SF SITE ID : ZJKT2_4217
Technology : TDD
NAME: NAME:
SIGNATURE: SIGNATURE:
DATE: DATE:
Site ID: ZJKT_4217
City:
Jakarta
ZJKT_4217
SITE NAME:
Wotgalih
Date
Single Site Verification Phase4B_V.21 2019/08/2 1 (24)
2
Site ID: ZJKT_4217
ZJKT_4217 590217 ZJKT_4217_16 367 1547 27 270 300 0/2 -6.12062 106.20429
RET
Date
Single Site Verification Phase4B_V.21 2019/08/2 2 (24)
2
Site ID: ZJKT_4217
Route
Site Addres ZJKT_4217 : Jl. Raya Serang - Jkt, Kalodran, Kec. Walantaka, Kota Serang, Banten
42183
Date
Single Site Verification Phase4B_V.21 2019/08/2 3 (24)
2
Site ID: ZJKT_4217
3. KPI Summary
Summary
Source
SN Test Target PreDT SSV Pass/Fail
4 RRC Connection Success Rate > 99% N/A 100% Pass DT Mobile
7 Peak Value (Single Sample) TDD 30M>100 Mbps 98.81 Mbps 118.22 Mbps Pass DT Mobile
11 VoLTE Setup Success Rate > 98.5% N/A 100% Pass DT Mobile
• <70%*
Date
Single Site Verification Phase4B_V.21 2019/08/2 4 (24)
2
Site ID: ZJKT_4217
ZJKT_4217
Summary
Sec C Source
SN KPIs Target Before After Gain% Pass/Fail
• >=85%
• <70%*
Cell UL Average
2 N/A 1.23 1.03 0.75 1.78 Reference OSS Data
Throughput(Mbps)
Average DL user
3 N/A 30.00 8.88 16.23 12.55 Reference OSS Data
Throughput (Mbps)
Average UL user
4 N/A 1.10 0.91 0.97 0.94 Reference OSS Data
Throughput (Mbps)*
5 VolumeDL (GByte) N/A 7.76 4.70 2.56 7.26 Reference OSS Data
6 Average RRC Users N/A 38.46 60.96 19.78 80.74 Reference OSS Data
7 DL PRB Utilization N/A 47.80% 55.20% 27.54% 41.37% Reference OSS Data
9 Active Users N/A 17.21 27.17 10.07 37.24 Reference OSS Data
10 Max Users N/A 66.00 97.60 40.40 138.00 Reference OSS Data
11 RRC Request Success Rate N/A 99.76% 99.98% 99.99% 99.99% Reference OSS Data
13 ERAB Drop Rate N/A 0.26% 0.37% 0.49% 0.43% Reference OSS Data
14 VoLTE Drop Rate N/A 0.00% 0.00% 0.00% 0.00% Reference OSS Data
Date
Single Site Verification Phase4B_V.21 2019/08/2 5 (24)
2
Site ID: ZJKT_4217
Notes:
1. Based on TMM#31 Dated Aug 23th 2019 Page 5 of 8. Following Categories of
Gain% will be referred during SSV.
>=85%
80%~85%
70%~80%
<70%* (ZTE should provide justification and mutually agree with smartfren).
2.Before & After OSS KPI Statistical period should be at least 3 days busy hour.
Date
Single Site Verification Phase4B_V.21 2019/08/2 6 (24)
2
Site ID: ZJKT_4217
4. Map Review
4.1 RSRP Plot
Before After
4.2 SINRPlot
Before After
Date
Single Site Verification Phase4B_V.21 2019/08/2 7 (24)
2
Site ID: ZJKT_4217
4.3 DownlinkThroughputPlot
Before After
Date
Single Site Verification Phase4B_V.21 2019/08/2 8 (24)
2
Site ID: ZJKT_4217
5. TA Overshooting
Cell Overshooting
Distance criteria
Distance 1st Overshooting
Site Name Sector (70% site (>80%sampel
tier km (Yes/No)
distance)- <=cell
km distance) - %
ZJKT_4217 ZJKT_4217 _SEC C1 1166 816.200 84.27% No
ZJKT_4217 ZJKT_4217 _SEC C2 1106 774.200 88.56% No
Note: First Neighbour site should show into the plot to chechk over shooting or not
Conclusion_1 : Refer to the OSS TA, More than 80% samples <= 70% cell
distance. So this Infill site does not have overshooting.
Conclusion_2 : Refer to the PCI Plot, DT Route PCI is matching with site PCI.
So this Infill site does not have crossfiber.
Cell distance (m) 78 234 390 546 702 858 1014 1560 2106 2652 3120 3900 6318 10062
Date
Single Site Verification Phase4B_V.21 2019/08/2 9 (24)
2
Site ID: ZJKT_4217
6. Speedtest
6.1 OOKLA SPEEDTEST
Sector 3 Sector 3
6.2 NperfSPEEDTEST
Sector 3 Sector 3
Date
Single Site Verification Phase4B_V.21 2019/08/2 10 (24)
2
Smarfren 4G LTE
Engineering Site Audit Information
Site ID Site Name Region City Latitude Longitude Phase Site Type
N/A N/A
Azimuth After Swap
Cell A Cell B Cell C
N/A N/A
Mechanical Tilt Before Swap
Cell A Cell B Cell C
N/A N/A
Mechanical Tilt After Swap
Cell A Cell B Cell C
N/A N/A
High Antenna
Cell A Cell B Cell C
N/A N/A
Cell A Cell B Cell C
High Antenna
Cell A Cell B Cell C
N/A N/A