NAME OF CONTRACTOR : RELIABLE CONSTRUCTIONS

GSTIN NO. CONTRACTOR : 06AQJPT9988P1ZC SAC CODE :


NAME OF CLIENT : SH. GURMAIL SINGH
NAME OF WORK : CONSTRUCTION OF WAREHOUSE AT VILLAGE KHANDSA.
NAME OF LOCATION : GURUGRAM (HARYANA)
SHED BUILDING

MATERIAL RATE MATERIAL AMOUNT LABOUR RATE LABOUR AMOUNT TOTAL (MATERIAL TOTAL (MATERIAL +
S.NO. PARTICULARS UNIT QTY. + LABOUR) RATE LABOUR) AMOUNT

1 EARTHWORK IN SURFACE EXCAVATION NOT


EXCEEEDING 30CM IN DEPTH BUT EXCEEDING
1.5 M IN WIDTH AS WELL AS 10 SQM ON PLAN
INCLUDING GETTING OUT AND DISPOSAL OF
EXCAVATED EARTH UPTO 50 M AND LIFT UPTO SQM 4665.000 0.000 0.00 80.00 373200.00 80.00 373,200.00
1.5 M, AS DIRECTED BY ENGINEER- IN-CHARGE:

4 EXCAVATION IN FOUNDATION, TRENCHES UPTO


2M DEPTH INCLUDING DRESSING OF SIDES &
RAMMING OF BOTTOM & GETTING OUT THE
EXCAVATED SOIL AND DISPOSAL SURPLUS SOIL
AS DIRECTED WITH IN A LEAD OF 100 METERS
INCLUDING BACKFILLING IN WATERING,
RAMMING AND CONSOLIDATING ORDINARY CUM 1227.000 0.000 0.00 200.00 245400.00 200.00 245,400.00
SOIL I BOULDERMIX SOIL.

5
EARTH FILLING IN PLINTH OR WHEREVER
REQUIRED FOR BROUGHT FROM OUTSIDES IN
LAYERS NOT EXCEEDING 600mm THK CUM 18200.000 212.000 3858400.00 98.00 1783600.00 310.00 5,642,000.00
(COMPACTED) INCLUDING WATERING,
RAMMING, CONSOLIDATING & DRESSING ETC.
6 ANTI- TERMITE TREATMENT OF SOIL UNDER
FLOORS USING CHEMICAL EMULSION @ ONE
LITRE PER HOLE, 300 mm APART INCLUDING
DRILLING 12 mm DIAMETER HOLES WITH
Chlorpyriphos/Lindane E.C. 20% WITH 1% SQM 3935.000 60.000 236100.00 30.00 118050.00 90.00 354,150.00
CONCENTRATION.

7 PROVIDING & LAYING IN POSITION CEMENT


CONCRETE 1:4:8 (1CEMENT:4 COARSE SAND :8
GRADED STONE AGG. 40 MM IN FOUNDATION &
UNDER FLOOR INCL. CONSOLIDATION & CURING
(COMPLETE). AT ALL HEIGHT & LEVELS. CUM 900.000 4100.000 3690000.00 500.00 450000.00 4600.00 4,140,000.00

8 PROVIDING & LAYING IN POSITION REINFORCED


CEMENT CONCRETE M-25 GRADE / 1:1.5:3 (1
CEMENT: 1.5 COARSE SAND :3 GRADED STONE
AGGREGATE 20 MM NOMINAL SIZE) EXCLUDING
THE COST OF SHUTTERING & REINFORCEMENT
BUT INCLUDING CONSOLIDATION & CURING CUM 2325.000 5100.000 11857500.00 1700.00 3952500.00 6800.00 15,810,000.00
ETC.UPTO ANY HEIGHT.

9
CENTERING & SHUTTERING INCLUDING
STRUTTING , PROPPING ETC & REMOVAL OF SQM 5223.000 0.000 0.00 380.00 1984740.00 380.00 1,984,740.00
FORM UPTO ANY HEIGHT AS DIRECTED &
APPROVED.

10 BRICK WORK WITH BRICKS OF CLASS


DESIGNATION 75 & PLINTH JN FOUNDATION IN
C.M 1:6 INCLUDING CURING ETC. COMPLETE
IN ALL RESPECTS CUM 670.000 3484.000 2334280.00 1916.00 1283720.00 5400.00 3,618,000.00

11 20 MM THICK CEMENT PLASTER 1 :4 ON ( 1


CEMENT :4 FINE SAND ) BRICK WALLS,R.C.C.
WALLS SMOOTH FINISHED INCLUDING CURING SMT 4424.000 130.000 575120.00 150.00 663600.00 280.00 1,238,720.00
ETC. AT ALL LEVELS & HEIGHTS
12
12 MM THICK CEMENT PLASTER 1 :4 ON ( 1
CEMENT :4 COARSE SAND ) BRICK WALLS,R.C.C.
WALLS SMOOTH FINISHED INCLUDING CURING SMT 1522.000 85.000 129370.00 140.00 213080.00 225.00 342,450.00
ETC. AT ALL LEVELS & HEIGHTS

13
MAKING OF 125 MM HEIGHT SKIRTING INSIDE
OF SHED AREA (AL-AROUND OF WALLS) IN RM 270.000 180.000 48600.00 200.00 54000.00 380.00 102,600.00
CEMENT MORTAR WITH NEAT CEMENT FINISH.

14
COLD TWISTED STEEL (T.M.T) REINFORCEMENT
FOR R.C.C. WORK INCLUDING CUTTING ,
BENDING & PLACING IN POSITION ALL MT 152.000 51000.000 7752000.00 7000.00 1064000.00 58000.00 8,816,000.00
COMPLETE INCLUDING & COVER BLOCK &
BINDING WIRE. AT ALL HEIGHTS & LEVELS.

15 PROVIDING AND LAYING 150MM ,90MM THICK


STONE SOILING ALSO COMPACTING STONE
AGGREGATE OF SPECIFIED SIZES TO WBM
SPECIFICATION IN UNIFORM THICKNESS, HAND
PICKING, ROLLING WITH 3 WHEELED ROAD /
VIBRATORY ROLLER 8-10 TONNE CAPACITY IN
STAGES TO PROPER GRADE AND CAMBER,
APPLYING AND BROOMING REQUISITE TYPE OF
SCREENING / BINDING MATERIAL TO FILL UP
INTERSTICES OF COARSE AGGREGATE, SMT 7089.430 205.000 1453333.15 125.00 886178.75 330.00 2,339,511.90
WATERING AND COMPACTING TO THE
REQUIRED DENSITY.
16 PROVIDING AND LAYING 100MM ,65X40MM
THICK STONE SOILING ALSO COMPACTING
STONE AGGREGATE OF SPECIFIED SIZES TO
WBM SPECIFICATION IN UNIFORM THICKNESS,
HAND PICKING, ROLLING WITH 3 WHEELED
ROAD / VIBRATORY ROLLER 8-10 TONNE
CAPACITY IN STAGES TO PROPER GRADE AND
CAMBER, APPLYING AND BROOMING REQUISITE
TYPE OF SCREENING / BINDING MATERIAL TO SMT 6935.000 150.000 1040250.00 80.00 554800.00 230.00 1,595,050.00
FILL UP INTERSTICES OF COARSE AGGREGATE,
WATERING AND COMPACTING TO THE
REQUIRED DENSITY.

17 MECHANICAL CHARGE OF TREMIX FLOOR


INCLUDING COST OF FLOOR HARDNENER@ 2.5 SMT 6935.000 50.000 346750.00 50.00 346750.00 100.00 693,500.00
KG PER SQUARE METER SURFACE AREA.

18 MECHANICAL CHARGE OF 12X25mm THICK


GROVE IN FLOOR WITH BITUMEN FILLING 2776.000 10.000 27760.00 50.00 138800.00 60.00 166,560.00
RM

19 PROVIDING & FIXING 250MM WIDE CHIKEN


WIREMESH WITH NAILS AT THE JUNCTION OF
BRICK WORK & R.C.C. BEAM OR COLUMNS SMT 400.000 75.000 30000.00 100.00 40000.00 175.00 70,000.00
BEFORE PLASTER WORK

20
PROVIDING ft FIXING P.V.C. RAIN WATER PIPE
(4K.G. PER SQCM WORKING PRESSURE )
JOINTED WITH SEAL RING IN WALLS , COLUMNS
OR SURFACE INCLUDING ALL FITTINGS RMT 223.000 320.000 71360.00 300.00 66900.00 620.00 138,260.00
,FIXTUREES ENCASING IN CEMENT CONCRETE
(1:3:6) 150 MM DIA AT FRONT ELEVATION WALL
21 PROVIDING/FIXING OF POWDER COATED
ALUMINIUM TUBULAR,Z SECTION (HOLLOW Z
SECTION & LAM Z SECTION (14G)OR AS
APPROVED SECTIONS FOR WINDOWS /
VENTILATORS AND OTHER SUCH TYPES OF
OPENINGS WITH 5 MM THICK GLASSS WITH
OPENABLE PANELS (AS REQUIRED) WITH ALL SQM 332.640 3200.000 1064448.00 800.00 266112.00 4000.00 1,330,560.00
ACCESSORIES AS PER THE DRG.PROVIDED BY
ARCHITECT.

22 PROVIDING FIXING OF MS SHEET DOORS WITH


ALL NECESSARY FITTINGS AS PER DRGS /DESIGN
PROVIDED BY ARCHITECT WITH 3 COATS OF
ENAMEL PAINT WITH PUTTY /PRIMER. SQM 10.000 1200.000 12000.00 400.00 4000.00 1600.00 16,000.00

23
PROVIDING FIXING OF M. S ROLLING SHUTTER
WITH ALL NECESSARY FITTINGS AS PER DRGS
/DESIGN PROVIDED BY ARCHITECT WITH 2
COATS OF ENAMEL PAINT WITH PUTTY /PRIMER
SQM 150.000 3200.000 480000.00 800.00 120000.00 4000.00 600,000.00
CONTROLLED BY ELECTRICALLY OPERATED
MOTOR.

24
PROVIDING/LAYING OF 3 COAT OF ACRYLIC
DISTEMPER WITH PRIMER/PUTTY BASE THE
SHED AREA & 3 COAT OF EXTERNAL PAINT WITH
PRIMER /PUTTY BASE IN OUTSIDE AREA SQM 4967.000 190.000 943730.00 130.00 645710.00 320.00 1,589,440.00
INCLUDING SCAFFOLDING OF APPROVED COLOR
AS PER THE ARCHITECT SPECIFICATION.

TEXURE PAINT SQM 150.000 220.000 33000.00 140.00 21000.00 360.00 54,000.00

25
PROVIDING/LAYING OF 25MM TH. KOTA STONE
FLOORING AND SKIRTING WITH FULL ROUND
NOSING OVER CEMENT MORTAR WITH
SQM 52.000 450.000 23400.00 600.00 31200.00 1050.00 54,600.00
ORDINARY POLISH IN STAIRCASE.
26
PROVIDING & FIXING ON WALL 7' UPTO TO HIGH
& IN FLOORING WORK CERAMIC TILES
APPROVED MAKE, COLOUR, SIZE & THICKNESS
LAID 1:4 INCLUDING GROUTING THE JOINTS SQM 449.000 560.000 251440.00 400.00 179600.00 960.00 431,040.00
WITH WHITE CEMENT & MATCHING PIGMENT
ETC. COMPLETE .(BASIC RATE OFTILE •RS
376.00PER SQMT)

27
PROVIDING/ LAYING OF 2-4 COAT OF TAPCREATE
WITH 20MM WATER PROOF PLASTER IN
SUNKEN/ TOILET AREAS. FILLING OF FLY ASH SQM 64.000 200.000 12800.00 120.00 7680.00 320.00 20,480.00
BLOCKS IN SUNKEN AREA AND 40 MM TH.
CEMENT CONCRETE 1:4:8 OVER IT.

28
LAYING C C 1:3:6 IN STEPS FOR STAIRS
INCULDING SHUTTERING ETC. AT ALL HEIGHTS & NOS 95.000 276.000 26220.00 180.00 17100.00 456.00 43,320.00
LEVELS. ( W= 1200mm, R= 150mm, T=300mm)

29
FALSE CEILING :PROVIDING/ LAYING OF
ARMSTRONG OR EQUIVALENT TILE WITH
REQUIRED GI CHANNELS AND OTHER SQM 200.000 900.000 180000.00 700.00 140000.00 1600.00 320,000.00
NECESSARY FITTINGS AS PER THE DRG. / DESIGN
PROVIDED BY THE ARCHITECT.

30 FLOORING FIXING OF VITRIFIED TILE (BASIC


COST @ RS 45/- PER SQFT.) IN MEZZANINE AREA
ACCORDING TO DESIGN & DRGS. PROVIDED BY
THE ARCHITECT. SQM 200.000 600.000 120000.00 400.00 80000.00 1000.00 200,000.00

31 TERRACING WORK PROVIDING/LAYING OF


TERRACING WORK ON MEZZANINE ROOF ACC
TO THE DRG /DESIGN PROVIDED BY THE SQM 215.000 480.000 103200.00 320.00 68800.00 800.00 172,000.00
ARCHITECT.
32 MAKING & FIXING OF MS RAILING WITH
MAKING HOLES ETC. IN STAIRCASE AS PER THE
DRG. /DESIGN ( PROVIDED BY THE ARCHITECT)
WITH 2 COATS OF ENAMEL PAINT OF APPROVED METRE 15.000 1400.000 21000.00 600.00 9000.00 2000.00 30,000.00
SHADE.

33
MAKING ROUND AT JUNCTIONS OF WALL &
FLOORING IN CEMENT, SAND MORTAR IN RATIO
1:4 WITH ROUNDING OF RADIUS AS 75mm. IN RMT 610.000 60.000 36600.00 90.00 54900.00 150.00 91,500.00
STROM WATER DRAIN CHANNEL & WATER
TANKS AT ALL HEIGHT & LEVELS.

