Sie sind auf Seite 1von 37

Production Booklet

Unit 9 & 10

Music video

“Can’t Stop” by The Red Hot


Chilli Peppers

College deadline: 28th November 2019


Shooting script
Unit 9 & 10.

Music video – Can’t Stop

Scene 1

Will stands by the sink in his kitchen slowly (The radio plays an indistinct song in
washing up dishes. background)

He slowly places the last plate on the drying


rack and feeling fatigued he walks over towards
the sofa in his kitchen.

0:00 - He sits down on the sofa, tired and (The song on the radio changes to “Cant stop”
unrested with a deep sigh. by the red Hot Chilli Peppers)

The camera pans the room as the song starts


and builds up.

0:23 - The camera returns to Will after a full (The song reaches the climax in the intro)
360-degree pan of the room.

Will is now a younger version of himself in the


present time.

Will looks down at himself. He sits in the baggy


clothes he was wearing and gets up, with
energy and smiles with excitement.

0:33 - he takes the clothes off revealing better Can't stop, addicted to the shindig
fit younger oriented clothing underneath. Chop Top, he says I'm gonna win big

0:39 - He rushes to his front door and puts Choose not a life of imitation
running shoes on, he goes outside and looks Distant cousin to the reservation
out on the world around him with a smile on
his face

0:44 - Will then starts running with joy and Defunct the pistol that you pay for
energy, looking at his surroundings. This punk, the feeling that you stay for
In time I want to be your best friend
He continues to run through a park smiling and East side lovers living on the west end
taking notice of his surroundings.
Knocked out but boy you better come to
Don't die, you know the truth as some do
Go write your message on the pavement
Burn so bright I wonder what the wave meant

1:05 - He then gets to a woods and notices a White heat is screaming in the jungle
modern mountain bike. Complete the motion if you stumble
Go ask the dust for any answers
The camera points at the bike then pans back
to Will, he is suddenly wearing mountain bike Come back strong with fifty belly dancers
clothing and gear.

He looks down at his body confused but then


rushes towards the bike.

1:15 - He jumps onto the mountain bike The world I love


continuing the feeling of energy. The tears I drop
To be part of
He rides into the woods The wave, can't stop
Ever wonder if it's all for you?
Will goes onto the start of a woodland bike
trail. The world I love
He corners hard round the turns and flies The trains I hop
through jumps while travelling further downhill. To be part of
The wave, can't stop
1:35 - The final shot is of Will riding past the Come and tell me when it's time to
camera quickly as the camera shakes slightly.

Scene 2

1:36 - Will is now wearing casual clothes. Sweetheart is bleeding in the snow cone
He walks up to his car, gets in and starts the So smart, she's leading me to ozone
engine, he grips the steering wheel and revs the Music the great communicator
engine. Use two sticks to make it in the nature

He then releases the hand brake and drives off. I'll get you into penetration
The gender of a generation
The birth of every other nation
Worth your weight, the gold of meditation
This chapter's going to be a close one
Smoke rings, I know your going to blow one
All on a spaceship persevering
Use my hands for everything but steering

2:10 - Will arrives at a long stretch of road and Can't stop the spirits when they need you
decides to drive as fast as he can down the Mop tops are happy when they feed you
stretch of road. J. Butterfly is in the treetop
Birds that blow the meaning into bebop
He shifts quickly and accelerates fast causing The world I love
high revs in the car. The tears I drop
The car gets faster and faster. To be part of
The wave, can't stop
Ever wonder if it's all for you?

2:30 - Will smiles while travelling at a high The world I love


speed. The trains I hop
To be part of
Scene 3 The wave, can't stop
Come and tell me when it's time to

2:40 - Will runs through a garden joyfully and Wait a minute I'm passing out
still smiling, he goes through a break in a Win or lose, just like you
hedgerow at the end of the garden and sees a Far more shocking
trampoline. Than anything I ever knew
How about you?

