3000ft,
4500ft and 6000ft. Laid down casing Landing joint. Circulated to condition mud and reduced YP as per
cement job requirement. Meanwhile Rigged down WDI TRS equipment.

CEMENTING
Pressure testing cementing lines @ LP 500psi and HP 4000psi for 15mins. Held pre job safety meeting.
Pumped 155bbl of 14.3ppg spacer from rig pump and dropped bottom plug. Switched over to Dowel unit,
fly mixed and pumped lead slurry 1080bbl of 15.8ppg cement @ 5–6bpm from Dowel pumping unit
followed by 100bbl of 15.8ppg batch mixed tail slurry from Dowel pumping unit @ 5–6bpm. Dropped top
plug.Displaced cement with 10bbl of 14.3ppg spacer.switched over to rig pumps and pumped 942bbl of
12.7ppg mud, observed top plug not bumped. Pumped half shoe track volume (6bbl).Bleed off pressure
and observed no back flow.Received and dumped 159bbl of contaminated mud and spacer (13–13.6ppg) +
contaminated spacer and cement 19bbl (13.6–14ppg) and 251bbl neat cement (14.5ppg–15.5ppg). WOC.

WORKED ON WELL HEAD and BOP


Nippled down BOP stack. Rough cut 13⅜" Casing stub. Laid down 13⅜" Landing joint. Final cut and
dressed 13⅜" Casing stub. Installed 21¼” 5k x 13⅝" 10k casing head spool on 13⅜" Casing stub. Pressure
tested cavity @ LP 500psi for 5mins and HP 2000psi for 15mins, Ok. Pressure tested seal @ LP 500psi for
5mins and HP 2000psi for 15mins, Ok. Nippled up 13⅝" 10k BOP stack.

BOP PRESSURE TEST


Nippled up 13⅜”–10k BOP stack and function tested from rig floor, tool pusher panel and accumulator
unit. Ran in hole 1 stand of 5" HWDrill pipes + test plug + 1x 5" Drill pipes + 1 x 5" pup joint + side entry
sub + IBOP and seated test plug in Casing head housing. pressure tested BOP: 1st test: tested lower pipe
ram @ LP 300psi for Minimum and HP 7000psi for 10min, found Ok. 2nd test: tested upper pipe ram
against manual valve of kill line and upstream valve of chOke manifold @ LP 300psi for Minimum and HP
7000psi for 10min, found Ok. 3rd test: tested upper pipe ram against HCR valve of kill and chOke line @
LP 300psi for 5min and HP 7000psi for 10min, found Ok. 4th test: tested upper pipe ram against manual

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 100
valve of chOke line and NRV @ LP 300psi for 5min and HP 7000psi for 10min, found Ok. 5th test: tested
annular ram @ LP 300psi for 5min and HP 3500psi for 10min, found Ok. 6th test: tested blind ram @ LP
300psi for 5min and HP 7000psi for 10min, found Ok. Installed wear bushing.

4.4 12 ¼″ HOLE SECTION

Section Drilled : 6515ft to 12742ft


Section Length : 6227ft
Number of Bits : 06 NB, 7RR
9 ⅝″ Casing Shoe : 12737ft

MUD SUMMARY OF SECTION

Type : 7% KCl Polymer


Density : 12.7–13.6

RUN # 17
ON
BHA BIT BIT JETS SERIAL DEPTH (ft) DRIL BTM ROP
TYPE MADE IADC GRADING
NO. NO. SIZE SIZE NO.
IN OUT FT HR FT/hr
1–1–NO–A–1–I–NO–
17 07 GX03 BAKER 12 ¼″ 3x20 – 6067808 COC
BHA

RUN SUMMARY
Made up new 12¼” Tricon Bit on slick BHA and ran in hole down to 908ft (top of BHA) Break circulated
on top of BHA. Ran in hole 5" Drill pipes stands from 4143ft to 5919ft and is in progress. Break circulated @
5919ft. Drilled out cement + float collar and float shoe. Pressure tested casing at 2500psiOK. Conducted
shoe bond test with EMW 16.8ppg. Pulled out of hole to surface.

RUN # 18
DRI ON
BHA BIT MAD BIT JETS SERIAL DEPTH (ft) ROP
TYPE IADC L BTM GRADING
NO. NO. E SIZE SIZE NO.
IN OUT FT HR FT/hr
SMIT 6x14 JM3238 1– 3– CT– S– X– 1– BT–
18 8 MSI616 12 ¼″ – 6515 6615 100 11.09 9.0
H BHA

DRILLING PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
12 110 2090 621

RUN SUMMARY
Made up 12¼” PDC Bit # 08 (used at Jh and ial–1) and ran in hole down to 905ft (top of BHA). Break
circulated. Ran in hole 12¼” PDC Bit from 905ft to 6515ft. Drilled from 6515ft to 6615ft. Circulated to clean
hole prior to pull out of hole. Flow checked – well static. Pulled out of holefrom 6615ft to surface. Laid
down Bit.

RUN # 19
ON
BHA BIT MAD BIT JETS IAD SERIAL DEPTH (m) DRIL ROP
TYPE BTM GRADING
NO. NO. E SIZE SIZE C NO.
IN OUT FT HR FT/hr

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 101
SMIT 3x20 137 RH8471 5– 6– CT– A– E– I– WT–
19 9 SB137 12 ¼″ 6615 6828 213 37.18 19.1
H BHA

DRILLING PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
16 110 3076 621

RUN SUMMARY
Made up 12¼” Tricon Bit # 9 + Mud Motor + String Stab + NMDC + flow sub. Adjusted bent housing to
1.76°. Scribed MWD tool. Performed shallow function test Mud Motor and MWD tool @ 400GPM, 600psi,
Ok. Ran in hole 12¼” Tricon Bit # 9 to 965ft to 6615ft (hole free). Precautionary washed down last stand.
Drilled 12¼” hole with sliding/Rotary Mode from 6615ft to 6711ft. Drilled 12¼” hole with Rotary Mode
from 6711ft to 6725ft. Conducted MWD survey. Drilled 12¼” hole with slide and Rotary Mode from 6725ft
to 6818ft. Conducted MWD survey. Drilled 12¼” hole with slide and Rotary Mode from 6818ft to 6828ft.
Pumped 40bbls Hi-Vis pill and circulated to clean hole prior to pull out of hole. Flow checked – well static.
Pulled out of hole12¼” Tricon Bit from 6828ft to 6447ft (inside 13⅜" casing shoe). Serviced TDS. Pulled out
of holefrom 6447ft to 971ft (top of BHA). Pulled out of holesingle by single from 971ft to surface.

RUN # 20
ON
BHA BIT BIT JETS IAD SERIAL DEPTH (m) DRIL BTM ROP
TYPE MADE GRADING
NO. NO. SIZE SIZE C NO.
IN OUT ft HR ft/hr

VTD619DG 2–3–WT–G–X– I–NO–


20 10 VAREL 12 ¼″ 6x14 – 6014263 6828 8884 2056 158.53 12.9
X BHA

DRILLING PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)

9.4 110 3414 621

RUN SUMMARY
Made up 12¼" PDC Bit + 9⅝" Mud Motor + 12" String Stab + NMDC + flow sub. Adjusted bent housing to
1.22° and scribed MWD tool. Performed shallow function test Mud Motor and MWD tool @ 650GPM and
pressure 800–850psi, Ok. Ran in hole single by single down to 983ft (top of BHA). Ran in hole from 983ft to
6457ft (inside 13⅜" casing shoe) fill up string after every 15 stands. Slipped 27ft Drillline. Calibrated Petro
depth sensor. Ran in hole from 6457ft to 6736ft. Ran in hole 12¼” PDC Bit from 6736ft to 6828ft (Bottom)
Precautionary reamed down last stand. Broke Bit with low parameters. Drilled 12¼” hole with Rotary
Mode from 6828ft to 6925ft. Conducted MWD survey. Drilled 12¼” hole with Rotary Mode from 6925ft to
7016ft. Conducted MWD survey. Drilled 12¼” hole with Rotary Mode from 7016ft to 7030ft. Drilled 12¼”
hole with sliding mode from 7030ft to 7060ft. Drilled 12¼” hole with Rotary Mode from 7060ft to 7108ft.
Conducted MWD survey. Drilled 12¼” hole with Rotary Mode from 7108ft to 7117ft. Drilled 12¼” hole
with Rotary Mode from 7117ft to 7203ft. Conducted MWD survey. Survey depth 7146ft. Drilled 12¼” hole
with Rotary Mode from 7203ft to 7296ft. Conducted MWD survey. Survey depth 7238ft. Drilled 12¼” hole
with Rotary Mode from 7296ft to 7307ft. Drilled 12¼” hole with sliding mode from 7307ft to 7342ft. Drilled
12¼” hole with Rotary Mode from 7342ft to 7386ft. Conducted MWD survey. Survey depth 7328ft.
Circulated out Hi-Vis pill to clean hole. Performed wiper trip from 7386ft to 6645ft, Hole free. Drilled 12¼”
hole with Rotary Mode from 7386ft to 7400ft. Drilled 12¼” hole with Slide Mode from 7400ft to 7415ft.
Drilled 12¼” hole with Rotary Mode from 7415ft to 7479ft. Conducted MWD survey. Drilled 12¼” hole
with Rotary Mode from 7479ft to 7573ft. Conducted MWD survey. Drilled 12¼” hole with Slide Mode from

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 102
7573ft to 7600ft. Drilled 12¼” hole with Rotary Mode from 7600ft to 7650ft. Drilled 12¼” hole with Rotary
Mode from 7650ft to 7665ft. Conducted MWD survey. Drilled 12¼” hole with Rotary/Slide Mode from
7665ft to 7685ft. Drilled 12¼” hole with Rotary Mode from 7685ft to 7760ft. Conducted MWD survey.
Drilled 12¼” hole with Slide Mode from 7760ft to 7795ft. Drilled 12¼” hole with Rotary Mode from 7795ft
to 7852ft. Conducted MWD survey. Drilled 12¼” hole with Rotary Mode from 7852ft to 7860ft. Drilled 12¼”
hole with Slide Mode from 7860ft to 7885ft. Drilled 12¼” hole with Rotary Mode from 7885ft to 7945ft.
Conducted MWD survey. Circulated out Hi-Vis prior to perform wiper trip. Performed wiper trip from
7945ft to 7209ft, hole free. Ran in hole from 7209ft to 7945ft, hole free. Drilled 12¼” hole with Slide Mode
from 7945ft to 7973ft. Drilled 12¼” hole with Rotary Mode from 7973ft to 8039ft. Conducted MWD survey.
Drilled 12¼” hole with Rotary Mode from 8039ft to 8132ft. Conducted MWD survey. Drilled 12¼” hole
with Rotary Mode from 8132ft to 8140ft. Drilled 12¼” hole with Rotary Mode from 8140ft to 8231ft.
Conducted MWD survey. Drilled 12¼” hole with Rotary Mode from 8231ft to 8318ft. Conducted MWD
survey. Drilled 12¼” hole with Rotary Mode from 8318ft to 8394ft. Drilled 12¼” hole with Rotary Mode
from 8394ft to 8408ft. Conducted MWD survey. Drilled 12¼” hole with Rotary Mode from 8408ft to 8413ft.
Circulated out Hi-Vis prior to perform wiper trip. Performed wiper trip from 8413ft to 7855ft, hole free. Ran
in hole from 7855ft to 8413ft, (reamed down last single). Drilled 12¼” hole with Rotary Mode from 8413ft to
8502ft. Conducted MWD survey, drilled 12¼” hole with Rotary Mode from 8502ft to 8592ft. Conducted
MWD survey. Drilled 12¼” hole with Rotary Mode from 8592ft to 8633ft. Drilled 12¼” hole with Rotary
Mode from 8633ft to 8685ft. Conducted MWD survey. Drilled 12¼” hole with Rotary Mode from 8685ft to
8800ft. Conducted MWD survey. Drilled 12¼” hole with Rotary Mode from 8800ft to 8873ft. Conducted
MWD survey. Drilled 12¼” hole with Rotary Mode from 8873ft to 8883ft. Observed pressure increased
from 3650psi to 3800psi. Worked on string to stabilize pressure. Circulated out to stabilize pressure
meanwhile drilled 12¼” hole with Rotary Mode from 8883ft to 8884ft. Circulated out Hi-Vis prior to pull
out of hole. Flow checked, Ok,Pulled out of hole12¼” Bit from 8884ft to 960ft (top of BHA). Flow checked,
Ok. Pulled out of hole12¼” Bit from 960ft to surface. Laid down Bit + Mud Motor + MWD tools. Retrieved
wear bushing prior to pressure test BOP. Ran in hole 1 stand of 5" Drill pipes + test plug + 1 x 5" Drill pipes
+ 1 x pup joint 5" Drill pipes + side entry sub + IBOP and seated test plug in section B. Pressure tested BOP
as per plan. Retrieved testing plug and installed wear bushing. Laid down pressure test assembly.

RUN # 21
ON
BHA BIT BIT JETS IAD SERIAL DEPTH (ft) DRIL BTM ROP
TYPE MADE GRADING
NO. NO. SIZE SIZE C NO.
IN OUT ft HR ft/hr

1–1–ER–A–1–I–NO–
21 11 GF30BODVOPS VAREL 12 ¼″ 4x20 537 RH9061 8884 8951 68 34.15 1.99
BHA

DRILLING PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
18 110 3481 621

RUN SUMMARY
Made up 12¼" new Tricon Bit + 8" Mud Motor + String Stab + NMDC + flow sub. Scribed MWD tool and
Performed shallow function test Mud Motor and MWD tool @ 500GPM, 800psi, Ok. Ran in hole 12¼” Bit
down to 2274ft (fill up string after every 15 stands). Ran in hole 12¼” Tricon Bit from 2274ft to 6430ft.
Slipped 36ft of Drillline. Serviced and maintenance TDS. Ran in hole from 6430ft to 8884ft. Reamed down
from 8765ft to 8884ft. Drilled 12¼” hole with Rotary Mode from 8884ft to 8889ft. Drilled 12¼” hole in Slide
Mode from 8889ft to 8907ft. Drilled 12¼” hole in Rotary Mode from 8907ft to 8912. Drilled 12¼” hole in
Rotary Mode from 8912ft to 8928ft. Drilled 12¼” hole in Slide Mode from 8928ft to 8929ft. Drilled 12¼” hole
in Rotary Mode from 8929ft to 8934ft. Drilled 12¼” hole in Slide Mode from 8934ft to 8951ft. Observed no
drill off (00: 00hrs–3: 00hrs) decided to pull out of hole. Flow checked for 15min – well static. Pulled out of
hole5" Drill pipes from 8951ft to 5435ft and is in progress, (flow checked at 13⅜" Casing shoe, Ok). Pulled
out of hole12¼” Bit from 5435ft to surface. Laid down Bit + stabilizer. Laid down Mud Motor + MWD tools.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 103
RUN # 22

DRILL
ING PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
12.53 201.9 3238 683.3
RUN SUMMARY

Picked up 12¼” PDC Bit + 9⅝" Mud motor. Adjusted bent housing to 1.22° and scribed MWD tool. Ran in
hole down to 66ft. Shallow tested Mud motor, Made up 12¼” PDC Bit (RR1) with directional assembly and
ran in hole down to 6457ft, flow checked, Ok. Slipped 27ft of Drillline. Ran in hole 12¼” PDC Bit from 6457ft
to 8951ft, Reamed down last stand. Drilled 12¼” hole in Rotary Mode from 8951ft to 8955ft. Drilled 12¼”
hole in Slide Mode from 8955ft to 8968ft. Conducted MWD survey. Drilled 12¼” hole in Slide Mode from
8968ft to 8982ft. Drilled 12¼” hole in Rotary Mode from 8982ft to 9022ft. Drilled 12¼” hole in Slide Mode
from 9022ft to 9058ft. Drilled 12¼” hole in Rotary Mode from 9058ft to 9063ft. Conducted MWD survey.
Drilled 12¼” hole in Slide/Rotary Mode from 9063ft to 9078ft. Drilled 12¼” hole in Slide Mode from 9078ft
to 9084ft. Drilled 12¼” hole in Rotary Mode from 9084ft to 9135ft. Drilled 12¼” hole in Slide Mode from
9135ft to 9158ft. Conducted MWD survey. Drilled 12¼” hole in Rotary Mode from 9158ft to 9169ft. Drilled
12¼” hole in Slide Mode from 9169ft to 9196ft. Drilled 12¼” hole in Rotary Mode from 9196ft to 9252ft.
Conducted MWD survey @ 9192ft, Incl: 2.1°, AZM: 324.60°. Drilled 12¼” hole in Rotary Mode from 9252ft to
9262ft. Drilled 12¼” hole in Slide Mode from 9262ft to 9293ft. Drilled 12¼” hole in Slide Mode from 9293ft to
9311ft. Drilled 12¼” hole in Rotary Mode from 9311ft to 9345ft. Conducted MWD survey @ 9289ft, Incl: 1.5°,
AZM: 330.20°. Drilled 12¼” hole in Rotary Mode from 9345ft to 9364ft. Observed no drill off, decided to pull
out of hole. Conducted MWD survey @ 9304ft, Incl: 1.5°, AZM: 335.3°. (flow checked for 15min – well static).
Pulled out of hole12¼” PDC Bit from 9364ft to 9333ft. Observed Drawworks malfunctioning (fan sensor
resistor brake failure).Worked on Drawworks and fixed the same (Meanwhile circulating and rotating the
string). Pulled out of hole to surface and laid down BHA.

RUN # 23
ON
BHA BIT BIT JETS IAD SERIAL DEPTH (ft) DRIL BTM ROP
TYPE MADE GRADING
NO. NO. SIZE SIZE C NO.
IN OUT ft HR ft/hr

MDSI616L 1–2–CT–A–X–I–NO–
23 12 SMITH 12 ¼″ 6x16 – JM3239 9364 9690 326 67.81 4.80
B PX DTF

DRILLING PARAMETERS
WOB RPM SPP ON FLOW RATE
BHA BIT BIT JETS IAD SERIAL DEPTH (ft) DRIL BT ROP
TYPE MADE (GPM)GRADING
NO. NO. SIZE SIZE C NO. M
13.4 173 3289
IN OUT ft HR ft/hr 703

VTD619D 92.0
22 10RR1 VAREL 12 ¼″ 6x14 – 6014263 8951 9364 413 4.48
GX 1 5–8–BT–A–X– I–WT–PR

RUN SUMMARY
Made up new 12¼” PDC Bit and ran in hole to 9364ft. Drilled 12¼” from 9364ft to 9365ft. Broke Bit with low
parameters and drilled 12¼” hole in Rotary Mode from 9365ft to 9435ft. Conducted MWD survey @ 9377ft,
Incl: 1.9°, AZM: 334.4°. Drilled 12¼” hole in Rotary Mode from 9435ft to 9502ft. Drilled 12¼” hole in Slide
Mode from 9502ft to 9504ft. Drilled 12¼” hole in Rotary Mode from 9504ft to 9530ft. Conducted MWD

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 104
survey @ 9472ft, Incl: 2.2°, AZM: 335.8°. Drilled 12¼” hole in Rotary Mode from 9530ft to 9690ft. Attempted
to conduct survey, observed MWD tool malfunctioning. Pumped 30bbls Hi-Vis pill and circulated out to
clean hole prior to pull out of hole. Pulled out of hole to surface and laid down Bit and Mud motor.

