Red Hill C of E
Primary School
Worcestershire
Evaluation
The aims of this project were clearly stated at the
outset, a prerequisite for achieving a well-designed
building. The architect led on the environmental
agenda, and sought to create a building that was
sustainable in both construction and operation
and would adapt well to future climate change.
Sustainability in construction has been approached
The building responds positively to its context and intelligently. The review of the specification to optimise
makes good use of the existing mature landscape. recycling and minimise waste is laudable as well as
The access has been well organised, and the car cost effective and should be standard practice on all
parking does not overly dominate the setting. The projects. The review of the design against predicted
orientation works well and the use of the SUDS climate changes is also innovative and highly
drainage scheme as an educational feature is commendable.
innovative and commendable.
One of the most interesting aspects of the project is
The internal planning of the building is good. The the way the process of design was organised. Unlike
use of a central corridor produces an efficient plan. many other recent schools projects, adequate time for
It is an attractive space with good daylighting from design was provided in the programme. This allowed
north-facing rooflights and is enhanced by the small a well thought-out brief to be produced and a good
internal courtyard. The classrooms are attractive and dialogue to take place between the school and the
provide an excellent learning environment. A sloping design team, including a number of other design
ceiling up to rooflights at the front offers even disciplines such as the landscape architect and
daylighting, creates a generous volume and provides artists. The design has clearly been through several
through ventilation. The school has a number of iterations, including one following the review of the
additional teaching spaces and small rooms that design against the sustainability and climate change
can accommodate new approaches to teaching checklists. This has clearly led to the achievement of
and learning. There is good storage and adequate a well-resolved scheme, which was procured through
provision for coats and bags that are sensibly located. a straightforward, traditional route.
Published in 2009 by the
Commission for Architecture
and the Built Environment.
Written and researched by:
Andrew Beard Architect Ltd
Images: Ashley Bingham,
A&M Photography Ltd
Graphic design: Duffy
Although every care has been
taken in preparing this report,
no responsibility or liability
will be accepted by CABE,
its employees, agents or
advisors for its accuracy
or completeness.
All rights reserved. No part
of this publication may be
reproduced, stored in a
retrieval system, copied or
transmitted without the prior
written consent of the
publisher except that the
material may be photocopied
for non-commercial purposes
without permission from
the publisher.
Project summary This publication is available
in alternative formats on
Project name Quantity surveyor request from the publisher.
Red Hill C of E Primary School Bridgewater and Carlton
Address Client
Midhurst Close, Worcestershire County Council
Worcester WR5 2HY Children’s Services
Consultants/contractor involved
Project team members
Frank Galliers Ltd of Shrewsbury
Architect and structural engineer
Project type
Worcestershire County Council
New-build replacement school
Property Services
No of pupil places (FTE)
Services engineer
210 plus 26-place nursery
Shire Consulting
Procurement type
Landscape architect
Traditional – JCT IFC98 contract
Robert Bray Associates Ltd
Construction period
Acoustic engineer
January 2006 – April 2007
BDP Acoustics