3:00 - Will runs up to a trampoline with energy Ten more reasons


and excitement focusing on getting on. He Why I need somebody new just like you
mounts onto the trampoline and starts Far more shocking than anything I ever knew
jumping. Right on cue

He jumps in random and different ways while (Instrumental segment)


gaining variable heights with each jump. |
He then does two higher jumps before doing a |
front flip. |
|
3:21 - He lands the front flip then smiles with |
joy after while still jumping on the trampoline |
in a carefree manner. |
|
3:21 – 3:28 - Will smiles at what he has just |
done while still standing on the trampoline as |
his momentum slows while he stops jumping. |

Scene 4

3:29 – Will walks towards his garage in between


his house and another equally tall house. He
raises his hands while walking in a random Can't stop, addicted to the shindig
linear pattern walking forward. Chop Top, he says I'm gonna win big
Choose not a life of imitation
Distant cousin to the reservation

3:42 - He then starts dancing to the rhythm of Defunct the pistol that you pay for
the song with random movements and no This punk, the feeling that you stay for
obvious specific intention of what he will do In time I want to be your best friend
next. East side lovers living on the west end
Knocked out but boy, you better come to
Don't die you know the truth as some do
Go write your message on the pavement

Burn so bright I wonder what the wave meant


Kick start the golden generator
4:00 - Will walks into his house, through the Sweet talk but don't intimidate her
corridor and slowly walks back to the sofa in his Can't stop the gods from engineering
kitchen.
Feel no need for any interfering
Your image in the dictionary

4:10 - He slowly sits down and smiles directly at


the camera while the camera sits directly in This life is more than ordinary
front of him. Can I get two, maybe even three of these?
Coming from space
4:15 – The camera then slowly pans the room To teach you of the Pleiades
360 degrees then returns to Will. Can't stop the spirits when they need you
This life is more than just a read through

Silent ending
4:30 - Will is back to his normal self.
We see him wearing his original clothes and
smiling at the camera while it sits directly in
front of him.

Script by Toby Hill


Storyboards
Storyboards by Toby
Equipment list
Equipment list by Lucca
Props list
Props list by Lucca
Crew list

Crew list by Lucca


Contingency plan
Contingency plan by Lucca
Locations recces

Location Recce:
Driveway of House (outside of
house)

Type of room/area: Driveway


and front door ofHouse.

Location Address:

28 Kennedy Ave, High


Wycombe, England

Sat Nav details (Post code):

Hp11 1BY
nearest train station:

HP13 6NN
Nearest Bus stop:
HP12 3TB

Lighting Information: Solutions:


Direct sunlight permeates through the driveway No solution needed as all lighting for the scenes
and the surrounding area of the house making filmed in this location will be natural sunlight.
for great natural lighting which means we will
get a good clear image for the production.
Sound Information: Solutions:
As the house is in a fairly quiet residential area, Fortunately for our music video we will be
there are few possibilities for sound issues. removing the audio recorded for these scenes if
Potentially a domestic animal or car going by. unusable and will have the music over the top
as well as implemented sound effects but we
will use diegetic recorded sound if we decide
we want it.
Power Information: Solutions:
Both cameras require batteries to run. We have four fully charged rechargeable
The microphone runs off the camera battery. batteries that can record at least 30 minutes of
pure high-quality recording time each.

Hazards: Solutions:
The location is very safe however as he are
partially filming on a driveway there is the risk
of someone driving onto it while filming and We have organised for the residents to park
hitting a cast or crew member. nearby off the drive for the duration of filming
to work around this problem.

Location Recce:
Kitchen

Type of room/area: House


Kitchen

Location Address:

28 Kennedy Avenue, High


Wycombe, England

Sat Nav details (Post code):

HP11 1BY
nearest Train Station:

HP13 6NN
Nearest Bus stop:
HP12 3TB

Lighting Information: Solutions:


Bright clear lighting from high quality ceiling As there are no issues with lighting we require
lighting and LED’S around cupboards. no solutions for this. We will actually be using a
Good natural lighting from the large windowed lack of light to connote emotions in the
doors and surrounding windows around the production when filming.
doors however this is only at the far end of the
Kitchen so we will be relying on ceiling lighting.

Sound Information: Solutions:


Due to the large open design there is some To stop unwanted reverb we will be using
reverb however as it is a music video we will be sound effects in post-production, we will also
implementing the sounds ourselves as we don’t record diegetic sound on scene with a
not have any dialogue and the only audio directional shotgun microphone.
needed will be diegetic sound effects recorded
on scene or implemented sound effects in post-
production.