RUN # 24
ON
DRI
BHA BIT BIT JETS IAD SERIAL DEPTH (ft) BT ROP
TYPE MADE L GRADING
NO. NO. SIZE SIZE C NO. M
IN OUT ft HR ft/hr

MDSI616 1– 2 – CT– A– X– I– PN–


24 12RR1 SMITH 12 ¼″ 6x16 _ JM3239 9690 10556 866 150 5.77
LBPX BHA

DRILLING PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
10 60/145 3447 681

RUN SUMMARY
Made up 12¼” Tricon Bit + 9⅝" Mud Motor + 12⅛" String Stab + NMDC + flow sub. Adjusted bent housing
to 1.5° and scribed MWD tool. Performed shallow function test Mud Motor and MWD tool @GPM: 650 and
SPP: 920psi, Ok. Pulled back and laid down Tricon Bit. Made up new 12¼” PDC Bit (RR) and ran in hole to
9690ft. Drilled 12¼” from 9690ft to t to 9811ft in Rotary/Slide Mode. Conducted MWD survey @ 9750ft,
Incl: 2.0°, AZM: 334.20°. Drilled 12¼” from 9811ft to 9954ft in Rotary/Slide mode. Conducted MWD survey
@ 9846ft, Incl: 2.0°, AZM: 334.36°. Drilled 12¼” from 9954ft to 10058ft in Rotary/Slide mode. Conducted
MWD survey @ 9945ft, Incl: 1.5°, AZM: 337.36°. Drilled 12¼” hole in Rotary Mode from 10058ft to 10105ft.
Conducted MWD survey @ 10031ft, Incl: 0.9°, AZM: 330.06°. Drilled 12¼” hole in sliding mode from
10105ft to 10120ft. Observed 2bbl gain on mud tank. Maximum gas: 12.46% and Minimum cut wt 12.5ppg.
Flow checked for 30min, well trickling @ 4.5 BPH. Total gain 8bbls. Circulated for bottom up. Observed
Maximum gas: 11.49% and Minimum cut wt: 12.5ppg. Drilled 12¼” hole in sliding mode from 10120ft to
10147ft. Mud wt increased from 12.9ppg to 13ppg. Drilled 12¼” hole in sliding mode from 10147ft to
10180ft. Drilled 12¼” hole in Rotary Mode from 10180ft to 10189ft. Conducted MWD survey @ 10126ft, Incl:
0.4°, AZM: 265.16°. Pumped 30bbls Hi-Vis pill and circulated out to clean hole prior to perform wiper trip.
Flow checked – well static. Performed wiper trip from 9531ft to 10189ft (hole free). Drilled 12¼” hole in
Rotary Mode from 10189ft to 10283ft. Observed Maximum trip gas: 24.55% and Minimum cut wt: 12.6ppg.
Conducted MWD survey @ 10217ft, Incl: 1.0°, AZM: 202.86°. Conducted MWD survey @ 10315ft, Incl: 1.2°,
AZM: 208.76°. Drilled 12¼” hole in Rotary Mode from 10377ft to 10405ft. Drilled 12¼” from 10405ft to
10546ft in Rotary and slide mode. Conducted MWD survey, observed formation gas. Maximum 64.6% with
minimum cut mud weight 11.7ppg, Flow check well trickling with 3bbl/hr. Closed BOP. Recorded SICP:
50psi. Circulated out for bottoms up through poor boy°asser. Circulated for bottom up through poor
boy°asser and observed Maximum gas 72% with minimum cut mud weight 10.7ppg. Stopped pump and
close the well. Recorded SICP: 280psi and SIDP: 220psi. Held pre job safety meeting, started killing well
with driller method. Pumped kill mud of 13.4ppg, ICP: 650psi, FCP: 444psi. Maintained pressure from ICP
to FCP till surface to Bit. Maintained FCP till Bit to surface.Minimum mud cut = 10.8ppg, Maximum TG =
72%. After complete cycle, observed shut in pressure recorded SICP: 0psi and SIDPP = 0psi. Opened BOP,
Picked up string and rotate found free. Flow checked for 30min – well static. Pumped 40bbl Hi-Vis and
circulated out to homogenize mud. Took check shot (survey): Survey depth: 10,482ft, Incl: 1.4°, AZM:
217.16°. Flow checked, Ok. Pulled out of holefrom 10546ft to 10095ft (5 stands). Flow checked for 30min,
well trickled with 2 BPH. Ran in hole from 10095ft to 10,546ft. Drilled 12¼” hole in Rotary Mode from
10546ft to 10556ft. (meanwhile increased mud weight from 13.4ppg to 13.6ppg.) Circulated out to
homogenize mud. Took SCR. Flow checked – well static. Pulled out of holefrom 10546ft to 10095ft (5
stands). Flow checked for 20min – well static. Pulled out of hole12¼” PDC Bit from 10095ft to surface.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 105
BOP PRESSURE TEST
Made up BOP pressure tested assembly 1 stand of 5” Drill pipes + test plug + 1 x 5" Drill pipes + 1 x pup
joint 10" + side entry sub + safety valve + 5" pup joint and seated test plug in well head. Pressure tested
BOP. 1st test: tested lower pipe ram against HCR TDS valve @ LP 300psi for 5min. and HP 7000psi for
10min. found Ok. 2nd test: Tested upper pipe ram against HCR of kill line and HCR of chOke line and
manual TDS valve @ LP 300psi for 5min and HP 7000psi for 10min. found Ok. 3rd test: tested upper pipe
ram against kill line and chOke line manual valve and safety valve @ LP 300psi for 5min. and HP 7000psi
for 10min. 4th test: tested annular ram @ LP 300psi for 5min. and HP 3500psi for 10min. found Ok. 5th test:
Tested blind ram against NRV and chOke manifold coflex hose @LP 300psi for 5min and HP 7000psi for
10min. found Ok, retrieved testing plug and installed wear bushing. Laid down pressure test assembly.

RUN # 25
ON
BHA BIT BIT JETS IAD SERIAL DEPTH (ft) DRIL ROP
TYPE MADE BTM GRADING
NO. NO. SIZE SIZE C NO.
IN OUT ft HR ft/hr

MDSI616
25 12RR2 SMITH 12 ¼″ 6x16 _ JM3229 10556 11380 824 181.3 4.54 2–3–CT–A–X–I–WT–DTF
LBPX

DRILLING PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
9 58/201 3394 635

RUN SUMMARY

Made up 12¼” Tricon Bit + 8½” Mud Motor + 12.18" String Stab + NMDC + flow sub. Adjusted bent
housing to 1.22° and scribed MWD tool. Performed shallow function test Mud Motor and MWD tool
@GPM: 450 and SPP: 500psi, Ok. Pulled back and laid down Tricon Bit. Made up 12¼” PDC Bit # 12 (RR2)
with directional assembly + new BHA and ran in hole down to 6362ft (inside Casing shoe). Slipped 33ft of
Drillline. Changed wash pipe. Serviced and lubricated TDS. Ran in hole from 6362ft to 10556ft. (washed
down last stand). Drilled 12¼” hole in Rotary Mode from 10556ft to 10558ft. Circulated out gas with
Maximum gas 27% and Minimum cut mud weight 12.7ppg. Closed BOP and circulated out through poor
boy°asser while observed Maximum gas 32% and Minimum cut mud weight 12.5ppg. Drilled 12¼” hole in
Rotary Mode from 10558ft to 10564ft. Conducted MWD survey @ 10506ft, Incl: 1.4°, AZM: 216.90°. Drilled
12¼” hole in Rotary Mode from 10564ft to 10612ft. Drilled 12¼” hole in Rotary Mode from 10612ft to
10661ft. During drilling at 10,636ft, observed Maximum gas 20.5% with minimum cut mud weight 13.3ppg.
Conducted MWD survey @ 10604ft, Incl: 1.4°, AZM: 216.56°. Drilled 12¼” hole in Rotary Mode from
10661ft to 10721ft. Drilled 12¼” hole in Rotary Mode from 10721ft to 10756ft. Conducted MWD survey @
10698ft, Incl: 1.4°, AZM: 213.10°. Drilled 12¼” hole in Rotary Mode from 10756ft to 10835ft. Drilled 12¼”
hole in Rotary Mode from 10835ft to 10849ft. Conducted MWD survey @ 10791ft, Incl: 1.5°, AZM: 214.86°.
Drilled 12¼” hole in Rotary Mode from 10849ft to 10939ft. Drilled 12¼” hole in Rotary Mode from 10939ft
to 10942ft. Conducted MWD survey @ 10885ft, Incl: 1.6°, AZM: 211.2°. Drilled 12¼” hole in Rotary Mode
from 10942ft to 10945ft. During drilling observed pressure dropped from 3400psi to 3000psi. Stopped
drilling and Picked up string. Checked surface equipment and found Ok. Meanwhile kept string in
reciprocation. Observed pressure further dropped to 2400psi from 3000psi. Decided to pull out of hole to
check drill string. Flow checked – well static. WetPulled out of hole12¼” Bit from 10945ft to 4260ft.
(observed tight spot of 20–25klbs @ 10960', 8601', 6633'. Cleared the same with reciprocation) Found wash
out in 5" Drill pipes body (joint # 107, hole depth: 4295ft) replaced the joint. Ran in hole 12¼” Bit from
4260ft to 6454ft. (inside 13⅜" casing shoe) Slipped 23ft Drillline. Ran in hole 12¼” Bit from 6454ft to 6639ft.
Circulated to check pressure and observed constant pressure during circulation. GPM: 400, SPP: 1070psi.
GPM: 640, SPP: 2400psi Ran in hole 12¼” Bit from 6639ft to 10945ft. Washed down last stand. Drilled 12¼”
hole in Rotary Mode from 10945ft to 10948ft. Circulated out gas with Maximum gas 37% and Minimum cut
mud weight 12.4ppg. Closed annular bop and circulated out through poor boy°asser while observed
Maximum gas 54% and Minimum cut mud weight 12.8ppg. (Reciprocated string intermittently). Drilled

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 106
12¼” hole in Rotary Mode from 10948ft to 10970ft. Drilled 12¼” hole in Rotary Mode from 10970ft to
11035ft. Conducted MWD survey @ 10979ft, Incl: 1.8°, AZM: 208.8°. Drilled 12¼” hole in mode from
11035ft to 11075ft. Drilled 12¼” hole in Rotary Mode from 11075ft to 11100ft. Drilled 12¼” hole in Slide
Mode from 11100ft to 11,101ft. (due to less ROP, ends Slide Mode and resumed rotation mode). Drilled
12¼” hole in Rotary Mode from 11,101ft to 11128ft. Conducted MWD survey @ 11074ft, Incl: 1.8°, AZM:
205.76°. Drilled 12¼” hole in Rotary Mode from 11128ft to 11178ft. Drilled 12¼” hole in Rotary Mode from
11178ft to 11191ft. Drilled 12¼” hole in Slide Mode from 11191ft to 11194ft. Drilled 12¼” hole in Rotary
Mode from 11194ft to 11207ft. Drilled 12¼” hole in Slide Mode from 11207ft to 11208ft. Drilled 12¼” hole in
Rotary Mode from 11208ft to 11225ft. Conducted MWD survey @ 11172ft, Incl: 2.1°, AZM: 203.0°. Drilled
12¼” hole in Rotary Mode from 11225ft to 11255ft. Drilled 12¼” hole in Rotary Mode from 11255ft to
11311ft. (during drilling at 11311ft, observed TDS stalled and string got stuck). Made several attempts to
release stuck string with maximum over pull 60klbs, Maximum compression 30klbs and Maximum TRQ =
15–20ft.klbs, GPM = 400, SPP: 1900–2000psi. Observed string free. Reamed and cleaned complete stand.
Drilled 12¼” hole in Rotary Mode from 11311ft to 11317ft. Conducted MWD survey @ 11262ft, Incl: 2.2°,
AZM: 201.30°. Drilled 12¼” hole in Rotary Mode from 11317ft to 11360ft. Drilled 12¼” hole in Rotary Mode
from 11360ft to 11380ft. Circulated out Hi-Vis pill to clean hole prior to pull out of hole. Pulled out of
hole12¼” PDC Bit from 11380ft to 6407ft (inside 13⅜” casing shoe) flow checked – well static. Pulled out of
holefrom 6407ft to 978ft (top of BHA) flow checked well static. Pulled out of holesingle by single from 978ft
to surface. Laid down 12¼” PDC Bit + 8½” Mud Motor +MWD tool + flow sub + 14 x 8" Drill collars +
Drilling jar + 15 x 5" Heavey drill pipes. Found MWD tool head and flow sub seat area wash out. Made up
12¼” Tricon Bit + 9⅝" Mud Motor + X–Over + 12⅛" String Stab + NMDC + Flow sub. Adjusted bent
housing to 1.22° and scribed MWD tool. Performed shallow function test Mud Motor and MWD tool
@GPM: 515 and SPP: 650psi, Ok. Pulled back and laid down Tricon Bit.

RUN # 26
ON
BHA BIT MAD BIT JETS IAD SERIAL DEPTH (ft) DRIL BTM ROP
TYPE GRADING
NO. NO. E SIZE SIZE C NO.
IN OUT ft HR ft/hr

MDSI616 SMIT
26 13 12 ¼″ 6x16 _ JM9025 11380 12678 1298 180.21 7.20 2–3–BT–A–X–I–CT–BHA
LBPX H

DRILLING PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
14 39/181 3240 627
RUN SUMMARY
Made up new 12¼” PDC Bit # 13 with directional assembly and ran in hole single by single down to 605ft.
Ran in hole 12¼" PDC Bit # 13 with directional assembly single by single from 605ft to 978ft (top of BHA).
Ran in hole 12¼" PDC Bit # 13 with directional assembly down to from 978 to 6455ft (inside Casing shoe).
Slipped 27ft of Drillline and cut 95ft. Ran in hole 12¼" PDC Bit from 6455ft down to 11281ft Reamed and
washed down from 11281ft to 11380ft. Circulated out Hi–Vis. Observed Maximum gas 37 and Minimum
cut Mud weight 12.3ppg. Broke Bit with low parameter. Drilled 12¼" hole in Rotary Mode from 11,380ft to
11,410ft. Conducted MWD survey @ 11348ft, Incl: 2.0°, AZM: 193.60°. Drilled 12¼" hole in Rotary Mode
from 11,410ft to 11,420ft. 12¼" hole in Slide Mode from 11,420ft to 11,436ft. Drilled 12¼" hole in Slide Mode
from 11,436ft to 11,475ft. Drilled 12¼" hole in Rotary Mode from 11,475ft to 11,505ft. Conducted MWD
survey @ 11445ft, Incl: 1.4°, AZM: 184.0°. Drilled 12¼" hole in Rotary Mode from 11,505ft to 11,582ft. Drilled
12¼" hole in Rotary Mode from 11,582ft to 11,599ft. Conducted MWD survey @ 11540ft, Incl: 1.0°, AZM:
174.56° Drilled 12¼" hole in Rotary Mode from 11,599ft to 11,610ft. Drilled 12¼" hole in Slide Mode from
11,610ft to 11,647ft. Drilled 12¼" hole in Rotary Mode from 11,647ft to 11,689ft. During drilling observed
pressure dropped from 3400psi to 3000psi. Stopped drilling and Picked up string. Checked mud pumps,
surface equipment, found Ok. Meanwhile kept string in reciprocation. Observed pressure further dropped
from 3000psi to 2400psi. Decided to pull out of hole to check drill string. Conducted MWD survey @

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 107
11633ft, Incl: 0.8°, AZM: 150.80°. Flow checked – well static. WetPulled out of hole12¼" PDC Bit from
11689ft to 6420ft. Wet pulled out of hole12¼" PDC Bit from 6420ft to 4915ft.Found wash out in 5" Drill pipes
body (joint # 128, hole depth: 4948ft) replaced the joint. Slipped drill line. Ran in hole 12¼" Bit from 6454ft
to 6732ft.Circulated out to check pressure, Ok. Ran in hole 12¼" Bit from 6732ft to 11,689ft.Washed down
last stand. Drilled 12¼" hole in Rotary Mode from 11,689ft to 11,694ft Circulated out gas with maximum gas
41% and minimum cut mud weight 12.4ppg. (Reciprocated string intermittently). Drilled 12¼" hole in
Rotary Mode from 11,694ft to 11,790ft. Conducted MWD survey @ 11730ft, Incl: 0.5°, AZM: 141.06°. Took
SCR. Drilled 12¼" hole in Rotary Mode from 11,790ft to 11,823ft. Drilled 12¼" hole in Rotary Mode from
11823ft to 12050ft. Drilled 12¼" hole in Rotary Mode from 12050ft to 12193ft. Observed Tr – 5% Pressure
and Mechanical Caving during drilling. Drilled 12¼" hole in Rotary Mode from 12193ft to 12300ft.
Conducted Survey @ 12207ft, Incl: 0.7 AZM: 337.56 TVD: 12195ft. Drilled 12¼" hole in Rotary Mode from
12300ft to 12450ft. Conducted Survey @ 12297ft, Incl: 0.9 AZM: 336.06 TVD: 12195ft. Drilled 12¼" hole in
Rotary Mode from 12450ft to 12584ft. Conducted Survey @ 12486ft, Incl: 1.2 AZM: 322.66 TVD: 12473.90ft.
Drilled 12¼" hole in Rotary Mode from 12584ft to 12678ft. Conducted Survey @ 12579ft, Incl: 1.1 AZM:
315.06 TVD: 12566.88ft. Circulated out 50bbl Hi-Vis pill to clean hole prior to pull out of hole for BOP
pressure test. Flow checked – well static. Pulled out of hole12¼" Bit from 12678ft to 9118ft. Pulled out of
hole12¼˝ Bit and Directional BHA from 12678ft to surface. Pressure tested BOP. Performed Shallow test of
Mud motor and MWD tool.

RUN # 27

ON
BHA BIT MAD BIT JETS IAD SERIAL DEPTH (ft) DRIL BTM ROP
TYPE GRADING
NO. NO. E SIZE SIZE C NO.
IN OUT ft HR ft/hr

MDSI616 SMIT
27 13RR 12 ¼″ 6x16 _ JM9025 12678 12642 64 16.8 3.80 2–3–BT–A–X– I–CT–TD
LBPX H

DRILLING PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
13.5 39/181 3497 604

RUN SUMMARY
Ran in hole12¼" RR PDC Bit with directional BHA down to 8958. Ran in hole 12¼" Bit from 8958ft to
12670ft. Hard reamed from 12670ft down to 12678ft. Pumped 30bbl Hi-Vis pill. Observed trip gases at
bottom up. Circulated out trip gases. Observed maximum gas: 51% and minimum Mud cut wt: 12ppg.
Drilled 12¼" hole in Rotary Mode from 12678ft to 12736ft. Conducted Survey @ 12672ft, Incl: 1.0 AZM:
333.90 TVD: 12659.86ft. Drilled 12¼" hole in Rotary Mode from 12736ft to 12742ft (Section TD). Circulated
bottom up. Conducted Survey @ 12687ft, Incl: 0.9 AZM: 332.70 TVD: 12674.86ft. Performed wiper trip from
12742ft to 6646ft. Ran in hole back from 6646ft to 12742. Pumped 50bbl Hi-Vis pill. Circulated bottom up.
Observed maximum trip gas: 75.3% and minimum Mud cut wt: 13.1ppg. Circulated till mud wt
homogenized. Flow checked – well static. Pull out of holePulled out of hole12¼" Bit from 12742ft to 4413ft.
Pulled out of hole12¼” Bit from 4413ft to Surface. Laid down BHA and directional assembly

WIRELINE LOGGING RUN 1


Conducted Wireline logs (HMI–BHC–GR). Pulled out of holeWireline logging suit to surface. Flow checked
for 30 min, well trickled @ 2.2bbl/hr. Logger depth = 12,756ft. Borehole volume = 5910³. Integrated cement
volume = 2800³ AVG. Hole size = 13.024". Rigged down WDI Wireine Logging equipment. maximum
deviation = 5.674° @ 8767ft, maximum AZI = 369.97° @ 6877ft. Bottom hole temp = 224.7 F

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 108
RUN # 28

ON
DEPTH (ft) DRIL ROP
BHA BIT BIT JETS SERIAL BTM
TYPE MADE IADC GRADING
NO. NO. SIZE SIZE NO. FT/H
IN OUT FT HR
R
2–3–BT–A–X– I–
MDSI616
28 3RR2 SMITH 12 ¼″ 6x16 _ JM9025 Condition Trip CT–LOG
LBPX

PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
– 54/137 3270 566

RUN SUMMARY
Ran in hole 12¼”PDC Bit down to 12742ft. Pumped 40bbl Hi-Vis pill and circulated to increase Mud
weight from 13.6ppg to 14.0ppg. During circulation, observed pressure dropped from 3200psi to 2200psi.
Checked surface equipments, found Ok. Decided to pull out of hole to check suspected drill string wash
out. Pulled out 12¼”“ Bit from 12742ft to 6013ft. Found wash out in 5" Drill pipe body (joint # 163, hole
depth = 6727ft), replaced the same. Ran in hole 12¼” Bit from 6013ft to 12742ft. Circulated out to check
pressure at 6553ft, Ok. Circulated out to increase mud weight from 13.6ppg to 14.0ppg. MW In/Out:
14.0ppg/14.0ppg. Pulled out 12¼” PDC Bit from 12,742ft to 11,779ft to Surface.