34 DRAIN COVERS RCC AS PER DRG &


SPECIFICATION.
NOS 485.000 800.000 388000.00 400.00 194000.00 1200.00 582,000.00

35 PROVIDING AND FIXING OF 14000 LITRES OVER


HEAD TANK FOR WATER SUPPLY AND FIRE
FIGHTING OF SINTEX OR EQUIVALENT MAKE. LITRES 14000.000 7.000 98000.00 0.00 0.00 7.00 98,000.00

36 PROVIDING & FIXING STEPS & SLEEVES IN RCC


UG TANK & PUMP ROOM NOS 38.000 100.000 3800.00 100.00 3800.00 200.00 7,600.00

37 MS SHED ABOVE CUTOUT OF PUMP ROOM &


STAIRCASE OF PUMP ROOM SQM 9.150 3000.000 27450.00 1304.00 11931.60 4304.00 39,381.60

38 PROVIDING & SPREADING FILTER MEDIUM IN


RAIN WATER HARVESTING CUM 12.000 1500.000 18000.00 0.00 0.00 1500.00 18,000.00

39 300 MM DIA BORING WITH COMPLETE


ACCESSORIES.
NOS 1.000 112770.00 0.00 112770.00 112,770.00
112770.000 0.00

40
PROVIDING AND FILLING PEA GRAVELS PACKING
ALL AROUND THE PIPE UPTO GROUND LEVEL CFT 300.000 42.000 12600.00 0.00 0.00 42.00 12,600.00
41 PLUMBING WORK PROVIDING/ LAYING OF
INTERNAL GI & CPVC PLUMBING CONDUITING,
(HORIZONTAL IN TOILETS AND VERTICAL IN
SHAFTS /OPEN AREA) FITTINGS & FIXTURES ALL
COMPLETE FOR TOILETS/ PANTRY UPTO NOS /
EXTERNAL MANHOLE. PROVIDING FIXING, UNIT 8.000 50000.000 400000.00 30000.00 240000.00 80000.00 640,000.00
URINAL and WB AS PER SAMPLE APPROVED LS
WITH ALL NECESSARY FITINGS COMPLETE.

42 PROVIDING/ LAYING OF INTERNAL


CONDUITING, BOXES, DIBBIES ETC. WIRES,
PLATES & NORMAL SWITCHES FOR GENERAL
ELECTRICAL WORK INCLUDING FIXTURES AS PER
ARCHITECT DWG./ DESIGN UPTO MCB ONLY ON
WALL AREA. PROVIDING /LAYING OF INTERNAL
CONDUITING & WIRING & FIXING OF LIGHT IN
SHED AREA ACCORDING TO DRG./DESIGN BASIC
COST FOR ELECTRICAL FIXTURES WITH ALL
ACCESSORIES :- TUBELIGHT = Rs. 500/-
CEILING LIGHT = Rs. 600/- BRACKET
LIGHT = Rs. 300/- CEILING FAN = Rs.
2000/- EXHUST FAN = Rs. 1000/- SHED LIGHT
= Rs. 5000/-

SHED BUILDING AREA (LUMP SUM) SQM-LS 3935.000 156.000 613860.00 100.00 393500.00 256.00 1,007,360.00
MAZZENINE GROUND FLOOR SQM-LS 2315.000 90.000 208350.00 60.00 138900.00 150.00 347,250.00
MAZZENINE FIRST FLOOR SQM-LS 2315.000 150.000 347250.00 100.00 231500.00 250.00 578,750.00
BOUNDARY WALL (LIGHT POINT) NOS-LS 44.000 6000.000 264000.00 2000.00 88000.00 8000.00 352,000.00
RCC PUMP ROOM NOS-LS 8.000 6000.000 48000.00 2000.00 16000.00 8000.00 64,000.00

43 FIXING MAKING & FIXING OF GATE AND GRILL


WORK WITH ALL THE REQUIRED SCAFFOLDING
AS PER DRG. /DESIGN ETC COMPLETE AS PER
THE DRG. /DESIGN PROVIDED BY THE PER KGS 3000 60.000 180000.00 30.000 90000.00 90.00 270,000.00
ARCHITECT.

44 EXTERNAL SEWER LINE INCLUDING MANHOLE


ETC COMPLETE. RM 70 1500 105000.00 900 63000.00 2400.00 168,000.00
PROVIDING/LAYING OF EXCAVATION/ BACK
FILLING ,P.C.C, SAND FILLING ,LAYING OF WATER
SUPPLY PIPES WITH VALVES ETC. . COMPLETE
FROM U.G TANK TO OVER HEAD TANK &
CONNECTIONS WITH TANKS AND IN OPEN
45 DRIVEWAY WHERE EVER REQUIRED. ASPER THE RM 110 180 19800.00 40 4400.00 220.00 24,200.00
DRG. /DESIGN PROVIDED BY THE ARCHITECT

TOTAL AMOUNT OF WORK (IN RS) 39605541.15 17339452.35 56,944,993.50


DATED:- 25th FEB, 2018

SHRI. P.C SHARMA JI


PLOT NO- , SECTOR-83, GURUGRAM (HARYANA)

RESIDENTIAL RCC BUILDING (CIVIL WORK) MESUREMENT BOOK


S.N0. DECRIPTION UNIT NOS. L B H QUANTITY
1.0 DRESSING, LEVELLING & COMPACTION OF EARTH
Residential Block area inside Sqm. 1 1 1 12.650 17.170 217.201
Residential Block area inside Sqm. 1 1 1 3.287 9.150 30.076
TOTAL QTY. OF DRESSING, LEVELLING & COMPACTION (IN SQM.) 247.277

2.0 EARTHWORK IN EXCAVATION


Footing F1 on grid A1,A2,F1,F2 & F4 Cum 5 1 1 2.45 3.89 1.624 77.388
Footing F2 on grid D1 Cum 1 1 1 3.36 3.36 1.624 18.334
Footing F3 on grid C1,B1,B4 Cum 3 1 1 3.67 3.67 1.624 65.620
Footing F4 on grid C4,E4 Cum 2 1 1 3.82 3.82 1.624 47.396
Footing F5 on grid B2,B3 Cum 2 1 1 4.125 4.125 1.624 55.267
Footing F6 on grid A1,A2 Cum 2 1 1 4.43 4.43 1.624 63.742
Footing CF on grid F3 Cum 1 1 1 4.353 4.88 2.1 44.610
Tie beam aprox. Cum 1 1 1 100 1 1.624 162.400
Tie beam below part. wall aprox. Cum 1 1 1 20 1 1.624 32.480
TOTAL QTY. OF EARTHWORK IN EXCAVATION (IN CUM.) 567.237

3.0 ANTI- TERMITE TREATMENT


Residential Block area inside Sqm. 1 1 1 12.650 17.170 217.201
Residential Block area inside Sqm. 1 1 1 3.287 9.150 30.076
TOTAL QTY. OF ANTI- TERMITE TREATMENT (IN SQM.) 247.277

4.0 PCC (1:4:8)


Footing F1 on grid A1,A2,F1,F2 & F4 Cum 5 1 1 1.65 3.09 0.100 2.549
Footing F2 on grid D1 Cum 1 1 1 2.56 2.56 0.100 0.655
Footing F3 on grid C1,B1,B4 Cum 3 1 1 2.87 2.87 0.100 2.471
Footing F4 on grid C4,E4 Cum 2 1 1 3.02 3.02 0.100 1.824
Footing F5 on grid B2,B3 Cum 2 1 1 3.325 3.325 0.100 2.211
Footing F6 on grid A1,A2 Cum 2 1 1 3.63 3.63 0.100 2.635
Footing CF on grid F3 Cum 1 1 1 3.53 4.08 0.100 1.440
Plinth Beam aprox. Cum 1 1 1 130.000 0.600 0.200 15.600
Plinth Beam pation wall aprox. Cum 1 1 1 20.000 0.600 0.200 2.400
Residential Block area inside Cum 1 1 1 12.650 17.170 0.100 21.720
Residential Block area inside Cum 1 1 1 3.287 9.150 0.100 3.008
TOTAL QTY. OF PCC (1:4:8) IN CUM. 56.514

5.0 CENTERING & SHUTTERING


Sub-Structure
Footing F1 on grid A1,A2,F1,F2 & F4 Sqm. 5 2 1 1.45 0.200 2.900
Footing F1 on grid A1,A2,F1,F2 & F5 Sqm. 5 2 1 2.89 0.200 5.780
Footing F2 on grid D1 Sqm. 1 4 1 2.36 0.250 2.360

Page 10 of 43
Footing F3 on grid C1,B1,B4 Sqm. 3 4 1 2.67 0.250 8.010
Footing F4 on grid C4,E4 Sqm. 2 4 1 2.82 0.250 5.640
DATED:- 25th FEB, 2018

SHRI. P.C SHARMA JI


PLOT NO- , SECTOR-83, GURUGRAM (HARYANA)

RESIDENTIAL RCC BUILDING (CIVIL WORK) MESUREMENT BOOK


S.N0. DECRIPTION UNIT NOS. L B H QUANTITY
Footing F5 on grid B2,B3 Sqm. 2 1 1 3.125 0.200 1.250
Footing F6 on grid A1,A2 Sqm. 2 4 1 3.43 0.250 6.860
Footing CF on grid F3 Sqm. 1 2 1 3.353 0.500 3.353
Footing CF on grid F4 Sqm. 1 2 1 4.88 0.500 4.880
Footing CF on grid F5 Sqm. 1 2 1 3.353 0.500 3.353
Plinth Beam aprox. Sqm. 1 2 1 130.000 0.450 117.000
Plinth Beam pation wall aprox. Sqm. 1 2 1 20.000 0.300 12.000
Pedestal C1 on grid A1,A2,F1,F2 & F4 Sqm. 5 2 1 0.460 1.500 6.900
Pedestal C1 on grid A1,A2,F1,F2 & F5 Sqm. 5 2 1 0.230 1.500 3.450
Pedestal C2 on grid D1 Sqm. 6 2 1 0.460 1.500 8.280
Pedestal C2 on grid D2 Sqm. 6 2 1 0.230 1.500 4.140
Pedestal C3 on grid C1,B1,B4 Sqm. 3 2 1 0.460 1.500 4.140
Pedestal C3 on grid C1,B1,B5 Sqm. 3 2 1 0.230 1.500 2.070
Lift pit Sqm. 1 2 4 2.300 1.800 33.120
Stilt floor
Column C1 on grid A1,A2,F1,F2 & F4 Sqm. 5 2 1 0.460 3.500 16.100
Column C1 on grid A1,A2,F1,F2 & F5 Sqm. 5 2 1 0.230 3.500 8.050
ColumnC2 on grid D1 Sqm. 6 2 1 0.460 3.500 19.320
Column C2 on grid D1 Sqm. 6 2 1 0.230 3.500 9.660
ColumnC3 on grid C1,B1,B4 Sqm. 3 2 1 0.460 3.500 9.660
Column C3 on grid C1,B1,B5 Sqm. 3 2 1 0.230 3.500 4.830
Lift pit Sqm. 1 2 1 23.000 3.500 161.000
Plinth Beam aprox. Sqm. 1 2 1 140.000 0.300 84.000
Stilt floor Sqm. 1 1 1 12.652 17.170 217.235
Stilt floor Sqm. 1 1 1 3.277 9.156 30.004
Chajja Sqm. 1 1 1 14.176 1.524 21.604
Chajja Sqm. 1 1 1 6.250 1.524 9.525
Chajja Sqm. 1 1 1 15.854 1.524 24.161
Staircase landing Sqm. 1 1 1 3.000 1.625 4.875
tapered Sqm. 1 2 1 4.500 1.520 13.680
Lintel Beams Sqm. 27 1 1 0.500 6.700 90.450
Ground floor
Column C1 on grid A1,A2,F1,F2 & F4 Sqm. 5 2 1 0.460 3.500 16.100
Column C1 on grid A1,A2,F1,F2 & F5 Sqm. 5 2 1 0.230 3.500 8.050
ColumnC2 on grid D1 Sqm. 6 2 1 0.460 3.500 19.320
Column C2 on grid D1 Sqm. 6 2 1 0.230 3.500 9.660
ColumnC3 on grid C1,B1,B4 Sqm. 3 2 1 0.460 3.500 9.660
Column C3 on grid C1,B1,B5 Sqm. 3 2 1 0.230 3.500 4.830
Lift pit Sqm. 1 2 1 23.000 3.500 161.000

Page 11 of 43
Plinth Beam aprox. Sqm. 1 2 1 140.000 0.300 84.000
Stilt floor Sqm. 1 1 1 12.652 17.170 217.235
Stilt floor Sqm. 1 1 1 3.277 9.156 30.004
Chajja Sqm. 1 1 1 14.176 1.524 21.604
DATED:- 25th FEB, 2018

SHRI. P.C SHARMA JI


PLOT NO- , SECTOR-83, GURUGRAM (HARYANA)