Power Information: Solutions:


Both cameras require batteries to record. We have four spare rechargeable batteries
that last for at least 30 minutes of pure
recording time in high quality settings.
Hazards: Solutions:
The floor is slippery when wearing socks as it is We will be wearing shoes to grip to avoid this
a smooth surface and the actor or cameraman hazard.
could fall.
Location Recce:
Park

Type of room/area:

Residential park

Location Address:

Kennedy Avenue, High


Wycombe, England

Sat Nav details (Post code):

HP11 1BY
nearest train station:
HP13 6NN
Nearest Bus stop:
HP12 3RX

Lighting Information: Solutions:


The trees cover some of the sky however an Due to lack of leaves on the trees and very low
adequate about of light breaks through for the chance of them growing before filming we will
productions purposes. not have lighting issues for our planned filming
We will be filming in Autumn/Winter so this times.
means that there will be less leaves on the
trees so more light will be let in.

Sound Information: Solutions:


There may be some birdsong in the If we do get birdsong, we would like to keep it
background. Few people will be out due to the in our production as it adds to the scene
cold weather, some cars may pass in the however we may implement it regardless. We
background. have no problem with other people being
around when filming and we have chosen a
time to film when less people so there will be
less background noise. As the park is not very
close to active roads at all there will be a low
chance of car noise being an issue however the
song overlapping the audio will likely drown it
out and we plan to use mostly non-diegetic
audio so that we do not have too much
background noise cluttering the audio, also the
chance of us using all background noise is
minimal to get around this issue.
Power Information: Solutions:
Both cameras require rechargeable batteries. Fortunately, we have four rechargeable
The shotgun microphone runs off of the batteries that record at least 30 minutes of
camera’s power pure high-quality recording time.

Hazards: Solutions:
There are few noticeable hazards however as Our actor will be wearing running shoes that
the conditions are likely to be wet the ground feature rubber soles for grip, there is also a
could be slippery when the actor is running dedicated hard path that he will run over to
through the park. avoid slippery mud and running is not a hard
activity to do without falling.
Location Recce:
A4130 (Long stretch of road)

Type of room/area:

Single carriage way.

Location Address:

A4130, Fairmile, Henley-On-


Thames.

Sat Nav details (Post code):

RG9 4NR
nearest train station:
RG9 1FR
Nearest Bus stop:
RG9 2JP

Lighting Information: Solutions:


The road is below an open sky with good clear There are no issues with lighting and therefore
natural lighting along the entirety of the road, require no solutions.
this also permeates well into the car we will be
using for the scene for our filming purposes.

Sound Information: Solutions:


The cars on the road are the only prominent In editing we will likely take out almost all audio
noises in the surrounding area and nothing else for the scene filmed in this location as we will
that is commonly heard or likely to interfere use sound effects in post-production and Foley
with our filming. from inside the car itself for diegetic sound
effects, we are also going to have the song
playing over the footage so there are not going
to be many issues with sound as most of it will
be dealt with in post-production editing.
Power Information: Solutions:
Both DSLR cameras require batteries to run. We have four fully charged rechargeable
The microphone requires power from a camera batteries that can record for at least 30 minutes
to work. of pure high-quality recording time.

Hazards: Solutions:
As there is a car involved and it will travelling at The driver has in depth experience with driving
a speed of 60 MPH at the most there is a risk of and when learning had a lot of lessons to
crashing. prepare for his test so he is capable of handling
the car at such speeds, the car will be travelling
Also the cameraman will be by the road in a straight linear trajectory so there is little
recording, the traffic represents a hazard for chance of him being able to crash into anything.
him as well. The cameraman will stand at a safe distance
from the road and due to one of our cameras
having a lens that can zoom up to 150mm he
can zoom in to the car so that we still get the
desired shots while keeping him safe. The car is
also equipped with all necessary safety
precautions to minimize risks.
Location Recce:
Garden/trampoline

Type of room/area:

House garden

Location Address:

Ferry lane, Medmenham,


England

Sat Nav details (Post code):

SL7 2EZ
nearest train station:
SL7 1RD
Nearest Bus stop:
SL7 2HH

Lighting Information: Solutions:


There is good clear natural lighting due to the There are no issues with lighting and therefore
lack of overhanging trees and well- require no solution.
trimmed/cared for flora so lots of natural
sunlight can get through and lights the garden
and trampoline perfectly.