WIRELINE LOGGING RUN 2


Held pre job safety meeting. Make up and ran in hole Wireline logging Suite (Run # 2: Density Log) down
to 4500ft, checked tool prior to enter in open hole, Caliper malfunctioned. Pulled out logging tool to surface
and rectified the problem. Ran in hole density log down to 12,750ft (logger depth) and conducted logging.
Pulled out log to surface. Make up Wireline logging suite (Run # 3: Resistively Log) and ran in hole down
to 12,750ft (logger depth), Conducted logging and Pulled out to surface. Rig down WDI Wireline Tools.

RUN # 29

ON
BHA BIT BIT JETS SERIAL DEPTH (ft) DRIL ROP
TYPE MADE IADC BTM GRADING
NO. NO. SIZE SIZE NO.
IN OUT FT HR FT/HR
3–4–BT–A–X–
MDSI616
29 3RR3 SMITH 12 ¼″ 6x16 _ JM9025 Condition Trip I–CT–TD
LBPX

PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
– 80/157 3100 514

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 109
RUN SUMMARY
Made up 12¼” PDC Bit and ran in hole from Surface to 12742ft. Circulated out 40bbl Hi-Vis to clean hole
prior to pull out of hole. Observed maximum trip gas: 7.1%. Flow checked– well static. Pulled out of hole
12¼” from 12742ft to Surface. Flow checked at top of BHA – Ok. Laid Down 8” Drill Collars, Directional
assembly. Laid down 8” Drill collar and directional assembly.

9⅝” CASING
Changed Rams to 9⅝”. Pressure tested the Same. Rigged up WDI TRS equipments. Held pre job safety
meeting. Made up and ran in hole shoe track (length=126.50') down to 126.50ft. Applied baker seal lock to
shoe track. Checked integrity of float shoe and float collar, found Ok. Continued to run in hole 100 x
9⅝”CSG (53.5 PPF, C–95, NSCC) joints down to 8078ft (Filled up Casing after every 15 joints). Continued to
run 9⅝" casing (53.5#, C–95, NSCC) from 8078ft to bottom. Confirmed TD with 15klbs @ 12742ft with
circulation. Spaced out casing with shoe at 12737ft. Circulated to condition mud and reduced YP as per
cement job requirement (GPM = 330, SPP = 725psi). Meanwhile Rigged down WDI TRS equipment.

CEMENTING

1st stage cement job


Prepared mixed fluid for cement job. (Observed 2.2% gas at bottom up). Rigged up dowel surface lines and
pressure tested the same @ low 500psi and high 4000psi, hold for 10 minutes, Ok. Held pre job safety
meeting. Pumped 150bbl of 14.8ppg spacer. Dropped by pass plug and installed circulating head. Fly mixed
and pumped 235bbl of 15.8ppg lead slurry @ 5–6bpm. Pumped lead slurry 235bbl of 15.8ppg and tail slurry
270bbl of 16.2ppg from SLB (Dowell) pumping unit @ 5–6bpm. Dropped shut–off plug. Displaced cement
with 10bbl of 14.8ppg spacer. Pumped 898bbl of 14ppg Mud, Observed Plug not bumped. Obesrved no
back flow. Dropped opening bomb. Opened DV ports @ 850psi and established circulation. Circulated
through DV ports. Picked up BOP, slacked 20% weight (110klbs) of casing. Set 9⅝" casing slip and seal
assembly. Landed casing in 80% tension (490klbs) in 13⅝” 10k casing spool. Observed well flowing while
landing casing. WOC. Resumed circulation through side outlet of 13⅝”10k casing spool. Flow checked, well
flowing @ 12bbl/hr. decided to increase mud weight from 14ppg to 15ppg. During circulation, observed
maximum gas 23.3% and minimum cut Mud weight 13.3ppg. Circulated to homogenize mud.
Circulated out to homogenize/increase Mud weight from 15ppg to 15.5ppg, observed maximum gas 8%.
Flow checked, well flowing @ 4.5 BPH. Circulated out to homogenize/increase Mud weight from 15.5ppg
to 16.0ppg, observed maximum gas 36% and minimum cut Mud weight 13.8ppg. Flow checked, well
flowing @ 3bph. Circulated out to homogenize/increase Mud weight from 16ppg to 17ppg, observed
maximum gas 22.7% and minimum cut Mud weight 15.7ppg. Mud weight in/out: 17ppg/16.9ppg.
Circulation to homogenize Mud, meanwhile cut cement + Hematite prior to blend for 2nd stage cement job.
Circulated out to homogenize Mud, meanwhile Prepared blend of cement + Hematite and dispatched to Slb
laboratory for testing. Prepared 160 bbls of 17.6ppg spacer for 2nd stage cement job.

2st Stage Cement Job


Circulated and homogenized mud weight to 17ppg. Rigged down circulation head and. Rigged up dowell
cementing head. Pressure tested dowell surface cementing lines @ low pressure 500psi and high pressure
4000psi for 15 mins, Ok. Continued circulation mean while prepared mix fluid. Held HELD PRE JOB
SAFETY MEETING. Pumped 100 bbls of 17.6ppg spacer from rig pump. Pumped 290 bbl of 18.2ppg lead
cement slurry @ 5-6 BPM, followed by 100 bbl of 18.2ppg batch mixed tail slurry from SLB pumping unit @
5-7 BPM. Dropped closing plug and displaced cement with 4 bbl of spacer from SLB pumping unit
followed by 449 bbl of 17.0ppg mud. Bumped closing plug (92 % pump efficiency), increased pressure to
2500psi and hold pressure for 30 mins, Ok. Bleed off pressure and observed no back flow. Received and
dumped 100 bbls of contaminated spacer (17.7-18ppg) and 183 bbls of neat cement (18.2ppg) while
displacement. Applied and maintained 300psi pressure to annulus (13-3/8" x 9⅝") by dowell pumping unit.

WORKED ON WELL HEAD and BOP


Worked on well head. Nippled up 13⅝" 10k x 11"-10k casing spool. Pressure tested well head. Pressure
tested 9⅝" stub seal and slip seal assembly at 2500psi for 30 mins, Ok. Made up BOP Pressure tested
assembly (1 stand of 5" HWDP + test plug + 1 x 5" Drill pipes + 1 x pup joint 5" Drill pipe+ side entry sub +
IBOP) and seated test plug in well head. 1st Test : tested lower pipe ram against IBOP valve @ LP 300psi for

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 110
5min and HP 7000psi for 10min, Ok. 2nd Test : tested annular ram @ LP 300psi for 5min. and HP 3500psi
for 10 min, found Ok. 3rd Test: tested upper pipe ram against TDS manual valve and HCR of kill line and
HCR of choke line @ LP 300psi for 5min and HP 7000psi for 10 mins, Ok. 4th Test : tested upper pipe ram
against safety valve, kill line and choke line manual valve @ LP 300psi for 5min and HP 7000psi for 10 min,
Ok. 5th Test: tested blind ram against NRV valve and choke manifold coflex hose, observed pressure drop.
checked seal of plug tester, Ok. Conducted the same test @ LP 300psi for 5min and HP 7000psi for 10min,
Ok. Retrieved testing plug and installed wear bushing. Laid down pressure test assembly. Replaced saver
sub, lower and upper IBOP of TDS. Nippled up DSA, BOP stack and bell nipple.

CUT OF CEMENT
Ran in hole 8½” Tricone bit from 4430ft to 6402ft. Washed down last stand and tagged closing plug with
6-7klbs. Circulated out/homogenized to reduce mud weight from 17ppg to 14ppg. Pressure tested casing
above DV at 2500 psi for 15min (with 500 psi increment), Ok. Drilled closing plug, opening bomb and DV
from 6402ft down to 6404ft. Received rubber and metallic junk at shakers. Ran in hole 8½” Tricone bit from
6404ft to 11890ft. Got obstruction and chased down opening bomb pieces @ 11890ft. Washed down from
11890ft to 12330ft. Tagged hard cement @ 12330ft. Drilled out hard cement from 12330ft to 12537ft.

4.5 8½″ HOLE SECTION

Section Drilled : 12742ft to 14586ft


Section Length : 1844ft
Number of Bits : 05 NB, 7RR
7” Casing Shoe : 14586ft

MUD SUMMARY OF SECTION

Type : KCl Polymer


Density : 11–13 ppg

RUN #30
DEPTH ON
BHA BIT BIT JETS IAD SERIAL DRIL ROP
TYPE MADE (FT) BTM GRADING
NO. NO. SIZE SIZE C NO.
IN OUT FT HR FT/HR

30 14 FDS+VPS SMITH 8½” 3x20 117 PZ4568 COC 4-5-CT-A-4 I-NO-HR

PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
– - - -

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 111
RUN SUMMARY
Made up new 8½” Tricone bit # 14 on slick BHA (bit sub + 18 x 6½" DC + d/jar + 2 x 6½" Dc + 15 HWDP)
and Ran in hole single by single down to 1084ft (top of BHA). Ran in hole 8½” Tricone bit from 1084ft to
6402ft. Washed down last stand and tagged closing plug with 6-7klbs. Circulated out/homogenized to
reduce mud weight from 17ppg to 14ppg. Pressure tested casing above DV at 2500 psi for 15min (with 500
psi increment), Ok. Drilled closing plug, opening bomb and DV from 6402ft down to 6404ft. Received
rubber and metallic junk at shakers. Ran in hole 8½” Tricone bit from 6404ft to 11890ft. Got obstruction and
chased down opening bomb pieces @ 11890ft. Washed down from 11890ft to 12330ft. Tagged hard cement
@ 12330ft. Drilled out hard cement from 12330ft to 12600ft. Pumped Hi − Vis and circulated out to
homogenize mud prior to pressure test casing. Pressure tested Casing (10ft above baffle collar) at 2500psi
for 15 min(with 500psi increment), Ok. Drilled out hard cement from 12600ft to 12731ft (6ft above shoe).
Pressure tested Casing at 2500psi for 15 minimum (with 500psi increment), Ok. Pulled out of hole 8½" Bit
from 12,731ft to surface.

RUN #31
DEPTH ON
BHA BIT BIT JETS IAD SERIAL DRIL ROP
TYPE MADE (FT) BTM GRADING
NO. NO. SIZE SIZE C NO.
IN OUT FT HR FT/HR
14RR FDS+VPS 3x20 117 PZ4568
31 SMITH 8½” SCRAPER 1-1-WT-A-E-I-NO-LOG
1

PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
– - - -

RUN SUMMARY
Made up 9⅝” Casing scrapper and ran in hole down to 12600ft. Slipped 33ft of drill line. Ran in hole 8½” bit
with 9⅝" casing scrapper from 12600ft to 12731ft (PBTD). Washed down last two stands. Circulated out Hi
− Vis to clean hole prior to pull out of hole for logging. Pulled out of hole 8½ bit with 9⅝" Casing scrapper
to surface.

WIRELINE LOGGING
Held pre job safety meeting. Picked up WFD BOP on 7" shooting nipple and tested the same @ 300psi, Ok.
Rigged up Made up logging suite and ran in hole logging suite (CBL − VDL − CCL − GR) down to 12738ft
and conducted logging. Logger depth = 12738ft. Rigged down WFD logging equipment.

RUN #32

ON
BHA BIT MAD BIT JETS IAD SERIAL DEPTH (ft) DRIL BTM ROP
TYPE GRADING
NO. NO. E SIZE SIZE C NO.
IN OUT ft HR ft/hr
SMIT
32 14RR2 FDS+VPS 8½” 3x20 117 PZ4568 12472 12958 216 62.50 3.46 4-5-CT-A-4-I-NO-HR
H

PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 112
23.5 61/85 1790 452

RUN SUMMARY
Made up and ran in hole 8½" Tricone bit down to 1300ft. (Picked up new 6½" drilling jar), slipped 45ft and
cut 90ft drill line. Lubricated TDS and adjusted Petro depth sensor. Ran in hole 8½" Triconebit from 1300ft
to 12731ft. Washed down last stand. Circulated to homogenize mud prior to displace mud with 11ppg mud
(7% KCl polymer/NDM. Pumped 130 bbls Hi-Vis pill and displaced hole with 11ppg mud (7 % KCl
polymer/NDM). Drilled out cement from 12731ft to 12737ft and tagged float shoe. Drilled float shoe and
cement (rat hole ) down to 12742ft. Drilled 8½" hole from 12742ft to 12886ft. Observed pressure drop
gradually from 1780psi to 1510psi. Picked up string, checked surface equipment and mud pumps.
Observed bleed off valve of Mud Pump # 1 wash out, replaced the same. Drilled 8½" hole from 12886ft to
12888ft. Observed pressure dropped. Pulled out of hole bit from 12888ft to 6193ft. Found wash out in 5"
Drill Pipe. Replaced the same. Ran in hole from 6193ft to 12675ft. Slipped drill line and service TDS. Ran in
hole from 12675ft to bottom. Drilled 8½" hole to 12921ft to 12958ft. Observed maximum background gas
5.4% and minimum cut mud weight: 10.8ppg. Circulated to increase mud weight from 11ppg to 11.3ppg.
Flow checked. Well trickling @ 1.5BPH. Circulated for bottom up, observed maximum gas 17.90% and
minimum cut mud weight 10.8ppg. Circulated to increase mud weight from 11.3ppg to 11.5ppg. Flow
checked. Well trickling @ 1BPH. Circulated for bottom up, observed maximum gas 0.74%. Pulled out of
hole from 12958ft to surface.

RUN #33

ON
BHA BIT MAD BIT JETS IAD SERIAL DEPTH (ft) DRIL BTM ROP
TYPE GRADING
NO. NO. E SIZE SIZE C NO.
IN OUT ft HR ft/hr
SMIT
33 15 MDSI616L 8½” 6x14 117 JM982412958 13030 72 11.9 6.04 1-1-CT-A-X-I-NO-CP
H
BPxG

PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
13.2 82 2497 475

RUN SUMMARY
Made up and ran in hole 8½" PDC bit # 15 on pendulum assembly (S.stab at 30ft and 60ft) down to 12682ft
to 12737ft. Reamed down from 12737ft to 12958ft (bottom)Observed maximum trip gas 68% and minimum
cut mud weight 11ppg. Drilled 8½" hole from 12958ft to 13030ft. Observed mud splashed at rig floor and
maximum gas 35.3 % due to splash, Picked up string and shut the well. Recorded SICP= 200psi. Circulating
through poor boy degasser to shale shaker with SPM: 50 and GPM: 220. Maximum gas: 84 %, Average gas:
35 % and minimum gas 20 %. minimum cut wt: 9.3ppg. Meanwhile increasing mud weight to 12.5ppg (in
steps) in active system. Circulated through poor boy degasser to shale shaker to increase mud weight to
13ppg. Maximum gas: 38 %, minimum gas 5 %, minimum cut wt: 10.6ppgAt 5% gas, opened annular BOP.
Circulated through flow line to homogenize mud. Mud wt in/out: 13/13ppg. Back ground gases 2%
(Dumped 70 bbl during killing operation) drilled 8½" hole from 12985ft to 13030ft. (observed dynamic
losses @ 5BPH, total=30 bbl loss). Circulated for bottom up to collect sample. Declared coring point @
13030ft. Circulated out Hi − Vis pill to clean hole prior to pull out of hole for coring. Conducted flow
checked, well static. Pulled out of hole from 13030ft to surface.

RUN #34

BHA BIT TYPE MAD BIT JETS IAD SERIAL DEPTH (ft) DRIL ON ROP GRADING
NO. NO. E SIZE SIZE C NO. BTM

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 113
IN OUT ft HR ft/hr

34 16 FC3843 HLB 8½” 8x17 - 1294322 13030 13055 25 8.67 2.88 -


3

PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
9.3 55 635 212

RUN SUMMARY
Made up and ran in hole 8½" core head with 6¾" core barrel assembly down to 12718ft. slipped 16ft drill
line. Cont'd Ran in hole core head from 12718ft to 12872ft. Reamed from 12872ft to 13030ft. Circulated for
bottoms up , GPM=275, SPP=930psi. (Observed 14% of gases and minimum cut mud wt: 12.4ppg). Dropped
1¼" ball and circulated till it reaches at ball seat. Observed pressure increased from 550psi to 630psi. Took
SCR. Cut core from 13030ft to 13055ft. Observed no drill off. Broke core with 5klbs drag. Flow checked −
Ok. Pulled out of hole coring assembly from 13055ft to 12737ft (inside 9⅝" casing shoe). Flow checked −
Ok. Pulled out of hole 8½" coring assembly from 12737ft to 1030ft (top of BHA). Laid down 15 x 5" Drill
pipes single by single. Found wash out on 5" Drill pipe# 169, G − 105 (Drilling depth: 6790ft).Flow checked,
well static. Pulled out of hole from 1030ft to surface. Laid down 8½" Core head + Core barrel. Core
recovered: 21.5ft (86 %).

RUN #35

ON
BHA BIT MAD BIT JETS IAD SERIAL DEPTH (ft) DRIL BTM ROP
TYPE GRADING
NO. NO. E SIZE SIZE C NO.
IN OUT ft HR ft/hr
SMIT
35 15RR1 MDSI616L 8½” 6x14 117 JM9824 13055 14226 1171 107.40 10.9 1-1-WT-G X-I-NO-BHA
H
BPxG

PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
3-24 41/169 2616 422

RUN SUMMARY
Made up Directional BHA and Adjusted bent to 1.22°. Performed shallow function test of mud motor and
MWD tool. Made up 8½" PDC Bit#15(RR1) and ran in hole down to top of BHA (1070ft).Break circulated.
Ran in hole 8½" PDC Bit from 1070ft to 12623ft. (casing shoe). Picked up 15 x 5" Drill pipes, S − 135 and ran
in hole single by single. Slipped 30ft and cut 105ft drill line. Resumed run in hole from 12756ft to 13055ft
(bottom), hole free. Washed down last single. Drilled 8½" hole in Rotary Mode from 13055ft to 13136ft
Conducted MWD Survey @ 13083. Drilled 8½" hole in Rotary Mode from 13136ft to 13236ft conducted
MWD Survey @ 13177 . Drilled 8½" hole in Rotary Mode from 13236ft to 13325ft to 13336ft. Drilled 8½" hole
in Slide Mode from 13336ft to 13358ft. Drilled 8½" hole in Rotary Mode from 13358ft to 13417ft. Observed
drop of 300psi in pressure. Checked surface equipment. Decided to pull out of hole to check drill string.
Flow checked, well static. Wet Pulled out of hole from 13417ft to 6021ft. Found washout in Drill pipe joint
# 160 (washout depth = 7395ft). Replaced the same. Ran in hole 8½" bit from 6050 to 12737ft (inside Casing
shoe). Slipped 20ft drill line. Ran in hole 8½" bit from 12737 to 13417ft, (hole free). Washed down last single.
Drilled 8½" hole in Rotary Mode from 13417ft to 13420ft. Conducted MWD survey. Drilled 8½" hole in
Rotary Mode from 13420ft to 13665ft. Conducted MWD survey. Drilled 8½" hole in Rotary and Slide Mode
from 13665ft to 13973ft. Conducted MWD survey at each connection. Drilled 8½" hole in rotary mode from

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 114
13973ft to 13986ft. Conducted MWD survey. Circulated out 40 bbl Hi-Vis pill to clean hole prior to wiper
trip. Flow checked, well static. Conducted wiper trip from 13986ft to 13358ft. Drilled 8½" hole in rotary
mode from 13986ft to 14081ft. (on bottom up), observed 28.54% Trip gas and maximum cut Mud wt: 12.6
ppg. Drilled 8½" hole in rotary mode from 14081ft to 14226ft. Circulated out Hi-Vis to clean hole prior to
pull out of hole (flow checked, well static). Pulled out of hole 8½" “PDC Bit from 14,226ft to surface.
Performed BOP pressure test.