RESIDENTIAL RCC BUILDING (CIVIL WORK) MESUREMENT BOOK


S.N0. DECRIPTION UNIT NOS. L B H QUANTITY
Chajja Sqm. 1 1 1 6.250 1.524 9.525
Chajja Sqm. 1 1 1 15.854 1.524 24.161
Staircase landing Sqm. 1 1 1 3.000 1.625 4.875
tapered Sqm. 1 2 1 4.500 1.520 13.680
Lintel Beams Sqm. 27 1 1 0.500 6.700 90.450
First floor
Column C1 on grid A1,A2,F1,F2 & F4 Sqm. 5 2 1 0.460 3.500 16.100
Column C1 on grid A1,A2,F1,F2 & F5 Sqm. 5 2 1 0.230 3.500 8.050
ColumnC2 on grid D1 Sqm. 6 2 1 0.460 3.500 19.320
Column C2 on grid D1 Sqm. 6 2 1 0.230 3.500 9.660
ColumnC3 on grid C1,B1,B4 Sqm. 3 2 1 0.460 3.500 9.660
Column C3 on grid C1,B1,B5 Sqm. 3 2 1 0.230 3.500 4.830
Lift pit Sqm. 1 2 1 23.000 3.500 161.000
Plinth Beam aprox. Sqm. 1 2 1 140.000 0.300 84.000
Stilt floor Sqm. 1 1 1 12.652 17.170 217.235
Stilt floor Sqm. 1 1 1 3.277 9.156 30.004
Chajja Sqm. 1 1 1 14.176 1.524 21.604
Chajja Sqm. 1 1 1 6.250 1.524 9.525
Chajja Sqm. 1 1 1 15.854 1.524 24.161
Staircase landing Sqm. 1 1 1 3.000 1.625 4.875
tapered Sqm. 1 2 1 4.500 1.520 13.680
Lintel Beams Sqm. 27 1 1 0.500 6.700 90.450
Mumty floor
Column C1 on grid A1,A2,F1,F2 & F4 Sqm. 5 2 1 0.460 3.500 16.100
Column C1 on grid A1,A2,F1,F2 & F5 Sqm. 5 2 1 0.230 3.500 8.050
ColumnC2 on grid D1 Sqm. 6 2 1 0.460 3.500 19.320
Column C2 on grid D1 Sqm. 6 2 1 0.230 3.500 9.660
Lift pit Sqm. 1 2 1 23.000 3.500 161.000
parapet Column C1 on grid A1,A2,F1,F2 & F4 Sqm. 5 2 1 0.460 1.000 4.600
Parapet Column C1 on grid A1,A2,F1,F2 & F5 Sqm. 5 2 1 0.230 1.000 2.300
Parapet ColumnC2 on grid D1 Sqm. 1 2 1 0.460 1.000 0.920
Parapet Column C2 on grid D2 Sqm. 1 2 1 0.230 1.000 0.460
Parapet ColumnC3 on grid C1,B1,B4 Sqm. 3 2 1 0.460 1.000 2.760
Parapet Column C3 on grid C1,B1,B5 Sqm. 3 2 1 0.230 1.000 1.380
Mumty floor Beam Sqm. 2 2 1 3.000 0.300 3.600
Mumty floor Beam Sqm. 2 2 1 5.600 0.300 6.720
Mumty slab Sqm. 1 1 1 10.000 3.340 33.400

Page 12 of 43
2678.220

8.0 RCC M-25


Sub-Structure
Footing F1 on grid A1,A2,F1,F2 & F4 Cum 5 1 1 1.521 7.605
Footing F2 on grid D1 Cum 1 1 1 1.890 1.890
Footing F3 on grid C1,B1,B4 Cum 3 1 1 2.705 8.115
Footing F4 on grid C4,E4 Cum 2 1 1 3.000 6.000
Footing F5 on grid B2,B3 Cum 2 1 1 3.573 7.146
DATED:- 25th FEB, 2018

SHRI. P.C SHARMA JI


PLOT NO- , SECTOR-83, GURUGRAM (HARYANA)

RESIDENTIAL RCC BUILDING (CIVIL WORK) MESUREMENT BOOK


S.N0. DECRIPTION UNIT NOS. L B H QUANTITY
Footing F6 on grid A1,A2 Cum 2 1 1 5.092 10.184
Footing CF on grid F3 Cum 1 1 1 5.200 3.400 0.500 8.840
Plinth Beam aprox. Cum 1 1 1 130.000 0.450 0.230 13.455
Plinth Beam pation wall aprox. Cum 1 1 1 20.000 0.450 0.230 2.070
Pedestal C1 on grid A1,A2,F1,F2 & F4 Cum 5 2 1 0.460 0.230 1.500 1.587
Pedestal C2 on grid D1 Cum 1 2 1 0.460 0.230 1.500 0.317
Pedestal C3 on grid C1,B1,B4 Cum 3 2 1 0.460 0.230 1.500 0.952
Lift pit Cum 1 4 1 2.300 0.115 1.800 1.904
Stilt floor
Column C1 on grid A1,A2,F1,F2 & F4 Cum 5 2 1 0.460 0.230 3.500 3.703
ColumnC2 on grid D1 Cum 6 2 1 0.460 0.230 3.500 4.444
ColumnC3 on grid C1,B1,B4 Cum 3 2 1 0.460 0.230 3.500 2.222
Lift pit Cum 1 4 1 2.000 3.500 0.230 6.440
Plinth Beam aprox. Cum 1 2 1 0.230 0.450 140.000 28.980
Stilt floor Cum 1 1 1 12.652 17.170 0.125 27.154
Stilt floor Cum 1 1 1 3.277 9.156 0.125 3.751
Chajja Cum 1 1 1 14.176 1.524 0.125 2.701
Chajja Cum 1 1 1 6.250 1.524 0.125 1.191
Chajja Cum 1 1 1 15.854 1.524 0.125 3.020
Staircase landing Cum 1 1 1 3.000 1.625 0.125 0.609
tapered Cum 1 2 1 4.500 1.520 0.125 1.710
Lintel Beams Cum 1 1 1 0.230 0.230 42.000 2.222
Ground floor 0.000
Column C1 on grid A1,A2,F1,F2 & F4 Cum 5 2 1 0.460 0.230 3.500 3.703
ColumnC2 on grid D1 Cum 6 2 1 0.460 0.230 3.500 4.444
ColumnC3 on grid C1,B1,B4 Cum 3 2 1 0.460 0.230 3.500 2.222
Lift pit Cum 1 2 1 23.000 3.500 0.230 37.030
Plinth Beam aprox. Cum 1 2 1 0.230 0.450 140.000 28.980
Stilt floor Cum 1 1 1 12.652 17.170 0.125 27.154
Stilt floor Cum 1 1 1 3.277 9.156 0.125 3.751
Chajja Cum 1 1 1 14.176 1.524 0.125 2.701
Chajja Cum 1 1 1 6.250 1.524 0.125 1.191

Page 13 of 43
Chajja Cum 1 1 1 15.854 1.524 0.125 3.020
Staircase landing Cum 1 1 1 3.000 1.625 0.125 0.609
tapered Cum 1 2 1 4.500 1.520 0.125 1.710
Lintel Beams Cum 1 1 1 0.230 0.230 42.000 2.222
First floor
Column C1 on grid A1,A2,F1,F2 & F4 Cum 5 2 1 0.460 0.230 3.500 3.703
ColumnC2 on grid D1 Cum 6 2 1 0.460 0.230 3.500 4.444
ColumnC3 on grid C1,B1,B4 Cum 3 2 1 0.460 0.230 3.500 2.222
Lift pit Cum 1 2 1 23.000 3.500 0.230 37.030
Plinth Beam aprox. Cum 1 2 1 0.230 0.450 140.000 28.980
Stilt floor Cum 1 1 1 12.652 17.170 0.125 27.154
DATED:- 25th FEB, 2018

SHRI. P.C SHARMA JI


PLOT NO- , SECTOR-83, GURUGRAM (HARYANA)

RESIDENTIAL RCC BUILDING (CIVIL WORK) MESUREMENT BOOK


S.N0. DECRIPTION UNIT NOS. L B H QUANTITY
Stilt floor Cum 1 1 1 3.277 9.156 0.125 3.751
Chajja Cum 1 1 1 14.176 1.524 0.125 2.701
Chajja Cum 1 1 1 6.250 1.524 0.125 1.191
Chajja Cum 1 1 1 15.854 1.524 0.125 3.020
Staircase landing Cum 1 1 1 3.000 1.625 0.125 0.609
tapered Cum 1 2 1 4.500 1.520 0.125 1.710
Lintel Beams Cum 1 1 1 0.230 0.230 42.000 2.222
Mumty floor
Column C1 on grid A1,A2,F1,F2 & F4 Cum 5 2 1 0.460 0.230 3.500 3.703
ColumnC2 on grid D1 Cum 6 2 1 0.460 0.230 3.500 4.444
Lift pit Cum 1 2 1 23.000 3.500 0.230 37.030
parapet Column C1 on grid A1,A2,F1,F2 & F4 Cum 5 2 1 0.460 0.230 1.000 1.058
Parapet ColumnC2 on grid D1 Cum 6 2 1 0.460 0.230 1.000 1.270
Parapet ColumnC3 on grid C1,B1,B4 Cum 3 2 1 0.460 0.230 1.000 0.635
Mumty floor Beam Sqm. 2 1 1 0.300 0.230 3.000 0.414
Mumty floor Beam Sqm. 2 1 1 0.300 0.230 5.600 0.773
Mumty slab Sqm. 1 1 1 10.000 3.340 0.125 4.175
TOTAL QTY. OF RCC- 25 (IN CUM) 443.823

10.0 BRICKWORK
Plinth Beam aprox. Cum 1 1 1 130.000 1.500 0.230 44.850
Plinth Beam pation wall aprox. Cum 1 1 1 20.000 1.500 0.230 6.900
Stilt Floor
9" thick outer wall Cum 1 1 1 70.000 3.000 0.230 48.300
Deduction for Door/Window Cum 1 1 1 48.400 0.230 -11.132
4.5" thick inner wall Cum 1 1 1 70.000 3.000 0.115 24.150
Deduction for Door/Window Cum 1 1 1 18.200 0.115 -2.093
Ground Floor
9" thick outer wall Cum 1 1 1 70.000 3.000 0.230 48.300
Deduction for Door/Window Cum 1 1 1 48.400 0.230 -11.132

Page 14 of 43
4.5" thick inner wall Cum 1 1 1 70.000 3.000 0.115 24.150
Deduction for Door/Window Cum 1 1 1 18.200 0.115 -2.093
First Floor
9" thick outer wall Cum 1 1 1 70.000 3.000 0.230 48.300
Deduction for Door/Window Cum 1 1 1 48.400 0.230 -11.132
4.5" thick inner wall Cum 1 1 1 70.000 3.000 0.115 24.150
Deduction for Door/Window Cum 1 1 1 18.200 0.115 -2.093
Mumty floor
9" thick outer Parapet wall Cum 1 1 1 40.000 1.000 0.230 9.200
9" thick outer Mumty wall Cum 1 1 1 20.000 3.000 0.230 13.800
TOTAL QTY. OF BRICKWORK (IN CUM) 252.425

DATED:- 25th FEB, 2018

SHRI. P.C SHARMA JI


PLOT NO- , SECTOR-83, GURUGRAM (HARYANA)

RESIDENTIAL RCC BUILDING (CIVIL WORK) MESUREMENT BOOK


S.N0. DECRIPTION UNIT NOS. L B H QUANTITY
11.0 PLASTERING WORK
Stilt floor plastering aprox. Including ceiling Sqm. 1 1 1 1200.00
Ground floor plastering aprox. Sqm. 1 1 1 900.000
first floor plastering aprox. Sqm. 1 1 1 900.000
Mumty floor Sqm. 1 2 1 40.000 3.300 264.000
Parapet Sqm. 1 1 1 20.000 1.000 20.000
TOTAL QTY. OF PLASTERING (IN SQM.) 3284.000

Page 15 of 43
372.357

13.787

Page 16 of 43
44.386

62.100

228.620

495.535

Page 17 of 43
226.550

Page 18 of 43
49.780

49.780

71.337

Page 19 of 43
48.139

5.362

Page 20 of 43
DATED:- 25th FEB, 2019

SHRI. P.C SHARMA JI


PLOT NO:H-5/12 SECTOR-82, GURUGRAM

RCC BUILDING MESUREMENT BOOK FOR STEEL REINFORCEMENT


S.N Description Dia Nos Length 8ɸ 10 ɸ 12ɸ 16 ɸ 20 ɸ 25 ɸ
1 FOUNDATION -- -- -- -- -- --
Footing F1 Bottom 12 5 15 1 3.000 -- -- 225 -- -- --
Footing F1 Bottom 12 5 29 1 1.550 -- -- 224.75 -- -- --
Footing F2 Bottom 10 3 48 1 2.600 -- 374.4 -- -- -- --
Footing F3 Bottom 10 3 54 1 2.900 -- 469.8 -- -- -- --
Footing F4 Bottom 10 2 58 1 3.020 -- 350.32 -- -- -- --
Footing F5 Bottom 10 2 64 1 3.220 -- 412.16 -- -- -- --
Footing F6 Bottom 10 2 70 1 3.630 -- 508.2 -- -- -- --
Footing CF1 Bottom 12 1 40 1 3.750 -- -- 150 -- -- --
Footing CF1 Bottom 12 1 27 1 5.280 -- -- 142.56 -- -- --
Footing CF1 Top 10 1 49 1 3.750 -- 183.75 -- -- -- --
Footing CF1 Top 10 1 34 1 5.280 -- 179.52 -- -- -- --
Chairs 12 1 20 1 2.500 -- -- 50 -- -- --
Lift Pit Wall vertical bar 16 1 48 1 5.000 -- -- -- 240 -- --
Lift Pit Wall vertical bar 12 1 48 1 5.000 -- -- 240 -- -- --
Lift Pit Wall vertical bar 10 1 48 1 5.000 -- 240 -- -- -- --
Ring x for Lift wall 10 3 14 1 4.250 -- 178.5 -- -- -- --
Ring Y for Lift wall 10 8 14 1 1.300 -- 145.6 -- -- -- --
Ring Z for Lift wall 8 22 25 1 0.552 303.6 -- -- -- -- --
Ring W for Lift wall 8 14 14 1 0.280 54.88 -- -- -- -- --
2 COLUMNS (Footing to DPC level) -- -- -- -- -- --
C1 16 5 12 1 5.000 -- -- -- 300 -- --
Ring 8 5 31 1 1.140 176.7 -- -- -- -- --
Ring ◊ 8 5 31 2 0.492 152.52 -- -- -- -- --
Ring Hook◊ 8 5 31 1 0.310 48.05 -- -- -- -- --
C2 20 6 4 1 5.000 -- -- -- -- 120 --
C2 16 6 8 1 5.000 -- -- -- 240 -- --
Ring 8 6 31 1 1.140 212.04 -- -- -- -- --
Ring ◊ 8 6 31 2 0.492 183.024 -- -- -- -- --
Ring Hook◊ 8 6 31 1 0.310 57.66 -- -- -- -- --
C3 20 4 12 1 5.000 -- -- -- -- 240 --
Ring 8 4 31 1 1.140 141.36 -- -- -- -- --
Ring ◊ 8 4 31 2 0.492 122.016 -- -- -- -- --
Ring Hook◊ 8 4 31 1 0.310 38.44 -- -- -- -- --
3 PLINTH BEAM AT DPC LEVEL -- -- -- -- -- --
PB1 Longitudinal Bar Top & Bottom 16 1 4 1 17.330 -- -- -- 69.32 -- --