Sound Information: Solutions:


Some background bird song but not very often. There are no obvious sound problems and
As it is a very quiet residential area there is audio quality is decent for our filming purposes
hardly any background sounds that could and we are going to be limiting the amount of
interfere with our production. diegetic sound we use when editing as the song
and the implemented sound effects will be the
majority of what viewers will hear.
Power Information: Solutions:
Both cameras require batteries to run. We have four fully charged rechargeable
The microphone runs off the power of the batteries that all last for at least 30 minutes of
camera. pure high-quality recording time each.

Hazards: Solutions:
The only major hazard seen from observations To help minimise the risks as much as possible,
will be when the actor is jumping on the the actor will wear grippy shoes for this scene,
trampoline as will a lot of physical activity there they also have a lot of experience with
are some risks; the actor could fall off the trampolining and the stunts he will perform on
trampoline or land on the trampoline the trampoline have been practiced many
awkwardly causing harm to them times before by the actor so he knows what he
unintentionally. is doing. We have also chosen a large
trampoline so that the actor is even less likely
to fall off.
Location Recce:
Woods

Type of room/area:

Woodland.

Location Address:

Winter Hill, Marlow, England

Sat Nav details (Post code):

SL7 *** (does not have direct


postcode)
nearest train station:
SL7 1RD
Nearest Bus stop:
SL7 1HA

Lighting Information: Solutions:


The woodland is covered by trees, many still We plan to film during the day when even on a
bearing leaves creating a canopy blocking cloudy day it is brightest. This means that we
natural light. During the daytime the light is will not have issues with brining expensive
clear and bright enough even on a cloudy to external lighting into a natural environment
film without external lights. and ensures good natural lighting for our
production.

Sound Information: Solutions:


Due to the cold conditions there is less wildlife We will be removing most audio from the
around however birdsong can still be hear, scenes filmed in this location and will likely
other than that there seem to be few people implement sound effects when necessary with
walking through and it is generally a quiet the potential for Foley sound meaning that the
place. chances of unwanted background noise are
minimal especially considering the louder music
that we will implement in post-production.
Power Information: Solutions:
Both cameras require batteries to run. We will have four fully charged rechargeable
The microphone is powered by being plugged batteries that all last for at least 30 minutes of
into the camera. pure high quality filming time each.

Hazards: Solutions:
In this scene the protagonist will be riding a The protagonist is an experiences mountain
mountain bike so there is a chance that he will biker and will be riding a trail he has practiced
fall off and potentially injure himself when riding a lot prior to filming in both wet and dry
riding. conditions, his bike tyres are ride and offer lots
Other than that there are no potentially of traction at low pressures, as well we this he
harmful fauna nor are the paths dangerous for will be wearing a helmet, gloves, kneepads and
anyone walking. his backpack has a built in back protector.