RUN #36

ON
BHA BIT MAD BIT JETS IAD SERIAL DEPTH (ft) DRIL BTM ROP
TYPE GRADING
NO. NO. E SIZE SIZE C NO.
IN OUT ft HR ft/hr
SMIT
36 15RR2 MDSI616L 8½” 6x14 117 JM9824 14226 14586 360 46.9 7.68 1-1-BT-G-X-I-PN-TD
H
BPxG

PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
3-19 33/172 3006 391

RUN SUMMARY
Made up Directional BHA and Adjusted bent to 1.5°. Performed shallow function test of Mud Motor and
MWD tool. Made up 8½" PDC Bit#15(RR2) On Directional Assembly and ran in hole down to 12737ft.
Worked on Drawworks and Power tong. Slipped drill line and service TDS. Ran in hole from 12737ft to
14226ft. Drilled 8½" hole in Rotary and Slide mode from 14226ft to 14540ft. Marked Top of Amb Formation
@14540ft. Drilled 8½" hole in Rotary mode from 14540ft to 14575ft. Circulation for bottom up. Conducted
survey at each connection. Drilled 8½" 14575ft to 14586ft. Circulated to bottom up for geological sample
and clean hole. Conducted wiper trip. Worked on TDS. Circulated out Hi-Vis pill prior to pull out of hole.
Pulled out of hole 8½" PDC Bit from 14586ft to surface.

WIRELINE LOGGING
Rigged up wireline logging gears. Ran in hole Run # 1 (HRLA-SP-GR) logging suite down to 14586 ft.
Conducted Run # 1 HRLA-SP-GR logging, laid down logging tools. Conducted Run # 2 (SPED-CNT-GR).
Rigged Down Weatherford Wireline.

RUN #37

ON
BHA BIT MAD BIT JETS IAD SERIAL DEPTH (ft) DRIL BTM ROP
TYPE GRADING
NO. NO. E SIZE SIZE C NO.
IN OUT ft HR ft/hr
SMIT
37 15RR3 MDSI616L 8½” 6x14 117 JM9824 BIT TRIP FOR LOGGING 1-1-BT-G-X-I-NO-LOG
H
BPxG

PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
– – – –

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 115
RUN SUMMARY
Made up 8½" PDC bit and ran in hole down to 14,586ft. Circulated out Hi-Vis to clean hole prior to logging.
On bottom up, observed maximum gas 49% and minimum cut Mud weight 12.3 ppg. Flow checked, well
static. Pulled out of hole 8½" PDC Bit from 14,586ft to surface.

WIRELINE LOGGING
Rigged up Weatherford Wireline equipments for Run#3. Ran in hole Run # 3 (CMI CXD GR) logging suite
down to 14611ft (logger depth) and conducted logs. (Avg hole size = 8.71"). Rigged down WFD Wireline
and Laid down shooting Nipple.

RUN #38

ON
BHA BIT MAD BIT JETS IAD SERIAL DEPTH (ft) DRIL BTM ROP
TYPE GRADING
NO. NO. E SIZE SIZE C NO.
IN OUT ft HR ft/hr
SMIT CONDITION TRIP FOR 7”
38 15RR4 MDSI616L 8½” 6x14 117 JM9824 1-1-BT-G-X-I-NO-LOG
H LINER
BPxG

PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
– – – –

RUN SUMMARY
Made up 8½" PDC Bit#15(RR4) on directional assembly and Ran in hole down to 14586ft. Hole free.
Pumped 100 bbls Hi-Vis pill and circulated out to clean hole prior to run in hole 7" liner. Observed at
bottom up maximum trip gas: 15.52% and Maximum cut wt: 12.6 ppg. Flow checked, well static. Pulled out
of hole 8½" PDC Bit from 14586ft to surface. Retrieved wear bushing prior to run 7" liner.

RIH 7" LINER


Rigged up WFD TRS equipment. Held pre job safety meeting. Made up and Ran in hole shoe track (reamer
shoe + 2 x 7" casing (7", 32 PPF, c-95, hydril slx) + float collar + 1 x 7" Casing joint + landing collar) down to
120ft. Applied baker lock and checked integrity of float equipments, Ok. Ran in hole 7" liner (7", 32 PPF,
c-95, hydril slx) down to 2080ft. Picked up and made up liner hanger and ran in hole down to 2117ft.
Recorded upward weight 98 klbs and downward weight 98 klbs. Rigged down WFD TRS. Installed U
clamp on pipe handler. Ran in hole 7" liner on 5" Drill pipes from 2117ft to 12696ft (inside 9⅝" CSG shoe).
(Break circulated at 7000ft and in CSG shoe). Ran in hole 7" Liner on 5" Drill pipes from 12696ft to 14591ft
and tagged bottom with 8klbs with circulation. Circulated out for bottoms up prior to set liner. Observed
Maximum Gas 6.2% and Maximum cut Mud weight 12.8ppg. Circulated till Back ground Gas decreased to
0.5-0.6 %. Dropped 1.75" bronze ball and Rigged up cement head with preloaded drill pipe dart. Ball seated
in landing collar with pressure increased up to 1500psi, held for 5 min. Set Liner hanger (keeping shoe @
14586ft) by applying pressure up to 1500psi. Slacked 240klbs weight on liner hanger. Increased pressure up
to 1800psi to release running tool, lost 60klbs liner weight, tool free. Sheared out the ball seat at 2400psi,
resumed circulation. Circulated to condition mud, prior to cement job.

CEMENT JOB
Prepared mix fluid. Rigged up SLB Dowell surface cementing lines. Held pre job safety meeting. Pumped
100bbls of low YP Mud (YP=17 lb/100ft2) @ 8bpm followed by 80 bbl spacer @ 7bpm with rig pump.
Pumped 88bbls of 16.4ppg cement slurry with SLB Dowell pumping unit @ 4-5bpm. Dropped drill pipe
dart and displaced cement with 20 bbl of 15ppg spacer followed by 40bbls of mud (13ppg) followed by
20bbls of spacer followed by 128bbls of mud (13ppg) @ 5-6bpm latched dart inside liner wiper plug
(observed increase in pressure from 1000psi to 2000psi, pressure dropped after releasing of liner wiper
plug). Further pumped 73bbls (liner volume) of mud (13ppg) and bumped liner wiper plug at landing

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 116
collar @ 2500psi and held pressure for 10mins, Ok. Bled off pressure and observed no back flow. Sting out
liner setting tool and pulled out of hole 10 stands of 5" Drill pipes up to 11453ft. Circulated to sweep out
contaminated mud. Pulled out of hole running tool from 11453ft to surface.

RUN #39

ON
BHA BIT MAD BIT JETS IAD SERIAL DEPTH (ft) DRIL BTM ROP
TYPE GRADING
NO. NO. E SIZE SIZE C NO.
IN OUT ft HR ft/hr
SMIT
39 17 GF30 8½” 3x32 537 RH4735 COC TOL 1-1-WT-A-1-I-NO BHA
H

PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
– – – –

RUN SUMMARY
Made up new 8½" Tricone Bit # 17 and ran in hole down to 1988ft and tagged soft cement @ 11,988ft with
5-6klbs. Cleaned out soft cement from 11988ft to 12122ft and tagged hard cement with 5-7klbs. Cleaned out
hard cement from 12122ft to 12476ft and tagged top of 7” liner @ 12476ft with 6klbs. Circulated for bottom
up prior to pull out of hole. Pulled out of hole 8½" bit from 12476ft to surface.
.
RUN #40

ON
BHA BIT MAD BIT JETS IAD SERIAL DEPTH (ft) DRIL BTM ROP
TYPE GRADING
NO. NO. E SIZE SIZE C NO.
IN OUT ft HR ft/hr
SMIT
40 18 FDGH 6" 3x20 - RJ1654 COC 5-3-CT-A-3-I-WT-BHA
H

PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
– – – –

RUN SUMMARY
Made up 6" Tricone Bit and ran in hole down with 3” and 5” Drill pipes to 12474ft. Passed TOL with
circulation and without circulation. Cleaned out/washed down cement from 12475ft to 14466ft. Tagged
liner wiper plug @ 14466ft (Top of landing collar: 14466ft). Circulated out Hi-Vis to clean hole prior to
pressure test. Pressure tested top of liner at 2500psi with increment of 500psi for 15 min, Ok. Drilled liner
wiper plug + landing collar and hard cement from 14466ft to 14578ft (PBTD). (Tagged float collar at
14506ft). Circulated out Hi-Vis to clean hole prior to pressure test. Pressure tested at 2500psi with increment
of 500psi for 15min, Ok. Pulled out of hole 6" Bit from 14578ft to surface.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 117
RUN #41

ON
BHA BIT MAD BIT JETS IAD SERIAL DEPTH (ft) DRIL BTM ROP
TYPE GRADING
NO. NO. E SIZE SIZE C NO.
IN OUT ft HR ft/hr
SMIT
41 18RR1 FDGH 6" 3x20 - RJ1654 7" SCRAPER Trip 5-3-CT-A-3- I-WT-LOG
H

PARAMETERS
FLOW RATE
WOB RPM SPP
(GPM)
– – – –

RUN SUMMARY
Made up 7" casing scrapper and ran in hole down to 1179ft (top of BHA). Break circulated at top of BHA.
Ran in hole 7" casing scrapper down to 14,578 ft PBTD (Plug back total depth) and scrapped 7" casing twice.
Passed smoothly through tool both with and without circulation. Filled up string after every 15 stands.
Washed down last 2 stand. Swept out Hi-Vis to clean hole prior to conduct Wireline logging. Pulled out of
hole 6" bit with 7" casing scrapper and Laid down 5" all Drill pipes single by single and Rack back 3 -1/2"
Drill pipes and BHA. Laid down bit & scrapper
.
WIRELINE LOGGING

Rigged up 7" shooting nipple and pressure tested the same at 300 psi for 5 min.
Rigged up wireline equipment.
Made up logging suite # 1 and RIH logging suite (SBT-CBL-VDL-GR) down to 14588 ft and conducted
logging. POOH to surface and laid down logging tools. Laid down shooting nipple. Made up logging suite
# 2 and RIH logging suite (VSP-GR) down to 14550 ft. Observed logging tool malfunctioning. Pulled out of
hole to 11775 ft and is in progress.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 118
4.6 BIT RECORD

Well Khaur North-1 details of Bit record and their performances are shown in Table No. 4.1. The Bit
hydraulics was calculated Bit wise as well as on daily basis through daily hydraulic reports.

4.7 MUD and BIT HYDRAULICS

Optimized hydraulics not only economized the drilling operations but also kept the hole in better
condition. Hydraulic properties were closely watched and kept in accordance with the prognoses properties
given in the drilling program of well Khaur North-1. However the prevailing conditions at the well was
also given due importance. Based on daily mud report, an optimized hydraulic report copies were provided
to all concerned personnel at site. Bit/Mud Hydraulics used in different phases of drilling at well Khaur
North-1. The Bit Hydraulic is shown in Table No. 4.2 and Daily Mud report is shown in Table No. 4.3.

4.8 DEVIATION SURVEY

Totco surveys were conducted at different depths. A summary of deviation surveys is given in Table No.
4.4 and MWD surveys are given in Table No. 4.5 respectively.

4.9 FLOW LINE DIFFERENTIAL TEMPERATURE

Flow line temperature was recorded at each feet wise deptht . Data of flowline temperatur is given in
Figure No. 4.1 respectively.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 119
PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1
Doc. # PSPB–SPR006–F–009 120
Section

5
Daily Well Diary
5.1 DAILY WELL DIARY

Rig time operation summary were continuously recorded below. Rig time analysis is summarized in Table
No. 5.1 and Figure No. 5.1.

Date: 10/11/17 Day: 01 Depth: 64ft


Khaur North–1 Well was spudded in on 9th November, 2017. Drilled 26” Hole Section from 51ft to 64ft,
Meanwhile increased mud weight from 8.9 to 9ppg.

Date: 11/11/17 Day: 02 Depth: 89ft


Drilled 26’’ hole from 64ft to 89ft, meanwhile increased mud weight from 9.0ppg to 9.1ppg.

Date: 12/11/17 Day: 03 Depth: 111ft


Drilled 26’’ hole from 89ft to 100ft. Conducted TOTCO survey@ 94ft. Incl: 0°. Pulled out of hole to surface,
added stabilizer, Ran in hole with same Bit down to 100ft. Drilled 26’’ hole from 100ft to 111ft. Meanwhile
increased mud weight from 9.1ppg to 9.2ppg.

Date: 13/11/17 Day: 04 Depth: 186ft


Drilled 26’’ hole from 111ft to 186ft. Meanwhile increased Mud weight from 9.2ppg to 9.3ppg.

Date: 14/11/17 Day: 05 Depth: 280ft


Drilled 26’’ hole from 186ft to 280ft. Conducted TOTCO survey@ 201ft. Incl: 0.9°, Meanwhile increased
Mud weight from 9.3ppg to 9.4ppg.

Date: 15/11/17 Day: 06 Depth: 386ft


Drilled 26’’ hole from 280ft to 386ft. Conducted TOTCO survey@ 290° . Incl: 0°.

Date: 16/11/17 Day: 07 Depth: 481ft


Drilled 26’’ hole from 386ft to 481ft. Conducted TOTCO survey@ 380ft and 471ft. Incl: 0.25° and 0.8°
respectively Meanwhile increased Mud weight from 9.4ppg to 9.5ppg.

Date: 17/11/17 Day: 08 Depth: 598ft


Drilled 26’’ hole from 481ft to 511ft. Pulled out of holefrom 511ft to surface prior to change the Bit. Ran in
hole with new 26” Bit down to 511ft and drilled down to 561ft. Conducted TOTCO survey@ 561ft Incl:
0.25°. Drilled from 561ft to 598ft. Meanwhile increased Mud weight from 9.5ppg to 9.6ppg.

Date: 18/11/17 Day: 09 Depth: 707ft


Drilled 26’’ hole from 598ft to 707ft. Conducted TOTCO survey@ 701ft Incl: 0.25°. Observed malfunctioning
in TDS. Pulled out of hole to surface fixed the same. Ran in hole down to 521ft.

Date: 19/11/17 Day: 10 Depth: 844ft


Drilled 26’’ hole from 707ft to 844ft. Conducted TOTCO survey @ 794ft Incl: 0.94°.

Date: 20/11/17 Day: 11 Depth: 939ft


Drilled 26’’ hole from 844ft to 893ft. Conducted TOTCO survey @ 888ft Incl: 1.0°. Observed bolt of Junction
box loosed and broken of TDS, fixed the same. Resumed drilling from 893ft to 939ft. Meanwhile increased
mud weight from 9.6ppg to 9.7ppg.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 121
Date: 21/11/17 Day: 12 Depth: 1102ft
Drilled 26’’ hole from 939ft to 985ft. Conducted TOTCO survey @ 978ft Incl: 1.0°. Resumed drilling from
985ft to 1078ft. Conducted TOTCO survey @ 1069ft Incl: 1.0°. Resumed drilling from 1078ft to 1102ft.

Date: 22/11/17 Day: 13 Depth: 1219ft


Drilled 26’’ hole from 1102ft to 1172ft. Conducted TOTCO survey @ 1164ft Incl: 2.0°. Resumed drilling from
1172ft to 1219ft. Conducted TOTCO survey @ 1200ft Incl: 1.0°. Circulated for bottom up andPulled out of
holefrom 1219ft to surface prior to change the Bit. Ran in hole with new Tricon Bit down to 1219ft and
resumed drilling.

Date: 23/11/17 Day: 14 Depth: 1489ft


Drilled 26’’ hole from 1219ft to 1489ft. Conducted TOTCO survey @ 1260ft, 1357ft, and 1450ft Incl: 1.5°, 1.0°,
and 1.50° respectively.

Date: 24/11/17 Day: 15 Depth: 1699ft


Drilled 26’’ Hole from 1489ft to 1699ft. Meanwhile mud weight increased from 9.7ppg to 9.8ppg.
Conducted TOTCO survey @ 1548ft, 1640ft, Incl: 2.0°, 2.5° respectively.

Date: 25/11/17 Day: 16 Depth: 1835ft


Drilled 26’’ Hole from 1699ft to 1835ft. Conducted TOTCO survey @ 1736ft, 1830ft, Incl: 2.25°, 2.8°
respectively. Malfunction in TDS work on TDS, Attempted to rectify the problem but no success. Pulled out
of hole26” Bit from 1835ft to Surface prior to work on TDS. Working on TDS.

Date: 26/11/17 Day: 17 Depth: 1912ft


Worked on TDS. Laid down 03 Drill collars + 02 x 26” Stabs. Inspected 02 x 26” Stabs, Picked up and made
up 3 x 9½” Drill collars + 02 x 26” Stabs and ran in hole with RR Tricon Bit from Surface to 1835ft. Drilled
26” hole section from 1835ft to 1912ft. Meanwhile increased mud weight from 9.8ppg to 10.4ppg.

Date: 27/11/17 Day: 18 Depth: 2017ft


Drilled 26” hole section from 1912ft to 2017ft (Declared 26” Hole Section TD @ 2017ft). Conducted TOTCO
survey @ 1925ft, 2010ft, Incl: 2.75°, 2.90° respectively. Meanwhile increased mud weight from 10.4ppg to
11.0ppg. Pumped 100bbl Hi-Vis and circulate out to clean.

Date: 28/11/17 Day: 19 Depth: 2017ft


Pumped 100bbls Hi-Vis and circulated out to clean the hole. Performed Wiper trip. Pulled out of hole26”
Tricon Bit from 2017ft to Surface. Rigged up Weatherford Wireline and conducted Wireline (MBM–BGL–
GR) logs. Pulled out of holeWireline tools to surface. Ran in hole 26” Tricon Bit down to 2017ft. Circulated
Hole for bottom up. Pulled out of holeTricon Bit to Surface. Rigged up Weatherford TRS equipments for
20” Casing job. Ran in hole 20” Casing down to 228ft.

Date: 29/11/17 Day: 20 Depth: 2017ft


Continued Ran in hole 20” Casing from 232ft to 2017ft. Confirmed TD @ 2017ft with circulation. Picked up
4ft with shoe at 2013ft. Made up circulating head and started circulation to condition mud. Meanwhile
prepare 130bbls spacer. Ran in hole 4½” cement stinger on 5”Drill pipes and stabbed into 20” Float collar at
1969ft. Circulation meanwhile prepared for cement job.

Date: 30/11/17 Day: 21 Depth: 2017ft


Circulated to clean hole. Conducted cement job. Pulled out of holecement stinger assembly to surface.
Waited on cement

Date: 01/12/17 Day: 22 Depth: 2017ft


Waited on cement. Meanwhile cut and recovered 20’’ Landing jnt and 30’’ Conductor. Installed well head
and pressure tested the same. Nippled up BOP.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 122
Date: 02/12/17 Day: 23 Depth: 2017ft
Nipple up BOP and Pressure tested the same. Ran in hole 17½’’ Bit down to 1959ft and tagged hard cement
at 1959ft. Circulated to homogenize 11ppg mud. Pressure tested 20’’ casing at 2000psi – Ok. Cleaned out
cement from 1959ft to 1976ft.

Date: 03/12/17 Day: 24 Depth: 2032ft


Drilled out cement down to 2003ft, Circulated out to homogenize mud, pressure tested casing at
2000psiOK. Drilled cement down to 2017ft and drilled 17 ½" hole from 2017ft to 2022ft. Attempted to
conduct shoe bond test at 100psi for 3–5min, Ok,200psi for 3–5min, Ok at 300psi observed pressure
dropped to 70psi, pumped 4.6bbl and attempted several times to hold pressure, but no success. Drilled
17½" hole from 2022ft to 2032ft. Pulled out of hole17 ½" Bit from 2032ft to surface. Ran in hole mule shoe on
5" Drill pipes drill pipe down to 2032ft. Circulated to homogenize mud prior to place cement plug.