Page 21 of 43
PB1 Extra Bar Top & Bottom 16 1 1 2 3.000 -- -- -- 6 -- --
Lapping 16 1 4 1 0.800 -- -- -- 3.2 -- --
Rings 8 1 150 1 1.020 153 -- -- -- -- --
PB2 Longitudinal Bar Top & Bottom 16 1 5 1 17.330 -- -- -- 86.65 -- --
PB2 Extra Bar Top & Bottom 16 1 3 1 4.000 -- -- -- 12 -- --
Lapping 16 1 4 1 0.800 -- -- -- 3.2 -- --
Rings 8 1 152 1 1.020 155.04 -- -- -- -- --
PB3 Longitudinal Bar Top & Bottom 16 1 4 1 2.880 -- -- -- 11.52 -- --
Rings 8 1 21 1 1.020 21.42 -- -- -- -- --
PB4 Longitudinal Bar Top & Bottom 16 1 4 1 11.400 -- -- -- 45.6 -- --
PB4 Extra Bar Top & Bottom 16 1 1 1 6.500 -- -- -- 6.5 -- --
Rings 8 1 84 1 1.020 85.68 -- -- -- -- --
PB5 Longitudinal Bar Top & Bottom 16 1 4 1 3.000 -- -- -- 12 -- --
Rings 8 1 21 1 1.020 21.42 -- -- -- -- --
PB6 Longitudinal Bar Top & Bottom 16 1 4 1 13.100 -- -- -- 52.4 -- --
Lapping 16 1 4 1 0.800 -- -- -- 3.2 -- --
PB6 Extra Bar Top & Bottom 16 1 2 1 3.000 -- -- -- 6 -- --
Rings 8 1 100 1 1.020 102 -- -- -- -- --
PB7 Longitudinal Bar Top & Bottom 16 1 5 1 6.550 -- -- -- 32.75 -- --
Rings 8 1 42 1 1.020 42.84 -- -- -- -- --
PB8 Longitudinal Bar Top & Bottom 16 1 4 1 18.040 -- -- -- 72.16 -- --
PB8 Extra Bar Top & Bottom 16 1 1 1 2.200 -- -- -- 2.2 -- --
PB8 Extra Bar Top & Bottom 16 1 1 2 3.280 -- -- -- 6.56 -- --
Lapping 16 1 4 1 0.800 -- -- -- 3.2 -- --
Rings 8 1 135 1 1.020 137.7 -- -- -- -- --
PB9 Longitudinal Bar Top & Bottom 16 1 4 1 18.040 -- -- -- 72.16 -- --
PB9 Extra Bar Top & Bottom 16 1 1 1 2.200 -- -- -- 2.2 -- --
PB9 Extra Bar Top & Bottom 16 1 4 2 3.280 -- -- -- 26.24 -- --
Lapping 16 1 4 1 0.800 -- -- -- 3.2 -- --
Rings 8 1 135 1 1.020 137.7 -- -- -- -- --
PB10 Longitudinal Bar Top & Bottom 16 1 5 1 6.770 -- -- -- 33.85 -- --
PB10 Extra Bar Top & Bottom 16 1 3 1 2.300 -- -- -- 6.9 -- --
Rings 8 1 48 1 1.020 48.96 -- -- -- -- --
PB11 Longitudinal Bar Top & Bottom 16 1 5 1 6.315 -- -- -- 31.575 -- --
Rings 8 1 41 1 1.020 41.82 -- -- -- -- --
PB12 Longitudinal Bar Top & Bottom 16 1 5 1 2.050 -- -- -- 10.25 -- --
Rings 8 1 21 1 1.020 21.42 -- -- -- -- --
PB13 Longitudinal Bar Top & Bottom 16 1 4 1 6.770 -- -- -- 27.08 -- --
PB13 Extra Bar Top & Bottom 16 1 3 2 2.300 -- -- -- 13.8 -- --
Rings 8 1 48 1 1.020 48.96 -- -- -- -- --
PB14 Longitudinal Bar Top & Bottom 16 1 5 1 10.200 -- -- -- 51 -- --
Rings 8 1 110 1 1.020 112.2 -- -- -- -- -- till dpc 7.082.66
3 DPC LEVEL TO GROUND FLOOR SLAB -- -- -- -- -- -- till ground floor beam 13.252

Page 22 of 43
C1 16 5 12 1 4.000 -- -- -- 240 -- -- till bottom bar of gf slab 15.531
Ring 8 5 31 1 1.140 176.7 -- -- -- -- -- Till gf slab 18.013
Ring ◊ 8 5 31 2 0.492 152.52 -- -- -- -- -- till after gf slab columns 23.923
Ring Hook◊ 8 5 31 1 0.310 48.05 -- -- -- -- -- ff slab 28.94
C2 20 6 4 1 4.000 -- -- -- -- 96 --
C2 16 6 8 1 4.000 -- -- -- 192 -- --
Ring 8 6 31 1 1.140 212.04 -- -- -- -- --
Ring ◊ 8 6 31 2 0.492 183.024 -- -- -- -- --
Ring Hook◊ 8 6 31 1 0.310 57.66 -- -- -- -- --
C3 20 4 12 1 4.000 -- -- -- -- 192 --
Ring 8 4 31 1 1.140 141.36 -- -- -- -- --
Ring ◊ 8 4 31 2 0.492 122.016 -- -- -- -- --
Ring Hook◊ 8 4 31 1 0.310 38.44 -- -- -- -- --
Lift Pit Wall vertical bar 16 1 48 1 4.000 -- -- -- 192 -- --
Lift Pit Wall vertical bar 12 1 48 1 4.000 -- -- 192 -- -- --
Lift Pit Wall vertical bar 10 1 48 1 4.000 -- 192 -- -- -- --
Ring x for Lift wall 10 3 21 1 4.250 -- 267.75 -- -- -- --
Ring Y for Lift wall 10 8 21 1 1.300 -- 218.4 -- -- -- --
Ring Z for Lift wall 8 22 25 1 0.552 303.6 -- -- -- -- --
Ring W for Lift wall 8 14 21 1 0.280 82.32 -- -- -- -- --
B1 Longitudinal Bar Top & Bottom 16 1 4 1 17.330 -- -- -- 69.32 -- --
B1 Extra Bar Top & Bottom 16 1 1 3 3.000 -- -- -- 9 -- --
B1 Extra Bar Top & Bottom 16 1 1 1 6.000 -- -- -- 6 -- --
Lapping 16 1 4 1 0.800 -- -- -- 3.2 -- --
Rings 10 1 150 1 1.020 -- 153 -- -- -- --
B2 Longitudinal Bar Top & Bottom 16 1 4 1 3.760 -- -- -- 15.04 -- --
Rings 10 1 25 1 1.020 -- 25.5 -- -- -- --
B3 Longitudinal Bar Top 20 1 2 1 17.330 -- -- -- -- 34.66 --
B3 Longitudinal Bar Bottom 16 1 2 1 17.330 -- -- -- 34.66 -- --
B3 Extra Bar Top 20 1 8 1 3.350 -- -- -- -- 26.8 --
B3 Extra Bar Bottom 16 1 1 1 8.230 -- -- -- 8.23 -- --
B3 Extra Bar Bottom 20 1 3 1 8.230 -- -- -- -- 24.69 --
Lapping 20 1 2 1 1.000 -- -- -- -- 2 --
Lapping 16 1 2 1 0.800 -- -- -- 1.6 -- --
Rings 8 1 70 1 1.020 71.4 -- -- -- -- --
Rings 10 1 66 1 1.020 -- 67.32 -- -- -- --
B4 Longitudinal Bar Top & Bottom 16 1 6 1 4.350 -- -- -- 26.1 -- --
Rings 10 1 31 1 1.020 -- 31.62 -- -- -- --
B5 Longitudinal Bar Top & Bottom 16 1 5 1 5.300 -- -- -- 26.5 -- --
Rings 10 1 40 1 1.020 -- 40.8 -- -- -- --
B6 Longitudinal Bar Top & Bottom 16 1 5 1 12.900 -- -- -- 64.5 -- --
Lapping 16 1 5 1 0.800 -- -- -- 4 -- --
B6 Extra Bar Top 20 1 3 1 1.800 -- -- -- -- 5.4 --

Page 23 of 43
B6 Extra Bar Top 12 1 2 1 3.000 -- -- 6 -- -- --
B6 Extra Bar Bottom 16 1 3 1 6.000 -- -- -- 18 -- --
Rings 10 1 60 1 1.020 -- 61.2 -- -- -- --
Rings 8 1 40 1 1.020 40.8 -- -- -- -- --
B7 Longitudinal Bar Top & Bottom 16 1 4 1 3.000 -- -- -- 12 -- --
Rings 10 1 19 1 1.020 -- 19.38 -- -- -- --
B8 Longitudinal Bar Top & Bottom 16 1 6 1 14.600 -- -- -- 87.6 -- --
Lapping 16 1 6 1 1.000 -- -- -- 6 -- --
B8 Extra Bar Top 12 1 4 1 3.000 -- -- 12 -- -- --
Rings 10 1 103 1 1.020 -- 105.06 -- -- -- --
B9Longitudinal Bar Top & Bottom 16 1 6 1 9.540 -- -- -- 57.24 -- --
Rings 8 1 80 1 1.020 81.6 -- -- -- -- --
B10 Longitudinal Bar Top & Bottom 16 1 6 1 21.040 -- -- -- 126.24 -- --
B10 Extra Bar Top & Bottom 16 1 2 1 8.000 -- -- -- 16 -- --
B10 Extra Bar Top & Bottom 16 1 6 1 3.280 -- -- -- 19.68 -- --
Lapping 16 1 6 1 0.800 -- -- -- 4.8 -- --
Lapping for chajja bottom bar 16 1 6 1 3.000 -- -- -- 18 -- --
Rings 10 1 100 1 1.020 -- 102 -- -- -- --
Rings 8 1 59 1 1.020 60.18 -- -- -- -- --
B11 Longitudinal Bar Top & Bottom 16 1 4 1 21.040 -- -- -- 84.16 -- --
B11 Longitudinal Bar Bottom 20 1 2 1 21.040 -- -- -- -- 42.08 --
B11 Extra Bar Top 20 1 6 1 4.900 -- -- -- -- 29.4 --
B11 Extra Bar Bottom 12 1 2 1 12.000 -- -- 24 -- -- --
Lapping 16 1 4 1 0.800 -- -- -- 3.2 -- --
Lapping 20 1 2 1 1.000 -- -- -- -- 2 --
Lapping for chajja bottom bar 20 1 6 1 3.000 -- -- -- -- 18 --
Rings 10 1 149 1 1.020 -- 151.98 -- -- -- --
B12 Longitudinal Bar Top & Bottom 16 1 5 1 13.900 -- -- -- 69.5 -- --
B12 Extra Bar Top 16 1 1 1 5.200 -- -- -- 5.2 -- --
B12 Extra Bar Bottom 12 1 4 1 4.500 -- -- 18 -- -- --
Lapping 16 1 5 1 13.900 -- -- -- 69.5 -- --
Lapping for chajja bottom bar 16 1 3 1 3.000 -- -- -- 9 -- --
Rings 8 1 104 1 1.020 106.08 -- -- -- -- --
B12 Longitudinal Bar Top & Bottom 16 1 5 1 13.900 -- -- -- 69.5 -- --
B12 Extra Bar Top 16 1 1 1 5.200 -- -- -- 5.2 -- --
B12 Extra Bar Bottom 12 1 4 1 4.500 -- -- 18 -- -- --
Lapping 16 1 5 1 13.900 -- -- -- 69.5 -- --
Lapping for chajja bottom bar 16 1 3 1 3.000 -- -- -- 9 -- --
Rings 8 1 104 1 1.020 106.08 -- -- -- -- --
B13 Longitudinal Bar Top & Bottom 16 1 5 1 8.000 -- -- -- 40 -- --
B13 Extra Bar Top 16 1 1 1 2.500 -- -- -- 2.5 -- --
B13 Extra Bar Bottom 12 1 4 1 5.400 -- -- 21.6 -- -- --
Lapping 16 1 5 1 0.800 -- -- -- 4 -- --

