Cost Index
2018 603.1
2013 567.3
2003 402
1. EXECUTIVE SUMMARY (2003 prices)
Total Capital Investment 172,600,000 $
Capital Investment Charged to This Project 174,744,000 $
Operating Cost 41,414,000 $/yr
Revenues 80,315,000 $/yr
Batch Size 3,879,941.80 MP Entities
Cost Basis Annual Rate 535,431,968 MP Entities/yr
Unit Production Cost 0.09 $/MP Entity
Net Unit Production Cost 0.09 $/MP Entity
Unit Production Revenue 0.15 $/MP Entity
Gross Margin 48% %
Return On Investment 25.52 %
Payback Time 3.92 years
IRR (After Taxes) 18.05 %
NPV (at 7.0% Interest) 141,303,000 $
181058.25903
258942935.32
262159468.66
62131301.99
120492478.86
MP Entities
MP Entities/yr
/MP Entity
/MP Entity
/MP Entity
$41,389,000.00
1. CASH FLOW ANALYSIS (thousand $)
Year Capital Investment Debt Finance Sales Revenues Operating Cost
1 -12,417 0 0 0
2 -16,556 0 0 0
3 -16,014 0 370 9,947
4 0 0 2,222 10,651
5 0 0 2,222 10,651
6 0 0 2,222 10,651
7 0 0 2,222 10,651
8 0 0 2,222 10,651
9 0 0 2,222 10,651
10 0 0 2,222 10,651
11 0 0 2,222 10,651
12 0 0 2,222 10,651
13 0 0 2,222 6,719
14 0 0 2,222 6,719
15 5,667 0 2,222 6,719
IRR/NPV SUMMARY
IRR Befor -100.00% Interest % 7 9
IRR After -100.00% NPV -75,808.00 -71,244.00
11
-67,293.00
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Cost Index
2018 603.1
2013 567.3
2003 402
$507,850.00 $761,901.33
$507,840.00 $761,886.33
$518,880.00 $778,449.07
$563,040.00 $844,700.06
$529,920.00 $795,011.82
$0.00 $0.00
$117,760.00 $176,669.29
$7,436,000.00 $11,155,849.75
$9,332,180.00 $14,000,591.44
$489,060.00 $733,711.66
$21,893,300.00 $32,845,396.09
$12,611,360.00 $18,920,177.15
$1,032,460.00 $1,548,946.83
$55,539,650.00 $83,323,290.82
3. FIXED CAPITAL ESTIMATE SUMMARY (2003 prices in $) - PRIMary
3A. Total Plant Direct Cost (TPDC) (physical cost) cost(2003)
1. Equipment Purchase Cost $15,393,972.00
2. Installation $2,991,000.00
3. Process Piping $4,305,000.00
4. Instrumentation $861,000.00
5. Insulation $689,000.00
6. Electrical $5,683,000.00
7. Buildings $4,133,000.00
8. Yard Improvement $861,000.00
9. Auxiliary Facilities $3,444,000.00
TPDC $31,576,000.00
IRR/NPV SUMMARY
IRR Before Taxes 20.70% Interest %
IRR After Taxes 18.05% NPV
7 9 11
141,303.00 103,647.00 72,701.00
H.
I.
J.
1
2
K.
1
2
L.
M.
N.
O.
Revenue/Savings Rates
Coated Tablet 3 in 'Final Product' (Main Revenue) 535,431,968 Entities/y
Revenue/Savings Price
Coated Tablet 3 in 'Final Product' (Main Revenue) 0.15 $/ Entity
Revenues/Savings
Coated Tablet 3 in 'Final Product' (Main Revenue) 80,314,795 $/yr
Total Revenues 80,314,795 $/yr
Total Savings 0 $/yr
$9,648,759.86
) 4. LABOR COST - PROCESS SUMMARY -Secondary
Labor Type Unit Cost ($
$1,672,055.74 Operator 69
TOTAL
$237,865.94
MARY -Secondary
Annual Amount (h) Annual Cost ($)
25,722 1,774,805
25,722 1,774,805
ROCESS SUMMARY
Annual Amount Ref. Units Annual Cost ($)
385,948 kW-h 38,595
7,060 MT 29,654
5,216 MT 2,086
70,335