Date: 04/12/17 Day: 25 Depth: 2032ft


Circulated to homogenize mud, placed 40bbl of 15.8ppg balanced plug, displaced with 11ppg mud. Pulled
out of hole to 1665ft, squeezed cement at 380psi, Ok. Waited on cement meanwhilePulled out of holecement
assembly to surface. Ran in hole 17 ½" Bit down to 1613ft. Waited on cement is in progress.

Date: 05/12/17 Day: 26 Depth: 2032ft


WOC. Ran in hole 17½" Bit from 1613ft down to 1919ft and tagged top of cement at same depth. Drilled
cement down to 2017ft, homogenized mud. Attempted to conduct shoe bond test as follows: 100psi for 3–
5min, Ok, 200psi for 3–5min, Ok, 300psi for 3–5min, Ok. At 410psi, observed pressure dropped to 160psi
(volume Pumped = 1.3bbl). Bled off pressure, observed 0.5bbl return. Drilled hard cement from 2017ft to
2027ft. circulated out to homogenize mud andPulled out of hole17 ½" Bit to surface. Ran in hole with mule
shoe + cement string down to 1948ft, washed down from 1948ft to 2027ft and tagged cement. Circulation
prior to place cement plug.

Date: 06/12/17 Day: 27 Depth: 2032ft


Circulated to homogenize mud, placed 40bbl of 15.8ppg balanced plug, displaced with 11ppg mud,Pulled
out of hole to 1665ft, reverse circulated out, closed pipe ram, squeezed cement at 630psi by pumping 10bbl
of mud and observed Maximum pressure 370psi but pressure did not hold, Bleed off pressure. WOC.
MeanwhilePulled out of holecement string to surface. Ran in hole 17½" Tricon Bit down to 1615ft. Waited
on cement.

Date: 07/12/17 Day: 28 Depth: 2032ft


WOC. Washed down and tagged TOC at 1935ft, Drilled cement down to 2015ft, homogenized mud,
conducted shoe bond test as follows: 0.3bbl pumped, pressure 25psi for 5min, Ok. 0.6bbl pumped, pressure
84psi for 5min, Ok. 0.9bbl pumped, pressure 190psi for 5min, Ok. 1.2bbl pumped, pressure 300psi dropped
to 280psi in 4min. 1.7bbl pumped, pressure 340psi dropped to 130psi in 2 hours.Bleed off pressure and
observed 0.7bbl return.Drilled hard cement from 2015ft to 2022ft. Pulled out of hole17½" Bit to surface. Ran
in hole cement string down to 2022ft, circulation in progress prior to place cement plug.

Date: 08/12/17 Day: 29 Depth: 2032ft


Placed 80bbl of 15.8ppg balanced plug, displaced with 11ppg mud,Pulled out of hole to 1600ft, reverse
circulated out, closed pipe ram, squeezed cement at 630psi, Ok. Pulled out of holecement string and ran in
hole 17½” Bit to 1600ft.
Date: 09/12/17 Day: 30 Depth: 2032ft
Waited on cement. Washed down to 1818ft and tagged TOC at 1818ft. Drilled mod hard to hard cement
from 1818ft to 2003ft. Meanwhile pressure tested 20’’ Casing at 1816ft, 1895ft, 1933ft and 1959ft at 700psi –
Ok. Circulated to homogenize mud is in progress prior to pressure test Casing at 2003ft.
Date: 10/12/17 Day: 31 Depth: 2111ft

Circulated hole for bottom up. Pressure tested casing at 2003ft @700psi. Drilled out cement down to 2015ft,
circulated to homogenize mud, conducted shoe bond testand applied 415psi pressure equivalent to 15ppg

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 123
and hold for 10min, Ok. Drilled cement from 2015ft to 2033ft, circulated to clean hole, Drilled 17 ½" hole
from 2033ft to 2111ft in Murree Formation.

Date: 11/12/17 Day: 32 Depth: 2170ft


Drilled 17 ½" hole from 2111ft to 2170ft in Murree Formation, circulated to clean hole. Dropped Totco
Survey tool andPulled out of holefrom 2170ft to surface to change BHA (Deviation 2.0° @ 2169ft). Made up
17 ½" Tricon Bit + 9⅝" Mud Motor + String Stab + X–Over + NMDC + Hoc. Adjusted bent housing to 0.93°
and scribed MWD tool. Performed shallow function test Mud Motor and mwd tool @ 610GPM, 900psi, Ok.
Pulled out of hole to surface and lay down Tricon Bit. Ran in hole 17 ½" PDC Bit with Mud Motor and MWD
tool down to 163ft.

Date: 12/12/17 Day: 33 Depth: 2500ft


Ran in hole 17 ½" PDC Bit with directional assembly down to 2007ft (inside Casing shoe), slipped Drillline
and inspected TDS. Reamed 17½" hole down to 2087, conducted MWD survey, reamed down to 2167ft and
conducted MWD survey. Drilled 17½" hole in Rotary/Slide Mode from 2170ft to 2500ft.

Date: 13/12/17 Day: 34 Depth: 3070ft


Drilled 17½” hole in Rotary/Slide Mode down to 2677ft, conducted directional survey, circulated out to
homogenize mud, performed wiper trip, hole free. Drilled 17½” hole in Rotary/Slide Mode down to from
2677ft to 3070ft.

Date: 14/12/17 Day: 35 Depth: 3640ft


Drilled 17½” hole in Rotary/Slide Mode down to 3200ft, conducted directional survey, circulated out to
homogenize mud, performed wiper trip, hole free. Drilled 17½” hole in Rotary/Slide Mode from 3200ft to
3640ft and is in progress.

Date: 15/12/17 Day: 36 Depth: 4040ft


Drilled 17½” hole in Rotary/Slide Mode from 3640ft down to 3758ft, conducted directional survey,
circulated out to homogenize mud, performed wiper trip from 3758ft to 3201ft, hole free. Drilled 17½” hole
in Rotary/Slide Mode from 3758ft down to 4040ft.

Date: 16/12/17 Day: 37 Depth: 4315ft


Drilled 17½″ hole in Rotary/Slide Mode from 4040ft to 4315ft. Conducted directional survey. Pumped 40bbl
Hi-Vis pill and circulating out to clean hole prior to POH.

Date: 17/12/17 Day: 38 Depth: 4315ft


Circulated to clean hole. Pulled out of hole to surface. Pressure tested BOP. Made up new 17½” Tricon Bit #
6, on same BHA and scribed MWD tool. Performed shallow function test Mud Motor and MWD tool @
600GPM, 800psi, Ok. Ran in hole 17½” Tricon Bit to 693ft.

Date: 18/12/17 Day: 39 Depth: 4345ft


Cut and slipped Drillline at casing shoe. Ran in hole to 3761ft. Reamed from 3761ft to 4315ft. Drilled from
4315ft to 4345ft. Increased MW during drilling from 11.5ppg to 12ppg in steps.

Date: 19/12/17 Day: 40 Depth: 4393ft


Drilled 17 ½" Hole with sliding mode from 4345ft to 4393ft.

Date: 20/12/17 Day: 41 Depth: 4432ft


Drilled 17½” hole with sliding mode from 4393ft to 4432ft.

Date: 21/12/17 Day: 42 Depth: 4472ft


Drill 17½" hole in Rotary/Slide Mode from 4432ft to 4472ft. Pulled out of holefrom 4472ft to 3716ft.
Date: 22/12/17 Day: 43 Depth: 4472ft
Pulled out of hole 17½” Tricon Bit from 3740ft to surface, Laid down BHA. Ran in hole 17½” PDC Bit (RR)
on directional BHA down to 4406ft.
Date: 23/12/17 Day: 44 Depth: 4683ft
Drilled 17½" hole from 4472ft to 4683ft. While drilling at 4476ft observed trip gas 48.5%. Conducted MWD

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 124
survey @ 4546ft, Incl: 2.6°, AZM: 126.2°

Date: 24/12/17 Day: 45 Depth: 4875ft


Drilled 17½" hole in Slide Mode from 4683ft to 4875ft. Conducted MWD survey. Last survey depth 4824ft.
Incl: 1.7°, AZM: 138.48°.

Date: 25/12/17 Day: 46 Depth: 5055ft


Drilled 17½" hole in Slide Mode from 4875ft to 4961ft. Conducted MWD survey. Survey depth 4919ft. Incl:
1.5°, AZM: 146.2°. Cirulated out 40bbl Hi-Vis pill till shakers clean. Performed wiper trip from 4961ft to
4434ft. while pulled out of hole, observed Maximum over pull of 15–20klbs. Drilled 17½" hole in Slide
Mode from 4961ft to 5055ft.

Date: 26/12/17 Day: 47 Depth: 5230ft


Drilled 17½" hole from 5055 to 5230ft. Conducted MWD survey. Survey depth 5104ft. Incl: 2.0°, AZM:
170.8°.

Date: 27/12/17 Day: 48 Depth: 5392ft


Drilled 17½" hole from 5230 to 5392ft. Conducted MWD survey. Survey depth 5287ft. Incl: 1.8°, AZM:
179.98°.

Date: 28/12/17 Day: 49 Depth: 5529ft


Drilled 17½” hole from 5392ft to 5516ft. MWD survey. Circulated out Hi-Vis pill till shakers clean, recorded
SCR and conducted flow check. Conducted wiper trip from 5516 to 4872ft. While pulled out of hole,
observed Maximum over pull of 20klbs. Pumped out from 5336ft to 5144ft and back reamed from 5144ft to
4962ft. Drilled 17½” hole from 5516ft to 5529ft.

Date: 29/12/17 Day: 50 Depth: 5556ft


Drilled 17½" hole in Slide Mode from 5529ft to 5532ft. Drilled 17½" hole in Rotary Mode from 5532ft to
5556ft. (Due to low ROP and abnormal differential pressure, decided to pull out of hole). Circulated out Hi-
Vis pill till shakers clean prior to pull out of hole. Flow checkedOK. Pulled out of hole17½” Bit from 5556ft
to 1991ft (inside 20" Casing shoe). Flow checked – well static.Pumped slug. Pulled out of hole17½” Bit from
1991ft to surface. Observed String Stab = 25% balled up and in gauged. Laid down Bit, broke out Mud
Motor and laid down the same. Made up 17½” PDC Bit (5RR2) and ran in hole on directional BHA down to
4038ft.

Date: 30/12/17 Day: 51 Depth: 5860ft


Ran in hole 17½” Bit on directional assembly to bottom. Drilled 17½” hole from 5556ft to 5860ft. Conducted
MWD survey.

Date: 31/12/17 Day: 52 Depth: 6090ft


Drilled 17½” hole from 5860ft to 6090ft. Conducted MWD survey. Pumped Hi-Vis pill. Flow check.
Conducted wiper trip,Pulled out of hole to shoe, Serviced TDS braking system and changing with new
calipers.

Date: 01/01/18 Day: 53 Depth: 6090ft


Repairing and maintenance of TDS braking system, function tested, Ran in hole 17½” Bit from shoe down
to 5529ft. (washed down from 5355ft to 5529ft) and ran in hole in progress.

Date: 02/01/18 Day: 54 Depth: 6427ft


Ran in hole to bottom. Drilled 17½” hole in Rotary Mode from 6090ft to 6427ft, Conducted MWD survey.
Drilling is in progress.

Date: 03/01/18 Day: 55 Depth: 6515ft


Drilled 17½” hole from 6427ft to 6515ft. Circulated out Hi-Vis till shaker clean. Pulled out of hole17½” Bit to
Casing shoe (while pulled out of hole, observed over pull of 20klbs, reamed back from 5932ft to 5155ft and
pumped out from 5155ft to 5061ft). Ran in hole again to bottom, while Ran in hole observed 20klbs
compression @ 6066ft, hard reamed from 6066ft to 6183ft and washed down from 6295ft to 6370ft.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 125
Circulated out Hi-Vis prior to pull out of hole to surface.

Date: 04/01/18 Day: 56 Depth: 6515ft


Increased mud weight from 12.5ppg to 12.7ppg, circulated to homogenize mud. Took SCR. Flow checked –
well static. Pulled out of hole17½” Bit to surface. Laid down Bit, NMDC, motor and flow sub. Observed
stab = 17–5/16" and 70% balled up. Bit: 60% balled up and observed 3 nozzles plugged with rubber
element. Took SLM and difference is 2.65ft. Drill pipes length: 5577.83ft Drill pipe, length with SLM:
5580.48ft. Rigged up WDI Wireline. Rigged up shooting nipple and Wireline BOP and pressure tested BOP
at 300psi for 5min, Ok. Ran in hole Wireline logging suite (HMI–BHC–GR) and conducted Wireline
logging. Pulled out of holeWireline.

Date: 05/01/18 Day: 57 Depth: 6515ft


Pulled out of hole Wireline logging suit to surface. Rigged down WDI Wireline. Pressure tested BOP. Ran
in hole 17½” PDC Bit with directional BHA (bent sub zero and without MWD) down to 1970ft (inside 20"
CSG). Slipped 29.5ft of Drillline. Ran in hole 17½” Bit from 1970ft to 6515ft and tagged section TD.
Observed 15–20klbs compression at 6333ft, clear the same. Reamed and washed till bottom. Pumped 70bbl
Hi-Vis and circulated out to homogenize mud. Meanwhile reciprocating and rotating the string. Took SCR,
checked rig pump efficiency– 97%. Flow checked – well static. Pulled out of hole17½” Bit from 6515ft to
5494ft. Observed 15–20klbs over pull at intervals of 6342–6296ft, 6250–6245ft. Cleared the same with
reciprocation the string. Pulled out of holeis in progress.

Date: 06/01/18 Day: 58 Depth: 6515ft


Pulled out of hole Bit to surface. Change Rams to 13⅜” CSG, Pressure tested. Rigged up Weatherford TRS
equipment and ran in hole 13⅜” Casing to 2786ft. Ran in hole 13⅜” CSG.

Date: 07/01/18 Day: 59 Depth: 6515ft


Ran in hole 13⅜” Casing (72#, C–95, BTC) from 2786ft to bottom. Washed down last stand, Tag TD. Circulate
out to reduce YP of mud. Rigged up Dowel SLB cementing head. Pressure testing cementing lines at LP
1000psi for 5min and HP 4000psi for 15min.OK

Date: 08/01/18 Day: 60 Depth: 6515ft


Conducted cement job of 13⅜" CSG, Nippled down BOP. Worked on well head and pressure tested,
NIPPLED UP 13⅝" 10K BOP stack is in progress.

.
Date: 09/01/18 Day: 61 Depth: 6515ft
Nippled up 13⅜” 10k BOP stack and function tested from rig floor, tool pusher panel and accumulator unit.
Ran in hole 1 stand of 5" HWDrill pipes + test plug + 1x 5" Drill pipes + 1 x 5" pup joint + side entry sub +
IBOP and seated test plug in Casing head housing. pressure tested BOP: 1st test: tested lower pipe ram @
LP 300psi for Minimum and HP 7000psi for 10min, found Ok. 2nd test: tested upper pipe ram against
manual valve of kill line and upstream valve of chOke manifold @ LP 300psi for Minimum and HP 7000psi
for 10min, found Ok. 3rd test: tested upper pipe ram against HCR valve of kill and chOke line @ LP 300psi
for Minimum and HP 7000psi for 10min, found Ok. 4th test: tested upper pipe ram against manual valve
of chOke line and NRV @ LP 300psi for 5min and HP 7000psi for 10min, found Ok. 5th test: tested annular
ram @ LP 300psi for 5min and HP 3500psi for 10min, found Ok. 6th test: tested blind ram @ LP 300psi for
5min and HP 7000psi for 10min, found Ok. Installed wear bushing. Made up new 12¼” Tricon Bit on slick
BHA and ran in hole down to 908ft (top of BHA) Break circulated on top of BHA. Ran in hole 5" Drill pipeS
stands from 4143ft to 5919ft and is in progress. Break circulated @ 5919ft.

Date: 10/01/18 Day: 62 Depth: 6515ft


Drilled out cement + float collar and float shoe. Pressure tested casing at 2500psiOK. Conducted shoe bond
test with EMW 16.8ppg. Pulled out of hole to surface. Made up 12¼” PDC Bit # 08 (used at Jh and ial–1)
and ran in hole down to 905ft (top of BHA). Break circulated. Ran in hole 12¼” PDC Bit from 905ft to 5554ft.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 126
Date: 11/01/18 Day: 63 Depth: 6615ft
Ran in hole to 6515ft. Drilled from 6515ft to 6615ft. Circulated to clean hole prior to pull out of hole. Flow
checked – well static. Pulled out of holefrom 6615ft to surface. Laid down Bit. Made up 12¼” Tricon Bit # 9
+ Mud Motor + String Stab + NMDC + flow sub. Adjusted bent housing to 1.76°. Scrib MWD tool.

Date: 12/01/18 Day: 64 Depth: 6711ft


Scribed MWD tool. Performed shallow function test Mud Motor and MWD tool @ 400GPM, 600psi, Ok.
Ran in hole 12¼” Tricon Bit # 9 to 965ft to 6615ft (hole free). Precautionary washed down last stand. Drilled
12¼” hole with sliding/Rotary Mode from 6615ft to 6711ft.

Date: 13/01/18 Day: 65 Depth: 6825ft

Drilled 12¼” hole with Rotary Mode from 6711ft to 6725ft. Conducted MWD survey. Drilled 12¼” hole
with slide and Rotary Mode from 6725ft to 6818ft. Conducted MWD survey. Drilled 12¼” hole with Slide
Mode from 6818ft to 6825ft.

Date: 14/01/18 Day: 66 Depth: 6828ft


Drilled 12¼” hole with slide and Rotary Mode from 6825ft to 6828ft. pumped 40bbls Hi-Vis pill and
circulated to clean hole prior to pull out of hole. Flow checked – well static. Pulled out of hole12¼” Tricon
Bit from 6828ft to 6447ft (inside 13⅜" casing shoe). Serviced TDS. Pulled out of holefrom 6447ft to 971ft (top
of BHA). Pulled out of holesingle by single from 971ft to surface.

Date: 15/01/18 Day: 67 Depth: 7117ft


Ran in hole 12¼” PDC Bit from 6736ft to 6828ft (Bottom) Precautionary reamed down last stand. Broke Bit
with low parameters. Drilled 12¼” hole with Rotary Mode from 6828ft to 6925ft. Conducted MWD survey.
Drilled 12¼” hole with Rotary Mode from 6925ft to 7016ft. Conducted MWD survey. Drilled 12¼” hole
with Rotary Mode from 7016ft to 7030ft. Drilled 12¼” hole with sliding mode from 7030ft to 7060ft. Drilled
12¼” hole with Rotary Mode from 7060ft to 7108ft. Conducted MWD survey. Drilled 12¼” hole with Rotary
Mode from 7108ft to 7117ft.

Date: 16/01/18 Day: 68 Depth: 7386ft


Drilled 12¼” hole with Rotary Mode from 7117ft to 7203ft. Conducted MWD survey. Survey depth 7146ft.
Drilled 12¼” hole with Rotary Mode from 7203ft to 7296ft. Conducted MWD survey. Survey depth 7238ft.
Drilled 12¼” hole with Rotary Mode from 7296ft to 7307ft. Drilled 12¼” hole with sliding mode from 7307ft
to 7342ft. Drilled 12¼” hole with Rotary Mode from 7342ft to 7386ft. Conducted MWD survey. Survey
depth 7328ft. Circulated out Hi-Vis pill to clean hole.

Date: 17/01/18 Day: 69 Depth: 7650ft


Performed wiper trip from 7386ft to 6645ft, Hole free. Drilled 12¼” hole with Rotary Mode from 7386ft to
7400ft. Drilled 12¼” hole with Slide Mode from 7400ft to 7415ft. Drilled 12¼” hole with Rotary Mode from
7415ft to 7479ft. Conducted MWD survey. Drilled 12¼” hole with Rotary Mode from 7479ft to 7573ft.
Conducted MWD survey. Drilled 12¼” hole with Slide Mode from 7573ft to 7600ft. Drilled 12¼” hole with
Rotary Mode from 7600ft to 7650ft.