Page 24 of 43
Lapping for chajja bottom bar 16 1 3 1 3.000 -- -- -- 9 -- --
Rings 10 1 44 1 1.020 -- 44.88 -- -- -- --
B14 Longitudinal Bar Top & Bottom 16 1 4 1 3.350 -- -- -- 13.4 -- --
Rings 8 1 25 1 1.020 25.5 -- -- -- -- --
B15 Longitudinal Bar Top & Bottom 20 1 6 1 3.000 -- -- -- -- 18 --
Rings 10 1 17 1 1.020 -- 17.34 -- -- -- --
B16 Longitudinal Bar Top & Bottom 16 1 6 1 8.400 -- -- -- 50.4 -- --
Rings 8 1 41 1 1.020 41.82 -- -- -- -- --
B16 Longitudinal Bar Top & Bottom 16 1 6 1 11.700 -- -- -- 70.2 -- --
Rings 8 1 110 1 1.020 112.2 -- -- -- -- --
Slab Ground floor grid B3-B4-C3-4 Bottom 10 1 39 1 7.240 -- 282.36 -- -- -- --
Slab Ground floor grid B3-B4-C3-4 Bottom 10 1 34 1 7.720 -- 262.48 -- -- -- --
Slab Ground floor grid B3-B4-C3-4 Distr 10 1 9 1 14.000 -- 126 -- -- -- --
Slab Ground floor grid B3-B4-C3-4 Distr 10 1 9 1 7.720 -- 69.48 -- -- -- --
Slab Ground floor grid C3,4 DE3,4 Bottom 10 1 57 1 3.700 -- 210.9 -- -- -- --
Slab Ground floor grid C3,4 DE3,4 Bottom 10 1 35 1 7.720 -- 270.2 -- -- -- --
Slab Ground floor grid EF-3 Bottom 10 1 11 1 3.300 -- 36.3 -- -- -- --
Slab Ground floor grid EF-3 Bottom 10 1 16 1 1.800 -- 28.8 -- -- -- --
chajja front of stair landing bottom 10 1 31 1 2.000 -- 62 -- -- -- --
Slab Ground floor grid BC2,3 Bottom 10 1 37 1 5.720 -- 211.64 -- -- -- --
Slab Ground floor grid BC2,3 Bottom 10 1 36 1 6.460 -- 232.56 -- -- -- --
Slab Ground floor grid CD-2,3 Bottom 8 1 61 1 2.400 146.4 -- -- -- -- --
Slab Ground floor grid CD-2,3 Bottom 8 1 13 1 6.460 83.98 -- -- -- -- --
Slab Ground floor grid DE3 sunken Bottom 8 1 12 1 3.460 41.52 -- -- -- -- --
Slab Ground floor grid DE3 sunken Bottom 8 1 31 1 2.200 68.2 -- -- -- -- --
Slab Ground floor grid DE2 Bottom 8 1 17 1 2.200 37.4 -- -- -- -- --
Slab Ground floor grid DE2 Bottom 8 1 15 1 2.860 42.9 -- -- -- -- --
Slab Ground floor grid F2 sunken Bottom 10 1 17 1 2.860 -- 48.62 -- -- -- --
Slab Ground floor grid F2 sunken Bottom 8 1 13 1 2.860 37.18 -- -- -- -- --
Slab Ground floor grid AB-1,2 Bottom 8 1 85 1 3.500 297.5 -- -- -- -- --
Slab Ground floor grid AB-1,2 Bottom 8 1 31 1 10.500 325.5 -- -- -- -- --
Slab Ground floor grid BC-1,2 Bottom 10 1 38 1 5.700 -- 216.6 -- -- -- --
Slab Ground floor grid BC-1,2 Bottom 10 1 38 1 7.200 -- 273.6 -- -- -- --
Slab Ground floor grid CD-1,2 Bottom 10 1 17 1 2.200 -- 37.4 -- -- -- --
Slab Ground floor grid CD-1,2 Bottom 8 1 11 1 3.000 33 -- -- -- -- --
Slab Ground floor grid CD-1,2 Bottom 8 1 14 1 4.300 60.2 -- -- -- -- --
Slab Ground floor grid CD-1,2 Bottom 8 1 37 1 3.000 111 -- -- -- -- --
Slab Ground floor grid EF-1,2 Bottom 8 1 55 1 4.400 242 -- -- -- -- --
Slab Ground floor grid EF-1,2 Bottom 8 1 41 1 7.300 299.3 -- -- -- -- --
Rear side chajja bottom Distribution bar 10 1 9 1 16.000 -- 144 -- -- -- --
B3,4 10 1 59 1 3.430 -- 202.37 -- -- -- --
Distribution 8 1 10 1 4.000 40 -- -- -- -- --
BCD4 10 1 82 1 4.000 -- 328 -- -- -- --

Page 25 of 43
chajja front of stair landing top 10 1 31 1 2.000 -- 62 -- -- -- --
Chajja Distribution 10 1 9 1 18.000 -- 162 -- -- -- --
Chajja Distribution 10 1 9 1 7.800 -- 70.2 -- -- -- --
C3,4 8 1 25 1 3.000 75 -- -- -- -- --
Distribution 8 1 30 1 4.000 120 -- -- -- -- --
E3,4 8 1 40 1 1.000 40 -- -- -- -- --
Distribution 8 1 5 1 4.000 20 -- -- -- -- --
E3,4 8 1 15 1 2.360 35.4 -- -- -- -- --
BCDE3 8 1 77 1 4.000 308 -- -- -- -- --
Distribution 8 1 20 1 9.000 180 -- -- -- -- --
A1,2 8 1 34 1 1.000 34 -- -- -- -- --
Distribution 8 1 4 1 3.500 14 -- -- -- -- --
B1,2,3 8 1 70 1 3.000 210 -- -- -- -- --
B1,2,3 8 1 24 1 1.000 24 -- -- -- -- --
Distribution 8 1 15 1 3.000 45 -- -- -- -- --
Distribution 8 1 5 1 3.000 15 -- -- -- -- --
Kitchen chajja 10 1 16 1 6.600 -- 105.6 -- -- -- --
Distribution 10 1 16 1 3.000 -- 48 -- -- -- --
CDE1,2 8 1 58 1 6.000 348 -- -- -- -- --
Distribution 8 1 27 1 3.000 81 -- -- -- -- --
ABCDEF1 10 1 154 1 3.400 -- 523.6 -- -- -- --
Distribution 8 1 9 1 16.000 144 -- -- -- -- --
Distribution 8 1 9 1 10.000 90 -- -- -- -- --
F1,2 8 1 58 1 1.000 58 -- -- -- -- --
Distribution 8 1 4 1 6.000 24 -- -- -- -- --
ABCDE2 8 1 124 1 4.000 496 -- -- -- -- --
Distribution 8 1 20 1 16.000 320 -- -- -- -- --
2F 8 1 24 1 1.000 24 -- -- -- -- --
Distribution 8 1 6 1 2.400 14.4 -- -- -- -- --
DEF2,3 10 1 17 1 5.000 -- 85 -- -- -- --
Distribution 8 1 22 1 3.000 66 -- -- -- -- --
DE2,3 10 1 21 1 3.000 -- 63 -- -- -- --
Distribution 8 1 20 1 3.000 60 -- -- -- -- --
Staircase slab landing bottom 12 1 11 1 3.000 -- -- 33 -- -- --
Staircase slab landing bottom 12 1 52 1 1.500 -- -- 78 -- -- --
Staircase slab landing bottom 10 1 21 1 7.000 -- 147 -- -- -- --
Staircase slab landing Top 12 1 11 1 3.000 -- -- 33 -- -- --
Staircase slab landing Top 12 1 32 1 1.500 -- -- 48 -- -- --
Staircase slab landing Top 10 1 22 1 3.000 -- 66 -- -- -- --
Staircase slab landing Top 10 1 22 1 1.200 -- 26.4 -- -- -- --
4 GROUND FLOOR TO FIRST FLOOR LEVEL
C1 16 5 12 1 4.000 -- -- -- 240 -- --
Ring 8 5 31 1 1.140 176.7 -- -- -- -- --

Page 26 of 43
Ring ◊ 8 5 31 2 0.492 152.52 -- -- -- -- --
Ring Hook◊ 8 5 31 1 0.310 48.05 -- -- -- -- --
C2 20 6 4 1 4.000 -- -- -- -- 96 --
C2 16 6 8 1 4.000 -- -- -- 192 -- --
Ring 8 6 31 1 1.140 212.04 -- -- -- -- --
Ring ◊ 8 6 31 2 0.492 183.024 -- -- -- -- --
Ring Hook◊ 8 6 31 1 0.310 57.66 -- -- -- -- --
C3 20 4 12 1 4.000 -- -- -- -- 192 --
Ring 8 4 31 1 1.140 141.36 -- -- -- -- --
Ring ◊ 8 4 31 2 0.492 122.016 -- -- -- -- --
Ring Hook◊ 8 4 31 1 0.310 38.44 -- -- -- -- --
Lift Pit Wall vertical bar 16 1 48 1 4.000 -- -- -- 192 -- --
Lift Pit Wall vertical bar 12 1 48 1 4.000 -- -- 192 -- -- --
Lift Pit Wall vertical bar 10 1 48 1 4.000 -- 192 -- -- -- --
Ring x for Lift wall 10 3 21 1 4.250 -- 267.75 -- -- -- --
Ring Y for Lift wall 10 8 21 1 1.300 -- 218.4 -- -- -- --
Ring Z for Lift wall 8 22 25 1 0.552 303.6 -- -- -- -- --
Ring W for Lift wall 8 14 21 1 0.280 82.32 -- -- -- -- --
B1 Longitudinal Bar Top & Bottom 16 1 4 1 17.330 -- -- -- 69.32 -- --
B1 Extra Bar Top & Bottom 16 1 1 3 3.000 -- -- -- 9 -- --
B1 Extra Bar Top & Bottom 16 1 1 1 6.000 -- -- -- 6 -- --
Lapping 16 1 4 1 0.800 -- -- -- 3.2 -- --
Rings 10 1 150 1 1.020 -- 153 -- -- -- --
B2 Longitudinal Bar Top & Bottom 16 1 4 1 3.760 -- -- -- 15.04 -- --
Rings 10 1 25 1 1.020 -- 25.5 -- -- -- --
B3 Longitudinal Bar Top 20 1 2 1 17.330 -- -- -- -- 34.66 --
B3 Longitudinal Bar Bottom 16 1 2 1 17.330 -- -- -- 34.66 -- --
B3 Extra Bar Top 20 1 8 1 3.350 -- -- -- -- 26.8 --
B3 Extra Bar Bottom 16 1 1 1 8.230 -- -- -- 8.23 -- --
B3 Extra Bar Bottom 20 1 3 1 8.230 -- -- -- -- 24.69 --
Lapping 20 1 2 1 1.000 -- -- -- -- 2 --
Lapping 16 1 2 1 0.800 -- -- -- 1.6 -- --
Rings 8 1 70 1 1.020 71.4 -- -- -- -- --
Rings 10 1 66 1 1.020 -- 67.32 -- -- -- --
B4 Longitudinal Bar Top & Bottom 16 1 6 1 4.350 -- -- -- 26.1 -- --
Rings 10 1 31 1 1.020 -- 31.62 -- -- -- --
B5 Longitudinal Bar Top & Bottom 16 1 5 1 5.300 -- -- -- 26.5 -- --
Rings 10 1 40 1 1.020 -- 40.8 -- -- -- --
B6 Longitudinal Bar Top & Bottom 16 1 5 1 12.900 -- -- -- 64.5 -- --
Lapping 16 1 5 1 0.800 -- -- -- 4 -- --
B6 Extra Bar Top 20 1 3 1 1.800 -- -- -- -- 5.4 --
B6 Extra Bar Top 12 1 2 1 3.000 -- -- 6 -- -- --
B6 Extra Bar Bottom 16 1 3 1 6.000 -- -- -- 18 -- --

Page 27 of 43
Rings 10 1 60 1 1.020 -- 61.2 -- -- -- --
Rings 8 1 40 1 1.020 40.8 -- -- -- -- --
B7 Longitudinal Bar Top & Bottom 16 1 4 1 3.000 -- -- -- 12 -- --
Rings 10 1 19 1 1.020 -- 19.38 -- -- -- --
B8 Longitudinal Bar Top & Bottom 16 1 6 1 14.600 -- -- -- 87.6 -- --
Lapping 16 1 6 1 1.000 -- -- -- 6 -- --
B8 Extra Bar Top 12 1 4 1 3.000 -- -- 12 -- -- --
Rings 10 1 103 1 1.020 -- 105.06 -- -- -- --
B9Longitudinal Bar Top & Bottom 16 1 6 1 9.540 -- -- -- 57.24 -- --
Rings 8 1 80 1 1.020 81.6 -- -- -- -- --
B10 Longitudinal Bar Top & Bottom 16 1 6 1 21.040 -- -- -- 126.24 -- --
B10 Extra Bar Top & Bottom 16 1 2 1 8.000 -- -- -- 16 -- --
B10 Extra Bar Top & Bottom 16 1 6 1 3.280 -- -- -- 19.68 -- --
Lapping 16 1 6 1 0.800 -- -- -- 4.8 -- --
Lapping for chajja bottom bar 16 1 6 1 3.000 -- -- -- 18 -- --
Rings 10 1 100 1 1.020 -- 102 -- -- -- --
Rings 8 1 59 1 1.020 60.18 -- -- -- -- --
B11 Longitudinal Bar Top & Bottom 16 1 4 1 21.040 -- -- -- 84.16 -- --
B11 Longitudinal Bar Bottom 20 1 2 1 21.040 -- -- -- -- 42.08 --
B11 Extra Bar Top 20 1 6 1 4.900 -- -- -- -- 29.4 --
B11 Extra Bar Bottom 12 1 2 1 12.000 -- -- 24 -- -- --
Lapping 16 1 4 1 0.800 -- -- -- 3.2 -- --
Lapping 20 1 2 1 1.000 -- -- -- -- 2 --
Lapping for chajja bottom bar 20 1 6 1 3.000 -- -- -- -- 18 --
Rings 10 1 149 1 1.020 -- 151.98 -- -- -- --
B12 Longitudinal Bar Top & Bottom 16 1 5 1 13.900 -- -- -- 69.5 -- --
B12 Extra Bar Top 16 1 1 1 5.200 -- -- -- 5.2 -- --
B12 Extra Bar Bottom 12 1 4 1 4.500 -- -- 18 -- -- --
Lapping 16 1 5 1 13.900 -- -- -- 69.5 -- --
Lapping for chajja bottom bar 16 1 3 1 3.000 -- -- -- 9 -- --
Rings 8 1 104 1 1.020 106.08 -- -- -- -- --
B12 Longitudinal Bar Top & Bottom 16 1 5 1 13.900 -- -- -- 69.5 -- --
B12 Extra Bar Top 16 1 1 1 5.200 -- -- -- 5.2 -- --
B12 Extra Bar Bottom 12 1 4 1 4.500 -- -- 18 -- -- --
Lapping 16 1 5 1 13.900 -- -- -- 69.5 -- --
Lapping for chajja bottom bar 16 1 3 1 3.000 -- -- -- 9 -- --
Rings 8 1 104 1 1.020 106.08 -- -- -- -- --
B13 Longitudinal Bar Top & Bottom 16 1 5 1 8.000 -- -- -- 40 -- --
B13 Extra Bar Top 16 1 1 1 2.500 -- -- -- 2.5 -- --
B13 Extra Bar Bottom 12 1 4 1 5.400 -- -- 21.6 -- -- --
Lapping 16 1 5 1 0.800 -- -- -- 4 -- --
Lapping for chajja bottom bar 16 1 3 1 3.000 -- -- -- 9 -- --
Rings 10 1 44 1 1.020 -- 44.88 -- -- -- --