Location recces by Toby


Consent forms
Forms by Toby
Planning schedule
Unit 9 & 10

Short film and music video

Date Plan of action Time & Location


PLANNING: Short film
07/10/2019 Create production booklet 9am – 4pm at College
Plan: Short film (And at home if necessary)
1. Shooting Script
2. Locations research
3. Organise actors and audition
4. Get actor and crew
confirmations.
08/10/2019 Short film: 9am – 4pm at college
1. Storyboards (And at home if necessary)
2. Props list
09/10/2019 Short film: 1) 9am – 12pm College
1. Character and crew list 2) 1pm – 4pm
2. Location recces Marlow: Meadow close, High Wycombe:
Sainsbury’s car park and Tuckin fish and
chip restaurant.
Henley-On-Thames:
Town centre, college.
10/10/2019 Short film: 1) 9am – 12pm College
1. Contingency plan 2) 1pm – 4pm (may change depending on
2. Auditions when actors can do audition) Location
depends on where actors can meet.
11/10/2019 Short film: 9am – 4pm
1. Make sure bibliography is up to College
date
2. Weekly blog
12/10/2019 PART-TIME JOB 8:30AM-5:30PM
13/10/2019 PART-TIME JOB 8:30AM-5:30PM
FILMING: Short film
14/10/2019 Short film: 1) 9am – 1pm
1. Assure that all planning for short College
film is complete and ready. 2) 2pm – 5pm
2. Prepare camera and Home
filming equipment for tomorrow.
15/10/2019 Short film: 1) 8:30am – Marlow, Meadow Close
• Film scene: 2) 12pm – Marlow Town/Henley town.
1. Scene 2 (introduction of Nick) 3) 3pm – Henley College, Mac suite
2. Scene 3 (commute to college).
3. Scene 4 (College class)
16/10/2019 Short film: 1) 12:00pm
• Film scene Henley college
1. Scene 5 (Stalkers planning room) 2) 8:30am
2. Scene 6 (Dog walk) Marlow, Gossmore park
3. Scene 7 (Part-time job) 3) 5pm
High Wycombe, Tuckin fish and chip
restaurant.
17/10/2019 Short film: 1) 4pm
• Film scene Marlow, Meadow close
1. Scene 8 (Finding coordinates)
(also accounts for scene 1)
18/10/2019 1. Finish any incomplete work from 9am – 4pm
LO’s previous to planning College
2. Complete weekly blog.
19/10/2019 PART-TIME JOB 8:30AM-5:30PM
20/10/2019 PART-TIME JOB 8:30AM-5:30PM
EDITING: Short film
21/10/2019 Short film: 1) 6pm
1. Film scene 9 (Et Pater Filium) High Wycombe, Sainsbury’s multi-story
2. Start editing short film – filter car park.
through shots and add to 2) 8am – 4pm
timeline College
22/10/2019 Short film: 9am – 4pm
1. Continue editing short film – add College
chosen clips and work on
audio/sound effects.
23/10/2019 Short film: 9am – 4pm
1. Continue editing – work on College
audio, adding sound effects and
levelling audio appropriately.
24/10/2019 Short film: 9am – 4pm
1. Continue editing – finish audio College
levelling and editing then work
on colour and image editing on
clips in sequence.
25/10/2019 Short film: 9am – 4pm
1. Check over short film and finish College
any of editing not yet done
including credits and on screen
text.
2. Review final version of edit and
compare to Lucca’s version.
3. Complete weekly blog.
26/10/2019 HOLIDAY - CORNWALL ALL DAY – (ALL WEEKEND)
27/10/2019 HOLIDAY - CORNWALL ALL DAY – (ALL WEEKEND)
Planning: Music video
28/10/2019 Music video: 8am – 4pm
1. Script – complete shooting script Home
with both actions and lyrics
corresponding – Review with May go overtime depending on
Lucca. progression.
2. Contact actors and crew – ask to
audition and find out availability.
3. Organise auditions – work out
times and when actors and crew
can audition as well as filming
availability during filming week.
29/10/2019 Music video: 8am – 4pm
1. Storyboards – Draw Home
corresponding to script with shot May go overtime depending on
types, actions and camera progression of work.
movement. (start once Lucca has
confirmed any changes to script.)
30/10/2019 Music video: 8am – 4pm
1. Confirm actors and crew once Home
auditions are complete – May go overtime if necessary to
screenshot emails and complete work.
2. Props list – list all props needed,
scenes, descriptions and when in
use.
3. Equipment list – All equipment to
be used when filming, what
scenes and what they look like.
4. Crew list – All actors and crew
that are in a scene or helping
record one.
31/10/2019 Music video: LOCATION RECCE LOCATIONS: House,
1. Location recces – Go to locations kitchen, Kennedy avenue park, Winter hill
and take photos of filming woods, Henley-On-Thames, Medmenham
locations, note down information – For scouting.
on lighting, sound, power and 8am – 1pm
hazards.
2:30pm – 5pm
Home – for type up
01/11/2019 Music video: 8am – 4pm
1. Contingency plan – Type up a Home
plan for the possibility of things
going wrong in terms of
everything; locations, actors,
equipment, weather, setbacks.
2. Complete weekly blog – include
screenshots and review week of
work.
02/11/2019 Music video: Home