Date: 18/01/18 Day: 70 Depth: 7945ft

Drilled 12¼” hole with Rotary Mode from 7650ft to 7665ft. Conducted MWD survey. Drilled 12¼” hole
with Rotary/Slide Mode from 7665ft to 7685ft. Drilled 12¼” hole with Rotary Mode from 7685ft to 7760ft.
Conducted MWD survey. Drilled 12¼” hole with Slide Mode from 7760ft to 7795ft. Drilled 12¼” hole with
Rotary Mode from 7795ft to 7852ft. Conducted MWD survey. Drilled 12¼” hole with Rotary Mode from
7852ft to 7860ft. Drilled 12¼” hole with Slide Mode from 7860ft to 7885ft. Drilled 12¼” hole with Rotary
Mode from 7885ft to 7945.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 127
Date: 19/01/18 Day: 71 Depth:
8140ft
Conducted MWD survey. Circulated out Hi-Vis prior to perform wiper trip. Performed wiper trip from
7945ft to 7209ft, hole free. Ran in hole from 7209ft to 7945ft, hole free. Drilled 12¼” hole with Slide Mode
from 7945ft to 7973ft. Drilled 12¼” hole with Rotary Mode from 7973ft to 8039ft. Conducted MWD survey.
Drilled 12¼” hole with Rotary Mode from 8039ft to 8132ft. Conducted MWD survey. Drilled 12¼” hole
with Rotary Mode from 8132ft to 8140ft.

Date: 20/01/18 Day: 72 Depth: 8394ft


Drilled 12¼” hole with Rotary Mode from 8140ft to 8231ft. Conducted MWD survey. Drilled 12¼” hole
with Rotary Mode from 8231ft to 8318ft. Conducted MWD survey. Drilled 12¼” hole with Rotary Mode
from 8318ft to 8394ft.

Date: 21/01/18 Day: 73 Depth: 8633ft


Drilled 12¼” hole with Rotary Mode from 8394ft to 8408ft. Conducted MWD survey. Drilled 12¼” hole
with Rotary Mode from 8408ft to 8413ft. Circulated out Hi-Vis prior to perform wiper trip. Performed
wiper trip from 8413ft to 7855ft, hole free. Ran in hole from 7855ft to 8413ft, (reamed down last single).
Drilled 12¼” hole with Rotary Mode from 8413ft to 8502ft. Conducted MWD survey, drilled 12¼” hole with
Rotary Mode from 8502ft to 8592ft. Conducted MWD survey. Drilled 12¼” hole with Rotary Mode from
8592ft to 8633ft.

Date: 22/01/18 Day: 74 Depth: 8883ft


Drilled 12¼” hole with Rotary Mode from 8633ft to 8685ft. Conducted MWD survey. Drilled 12¼” hole
with Rotary Mode from 8685ft to 8800ft. Conducted MWD survey. Drilled 12¼” hole with Rotary Mode
from 8800ft to 8873ft. Conducted MWD survey. Drilled 12¼” hole with Rotary Mode from 8873ft to 8883ft.
Observed pressure increased from 3650psi to 3800psi. Worked on string to stabilize pressure.

Date: 23/01/18 Day: 75 Depth: 8884ft


Circulated out to stabilize pressure meanwhile drilled 12¼” hole with Rotary Mode from 8883ft to 8884ft.
Circulated out Hi-Vis prior to pull out of hole. Flow checked, Ok,Pulled out of hole12¼” Bit from 8884ft to
960ft (top of BHA). Flow checked, Ok. Pulled out of hole12¼” Bit from 960ft to surface. Laid down Bit +
Mud Motor + MWD tools. Retrieved wear bushing prior to pressure test BOP. Ran in hole 1 stand of 5" Drill
pipes + test plug + 1 x 5" Drill pipes + 1 x pup joint 5" Drill pipes + side entry sub + IBOP and seated test
plug in section B. Pressure tested BOP as per plan. Retrieved testing plug and installed wear bushing. Laid
down pressure test assembly. Made up 12¼” new Tricon Bit + 8" Mud Motor + String Stab + NMDC + flow
sub. Scribed MWD tool and Performed shallow function test Mud Motor and MWD tool @ 500GPM,
800psi, Ok. Ran in hole 12¼” Bit down to 2274ft, (fill up string after every 15 stands).

Date: 24/01/18 Day: 76 Depth: 8912ft


Ran in hole 12¼” Tricon Bit from 2274ft to 6430ft. Slipped 36ft of Drillline. Serviced and maintenance TDS.
Ran in hole from 6430ft to 8884ft. Reamed down from 8765ft to 8884ft. Drilled 12¼” hole with Rotary Mode
from 8884ft to 8889ft. Drilled 12¼” hole in Slide Mode from 8889ft to 8907ft. Drilled 12¼” hole in Rotary
Mode from 8907ft to 8912.

Date: 25/01/18 Day: 77 Depth: 8951ft


Drilled 12¼” hole in Rotary Mode from 8912ft to 8928ft. Drilled 12¼” hole in Slide Mode from 8928ft to
8929ft. Drilled 12¼” hole in Rotary Mode from 8929ft to 8934ft. Drilled 12¼” hole in Slide Mode from 8934ft
to 8951ft. Observed no drill off (00: 00hrs–3: 00hrs) decided to pull out of hole. Flow checked for 15min –
well static. Pulled out of hole5" Drill pipes from 8951ft to 5435ft and is in progress, (flow checked at 13⅜"
Casing shoe, Ok).

Date: 26/01/18 Day: 78 Depth: 8974ft


Pulled out of hole 12¼” Bit from 5371ft to surface. Laid down Bit + stabilizer. Laid down Mud Motor +
MWD tools. Picked up 12¼” Tricon Bit + 9⅝" Mud motor. Adjusted bent housing to 1.22° and scribed
MWD tool. Ran in hole down to 66ft. Shallow tested Mud motor, Made up 12¼” PDC Bit (RR1) with
directional assembly and ran in hole down to 6457ft, flow checked, Ok. Slipped 27ft of Drillline. Ran in hole

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 128
12¼” PDC Bit from 6457ft to 8951ft, Reamed down last stand. Drilled 12¼” hole in Rotary Mode from
8951ft to 8955ft. Drilled 12¼” hole in Slide Mode from 8955ft to 8968ft. Conducted MWD survey. Drilled
12¼” hole in Slide Mode from 8968ft to 8974ft.

Date: 27/01/18 Day: 79 Depth: 9108ft


Drilled 12¼” hole in Slide Mode from 8974ft to 8982ft. Drilled 12¼” hole in Rotary Mode from 8982ft to
9022ft. Drilled 12¼” hole in Slide Mode from 9022ft to 9058ft. Drilled 12¼” hole in Rotary Mode from 9058ft
to 9063ft. Conducted MWD survey. Drilled 12¼” hole in Slide/Rotary Mode from 9063ft to 9078ft. Drilled
12¼” hole in Slide Mode from 9078ft to 9084ft. Drilled 12¼” hole in Rotary Mode from 9084ft to 9108ft.

Date: 28/01/18 Day: 80 Depth: 9190ft


Drilled 12¼” hole in Rotary Mode from 9108ft to 9135ft. Drilled 12¼” hole in Slide Mode from 9135ft to
9158ft. Conducted MWD survey. Drilled 12¼” hole in Rotary Mode from 9158ft to 9169ft. Drilled 12¼” hole
in Slide Mode from 9169ft to 9190ft.

Date: 29/01/18 Day: 81 Depth: 9293ft


Drilled 12¼” hole in Slide Mode from 9190ft to 9196ft. Drilled 12¼” hole in Rotary Mode from 9196ft to
9252ft. Conducted MWD survey @ 9192ft, Incl: 2.1°, AZM: 324.60°. Drilled 12¼” hole in Rotary Mode from
9252ft to 9262ft. Drilled 12¼” hole in Slide Mode from 9262ft to 9293ft.

Date: 30/01/18 Day: 82 Depth: 9364ft


Drilled 12¼” hole in Slide Mode from 9293ft to 9311ft. Drilled 12¼” hole in Rotary Mode from 9311ft to
9345ft. Conducted MWD survey @ 9289ft, Incl: 1.5°, AZM: 330.20°. Drilled 12¼” hole in Rotary Mode from
9345ft to 9364ft. Observed no drill off, decided to pull out of hole. Conducted MWD survey @ 9304ft, Incl:
1.5°, AZM: 335.3°. (flow checked for 15min – well static). Pulled out of hole12¼” PDC Bit from 9364ft to
9333ft. Observed Drawworks malfunctioning (fan sensor resistor brake failure).Worked on Drawworks and
fixed the same (Meanwhile circulating and rotating the string).At 0600hrs started to pull out of hole

Date: 31/01/18 Day: 83 Depth: 9364ft


Pulled out of hole to surface and laid down BHA. Made up new 12¼” PDC Bit and ran in hole to 9364ft.
Drilled 12¼” from 9364ft to 9365ft.

Date: 01/02/18 Day: 84 Depth: 9435ft


Broke Bit with low parameters and drilled 12¼” hole in Rotary Mode from 9365ft to 9430ft. Conducted
MWD survey @ 9377ft, Incl: 1.9°, AZM: 334.4°. Drilled 12¼” hole in Rotary Mode from 9430ft to 9435ft.

Date: 02/02/18 Day: 85 Depth: 9530ft


Drilled 12¼” hole in Rotary Mode from 9435ft to 9502ft. Drilled 12¼” hole in Slide Mode from 9502ft to
9504ft. Drilled 12¼” hole in Rotary Mode from 9504ft to 9524ft. Conducted MWD survey @ 9472ft, Incl: 2.2°,
AZM: 335.8°. Drilled 12¼” hole in Rotary Mode from 9524ft to 9530ft.

Date: 03/02/18 Day: 86 Depth: 9681ft


Drilled 12¼” hole in Rotary Mode from 9530ft to 9573ft. Attempted to conduct survey, observed MWD tool
malfunctioning. Drilled 12¼” hole in Rotary Mode from 9573ft to 9681ft.

Date: 04/02/18 Day: 87 Depth: 9698ft


Drilled 12¼” hole in Rotary Mode from 9681ft to 9690ft. Pumped 30bbls Hi-Vis pill and circulated out to
clean hole prior to pull out of hole. Pulled out of hole to surface and laid down Bit and Mud motor. Made
up 12¼” Tricon Bit + 9⅝" Mud Motor + 12⅛" String Stab + NMDC + flow sub. Adjusted bent housing to
1.5° and scribed MWD tool. Performed shallow function test Mud Motor and MWD tool @GPM: 650 and
SPP: 920psi, Ok. Pulled back and laid down Tricon Bit. Made up new 12¼” PDC Bit (RR) and ran in hole to
9690ft. Drilled 12¼” from 9690ft to 9698ft.

Date: 05/02/18 Day: 88 Depth: 9811ft


Drilled 12¼” from 9698ft to 9811ft in Rotary/Slide Mode. Conducted MWD survey @ 9750ft, Incl: 2.0°,
AZM: 334.20°.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 129
Date: 06/02/18 Day: 89 Depth: 9954ft
Drilled 12¼” from 9811ft to 9954ft in Rotary/Slide mode. Conducted MWD survey @ 9846ft, Incl: 2.0°,
AZM: 334.36°.

Date: 07/02/18 Day: 90 Depth: 10058ft


Drilled 12¼” from 9954ft to 10058ft in Rotary/Slide mode. Conducted MWD survey @ 9945ft, Incl: 1.5°,
AZM: 337.36°.

Date: 08/02/18 Day: 91 Depth: 10147ft


Drilled 12¼” hole in Rotary Mode from 10058ft to 10094ft. Conducted MWD survey @ 10031ft, Incl: 0.9°,
AZM: 330.06°. Drilled 12¼” hole in Rotary Mode from 10094ft to 10105ft. Drilled 12¼” hole in sliding mode
from 10105ft to 10120ft. Observed 2bbl gain on mud tank. Maximum gas: 12.46% and Minimum cut wt
12.5ppg. Flow checked for 30min, well trickling @ 4.5 BPH. Total gain 8bbls. Circulated for bottom up.
Observed Maximum gas: 11.49% and Minimum cut wt: 12.5ppg. Drilled 12¼” hole in sliding mode from
10120ft to 10147ft. Mud wt increased from 12.9ppg to 13ppg.

Date: 09/02/18 Day: 92 Depth: 10242ft


Drilled 12¼” hole in sliding mode from 10147ft to 10180ft. Drilled 12¼” hole in Rotary Mode from 10180ft
to 10189ft. Conducted MWD survey @ 10126ft, Incl: 0.4°, AZM: 265.16°. Pumped 30bbls Hi-Vis pill and
circulated out to clean hole prior to perform wiper trip. Flow checked – well static. Performed wiper trip
from 9531ft to 10189ft (hole free). Drilled 12¼” hole in Rotary Mode from 10189ft to 10242ft and is in
progress. Observed Maximum trip gas: 24.55% and Minimum cut wt: 12.6ppg.

Date: 10/02/18 Day: 93 Depth: 10405ft


Drilled 12¼” hole in Rotary Mode from 10242ft to 10283ft. Conducted MWD survey @ 10217ft, Incl: 1.0°,
AZM: 202.86°. Conducted MWD survey @ 10315ft, Incl: 1.2°, AZM: 208.76°. Drilled 12¼” hole in Rotary
Mode from 10377ft to 10405ft.

Date: 11/02/18 Day: 94 Depth: 10546ft


Drilled 12¼” from 10405ft to 10546ft in Rotary and slide mode. Conducted MWD survey, observed
formation gas. Maximum 64.6% with minimum cut mud weight 11.7ppg, Flow check well trickling with
3bbl/hr. Closed BOP. Recorded SICP: 50psi. Circulated out for bottoms up through poor boy°asser.

Date: 12/02/18 Day: 95 Depth: 10556ft


Circulated for bottom up through poor boy°asser and observed Maximum gas 72% with minimum cut mud
weight 10.7ppg. Stopped pump and close the well. Recorded SICP: 280psi and SIDP: 220psi. Held pre job
safety meeting, started killing well with driller method. Pumped kill mud of 13.4ppg, ICP: 650psi, FCP:
444psi. Maintained pressure from ICP to FCP till surface to Bit. Maintained FCP till Bit to surface.Minimum
mud cut = 10.8ppg, Maximum TG = 72%. After complete cycle, observed shut in pressure recorded SICP:
0psi and SIDPP = 0psi. Opened BOP, Picked up string and rotate found free. Flow checked for 30min – well
static. Pumped 40bbl Hi-Vis and circulated out to homogenize mud. Took check shot (survey): Survey
depth: 10,482ft, Incl: 1.4°, AZM: 217.16°. Flow checked, Ok. Pulled out of holefrom 10546ft to 10095ft (5
stands). Flow checked for 30min, well trickled with 2 BPH. Ran in hole from 10095ft to 10,546ft. Drilled
12¼” hole in Rotary Mode from 10546ft to 10556ft. (meanwhile increased mud weight from 13.4ppg to
13.6ppg.) Circulated out to homogenize mud. Took SCR. Flow checked – well static. Pulled out of holefrom
10546ft to 10095ft (5 stands). Flow checked for 20min – well static. Pulled out of hole12¼” PDC Bit from
10095ft to 7933ft.

Date: 13/02/18 Day: 96 Depth: 10556ft


Pulled out of hole 12¼” PDC Bit to surface. Laid down BHA + Mud Motor + NMDC + string stabilizer +
Bit. Observed one nozzle plugged. Replaced saver sub of TDS. Made up BOP pressure tested assembly 1
stand of 5” Drill pipes + test plug + 1x 5" Drill pipes + 1 x pup joint 10" + side entry sub + safety valve + 5"
pup joint and seated test plug in well head. Pressure tested BOP. 1st test: tested lower pipe ram against

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 130
HCR TDS valve @ LP 300psi for 5min. and HP 7000psi for 10min. found Ok. 2nd test: Tested upper pipe
ram against HCR of kill line and HCR of chOke line and manual TDS valve @ LP 300psi for 5min and HP
7000psi for 10min. found Ok. 3rd test: tested upper pipe ram against kill line and chOke line manual valve
and safety valve @ LP 300psi for 5min. and HP 7000psi for 10min. 4th test: tested annular ram @ LP 300psi
for 5min. and HP 3500psi for 10min. found Ok. 5th test: Tested blind ram against NRV and chOke
manifold coflex hose @LP 300psi for 5min and HP 7000psi for 10min. found Ok, retrieved testing plug and
installed wear bushing. Laid down pressure test assy. Worked on actuator of IBOP. Made up 12¼” Tricon
Bit + 8½” Mud Motor + 12.18" String Stab + NMDC + flow sub. Adjusted bent housing to 1.22° and scribed
MWD tool. Performed shallow function test Mud Motor and MWD tool @GPM: 450 and SPP: 500psi, Ok.
Pulled back and laid down Tricon Bit. Made up 12¼” PDC Bit # 12 (RR2) with directional assembly + new
BHA and ran in hole down to 947ft.

Date: 14/02/18 Day: 97 Depth: 10612ft


Ran in hole 12¼” PDC Bit from 978ft to 6362ft (inside Casing shoe). Slipped 33ft of Drillline. Changed wash
pipe. Serviced and lubricated TDS. Ran in hole from 6362ft to 10556ft. (washed down last stand). Drilled
12¼” hole in Rotary Mode from 10556ft to 10558ft. Circulated out gas with Maximum gas 27% and
Minimum cut mud weight 12.7ppg. Closed BOP and circulated out through poor boy°asser while observed
Maximum gas 32% and Minimum cut mud weight 12.5ppg. Drilled 12¼” hole in Rotary Mode from 10558ft
to 10564ft. Conducted MWD survey @ 10506ft, Incl: 1.4°, AZM: 216.90°. Drilled 12¼” hole in Rotary Mode
from 10564ft to 10612ft.

Date: 15/02/18 Day: 98 Depth: 10721ft


Drilled 12¼” hole in Rotary Mode from 10612ft to 10661ft. During drilling at 10,636ft, observed Maximum
gas 20.5% with minimum cut mud weight 13.3ppg. Conducted MWD survey @ 10604ft, Incl: 1.4°, AZM:
216.56°. Drilled 12¼” hole in Rotary Mode from 10661ft to 10721ft.

Date: 16/02/18 Day: 99 Depth: 10835ft


Drilled 12¼” hole in Rotary Mode from 10721ft to 10756ft. Conducted MWD survey @ 10698ft, Incl: 1.4°,
AZM: 213.10°. Drilled 12¼” hole in Rotary Mode from 10756ft to 10835ft.

Date: 17/02/18 Day: 100 Depth: 10939ft


Drilled 12¼” hole in Rotary Mode from 10835ft to 10849ft. Conducted MWD survey @ 10791ft, Incl: 1.5°,
AZM: 214.86°. Drilled 12¼” hole in Rotary Mode from 10849ft to 10939ft.

Date: 18/02/18 Day: 101 Depth: 10970ft


Drilled 12¼” hole in Rotary Mode from 10939ft to 10942ft. Conducted MWD survey @ 10885ft, Incl: 1.6°,
AZM: 211.2°. Drilled 12¼” hole in Rotary Mode from 10942ft to 10945ft. During drilling observed pressure
dropped from 3400psi to 3000psi. Stopped drilling and Picked up string. Checked surface equipment and
found Ok. Meanwhile kept string in reciprocation. Observed pressure further dropped to 2400psi from
3000psi. Decided to pull out of hole to check drill string. Flow checked – well static. WetPulled out of
hole12¼” Bit from 10945ft to 4260ft. (observed tight spot of 20–25klbs @ 10960', 8601', 6633'. Cleared the
same with reciprocation) Found wash out in 5" C body (joint # 107, hole depth: 4295ft) replaced the joint.
Ran in hole 12¼” Bit from 4260ft to 6454ft. (inside 13⅜" casing shoe) Slipped 23ft Drillline. Ran in hole 12¼”
Bit from 6454ft to 6639ft. Circulated to check pressure and observed constant pressure during circulation.
GPM: 400, SPP: 1070psi. GPM: 640, SPP: 2400psi Ran in hole 12¼” Bit from 6639ft to 10945ft. Washed down
last stand. Drilled 12¼” hole in Rotary Mode from 10945ft to 10948ft. Circulated out gas with Maximum gas
37% and Minimum cut mud weight 12.4ppg. Closed annular bop and circulated out through poor
boy°asser while observed Maximum gas 54% and Minimum cut mud weight 12.8ppg. (Reciprocated string
intermittently). Drilled 12¼” hole in Rotary Mode from 10948ft to 10970ft.