Page 28 of 43
B14 Longitudinal Bar Top & Bottom 16 1 4 1 3.350 -- -- -- 13.4 -- --
Rings 8 1 25 1 1.020 25.5 -- -- -- -- --
B15 Longitudinal Bar Top & Bottom 20 1 6 1 3.000 -- -- -- -- 18 --
Rings 10 1 17 1 1.020 -- 17.34 -- -- -- --
B16 Longitudinal Bar Top & Bottom 16 1 6 1 8.400 -- -- -- 50.4 -- --
Rings 8 1 41 1 1.020 41.82 -- -- -- -- --
B16 Longitudinal Bar Top & Bottom 16 1 6 1 11.700 -- -- -- 70.2 -- --
Rings 8 1 110 1 1.020 112.2 -- -- -- -- --
Slab Ground floor grid B3-B4-C3-4 Bottom 10 1 39 1 7.240 -- 282.36 -- -- -- --
Slab Ground floor grid B3-B4-C3-4 Bottom 10 1 34 1 7.720 -- 262.48 -- -- -- --
Slab Ground floor grid B3-B4-C3-4 Distr 10 1 9 1 14.000 -- 126 -- -- -- --
Slab Ground floor grid B3-B4-C3-4 Distr 10 1 9 1 7.720 -- 69.48 -- -- -- --
Slab Ground floor grid C3,4 DE3,4 Bottom 10 1 57 1 3.700 -- 210.9 -- -- -- --
Slab Ground floor grid C3,4 DE3,4 Bottom 10 1 35 1 7.720 -- 270.2 -- -- -- --
Slab Ground floor grid EF-3 Bottom 10 1 11 1 3.300 -- 36.3 -- -- -- --
Slab Ground floor grid EF-3 Bottom 10 1 16 1 1.800 -- 28.8 -- -- -- --
chajja front of stair landing bottom 10 1 31 1 2.000 -- 62 -- -- -- --
Slab Ground floor grid BC2,3 Bottom 10 1 37 1 5.720 -- 211.64 -- -- -- --
Slab Ground floor grid BC2,3 Bottom 10 1 36 1 6.460 -- 232.56 -- -- -- --
Slab Ground floor grid CD-2,3 Bottom 8 1 61 1 2.400 146.4 -- -- -- -- --
Slab Ground floor grid CD-2,3 Bottom 8 1 13 1 6.460 83.98 -- -- -- -- --
Slab Ground floor grid DE3 sunken Bottom 8 1 12 1 3.460 41.52 -- -- -- -- --
Slab Ground floor grid DE3 sunken Bottom 8 1 31 1 2.200 68.2 -- -- -- -- --
Slab Ground floor grid DE2 Bottom 8 1 17 1 2.200 37.4 -- -- -- -- --
Slab Ground floor grid DE2 Bottom 8 1 15 1 2.860 42.9 -- -- -- -- --
Slab Ground floor grid F2 sunken Bottom 10 1 17 1 2.860 -- 48.62 -- -- -- --
Slab Ground floor grid F2 sunken Bottom 8 1 13 1 2.860 37.18 -- -- -- -- --
Slab Ground floor grid AB-1,2 Bottom 8 1 85 1 3.500 297.5 -- -- -- -- --
Slab Ground floor grid AB-1,2 Bottom 8 1 31 1 10.500 325.5 -- -- -- -- --
Slab Ground floor grid BC-1,2 Bottom 10 1 38 1 5.700 -- 216.6 -- -- -- --
Slab Ground floor grid BC-1,2 Bottom 10 1 38 1 7.200 -- 273.6 -- -- -- --
Slab Ground floor grid CD-1,2 Bottom 10 1 17 1 2.200 -- 37.4 -- -- -- --
Slab Ground floor grid CD-1,2 Bottom 8 1 11 1 3.000 33 -- -- -- -- --
Slab Ground floor grid CD-1,2 Bottom 8 1 14 1 4.300 60.2 -- -- -- -- --
Slab Ground floor grid CD-1,2 Bottom 8 1 37 1 3.000 111 -- -- -- -- --
Slab Ground floor grid EF-1,2 Bottom 8 1 55 1 4.400 242 -- -- -- -- --
Slab Ground floor grid EF-1,2 Bottom 8 1 41 1 7.300 299.3 -- -- -- -- --
Rear side chajja bottom Distribution bar 10 1 9 1 16.000 -- 144 -- -- -- --
B3,4 10 1 59 1 3.430 -- 202.37 -- -- -- --
Distribution 8 1 10 1 4.000 40 -- -- -- -- --
BCD4 10 1 82 1 4.000 -- 328 -- -- -- --
chajja front of stair landing top 10 1 31 1 2.000 -- 62 -- -- -- --
Chajja Distribution 10 1 9 1 18.000 -- 162 -- -- -- --

Page 29 of 43
Chajja Distribution 10 1 9 1 7.800 -- 70.2 -- -- -- --
C3,4 8 1 25 1 3.000 75 -- -- -- -- --
Distribution 8 1 30 1 4.000 120 -- -- -- -- --
E3,4 8 1 40 1 1.000 40 -- -- -- -- --
Distribution 8 1 5 1 4.000 20 -- -- -- -- --
E3,4 8 1 15 1 2.360 35.4 -- -- -- -- --
BCDE3 8 1 77 1 4.000 308 -- -- -- -- --
Distribution 8 1 20 1 9.000 180 -- -- -- -- --
A1,2 8 1 34 1 1.000 34 -- -- -- -- --
Distribution 8 1 4 1 3.500 14 -- -- -- -- --
B1,2,3 8 1 70 1 3.000 210 -- -- -- -- --
B1,2,3 8 1 24 1 1.000 24 -- -- -- -- --
Distribution 8 1 15 1 3.000 45 -- -- -- -- --
Distribution 8 1 5 1 3.000 15 -- -- -- -- --
Kitchen chajja 10 1 16 1 6.600 -- 105.6 -- -- -- --
Distribution 10 1 16 1 3.000 -- 48 -- -- -- --
CDE1,2 8 1 58 1 6.000 348 -- -- -- -- --
Distribution 8 1 27 1 3.000 81 -- -- -- -- --
ABCDEF1 10 1 154 1 3.400 -- 523.6 -- -- -- --
Distribution 8 1 9 1 16.000 144 -- -- -- -- --
Distribution 8 1 9 1 10.000 90 -- -- -- -- --
F1,2 8 1 58 1 1.000 58 -- -- -- -- --
Distribution 8 1 4 1 6.000 24 -- -- -- -- --
ABCDE2 8 1 124 1 4.000 496 -- -- -- -- --
Distribution 8 1 20 1 16.000 320 -- -- -- -- --
2F 8 1 24 1 1.000 24 -- -- -- -- --
Distribution 8 1 6 1 2.400 14.4 -- -- -- -- --
DEF2,3 10 1 17 1 5.000 -- 85 -- -- -- --
Distribution 8 1 22 1 3.000 66 -- -- -- -- --
DE2,3 10 1 21 1 3.000 -- 63 -- -- -- --
Distribution 8 1 20 1 3.000 60 -- -- -- -- --
Staircase slab landing bottom 12 1 11 1 3.000 -- -- 33 -- -- --
Staircase slab landing bottom 12 1 52 1 1.500 -- -- 78 -- -- --
Staircase slab landing bottom 10 1 21 1 7.000 -- 147 -- -- -- --
Staircase slab landing Top 12 1 11 1 3.000 -- -- 33 -- -- --
Staircase slab landing Top 12 1 32 1 1.500 -- -- 48 -- -- --
Staircase slab landing Top 10 1 22 1 3.000 -- 66 -- -- -- --
Staircase slab landing Top 10 1 22 1 1.200 -- 26.4 -- -- -- --
5 FIRST FLOOR TO TERRACE FLOOR LEVEL -- -- -- -- -- --
C1 16 5 12 1 4.000 -- -- -- 240 -- --
Ring 8 5 31 1 1.140 176.7 -- -- -- -- --
Ring ◊ 8 5 31 2 0.492 152.52 -- -- -- -- --
Ring Hook◊ 8 5 31 1 0.310 48.05 -- -- -- -- --

Page 30 of 43
C2 20 6 4 1 4.000 -- -- -- -- 96 --
C2 16 6 8 1 4.000 -- -- -- 192 -- --
Ring 8 6 31 1 1.140 212.04 -- -- -- -- --
Ring ◊ 8 6 31 2 0.492 183.024 -- -- -- -- --
Ring Hook◊ 8 6 31 1 0.310 57.66 -- -- -- -- --
C3 20 4 12 1 4.000 -- -- -- -- 192 --
Ring 8 4 31 1 1.140 141.36 -- -- -- -- --
Ring ◊ 8 4 31 2 0.492 122.016 -- -- -- -- --
Ring Hook◊ 8 4 31 1 0.310 38.44 -- -- -- -- --
Lift Pit Wall vertical bar 16 1 48 1 4.000 -- -- -- 192 -- --
Lift Pit Wall vertical bar 12 1 48 1 4.000 -- -- 192 -- -- --
Lift Pit Wall vertical bar 10 1 48 1 4.000 -- 192 -- -- -- --
Ring x for Lift wall 10 3 21 1 4.250 -- 267.75 -- -- -- --
Ring Y for Lift wall 10 8 21 1 1.300 -- 218.4 -- -- -- --
Ring Z for Lift wall 8 22 25 1 0.552 303.6 -- -- -- -- --
Ring W for Lift wall 8 14 21 1 0.280 82.32 -- -- -- -- --
B1 Longitudinal Bar Top & Bottom 16 1 4 1 17.330 -- -- -- 69.32 -- --
B1 Extra Bar Top & Bottom 16 1 1 3 3.000 -- -- -- 9 -- --
B1 Extra Bar Top & Bottom 16 1 1 1 6.000 -- -- -- 6 -- --
Lapping 16 1 4 1 0.800 -- -- -- 3.2 -- --
Rings 10 1 150 1 1.020 -- 153 -- -- -- --
B2 Longitudinal Bar Top & Bottom 16 1 4 1 3.760 -- -- -- 15.04 -- --
Rings 10 1 25 1 1.020 -- 25.5 -- -- -- --
B3 Longitudinal Bar Top 20 1 2 1 17.330 -- -- -- -- 34.66 --
B3 Longitudinal Bar Bottom 16 1 2 1 17.330 -- -- -- 34.66 -- --
B3 Extra Bar Top 20 1 8 1 3.350 -- -- -- -- 26.8 --
B3 Extra Bar Bottom 16 1 1 1 8.230 -- -- -- 8.23 -- --
B3 Extra Bar Bottom 20 1 3 1 8.230 -- -- -- -- 24.69 --
Lapping 20 1 2 1 1.000 -- -- -- -- 2 --
Lapping 16 1 2 1 0.800 -- -- -- 1.6 -- --
Rings 8 1 70 1 1.020 71.4 -- -- -- -- --
Rings 10 1 66 1 1.020 -- 67.32 -- -- -- --
B4 Longitudinal Bar Top & Bottom 16 1 6 1 4.350 -- -- -- 26.1 -- --
Rings 10 1 31 1 1.020 -- 31.62 -- -- -- --
B5 Longitudinal Bar Top & Bottom 16 1 5 1 5.300 -- -- -- 26.5 -- --
Rings 10 1 40 1 1.020 -- 40.8 -- -- -- --
B6 Longitudinal Bar Top & Bottom 16 1 5 1 12.900 -- -- -- 64.5 -- --
Lapping 16 1 5 1 0.800 -- -- -- 4 -- --
B6 Extra Bar Top 20 1 3 1 1.800 -- -- -- -- 5.4 --
B6 Extra Bar Top 12 1 2 1 3.000 -- -- 6 -- -- --
B6 Extra Bar Bottom 16 1 3 1 6.000 -- -- -- 18 -- --
Rings 10 1 60 1 1.020 -- 61.2 -- -- -- --
Rings 8 1 40 1 1.020 40.8 -- -- -- -- --

Page 31 of 43
B7 Longitudinal Bar Top & Bottom 16 1 4 1 3.000 -- -- -- 12 -- --
Rings 10 1 19 1 1.020 -- 19.38 -- -- -- --
B8 Longitudinal Bar Top & Bottom 16 1 6 1 14.600 -- -- -- 87.6 -- --
Lapping 16 1 6 1 1.000 -- -- -- 6 -- --
B8 Extra Bar Top 12 1 4 1 3.000 -- -- 12 -- -- --
Rings 10 1 103 1 1.020 -- 105.06 -- -- -- --
B9Longitudinal Bar Top & Bottom 16 1 6 1 9.540 -- -- -- 57.24 -- --
Rings 8 1 80 1 1.020 81.6 -- -- -- -- --
B10 Longitudinal Bar Top & Bottom 16 1 6 1 21.040 -- -- -- 126.24 -- --
B10 Extra Bar Top & Bottom 16 1 2 1 8.000 -- -- -- 16 -- --
B10 Extra Bar Top & Bottom 16 1 6 1 3.280 -- -- -- 19.68 -- --
Lapping 16 1 6 1 0.800 -- -- -- 4.8 -- --
Lapping for chajja bottom bar 16 1 6 1 3.000 -- -- -- 18 -- --
Rings 10 1 100 1 1.020 -- 102 -- -- -- --
Rings 8 1 59 1 1.020 60.18 -- -- -- -- --
B11 Longitudinal Bar Top & Bottom 16 1 4 1 21.040 -- -- -- 84.16 -- --
B11 Longitudinal Bar Bottom 20 1 2 1 21.040 -- -- -- -- 42.08 --
B11 Extra Bar Top 20 1 6 1 4.900 -- -- -- -- 29.4 --
B11 Extra Bar Bottom 12 1 2 1 12.000 -- -- 24 -- -- --
Lapping 16 1 4 1 0.800 -- -- -- 3.2 -- --
Lapping 20 1 2 1 1.000 -- -- -- -- 2 --
Lapping for chajja bottom bar 20 1 6 1 3.000 -- -- -- -- 18 --
Rings 10 1 149 1 1.020 -- 151.98 -- -- -- --
B12 Longitudinal Bar Top & Bottom 16 1 5 1 13.900 -- -- -- 69.5 -- --
B12 Extra Bar Top 16 1 1 1 5.200 -- -- -- 5.2 -- --
B12 Extra Bar Bottom 12 1 4 1 4.500 -- -- 18 -- -- --
Lapping 16 1 5 1 13.900 -- -- -- 69.5 -- --
Lapping for chajja bottom bar 16 1 3 1 3.000 -- -- -- 9 -- --
Rings 8 1 104 1 1.020 106.08 -- -- -- -- --
B12 Longitudinal Bar Top & Bottom 16 1 5 1 13.900 -- -- -- 69.5 -- --
B12 Extra Bar Top 16 1 1 1 5.200 -- -- -- 5.2 -- --
B12 Extra Bar Bottom 12 1 4 1 4.500 -- -- 18 -- -- --
Lapping 16 1 5 1 13.900 -- -- -- 69.5 -- --
Lapping for chajja bottom bar 16 1 3 1 3.000 -- -- -- 9 -- --
Rings 8 1 104 1 1.020 106.08 -- -- -- -- --
B13 Longitudinal Bar Top & Bottom 16 1 5 1 8.000 -- -- -- 40 -- --
B13 Extra Bar Top 16 1 1 1 2.500 -- -- -- 2.5 -- --
B13 Extra Bar Bottom 12 1 4 1 5.400 -- -- 21.6 -- -- --
Lapping 16 1 5 1 0.800 -- -- -- 4 -- --
Lapping for chajja bottom bar 16 1 3 1 3.000 -- -- -- 9 -- --
Rings 10 1 44 1 1.020 -- 44.88 -- -- -- --
B14 Longitudinal Bar Top & Bottom 16 1 4 1 3.350 -- -- -- 13.4 -- --
Rings 8 1 25 1 1.020 25.5 -- -- -- -- --