1. Finish any work that has not All day if necessary
been completed this week.
03/11/2019 PART-TIME JOB 10:30AM – 4PM
04/11/2019 Music video: College
1. Ensure all planning is complete 8AM – 4PM
and that we are ready to film,
this includes all confirmations
and camera equipment
preparations.
Filming: Music video
05/11/2019 Music video: 28 Kennedy avenue: 9AM – 12PM
1. Film scene 1 – Running/mountain Quarry wood (Winter Hill): 1:30PM – 4PM
biking. Make sure running gear is
on scene, bring mountain bike
and bring mountain bike gear
and clothing. – Get behind the
scenes images.
06/11/2019 Music video: 28 Kennedy avenue, High Wycombe:
1. Film scene 2 – Driving stretch. 10AM – 12PM
Ensure the car is clean and filled
with enough fuel. Bring leather Henley-On-Thames: 1PM – 3:00pm
jacket. – get behind the scenes
images.
07/11/2019 Music video: The Gate Cottage, Ferry Lane,
1. Film scene 3 – Trampoline. Medmenham: 9AM – 12PM
Practice trampoline front flips
before filming, get their earlier. 28 Kenendy avenue. High Wycombe:
2. Film scene 4 – Dance. Revise 1:00PM – 3:00PM
dance sequence.
3. Get behind the scenes images.
08/11/2019 Music video: Home
1. Review all footage filmed this 8AM-4PM
week and plan for reshoots if
necessary.
2. Complete weekly blog for this
week.
09/11/2019 PART-TIME JOB 8:30AM -5:30PM
10/11/2019 Complete any work and reshoots needed 9AM- However long it takes.
to be ready for editing next week. Home or filming locations based on what
needs to be done.
Editing: Music video
11/11/2010 Music video: 8AM – 4PM
1. Transfer footage from SD card to College
flash drive then import onto
premier pro.
2. Filter through shots and start a
rough time line in premier pro.
12/11/2019 Music video: 8AM – 4PM
1. Import song for the music video College
2. Get all clips roughly onto the
timeline and start doing the
detailed editing to scene 1.
13/11/2019 Music video: 8AM – 4PM
1. Finish detailed editing for scene 1 College
2. Start and finish detailed editing
for scene 2
14/11/2019 Music video: 8AM – 4Pm
1. Start and finish editing scene 3 College
and 4.
2. Once detailed editing has been
completed go over production
and fine tune everything.
15/11/2019 Music video: 8AM – 4PM
1. Keep working on the final version College
of the edit, make sure all fine
tuning and smaller details are
finished, ensure production is at
the editing standard needed.
16/11/2019 PART-TIME JOB 8:30AM – 5:30PM
17/11/2019 1. Complete weekly blog from this Home
week of editing. 9AM – 10:30AM
18/11/2019 1. Catch-up on any work not College
already completed. This includes: 9AM – 4PM
weekly blogs, target audience,
codes and conventions, planning
and editing.
19/11/2019 1. Share and format all work with College
project partner (Lucca). 9:00AM – 4:00PM
2. Upload all work to website that
hasn’t been already, make sure
that it has personal production
logo on documents
3. Below each piece, state who
worked on what piece.
20/11/2019 1. Review each edited version of 9:00AM – 4:00PM
the music video and short film College
with Lucca and decide on which
one will be used for the pitch and
final version.
2. Do any work needed on own
version of edit to produce the
final version.
21/11/2019 1. Ensure all work is complete ready 9:00AM – 4:00PM
to submit for marking and College
deadline.
2. Send out final chosen versions of
the short film and music video
with a survey to get feedback on
the production quality and for
feedback to implement into
pitch.
DEADLINE FOR ALL WORK
OTHER THAN PITCH
22/11/2019 1. Continue to get feedback on Home
productions, ideally from target (However long it takes depending on
audience and start collecting the results and quantity).
results if any have come back.
23/11/2019 PART-TIME JOB 8:30AM – 5:30PM
24/11/2019 1. Look for more results from Home
survey and continue to collect (However long it takes depending on
them for the pitch. results and quantity).
PITCH WEEK
25/11/2019 1. Start pitch preparation with College
Lucca. Work on a PowerPoint 9:00AM – 4:00PM
presentation to present work
and to deliver the pitch.
26/11/2019 1. Continue working on pitch and College
finish by the end of the day ready 9:00AM – 4:00PM
for the 27th and 28th. Ensure you
are happy with the PowerPoint
presentation and that the
relevant information is on there.
2. Rehears presentation with Lucca
and ensure both you and him are
ready for the pitch slot.
27/11/2019 1. Watch and review pitches if College
necessary. (However long the pitches take).
2. Be ready to present pitch
depending on slot.
28/11/2019 1. Watch and review pitches if College
necessary. (However long the pitches take).
2. Be ready to present pitch
depending on slot.

Schedule by Toby

Das könnte Ihnen auch gefallen