Date: 19/02/18 Day: 102 Depth: 11075ft


Drilled 12¼” hole in Rotary Mode from 10970ft to 11035ft. Conducted MWD survey @ 10979ft, Incl: 1.8°,
AZM: 208.8°. Drilled 12¼” hole in mode from 11035ft to 11075ft.

Date: 20/02/18 Day: 103 Depth: 11178ft


Drilled 12¼” hole in Rotary Mode from 11075ft to 11100ft. Drilled 12¼” hole in Slide Mode from 11100ft to

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 131
11,101ft. (due to less ROP, ends Slide Mode and resumed rotation mode). Drilled 12¼” hole in Rotary Mode
from 11,101ft to 11128ft. Conducted MWD survey @ 11074ft, Incl: 1.8°, AZM: 205.76°. Drilled 12¼” hole in
Rotary Mode from 11128ft to 11178ft.

Date: 21/02/18 Day: 104 Depth: 11255ft


Drilled 12¼” hole in Rotary Mode from 11178ft to 11191ft. Drilled 12¼” hole in Slide Mode from 11191ft to
11194ft. Drilled 12¼” hole in Rotary Mode from 11194ft to 11207ft. Drilled 12¼” hole in Slide Mode from
11207ft to 11208ft. Drilled 12¼” hole in Rotary Mode from 11208ft to 11225ft. Conducted MWD survey @
11172ft, Incl: 2.1°, AZM: 203.0°. Drilled 12¼” hole in Rotary Mode from 11225ft to 11255ft.

Date: 22/02/18 Day: 105 Depth: 11360ft


Drilled 12¼” hole in Rotary Mode from 11255ft to 11311ft. (during drilling at 11311ft, observed TDS stalled
and string got stuck). Made several attempts to release stuck string with maximum over pull 60klbs,
Maximum compression 30klbs and Maximum TRQ = 15–20ft.klbs, GPM = 400, SPP: 1900–2000psi.
Observed string free. Reamed and cleaned complete stand. Drilled 12¼” hole in Rotary Mode from 11311ft
to 11317ft. Conducted MWD survey @ 11262ft, Incl: 2.2°, AZM: 201.30°. Drilled 12¼” hole in Rotary Mode
from 11317ft to 11360ft.

Date: 23/02/18 Day: 106 Depth: 11380ft


Drilled 12¼” hole in Rotary Mode from 11360ft to 11380ft. Circulated out Hi-Vis pill to clean hole prior to
pull out of hole. Pulled out of hole12¼” PDC Bit from 11380ft to 6407ft (inside 13⅜” casing shoe) flow
checked – well static. Pulled out of holefrom 6407ft to 978ft (top of BHA) flow checked well static. Pulled
out of holesingle by single from 978ft to surface. Laid down 12¼” PDC Bit + 8½” Mud Motor +MWD tool +
flow sub + 14 x 8" Drill collars + Drilling jar + 15 x 5" Heavey drill pipes. Found MWD tool head and flow
sub seat area wash out. Made up 12¼” Tricon Bit + 9⅝" Mud Motor + X–Over + 12⅛" String Stab + NMDC
+ Flow sub. Adjusted bent housing to 1.22° and scribed MWD tool. Performed shallow function test Mud
Motor and MWD tool @GPM: 515 and SPP: 650psi, Ok. Pulled back and laid down Tricon Bit. Made up new
12¼” PDC Bit # 13 with directional assembly and ran in hole single by single down to 605ft.

Date: 24/02/18 Day: 107 Depth: 11436ft


Ran in hole 12¼" PDC Bit # 13 with directional assembly single by single from 605ft to 978ft (top of BHA).
Ran in hole 12¼" PDC Bit # 13 with directional assembly down to from 978 to 6455ft (inside Casing shoe).
Slipped 27ft of Drillline and cut 95ft. Ran in hole 12¼" PDC Bit from 6455ft down to 11281ft Reamed and
washed down from 11281ft to 11380ft. Circulated out Hi–Vis. Observed Maximum gas 37 and Minimum
cut Mud weight 12.3ppg. Broke Bit with low parameter. Drilled 12¼" hole in Rotary Mode from 11,380ft to
11,410ft. Conducted MWD survey @ 11348ft, Incl: 2.0°, AZM: 193.60°. Drilled 12¼" hole in Rotary Mode
from 11,410ft to 11,420ft. 12¼" hole in Slide Mode from 11,420ft to 11,436ft

Date: 25/02/18 Day: 108 Depth: 11582ft


Drilled 12¼" hole in Slide Mode from 11,436ft to 11,475ft. Drilled 12¼" hole in Rotary Mode from 11,475ft to
11,505ft. Conducted MWD survey @ 11445ft, Incl: 1.4°, AZM: 184.0°. Drilled 12¼" hole in Rotary Mode from
11,505ft to 11,582ft.

Date: 26/02/18 Day: 109 Depth: 11689ft

Drilled 12¼" hole in Rotary Mode from 11,582ft to 11,599ft. Conducted MWD survey @ 11540ft, Incl: 1.0°,
AZM: 174.56° Drilled 12¼" hole in Rotary Mode from 11,599ft to 11,610ft. Drilled 12¼" hole in Slide Mode
from 11,610ft to 11,647ft. Drilled 12¼" hole in Rotary Mode from 11,647ft to 11,689ft. During drilling
observed pressure dropped from 3400psi to 3000psi. Stopped drilling and Picked up string. Checked mud
pumps, surface equipment, found Ok. Meanwhile kept string in reciprocation. Observed pressure further
dropped from 3000psi to 2400psi. Decided to pull out of hole to check drill string. Conducted MWD survey
@ 11633ft, Incl: 0.8°, AZM: 150.80°. Flow checked – well static. WetPulled out of hole12¼" PDC Bit from
11689ft to 6420ft.

Date: 27/02/18 Day: 110 Depth: 11823ft


Wet pulled out of hole12¼" PDC Bit from 6420ft to 4915ft.Found wash out in 5" Drill pipes body (joint #

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 132
128, hole depth: 4948ft) replaced the joint. Slipped drill line. Ran in hole 12¼" Bit from 6454ft to
6732ft.Circulated out to check pressure, Ok. Ran in hole 12¼" Bit from 6732ft to 11,689ft.Washed down last
stand. Drilled 12¼" hole in Rotary Mode from 11,689ft to 11,694ft Circulated out gas with maximum gas
41% and minimum cut mud weight 12.4ppg. (Reciprocated string intermittently). Drilled 12¼" hole in
Rotary Mode from 11,694ft to 11,790ft. Conducted MWD survey @ 11730ft, Incl: 0.5°, AZM: 141.06°. Took
SCR. Drilled 12¼" hole in Rotary Mode from 11,790ft to 11,823ft.

Date: 28/02/18 Day: 111 Depth: 12050ft


Drilled 12¼" hole in Rotary Mode from 11823ft to 12050ft.

Date: 01/03/18 Day: 112 Depth: 12193ft


Drilled 12¼" hole in Rotary Mode from 12050ft to 12193ft. Observed Tr – 5% Pressure and Mechanical
Caving during drilling.

Date: 02/03/18 Day: 113 Depth: 12300ft


Drilled 12¼" hole in Rotary Mode from 12193ft to 12300ft. Conducted Survey @ 12207ft, Incl: 0.7°, AZM:
337.56° TVD: 12195ft.

Date: 03/03/18 Day: 114 Depth:


Drilled 12¼" hole in Rotary Mode from 12300ft to 12450ft. Conducted Survey @ 12297ft, Incl: 0.9° AZM:
336.06 TVD: 12195ft.

Date: 04/03/18 Day: 115 Depth: 12558ft


Drilled 12¼" hole in Rotary Mode from 12450ft to 12584ft. Conducted Survey @ 12486ft, Incl: 1.2°, AZM:
322.66° TVD: 12473.90ft. Further drilling.

Date: 05/03/18 Day: 116 Depth: 12678ft


Drilled 12¼" hole in Rotary Mode from 12584ft to 12678ft. Conducted Survey @ 12579ft, Incl: 1.1 AZM:
315.06 TVD: 12566.88ft. Circulated out 50bbl Hi-Vis pill to clean hole prior to pull out of hole for BOP
pressure test. Flow checked – well static. Pulled out of hole12¼" Bit from 12678ft to 9118ft.

Date: 06/03/18 Day: 117 Depth: 12678ft


Pulled out of hole 12¼˝ Bit and Directional BHA from 12678ft to surface. Pressure tested BOP. Performed
Shallow test of Mud Motor and MWD tool. Ran in hole 12¼ RR PDC Bit with directional BHA down to
8958.

Date: 07/03/18 Day: 118 Depth: 12736ft


Ran in hole 12¼" Bit from 8958ft to 12670ft. Hard reamed from 12670ft down to 12678ft. Pumped 30bbl Hi-
Vis pill. Observed trip gases at bottom up. Circulated out trip gases. Observed maximum gas: 51% and
minimum Mud cut wt: 12ppg. Drilled 12¼" hole in Rotary Mode from 12678ft to 12736ft. Conducted
Survey @ 12672ft, Incl: 1.0° AZM: 333.90 TVD: 12659.86ft.

Date: 08/03/18 Day: 119 Depth: 12742ft


Drilled 12¼" hole in Rotary Mode from 12736ft to 12742ft (Section TD). Circulated bottom up. Conducted
Survey @ 12687ft, Incl: 0.9° AZM: 332.7° TVD: 12674.86ft. Performed wiper trip from 12742ft to 6646ft. Ran
in hole back from 6646ft to 12742. Pumped 50bbl Hi-Vis pill. Circulated bottom up. Observed maximum
trip gas: 75.3% and minimum Mud cut wt: 13.1ppg. Circulated till mud wt homogenized. Flow checked –
well static. Pulled out of hole12¼" Bit from 12742ft to 4413ft.

Date: 09/03/18 Day: 120 Depth: 12742ft


Pulled out of hole 12¼” Bit from 4413ft to Surface. Laid down BHA and directional assembly. Conducted
Wireline logs (HMI–BHC–GR). Pulled out of holeWireline logging suit to surface. Flow checked for 30 min,
well trickled @ 2.2bbl/hr. Ran in hole 12¼” Bit down to 6442ft .

Date: 10/03/18 Day: 121 Depth: 12742ft


Ran in hole 12¼” PDC Bit from 6442ft down to 12742ft. Pumped 40bbl Hi-Vis pill and circulated to increase

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 133
Mud weight from 13.6ppg to 14.0ppg. During circulation, observed pressure dropped from 3200psi to
2200psi. Checked surface equipments, found Ok. Decided to pull out of hole to check suspected drill string
wash out. Pulled out 12¼”“ Bit from 12742ft to 6013ft. Found wash out in 5" Drill pipe body (joint # 163,
hole depth = 6727ft), replaced the same. Ran in hole 12¼” Bit from 6013ft to 12742ft. Circulated out to check
pressure at 6553ft, Ok. Circulated out to increase mud weight from 13.6ppg to 14.0ppg. MW In/Out:
14.0ppg/14.0ppg. Pulled out 12¼” PDC Bit from 12,742ft to 11,779ft.

Date: 11/03/18 Day: 122 Depth: 12742ft


Pulled out of hole 12¼” PDC Bit from 11,779ft to Surface. Held prejob safety meeting. Made up and ran in
hole Wireline logging Suite (Run # 2: Density Log) down to 4500ft, checked tool prior to enter in open hole,
Caliper malfunctioned. Pulled out of holelogging tool to surface and rectified the problem. Ran in hole
density log down to 12,750ft (logger depth) and conducted logging. Pulled out of hole Wireline logging
tools to surface. Made up Wireline logging suite (Run # 3: Resistively Log) and ran in hole down to 12,750ft
(logger depth), Performed logging andPulled out of hole to surface. Riggeddown WDI Wireline logging
Tools.

Date: 12/03/18 Day: 123 Depth: 12742ft

Made up 12¼” PDC Bit and ran in hole from Surface to 12742ft. Circulated out 40bbl Hi-Vis to clean hole
prior to pull out of hole. Observed maximum trip gas: 7.1%. Flow checked– well static. Pulled out of hole
12¼” from 12742ft to Surface. Flow checked at top of BHA – Ok. Laid down 8” Drill Collars, Directional
assembly

Date: 13/03/18 Day: 124 Depth: 12742ft


Laid down 8” Drill collar and directional assembly. Changed Rams to 9⅝”. Pressure tested the Same.
Rigged up WDI TRS equipments. Held pre job safety meeting. Made up and ran in hole shoe track
(length=126.50') down to 126.50ft. Applied baker seal lock to shoe track. Checked integrity of float shoe and
float collar, found Ok. Continued to run in hole 100 x 9⅝”CSG (53.5 PPF, C–95, NSCC) joints down to 8078ft
(Filled up Casing after every 15 joints) and is in progress.

Date: 14/03/18 Day: 125 Depth: 12742ft


Continued to run 9⅝" casing (53.5#, C–95, NSCC) from 8078ft to bottom. Confirmed TD with 15klbs @
12742ft with circulation. Spaced out casing with shoe at 12737ft. Circulated to condition mud and reduced
YP as per cement job requirement (GPM = 330, SPP = 725psi). Meanwhile Rigged down WDI TRS
equipment. Prepared mixed fluid for cement job. (Observed 2.2% gas at bottom up). Rigged up dowel
surface lines and pressure tested the same @ low 500psi and high 4000psi, hold for 10 minutes, Ok. Held
pre job safety meeting. Pumped 150bbl of 14.8ppg spacer. Dropped by pass plug and installed circulating
head. Fly mixed and pumped 235bbl of 15.8ppg lead slurry @ 5–6bpm and is in progress.

Date: 15/03/18 Day: 126 Depth: 12742ft


Pumped lead slurry 235bbl of 15.8ppg and tail slurry 270bbl of 16.2ppg from SLB (Dowell) pumping unit @
5–6bpm. Dropped shut–off plug. Displaced cement with 10bbl of 14.8ppg spacer. Pumped 898bbl of 14ppg
Mud, Observed Plug not bumped. Obesrved no back flow. Dropped opening bomb. Opened DV ports @
850psi and established circulation. Circulated through DV ports. Picked up BOP, slacked 20% weight
(110klbs) of casing. Set 9⅝" casing slip and seal assembly. Landed casing in 80% tension (490klbs) in 13⅝”
10k casing spool. Observed well flowing while landing casing. WOC. Resumed circulation through side
outlet of 13⅝”10k casing spool. Flow checked, well flowing @ 12bbl/hr. decided to increase mud weight
from 14ppg to 15ppg. During circulation, observed maximum gas 23.3% and minimum cut Mud weight
13.3ppg. Circulated to homogenize mud.

Date: 16/03/18 Day: 127 Depth: 12742ft


Circulated out to homogenize/increase Mud weight from 15ppg to 15.5ppg, observed maximum gas 8%.
Flow checked, well flowing @ 4.5 BPH. Circulated out to homogenize/increase Mud weight from 15.5ppg
to 16.0ppg, observed maximum gas 36% and minimum cut Mud weight 13.8ppg. Flow checked, well
flowing @ 3bph. Circulated out to homogenize/increase Mud weight from 16ppg to 17ppg, observed
maximum gas 22.7% and minimum cut Mud weight 15.7ppg. Mud weight in/out: 17ppg/16.9ppg.
Circulation in progress.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 134
Date: 17/03/18 Day: 128 Depth: 12742ft
Circulated out to homogenize Mud weight in/out: 17ppg. meanwhile cut cement and Hematite prior to
blend them for 2nd stage cement job and is in progress.

Date: 18/03/18 Day: 129 Depth: 12742ft


Circulated out to homogenize Mud, meanwhile Prepared blend of cement + Hematite and dispatched to Slb
laboratory for testing. Prepared 160bbls of 17.6ppg spacer for 2nd stage cement job and is in progress.

Date: 19/03/18 Day: 130 Depth: 12742ft


Circulated to homogenize mud weight to 17ppg. Rigged down circulation head and. Rigged up dowel
cementing head. Pressure tested dowel surface cementing lines @ Low pressure 500psi and High pressure
4000psi for 15mins, Ok. Continued circulation meanwhile prepared mix fluid. Held pre job safety meeting.
Pumped 100bbls of 17.6ppg spacer from rig pump. Pumped 290bbl of 18.2ppg lead cement slurry @ 5 -6
BPM, followed by 100bbl of 18.2ppg batch mixed tail slurry from Dowel pumping unit @ 5 -7 BPM.
Dropped closing plug and displaced cement with 4bbl of spacer from Dowel pumping unit followed by 449
bbl of 17.0ppg mud. Bumped closing plug (92% pump efficiency), increased pressure to 2500psi and hold
pressure for 30mins, Ok. Bled off pressure and observed no back flow. Received and dumped 100 bbls of
contaminated spacer (17.7-18ppg) and 183bbls of neat cement (18.2ppg) while displacement. Applied and
maintained 300psi pressure to annulus (13⅜" x 9⅝") by dowel pumping unit. WOC while worked on well
head is in progress.

Date: 20/03/18 Day: 131 Depth: 12742ft


Worked on well head. Nippled up 13⅝" 10k x 11"-10k casing spool. Pressure tested well head. Pressure
tested 9⅝" stub seal and slip seal assembly at 2500psi for 30 mins, Ok. Made up BOP Pressure tested
assembly (1 stand of 5" HWDP + test plug + 1 x 5" Drill pipes + 1 x pup joint 5" Drill pipe+ side entry sub +
IBOP) and seated test plug in well head. 1st Test : tested lower pipe ram against IBOP valve @ LP 300psi for
5min and HP 7000psi for 10min, Ok. 2nd Test : tested annular ram @ LP 300psi for 5min. and HP 3500psi
for 10 min, found Ok. 3rd Test: tested upper pipe ram against TDS manual valve and HCR of kill line and
HCR of choke line @ LP 300psi for 5min and HP 7000psi for 10 mins, Ok. 4th Test : tested upper pipe ram
against safety valve, kill line and choke line manual valve @ LP 300psi for 5min and HP 7000psi for 10 min,
Ok. 5th Test: tested blind ram against NRV valve and choke manifold coflex hose, observed pressure drop.
checked seal of plug tester, Ok. Conducted the same test @ LP 300psi for 5min and HP 7000psi for 10min,
Ok. Retrieved testing plug and installed wear bushing. Laid down pressure test assembly. Replaced saver
sub, lower and upper IBOP of TDS. Nippled up DSA, BOP stack and bell nipple. Made up new 8½” Tricone
bit # 14 on slick BHA (bit sub + 18 x 6½" Drill collars + Drilling jar + 2 x 6½" Drill collar + 15 Heavey drill
pipes) and Ran in hole single by single down to 1084ft (Top of BHA). Ran in hole from 1084ft to 4430ft.

Date: 21/03/18 Day: 132 Depth: 12742ft

Ran in hole 8½” Tricone bit from 4430ft to 6402ft. Washed down last stand and tagged closing plug with
6-7klbs. Circulated out/homogenized to reduce mud weight from 17ppg to 14ppg. Pressure tested casing
above DV at 2500 psi for 15min (with 500 psi increment), Ok. Drilled closing plug, opening bomb and DV
from 6402ft down to 6404ft. Received rubber and metallic junk at shakers. Ran in hole 8½” Tricone bit from
6404ft to 11890ft. Got obstruction and chased down opening bomb pieces @ 11890ft. Washed down from
11890ft to 12330ft. Tagged hard cement @ 12330ft. Drilled out hard cement from 12330ft to 12537ft.