Page 32 of 43
B15 Longitudinal Bar Top & Bottom 20 1 6 1 3.000 -- -- -- -- 18 --
Rings 10 1 17 1 1.020 -- 17.34 -- -- -- --
B16 Longitudinal Bar Top & Bottom 16 1 6 1 8.400 -- -- -- 50.4 -- --
Rings 8 1 41 1 1.020 41.82 -- -- -- -- --
B16 Longitudinal Bar Top & Bottom 16 1 6 1 11.700 -- -- -- 70.2 -- --
Rings 8 1 110 1 1.020 112.2 -- -- -- -- --
Slab Ground floor grid B3-B4-C3-4 Bottom 10 1 39 1 7.240 -- 282.36 -- -- -- --
Slab Ground floor grid B3-B4-C3-4 Bottom 10 1 34 1 7.720 -- 262.48 -- -- -- --
Slab Ground floor grid B3-B4-C3-4 Distr 10 1 9 1 14.000 -- 126 -- -- -- --
Slab Ground floor grid B3-B4-C3-4 Distr 10 1 9 1 7.720 -- 69.48 -- -- -- --
Slab Ground floor grid C3,4 DE3,4 Bottom 10 1 57 1 3.700 -- 210.9 -- -- -- --
Slab Ground floor grid C3,4 DE3,4 Bottom 10 1 35 1 7.720 -- 270.2 -- -- -- --
Slab Ground floor grid EF-3 Bottom 10 1 11 1 3.300 -- 36.3 -- -- -- --
Slab Ground floor grid EF-3 Bottom 10 1 16 1 1.800 -- 28.8 -- -- -- --
chajja front of stair landing bottom 10 1 31 1 2.000 -- 62 -- -- -- --
Slab Ground floor grid BC2,3 Bottom 10 1 37 1 5.720 -- 211.64 -- -- -- --
Slab Ground floor grid BC2,3 Bottom 10 1 36 1 6.460 -- 232.56 -- -- -- --
Slab Ground floor grid CD-2,3 Bottom 8 1 61 1 2.400 146.4 -- -- -- -- --
Slab Ground floor grid CD-2,3 Bottom 8 1 13 1 6.460 83.98 -- -- -- -- --
Slab Ground floor grid DE3 sunken Bottom 8 1 12 1 3.460 41.52 -- -- -- -- --
Slab Ground floor grid DE3 sunken Bottom 8 1 31 1 2.200 68.2 -- -- -- -- --
Slab Ground floor grid DE2 Bottom 8 1 17 1 2.200 37.4 -- -- -- -- --
Slab Ground floor grid DE2 Bottom 8 1 15 1 2.860 42.9 -- -- -- -- --
Slab Ground floor grid F2 sunken Bottom 10 1 17 1 2.860 -- 48.62 -- -- -- --
Slab Ground floor grid F2 sunken Bottom 8 1 13 1 2.860 37.18 -- -- -- -- --
Slab Ground floor grid AB-1,2 Bottom 8 1 85 1 3.500 297.5 -- -- -- -- --
Slab Ground floor grid AB-1,2 Bottom 8 1 31 1 10.500 325.5 -- -- -- -- --
Slab Ground floor grid BC-1,2 Bottom 10 1 38 1 5.700 -- 216.6 -- -- -- --
Slab Ground floor grid BC-1,2 Bottom 10 1 38 1 7.200 -- 273.6 -- -- -- --
Slab Ground floor grid CD-1,2 Bottom 10 1 17 1 2.200 -- 37.4 -- -- -- --
Slab Ground floor grid CD-1,2 Bottom 8 1 11 1 3.000 33 -- -- -- -- --
Slab Ground floor grid CD-1,2 Bottom 8 1 14 1 4.300 60.2 -- -- -- -- --
Slab Ground floor grid CD-1,2 Bottom 8 1 37 1 3.000 111 -- -- -- -- --
Slab Ground floor grid EF-1,2 Bottom 8 1 55 1 4.400 242 -- -- -- -- --
Slab Ground floor grid EF-1,2 Bottom 8 1 41 1 7.300 299.3 -- -- -- -- --
Rear side chajja bottom Distribution bar 10 1 9 1 16.000 -- 144 -- -- -- --
B3,4 10 1 59 1 3.430 -- 202.37 -- -- -- --
Distribution 8 1 10 1 4.000 40 -- -- -- -- --
BCD4 10 1 82 1 4.000 -- 328 -- -- -- --
chajja front of stair landing top 10 1 31 1 2.000 -- 62 -- -- -- --
Chajja Distribution 10 1 9 1 18.000 -- 162 -- -- -- --
Chajja Distribution 10 1 9 1 7.800 -- 70.2 -- -- -- --
C3,4 8 1 25 1 3.000 75 -- -- -- -- --

Page 33 of 43
Distribution 8 1 30 1 4.000 120 -- -- -- -- --
E3,4 8 1 40 1 1.000 40 -- -- -- -- --
Distribution 8 1 5 1 4.000 20 -- -- -- -- --
E3,4 8 1 15 1 2.360 35.4 -- -- -- -- --
BCDE3 8 1 77 1 4.000 308 -- -- -- -- --
Distribution 8 1 20 1 9.000 180 -- -- -- -- --
A1,2 8 1 34 1 1.000 34 -- -- -- -- --
Distribution 8 1 4 1 3.500 14 -- -- -- -- --
B1,2,3 8 1 70 1 3.000 210 -- -- -- -- --
B1,2,3 8 1 24 1 1.000 24 -- -- -- -- --
Distribution 8 1 15 1 3.000 45 -- -- -- -- --
Distribution 8 1 5 1 3.000 15 -- -- -- -- --
Kitchen chajja 10 1 16 1 6.600 -- 105.6 -- -- -- --
Distribution 10 1 16 1 3.000 -- 48 -- -- -- --
CDE1,2 8 1 58 1 6.000 348 -- -- -- -- --
Distribution 8 1 27 1 3.000 81 -- -- -- -- --
ABCDEF1 10 1 154 1 3.400 -- 523.6 -- -- -- --
Distribution 8 1 9 1 16.000 144 -- -- -- -- --
Distribution 8 1 9 1 10.000 90 -- -- -- -- --
F1,2 8 1 58 1 1.000 58 -- -- -- -- --
Distribution 8 1 4 1 6.000 24 -- -- -- -- --
ABCDE2 8 1 124 1 4.000 496 -- -- -- -- --
Distribution 8 1 20 1 16.000 320 -- -- -- -- --
2F 8 1 24 1 1.000 24 -- -- -- -- --
Distribution 8 1 6 1 2.400 14.4 -- -- -- -- --
DEF2,3 10 1 17 1 5.000 -- 85 -- -- -- --
Distribution 8 1 22 1 3.000 66 -- -- -- -- --
DE2,3 10 1 21 1 3.000 -- 63 -- -- -- --
Distribution 8 1 20 1 3.000 60 -- -- -- -- --
Staircase slab landing bottom 12 1 11 1 3.000 -- -- 33 -- -- --
Staircase slab landing bottom 12 1 52 1 1.500 -- -- 78 -- -- --
Staircase slab landing bottom 10 1 21 1 7.000 -- 147 -- -- -- --
Staircase slab landing Top 12 1 11 1 3.000 -- -- 33 -- -- --
Staircase slab landing Top 12 1 32 1 1.500 -- -- 48 -- -- --
Staircase slab landing Top 10 1 22 1 3.000 -- 66 -- -- -- --
Staircase slab landing Top 10 1 22 1 1.200 -- 26.4 -- -- -- --
TERRACE FLOOR TO MUMTY LEVEL -- -- -- -- -- --
C1 16 1 12 1 4.000 -- -- -- 48 -- --
Ring 8 1 31 1 1.140 35.34 -- -- -- -- --
Ring ◊ 8 1 31 2 0.492 30.504 -- -- -- -- --
Ring Hook◊ 8 1 31 1 0.310 9.61 -- -- -- -- --
C2 20 3 4 1 4.000 -- -- -- -- 48 --
C2 16 3 8 1 4.000 -- -- -- 96 -- --

Page 34 of 43
Ring 8 3 31 1 1.140 106.02 -- -- -- -- --
Ring ◊ 8 3 31 2 0.492 91.512 -- -- -- -- --
Ring Hook◊ 8 3 31 1 0.310 28.83 -- -- -- -- --
Lift Pit Wall vertical bar 16 1 48 1 4.000 -- -- -- 192 -- --
Lift Pit Wall vertical bar 12 1 48 1 4.000 -- -- 192 -- -- --
Lift Pit Wall vertical bar 10 1 48 1 4.000 -- 192 -- -- -- --
Ring x for Lift wall 10 3 21 1 4.250 -- 267.75 -- -- -- --
Ring Y for Lift wall 10 8 21 1 1.300 -- 218.4 -- -- -- --
Ring Z for Lift wall 8 22 25 1 0.552 303.6 -- -- -- -- --
Ring W for Lift wall 8 14 21 1 0.280 82.32 -- -- -- -- --
B13 Longitudinal Bar Top & Bottom 16 1 5 1 8.000 -- -- -- 40 -- --
B13 Extra Bar Top 16 1 1 1 2.500 -- -- -- 2.5 -- --
B13 Extra Bar Bottom 12 1 4 1 5.400 -- -- 21.6 -- -- --
Lapping 16 1 5 1 0.800 -- -- -- 4 -- --
Lapping for chajja bottom bar 16 1 3 1 3.000 -- -- -- 9 -- --
Rings 10 1 44 1 1.020 -- 44.88 -- -- -- --
B16 Longitudinal Bar Top & Bottom 16 1 6 1 8.400 -- -- -- 50.4 -- --
Rings 8 1 41 1 1.020 41.82 -- -- -- -- --
B16 Longitudinal Bar Top & Bottom 16 1 6 1 11.700 -- -- -- 70.2 -- --
Rings 8 1 110 1 1.020 112.2 -- -- -- -- --
B8 16 1 6 1 4.000 -- -- -- 24 -- --
Rings 8 1 30 1 1.020 30.6 -- -- -- -- --
Slab mumty 10 1 75 2 3.400 -- 510 -- -- -- --
Slab mumty 8 1 33 2 9.000 594 -- -- -- -- --
Total length 24712.616 21976.3 2696.71 7551.7 1881.09 0
Wt / metre 0.395 0.62 0.89 1.58 2.47 3.85
Wt/ Diawise 9761.48332 13625 2400.07 11932 4646.29 0
NET WT/MT. 42364.879

Page 35 of 43
DATED:- 25th FEB, 2018 ANNEXURE-A

SHRI. P.C SHARMA JI


PLOT NO- , SECTOR-83, GURUGRAM (HARYANA)

CONSTRUCTION OF RESIDENTIAL BUILDING (WITH MATERIAL RATES)

S.NO. PARTICULARS UNIT QTY. RATE AMOUNT

1 EARTHWORK IN SURFACE EXCAVATION NOT EXCEEEDING


30CM IN DEPTH BUT EXCEEDING 1.5 M IN WIDTH AS WELL AS
10 SQM ON PLAN INCLUDING GETTING OUT AND DISPOSAL
OF EXCAVATED EARTH UPTO 50 M AND LIFT UPTO 1.5 M. SQM 247.28 80.00 19782.16
COMPLETE.

2 EXCAVATION IN FOUNDATION, TRENCHES UPTO 2M DEPTH


INCLUDING DRESSING OF SIDES & RAMMING OF BOTTOM &
GETTING OUT THE EXCAVATED SOIL AND DISPOSAL SURPLUS
SOIL AS DIRECTED WITH IN A LEAD OF 100 METERS
INCLUDING BACKFILLING IN WATERING, RAMMING AND CUM 567.24 140.00 79413.18
CONSOLIDATING ORDINARY SOIL.

3 ANTI- TERMITE TREATMENT OF SOIL UNDER FLOORS USING


CHEMICAL EMULSION @ ONE LITRE PER HOLE, 300 MM
APART INCLUDING DRILLING 12 mm DIAMETER HOLES WITH
Chlorpyriphos/Lindane E.C. 20% WITH 1% CONCENTRATION. SQM 247.28 90.00 22255.20

4 PROVIDING & LAYING IN POSITION CEMENT CONCRETE 1:4:8


(1CEMENT:4COARSE SAND :8 GRADED STONE AGG. 40 MM IN
FOUNDATION INCL. CONSOLIDATION & CURING (COMPLETE). CUM 56.51 4600.00 259964.40
AT ALL HEIGHT & LEVELS.