Date: 22/03/18 Day: 133 Depth: 12742ft

Drilled out hard cement from 12537ft to 12600ft. Pumped Hi − Vis and circulated out to homogenize mud
prior to pressure test casing. Pressure tested Casing (10ft above baffle collar) at 2500psi for 15 min(with
500psi increment), Ok. Drilled out hard cement from 12600ft to 12731ft (6ft above shoe). Pressure tested
Casing at 2500psi for 15 minimum (with 500psi increment), Ok. Pulled out of hole 8½" Bit from 12,731ft to
surface. Made up 9⅝” Casing scrapper and ran in hole down to 450ft and is in progress.

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 135
Date: 23/03/18 Day: 134 Depth: 12742ft

Ran in hole 8½” Bit with 9⅝" Casing scrapper down to 12600ft. Slipped 33ft of drill line. Ran in hole 8½” bit
with 9⅝" casing scrapper from 12600ft to 12731ft (PBTD). Washed down last two stands. Circulated out Hi
− Vis to clean hole prior to pull out of hole for logging. Pulled out of hole 8½ bit with 9⅝" Casing scrapper
to surface. Held pre job safety meeting. Picked up WFD BOP on 7" shooting nipple and tested the same @
300psi, Ok. Rigged up and made up WFD wire line suite (CBL − VDL − CCL − GR) is in progress.

Date: 24/03/18 Day: 135 Depth: 12742ft


Made up logging suite and ran in hole logging suite (CBL − VDL − CCL − GR) down to 12738ft and
conducted logging. Logger depth = 12738ft. Rigged down WFD logging equipment. Made up and ran in
hole 8½" Tricone bit down to 1300ft. (Picked up new 6½" drilling jar), slipped 45ft and cut 90ft drill line.
Lubricated TDS and adjusted Petro depth sensor. Ran in hole 8½" Triconebit from 1300ft to 11350ft and is in
progress. Picked up 54 x 5" Drill pipes (S − 135) single by single from rack.

Date: 25/03/18 Day: 136 Depth: 12816ft

Continued Ran in hole 8½" Tricone bit from 11350ft to 12731ft. Washed down last stand. Circulated to
homogenize mud prior to displace mud with 11ppg mud (7% KCl polymer/NDM. Pumped 130 bbls Hi −
Vis pill and displaced hole with 11ppg mud (7 % KCl polymer/NDM). Drilled out cement from 12731ft to
12737ft and tagged float shoe. Drilled float shoe and cement (rat hole ) down to 12742ft. Drilled 8½" hole
from 12742ft to 12816ft and is in progress.

Date: 26/03/18 Day: 137 Depth: 12887ft

Drilled 8½" hole from 12816ft to 12886ft. Observed pressure drop gradually from 1780psi to 1510psi in 05
hrs. Picked up string, checked surface equipment and mud pumps. Observed bleed off valve of mp # 1
wash out, replaced the same. Drilled 8½" hole from 12886ft to 12887ft and is in progress.
Date: 27/03/18 Day: 138 Depth: 12921ft
Drilled 8½" hole from 12887ft to 12888ft. Observed pressure dropped. Pulled out of hole bit from 12888ft to
6193ft. Found wash out in 5" Drill Pipe. Replaced the same. Ran in hole from 6193ft to 12675ft. Slipped drill
line and service TDS. Ran in hole from 12675ft to bottom. Drilled 8½" hole to 12921ft and is in progress

Date: 28/03/18 Day: 139 Depth: 12958ft


Drilled 8½" hole from 12921ft to 12958ft. Observed maximum background gas 5.4% and minimum cut mud
weight: 10.8ppg. Circulated to increase mud weight from 11ppg to 11.3ppg. Flow checked. Well trickling @
1.5BPH. Circulated for bottom up , observed maximum gas 17.90% and minimum cut mud weight 10.8ppg.
Circulated to increase mud weight from 11.3ppg to 11.5ppg. Flow checked. Well trickling @ 1BPH.
Circulated for bottom up, observed maximum gas 0.74%. Pulled out of hole from 12958ft to 6000ft and is in
progress. Flow checked @ casing shoe, well static.

Date: 29/03/18 Day: 140 Depth: 12985ft


Pulled out of hole 8½" Tricone bit from 6000ft to surface. Made up and ran in hole 8½" PDC bit # 15 on
pendulum assembly (S.stab at 30ft and 60ft) down to 12682ft to 12737ft. Reamed down from 12737ft to
12958ft (bottom)Observed maximum trip gas 68% and minimum cut mud weight 11ppg. Drilled 8½" hole
from 12958ft to 13030ft.. Observed mud splashed at rig floor and maximum gas 35.3 % due to splash,
Picked up string and shut the well. Recorded SICP= 200psi. Circulating through poor boy degasser to shale
shaker with SPM: 50 and GPM: 220. Maximum gas: 84 %, Average gas: 35 % and minimum gas 20 %.
minimum cut wt: 9.3ppg. Meanwhile increasing mud weight to 12.5ppg (in steps) in active system. Current
mud weight: 11.8ppg

Date: 30/03/18 Day: 141 Depth: 13030ft

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 136
Circulated through poor boy degasser to shale shaker to increase mud weight to 13ppg. Maximum gas: 38
%, minimum gas 5 %, minimum cut wt: 10.6ppgAt 5% gas, opened annular BOP. Circulated through flow
line to homogenize mud. Mud wt in/out: 13/13ppg. Back ground gases 2% (Dumped 70 bbl during killing
operation) drilled 8½" hole from 12985ft to 13030ft. (observed dynamic losses @ 5BPH, total=30 bbl loss).
Circulated for bottom up to collect sample. Declared coring point @ 13030ft. Circulated out Hi − Vis pill to
clean hole prior to pull out of hole for coring. Conducted flow checked, well static. Pulled out of hole from
13030ft to 191ft and is in progress. Observed obstruction @ 12841' and 12779'. Cleared the same. ( flow
checked @ 9⅝" casing shoe and top of BHA ).

Date: 31/03/18 Day: 142 Depth: 13055ft


Pulled out of hole from 191ft to surface. Made up and ran in hole 8½" core head with 6¾" core barrel
assembly down to 12718ft. slipped 16ft drill line. Cont'd Ran in hole core head from 12718ft to 12872ft.
Reamed from 12872ft to 13030ft. Circulated for bottoms up , GPM=275, SPP=930psi. (Observed 14% of
gases and minimum cut mud wt: 12.4ppg). Dropped 1¼" ball and circulated till it reaches at ball seat.
Observed pressure increased from 550psi to 630psi. Took SCR. Cut core from 13030ft to 13055ft. Observed
no drill off. Broke core with 5klbs drag. Flow checked − Ok. Pulled out of hole coring assembly from
13055ft to 12737ft (inside 9⅝" casing shoe). Flow checked − Ok. Pulled out of hole 8½" coring assembly
from 12737ft to 10748ft and is in progress.

Date: 01/04/18 Day: 143 Depth: 13055ft


Pulled out of hole 8½" coring assembly from 10748ft to 1030ft (top of BHA). Laid down 15 x 5" Drill pipes
single by single. Found wash out on 5" Drill pipe# 169, G − 105 (Drilling depth: 6790ft).Flow checked, well
static. Pulled out of hole from 1030ft to surface. Laid down 8½" Core head + Core barrel. Core recovered:
21.5ft (86 %). Made up Directional BHA and Adjusted bent to 1.22°. Performed shallow function test of mud
motor and MWD tool. Made up 8½" PDC Bit#15(RR) and ran in hole down to top of BHA (1070ft).Break
circulated. Ran in hole 8½" PDC Bit from 1070ft to 12623ft. (casing shoe). Picked up 15 x 5" Drill pipes, S −
135 and ran in hole single by single. Slipped 30ft and cut 105ft drill line. Resumed run in hole to 12756ft and
is in progress.

Date: 02/04/18 Day: 144 Depth: 13325ft


Ran in hole from 12756ft to 13055ft (bottom), hole free. Washed down last single. Drilled 8½" hole in Rotary
Mode from 13055ft to 13136ft Conducted MWD Survey @ 13083. Drilled 8½" hole in Rotary Mode from
13136ft to 13236ft conducted MWD Survey @ 13177 . Drilled 8½" hole in Rotary Mode from 13236ft to
13325ft and is in progress.

Date: 03/04/18 Day: 145 Depth: 13452ft


Drilled 8½" hole in Rotary Mode from 13325ft to 13336ft. Drilled 8½" hole in Slide Mode from 13336ft to
13358ft. Drilled 8½" hole in Rotary Mode from 13358ft to 13417ft. Observed drop of 300psi in pressure.
Checked surface equipment. Decided to pull out of hole to check drill string. Flow checked, well static. Wet
Pulled out of hole from 13417ft to 6021ft. Found washout in Drill pipe joint # 160 (washout depth = 7395ft).
Replaced the same. Ran in hole 8½" bit from 6050 to 12737ft (inside Casing shoe). Slipped 20ft drill line. Ran
in hole 8½" bit from 12737 to 13417ft, (hole free). Washed down last single. Drilled 8½" hole in Rotary Mode
from 13417ft to 13420ft. Conducted MWD survey. Drilled 8½" hole in Rotary Mode from 13420ft to 13452ft
and is in progress.

Date: 04/04/18 Day: 146 Depth: 13665ft


Drilled 8½" hole in Rotary and Slide Mode from 13452ft to 13665ft. Conducted MWD survey.

Date: 05/04/18 Day: 147 Depth:


13852ft
Drilled 8½" hole in Rotary and Slide Mode from 13665ft to 13852ft. Conducted MWD survey at each
connection. Drilling is in progress.

Date: 06/04/18 Day: 148 Depth:


13973ft

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 137
Drilled 8½" hole in Rotary and Slide mode from 13852ft to 13973ft. Conducted MWD survey at each
connection. Drilling is in progress.

Date: 07/04/18 Day: 149 Depth: 14226ft


Drilled 8½" hole in rotary mode from 13973ft to 13986ft. Conducted MWD survey. Circulated out 40 bbl Hi-
Vis pill to clean hole prior to wiper trip. Flow checked, well static. Conducted wiper trip from 13986ft to
13358ft. Drilled 8½" hole in rotary mode from 13986ft to 14081ft. (on bottom up), observed 28.54% Trip gas
and maximum cut Mud wt: 12.6 ppg. Drilled 8½" hole in rotary mode from 14081ft to 14226ft.

Date: 08/04/18 Day: 150 Depth: 14226ft


Circulated out Hi-Vis to clean hole prior to pull out of hole (flow checked, well static). Pulled out of hole
8½" “PDC Bit from 14,226ft to surface. Performed BOP pressure test. Made up Directional BHA and
adjusted bent to 1.5°. Performed shallow function test of Mud Motor and MWD tool. Made up 8½" PDC
Bit#15(RR2) On Directional Assembly and ran in hole down to 600ft. Run in hole is in progress.

Date: 09/04/18 Day: 151 Depth: 14252ft


Ran in hole 8½" PDC Bit from 600ft 12737ft. Worked on Draw works and Power tong. Slipped drill line and
service TDS. Ran in hole from 12737ft to 14226ft. Drilled 8½" hole in Rotary and Slide mode from 14226ft to
14252ft. conducted survey at each connection. Further drilling is in progress.

Date: 10/04/18 Day: 152 Depth: 14370ft


Drilled 8½" hole in Rotary and Slide mode from 14252ft to 14370ft. Conducted survey at each connection.
Further drilling is in progress.

Date: 11/04/18 Day: 153 Depth: 14586ft


Drilled 8½" hole in Rotary and Slide mode from 14370ft to 14540ft. Marked Top of Amb Formation
@14540ft. Drilled 8½" hole in Rotary mode from 14540ft to 14575ft. Circulation for bottom up. Conducted
survey at each connection. Drilling is in progress.

Date: 12/04/18 Day: 154 Depth: 14586ft


Drilled 8½" 14575ft to 14586ft. Circulated to bottom up for geological sample and clean hole. Conducted
wiper trip. Worked on TDS. Circulated out Hi-Vis pill prior to pull out of hole. Pulled out of hole 8½" PDC
Bit from 14586ft to surface. Riggedup wireline logging gears. Ran in hole Run # 1 (HRLA-SP-GR) logging
suite down to 1200ft and is in progress.

Date: 13/04/18 Day: 155 Depth: 14586ft


Conducted Run # 1 HRLA-SP-GR logging, laid down logging tools. Conducted Run # 2. Rigged Down
Weatherford Wireline. Madeup 8½" PDC bit and ran in hole down to 13784ft. Ran in hole is in progress.

Date: 14/04/18 Day: 156 Depth: 14586ft


Ran in hole 8½" PDC Bit from 13784ft to 14,586ft. Circulated out Hi-Vis to clean hole prior to logging. On
bottom up, observed maximum gas 49% and minimum cut Mud weight 12.3 ppg. Flow checked, well static.
Pulled out of hole 8½" PDC Bit from 14,586ft to surface. Rigged up Weatherford Wireline equipments for
Run#3. Ran in hole Run # 3 (CMI-CXD-GR) logging suite down to 14611ft(logger depth) and conducting
logs is in progress

Date: 15/04/18 Day: 157 Depth: 14586ft


Ran in hole Run # 3 (CMI CXD GR) logging suite down to 14611ft (logger depth) and conducted logs. (Avg
hole size = 8.71"). Rigged down WFD Wireline and Laid down shooting Nipple. Made up 8½" Tricone Bit +
6¾" Mud motor and performed function test. Made up 8½" PDC Bit#15(RR4) on directional assembly and
Ran in hole down to 14586ft. Hole free. Pumped 100 bbls Hi-Vis pill and circulated out to clean hole prior to
run in hole 7" liner. Observed at bottom up maximum trip gas: 15.52% and Maximum cut wt: 12.6 ppg.
Flow checked, well static. Pulled out of hole 8½" PDC Bit from 14586ft to 12567ft (hole Slick) and is in
progress.

Date: 16/04/18 Day: 158 Depth: 14586ft

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 138
Pulled out of hole 8½" PDC Bit from 12567ft to surface. Retrieved wear bushing prior to run 7" liner. Rigged
up WFD TRS equipment. Held pre job safety meeting. Made up and Ran in hole shoe track (reamer shoe + 2
x 7" casing (7", 32 PPF, c-95, hydril slx) + float collar + 1 x 7" Casing joint + landing collar) down to 120ft.
Applied baker lock and checked integrity of float equipments, Ok. Ran in hole 7" liner (7", 32 PPF, c-95,
hydril slx) down to 2080ft. Picked up and made up liner hanger and ran in hole down to 2117ft. Recorded
upward weight 98 klbs and downward weight 98 klbs. Rigged down WFD TRS. Installed U clamp on pipe
handler. Ran in hole 7" liner on 5" Drill pipes from 2117ft to 3511ft and is in progress. (Filled up string after
every 5 stands).

Date: 17/04/18 Day: 159 Depth: 14586ft


Ran in hole 7" Liner on 5" Drill pipes from 3511ft to 12696ft (inside 9⅝" CSG shoe). (Break circulated at
7000ft and in CSG shoe). Ran in hole 7" Liner on 5" Drill pipes from 12696ft to 14591ft and tagged bottom
with 8klbs with circulation. Circulated out for bottoms up prior to set liner. Observed Maximum Gas 6.2%
and Maximum cut Mud weight 12.8ppg. Circulated till Back ground Gas decreased to 0.5 -0.6 %. Dropped
1.75" bronze ball and Rigged up cement head with preloaded drill pipe dart. Ball seated in landing collar
with pressure increased up to 1500psi, held for 5 min. Set Liner hanger (keeping shoe @ 14586ft) by
applying pressure up to 1500psi. Slacked 240klbs weight on liner hanger. Increased pressure up to 1800psi
to release running tool, lost 60klbs liner weight, tool free. Sheared out the ball seat at 2400psi, resumed
circulation. Circulated to condition mud, prior to cement job. prepared mix fluid. Rigged up SLB Dowell
surface cementing lines. Held pre job safety meeting. Pumped 100bbls of low YP Mud (YP=17 lb/100ft2) @
8bpm followed by 80 bbl spacer @ 7bpm with rig pump. Cement job is in progress.

Date: 18/04/18 Day: 160 Depth: 14586ft


Pumped 88bbls of 16.4ppg cement slurry with SLB Dowell pumping unit @ 4-5bpm. Dropped drill pipe
dart and displaced cement with 20 bbl of 15ppg spacer followed by 40bbls of mud (13ppg) followed by
20bbls of spacer followed by 128bbls of mud (13ppg) @ 5-6bpm latched dart inside liner wiper plug
(observed increase in pressure from 1000psi to 2000psi, pressure dropped after releasing of liner wiper
plug). Further pumped 73bbls (liner volume) of mud (13ppg) and bumped liner wiper plug at landing
collar @ 2500psi and held pressure for 10mins, Ok. Bled off pressure and observed no back flow. Sting out
liner setting tool and pulled out of hole 10 stands of 5" Drill pipes up to 11453ft. Circulated to sweep out
contaminated mud. Pulled out of hole running tool from 11453ft to surface. Picked up and made up new
8½" Tricone Bit # 17 and ran in hole down to 10703ft. Filled up stringer after every 15 stands. Run in hole is
in progress.

Date: 19/04/18 Day: 161 Depth: 14586ft


Ran in hole 8½" Tricone Bit from 10703ft to 11988ft and tagged soft cement @ 11,988ft with 5-6klbs. Cleaned
out soft cement from 11988ft to 12122ft and tagged hard cement with 5-7klbs. Cleaned out hard cement
from 12122ft to 12476ft and tagged top of 7” liner @ 12476ft with 6klbs. Circulated for bottom up prior to
pull out of hole. Pulled out of hole 8½" bit from 12476ft to surface. Made up 6" Tricone Bit and ran in hole
down with 3” and 5” Drill pipes to 2309ft. Run in hole is in progress.

Date: 20/04/18 Day: 162 Depth: 14586ft


Ran in hole 6" Bit from 2309ft to 12474ft. Passed TOL with circulation and without circulation. Cleaned
out/washed down cement from 12475ft to 14466ft. Tagged liner wiper plug @ 14466ft (Top of landing
collar: 14466ft). Circulated out Hi-Vis to clean hole prior to pressure test. Pressure tested top of liner at
2500psi with increment of 500psi for 15 min, Ok. Drilled liner wiper plug + landing collar and hard cement
from 14466ft to 14474ft and is in progress.

Date: 21/04/18 Day: 163 Depth: 14586ft


Drilled hard cement from 14472ft to 14474ft. Drilled hard cement from 14474ft to 14578ft (PBTD). (Tagged
float collar at 14506ft). Circulated out Hi-Vis to clean hole prior to pressure test. Pressure tested at 2500psi
with increment of 500psi for 15min, Ok. Pulled out of hole 6" Bit from 14578ft to surface. Made up 7" casing
scrapper and ran in hole down to 1179ft (top of BHA). Break circulated at top of BHA. Ran in hole 7" casing
scrapper to 2314ft and is in progress.

Date: 22/04/18 Day: 164 Depth: 14586ft

PetroServices GmbH–Mud Logging Services–Unit No. PTPS–9009 Well: Khaur North–1


Doc. # PSPB–SPR006–F–009 139
Ran in hole 6" bit with 7" casing scrapper down to 14,578 ft PBTD (Plug back total depth) and scrapped
7" casing twice. Passed smoothly through tool both with and without circulation. Filled up string after
every 15 stands. Washed down last 2 stand. Swept out Hi-Vis to clean hole prior to conduct Wireline
logging. Pulled out of hole 6" bit with 7" casing scrapper and Laid down 5" Drill pipes single by single to
7024 ft and is in progress.

Date: 23/04/18 Day: 165 Depth: 14586ft


Pulled out of hole 6" bit and 7" scrapper from 7024 ft to surface. Rigged up 7" shooting nipple and pressure
tested the same at 300psi for 5min. Conducted CBL-VDL logging. Ran in holeVSP-GR) down to 14550 ft.
Observed logging tool malfunction. Pulled out to 11775ft and is in progress.