5 CENTERING & SHUTTERING INCLUDING STRUTTING ,


PROPPING ETC & REMOVAL OF FORM UPTO ANY HEIGHT AS
DIRECTED & APPROVED. SQM 2577.00 380.00 979260.00

6 PROVIDING & LAYING IN POSITION REINFORCED CEMENT


CONCRETE M-25 GRADE / 1:1.5:3 (1 CEMENT: 1.5 COARSE
SAND :3 GRADED STONE AGGREGATE 20 MM NOMINAL SIZE)
EXCLUDING THE COST OF SHUTTERING & REINFORCEMENT
BUT INCLUDING CONSOLIDATION & CURING ETC.UPTO ANY CUM 475.00 6000.00 2850000.00
HEIGHT.

7 BRICK WORK WITH BRICKS OF CLASS DESIGNATION 75 &


PLINTH JN FOUNDATION IN C.M 1:6 INCLUDING CURING
ETC. COMPLETE. CUM 252.00 5200.00 1310400.00

8 12 MM THICK CEMENT PLASTER 1 :4 ON ( 1 CEMENT :4


COARSE SAND ) BRICK WALLS,R.C.C. WALLS SMOOTH
FINISHED INCLUDING CURING ETC. AT ALL LEVELS & HEIGHT SMT 3284.00 280.00 919520.00
COMPLETE.

9 COLD TWISTED STEEL (T.M.T) REINFORCEMENT FOR R.C.C.


WORK INCLUDING CUTTING , BENDING & PLACING IN
POSITION ALL COMPLETE INCLUDING & COVER BLOCK & MT 46.00 59000.00 2714000.00
BINDING WIRE. AT ALL HEIGHTS & LEVELS.

10 PROVIDING AND LAYING 100MM THK BRICK BAT COBA


WATER PROOFING TREATMENT TO ROOF INCLUDING
CLEANING THE SURFACE PROVIDING ALL ARROUND THE SMT 3255.00 60.00 195300.00
TERRACE WATER PROOF.

Page 36 of 43
TOTAL AMOUNT OF WORK FOR RESIDENTIAL BUILDING CIVIL WORK (IN RS) 9,349,895

Page 37 of 43
SHRI. P.C SHARMA JI
PLOT NO- 5,H-12, SECTOR-82, GURUGRAM (HARYANA)

WORK BREAKDOWN STRUCTURE WITH BOQ


WBS TASK NAME Unit QTY. Rate Amount
1 Issue of LOI
2 Mobilization
3 Residential Block
3.1 Foundation Work/Sub-Structure for Residential Block
3.1.1 Excavation,Dressing & Levelling Below Footings Cum. 450.00 80.00 36,000
3.1.2 PCC (1:4:8) below Footing Cum. 14.00 4200.00 58,800
3.1.3 Steel Reinforcement upto Pedestal MT 5.52 59000.00 325,385
3.1.4 Shuttering of Footing Sqm. 44.30 350.00 15,505
3.1.5 Concreting of Footing Cum. 50.00 5800.00 290,000
3.1.6 Shuttering of Pedestal & Lift pit upto Plinth beam bottom Sqm. 63.00 350.00 22,050
3.1.7 Concreting of pedestal & Lift pit upto Plinth beam bottom Cum. 4.80 6500.00 31,200
3.1.8 Earthfilling upto Plinth beam level Cum. 450.00 60.00 27,000
3.1.9 Dressing, levelling below Brick foundation Sqm. 102.00 80.00 8,160
3.1.10 PCC (1:4:8) below PB/Brickwall at DPC level Cum. 14.00 4200.00 58,800
3.1.11 Brickwork Below DPC level Cum. 66.00 5000.00 330,000
3.1.12 Steel Reinforcement of Plinth Beam MT 1.57 59000.00 92,807
3.1.13 Shuttering for Plinth Beam Sqm. 75.00 350.00 26,250
3.1.14 Concreting for PB at DPC level Cum. 8.63 5800.00 50,025
3.1.15 Earthfilling upto DPC level Cum. 250.00 295.00 73,750
Total Amount of Work in Foundation 1,445,732

3.2 Super Structure RCC for Residential Block


3.2.1 Steel Reinforcement of columns PB to GF level MT 2.89 59000.00 170,392
3.2.2 Shuttering for Columns Plinth Beam to GF level Sqm. 228.60 350.00 80,010
3.2.3 Concreting Columns & Lift pit upto PB to GF level Cum. 16.80 6500.00 109,200
3.2.4 Shuttering of Ground floor slab Cum. 500.00 350.00 175,000
3.2.5 Steel Reinforcement for GF Beam & Slab MT 8.04 59000.00 474,183
3.2.6 Concreting of Ground floor slab Cum. 71.30 5800.00 413,540
3.2.7 Steel Reinforcement of columns GF to FF level MT 2.89 59000.00 170,392
3.2.8 Shuttering for Columns GF to FF level Sqm. 228.60 350.00 80,010
3.2.9 Concreting Columns & Lift pit upto GF to FF level Cum. 16.80 6500.00 109,200
3.2.10 Shuttering of First floor slab Sqm. 500.00 350.00 175,000
3.2.11 Steel Reinforcement for First floor Beam & Slab MT 8.04 59000.00 474,183
3.2.12 Concreting of First floor slab Cum. 71.30 5800.00 413,540
3.2.13 Steel Reinforcement of columns FF to TF level MT 2.89 59000.00 170,392
3.2.14 Shuttering for Columns FF to TF level Sqm. 228.60 350.00 80,010
3.2.15 Concreting Columns & Lift pit upto FF to TF level Cum. 16.80 6500.00 109,200
3.2.16 Shuttering of Terrace floor slab Sqm. 500.00 350.00 175,000
3.2.17 Steel Reinforcement for Terrace floor Beam & Slab MT 8.04 59000.00 474,183
3.2.18 Concreting of Terrace floor slab Cum. 71.30 5800.00 413,540
3.2.19 Steel Reinforcement of columns TF to Mumty level MT 1.51 59000.00 89,208
3.2.20 Shuttering for Columns TF to Mumty level Sqm. 226.50 350.00 79,275
3.2.21 Concreting Columns & Lift pit upto TF to Mumty level Cum. 48.10 6500.00 312,650
3.2.22 Shuttering of Mumty floor slab Sqm. 43.70 350.00 15,295
3.2.23 Steel Reinforcement for Mumty floor Beam & Slab MT 1.00 59000.00 59,000
3.2.24 Concreting of Mumty floor slab Cum. 5.40 5800.00 31,320
Total Amount of Work in Super-structure (RCC ONLY) 4,853,723
SHRI. P.C SHARMA JI
PLOT NO- 5,H-12, SECTOR-82, GURUGRAM (HARYANA)

WORK BREAKDOWN STRUCTURE WITH BOQ


WBS TASK NAME Unit QTY. Rate Amount
3.3 Super Structure Brickwork, Plastering & Terracing work
3.3.1 Brickwork of Ground Floor Cum. 50.00 5000.00 250,000
3.3.2 Brickwork of First Floor Cum. 50.00 5000.00 250,000
3.3.3 Brickwork of Mumty Floor Cum. 10.00 5000.00 50,000
3.3.4 Brickwork of Perapet wall Cum. 18.60 5000.00 93,000
3.3.5 Fixing of Door & Window frames Sqm. 80.00 750.00 60,000
3.3.6 Plastering of inner side Ground floor Sqm. 552.00 280.00 154,560
3.3.7 Plastering of inner side First floor Sqm. 552.00 280.00 154,560
3.3.8 Plastering of inner side Mumty floor Sqm. 80.00 280.00 22,400
3.3.9 Plastering of inner side perapet wall Sqm. 80.00 280.00 22,400
3.3.10 Plastering work outer Elevation Sqm. 750.00 320.00 240,000
3.3.11 Water-proofing & filling of sunken portion of GF Sqm. 15.00 600.00 9,000
3.3.12 Water-proofing & filling of sunken portion of FF Sqm. 15.00 600.00 9,000
3.3.13 Brick -bat coba work at terrace roof Sqm. 302.50 600.00 181,500
3.3.14 Anti- Termite treatment in flooring Sqm. 302.50 90.00 27,225
3.3.15 PCC in flooring (kacha farsh) in Stilt floor Cum. 30.00 4200.00 126,000
3.3.16 Brick work in Stilt floor Cum. 50.00 5000.00 250,000
3.3.17 Fixing of Door & Window frames Sqm. 80.00 750.00 60,000
3.3.18 Plastering in Stilt floor Sqm. 552.00 280.00 154,560
Total Amount of Work in Super-structure (B/W & Plastering) 2,114,205

TOTAL AMOUNT OF WORK (IN RS) 8,413,660


DATED:- 25th FEB, 2019

SHRI. P.C SHARMA JI


PLOT NO:H-5/12 SECTOR-82, GURUGRAM

RCC BUILDING MESUREMENT BOOK FOR STEEL REINFORCEMENT


S.N Description Dia Nos Length 8ɸ
1 FOUNDATION --
Footing F1 Bottom 12 5 15 1 3.000 --
Footing F1 Bottom 12 5 29 1 1.550 --
Footing F2 Bottom 10 3 48 1 2.600 --
Footing F3 Bottom 10 3 54 1 2.900 --
Footing F4 Bottom 10 2 58 1 3.020 --
Footing F5 Bottom 10 2 64 1 3.220 --
Footing F6 Bottom 10 2 70 1 3.630 --
Footing CF1 Bottom 12 1 40 1 3.750 --
Footing CF1 Bottom 12 1 27 1 5.280 --
Footing CF1 Top 10 1 49 1 3.750 --
Footing CF1 Top 10 1 34 1 5.280 --
Chairs 12 1 20 1 2.500 --
Lift Pit Wall vertical bar 16 1 48 1 5.000 --
Lift Pit Wall vertical bar 12 1 48 1 5.000 --
Lift Pit Wall vertical bar 10 1 48 1 5.000 --
Ring x for Lift wall 10 3 14 1 4.250 --
Ring Y for Lift wall 10 8 14 1 1.300 --
Ring Z for Lift wall 8 22 25 1 0.552 303.6
Ring W for Lift wall 8 14 14 1 0.280 54.88
2 COLUMNS (Footing to DPC level) --
C1 16 5 12 1 5.000 --
Ring 8 5 31 1 1.140 176.7
Ring ◊ 8 5 31 2 0.492 152.52
Ring Hook◊ 8 5 31 1 0.310 48.05
C2 20 6 4 1 5.000 --
C2 16 6 8 1 5.000 --
Ring 8 6 31 1 1.140 212.04
Ring ◊ 8 6 31 2 0.492 183.024
Ring Hook◊ 8 6 31 1 0.310 57.66
C3 20 4 12 1 5.000 --
Ring 8 4 31 1 1.140 141.36
Ring ◊ 8 4 31 2 0.492 122.016
Ring Hook◊ 8 4 31 1 0.310 38.44
Total length 1490.29
Wt / metre 0.395
Wt/ Diawise 588.66455
NET WT/MT. 5515.21545
FORCEMENT
10 ɸ 12ɸ 16 ɸ 20 ɸ 25 ɸ
-- -- -- -- --
-- 225 -- -- --
-- 224.75 -- -- --
374.4 -- -- -- --
469.8 -- -- -- --
350.32 -- -- -- --
412.16 -- -- -- --
508.2 -- -- -- --
-- 150 -- -- --
-- 142.56 -- -- --
183.75 -- -- -- --
179.52 -- -- -- --
-- 50 -- -- --
-- -- 240 -- --
-- 240 -- -- --
240 -- -- -- --
178.5 -- -- -- --
145.6 -- -- -- --
-- -- -- -- --
-- -- -- -- --
-- -- -- -- --
-- -- 300 -- --
-- -- -- -- --
-- -- -- -- --
-- -- -- -- --
-- -- -- 120 --
-- -- 240 -- --
-- -- -- -- --
-- -- -- -- --
-- -- -- -- --
-- -- -- 240 --
-- -- -- -- --
-- -- -- -- --
-- -- -- -- --
3042.25 1032.31 780 360 0
0.62 0.89 1.58 2.47 3.85
1886.2 918.756 1232.4 889.2 0
DATED:- 25th FEB, 2019

SHRI. P.C SHARMA JI


PLOT NO:H-5/12 SECTOR-82, GURUGRAM

RCC BUILDING MESUREMENT BOOK FOR STEEL REINFORCEMENT


S.N Description Dia Nos Length 8ɸ
TERRACE FLOOR TO MUMTY LEVEL --
B13 Longitudinal Bar Top & Bottom 16 1 5 1 8.000 --
B13 Extra Bar Top 16 1 1 1 2.500 --
B13 Extra Bar Bottom 12 1 4 1 5.400 --
Lapping 16 1 5 1 0.800 --
Lapping for chajja bottom bar 16 1 3 1 3.000 --
Rings 10 1 44 1 1.020 --
B16 Longitudinal Bar Top & Bottom 16 1 6 1 8.400 --
Rings 8 1 41 1 1.020 41.82
B16 Longitudinal Bar Top & Bottom 16 1 6 1 11.700 --
Rings 8 1 110 1 1.020 112.2
B8 16 1 6 1 4.000 --
Rings 8 1 30 1 1.020 30.6
Slab mumty 10 1 75 2 3.400 --
Slab mumty 8 1 33 2 9.000 594
Total length 778.62
Wt / metre 0.395
Wt/ Diawise 307.5549
NET WT/MT. 986.9625
FORCEMENT
10 ɸ 12ɸ 16 ɸ 20 ɸ 25 ɸ
-- -- -- -- --
-- -- 40 -- --
-- -- 2.5 -- --
-- 21.6 -- -- --
-- -- 4 -- --
-- -- 9 -- --
44.88 -- -- -- --
-- -- 50.4 -- --
-- -- -- -- --
-- -- 70.2 -- --
-- -- -- -- --
-- -- 24 -- --
-- -- -- -- --
510 -- -- -- --
-- -- -- -- --
554.88 21.6 200.1 0 0
0.62 0.89 1.58 2.47 3.85
344.026 19.224 316.16 0 0