Sie sind auf Seite 1von 18

Be Creative

Competition:
Short film (romance)
By Hafsah Culasy
Pre-production booklet:

Contents:
• Proposal
• Production Schedule
• Location Recess
• Props List
• Crew list
• Actor confirmation
• Auditions
• Script
• Storyboards
Pre-production booklet:
Proposal:

My idea for my short film is based around a couple, the genre of my short film will be romance. The
short film will start off with both of them on a train, where they both look at each other and make
eye-contact with each other and smile at each other, when the boy gets off the train he leaves a
book filled with places he’s been to in London which are also places he likes to visit frequently. The
girl sees that he’s left the book and tries to give it to him as he leaves but it’s too late, so she decides
to take the book and look through it for clues on how she can give the book back to him. She
recognises all the places in his book and decides to go to each place and leave a note for him to find
and read and follow like a clue to each place like a hunt. He realises he’s lost his book and
remembers the last place he went to which was one that was in the book where he finds the clue
she left for him to read, at first he finds it weird that he finds a note instead of his book but then
sees the opportunity to find this mystery girl that has his book, he continues following the clues and
at the last clue he finds her standing there holding his book in her hand, when they hug each other
and walk off together.

The reason I am creating this music video is for the “Be Creative” competition, the winner will also
receive £50 as a reward. The winner will not also be chosen on how good their production is but by
how it looks, if the locations worked well with the narrative and how the shot are edited to show the
audience what’s going on and most importantly if the narrative is shown throughout the film and if
the narrative is clear to the audience. To ensure that my short film shows all these things I will be
using different effects on my camera such as ‘fluorescent’ to change the colour of the shot and not
just using auto for the entire video, I will also be colour grading a few shots to show the audience the
atmosphere of the shot based on how it looks in the audience’s minds. I will also be adding in sound
to make the short film more realistic as there won’t be any dialogue throughout the short film. The
target audience for my short film is 25-40-year olds and the final deadline where everything will
have to be submitted is the 28th November, the festival where all productions will be shown will be
on the 9th December.

From the responses of my surveys most of the responses said that they’d watch short films on
‘YouTube’ as well as ‘vimeo’ which is where I will be sharing my music video as it’s the biggest
platform out there as well as social media platforms such as ‘Facebook’, although I will not be
sharing my short film on Facebook as I don’t have that platform I will only be using YouTube as my
main platform.
Pre-production booklet:
Production schedule:

WEEK 1 (07/09/19-13/09/19)
Monday Tuesday Wednesda Thursday Friday Saturday Sunday
y
At College 8.45 – 4pm No No
Start Continue Start Complete Film college college
planning on writing the last pieces audition
booklet location script on script s
and recces
location and
recces productio
for music n
video schedule

At home Complete Complete


Complet Complete Continue Complete Finish any work any work
e productio working on storyboar weekly that that
proposal n the script ds blog hasn’t hasn’t
schedule and props been been
list complete complete
d d
WEEK 2 (14/09/19-20/09/19)
Monday Tuesday Wednesda Thursday Friday Saturday Sunday
y
At College 8.45 – 4pm No No
Start Continue Start Complet Film college college
planning on writing the e last audition
booklet location script pieces s
and recces on script
location and
recces productio
for short n
film schedule

At home Complete Complete


Complet Complete Continue Complet Finish any work any work
e productio working on e story weekly that that
proposal n the script boards blog hasn’t hasn’t
schedule and props been been
list complete complete
d d
WEEK 3 (21/09/19-27/09/19)
Monday Tuesda Wednesda Thursday Friday Saturday Sunday
y y
At College 8.45 – 4pm No No
Complet Filming Start Continue Complete college college
e any in editing editing any work
work on London that
productio for hasn’t
n booklet Short been
film complete
d
At home Complete Complete
Complet Look Complete Complete Finish any work any work
e any over any work any work weekly that that
work on footag that hasn’t that blog hasn’t hasn’t
productio e and been hasn’t been been
n booklet see if complete been complete complete
anythin d complete d d
g d
needs
to be
reshot
WEEK 5 4 (04/10/19-10/10/19)
(28/09/19-03/10/19)
Monday
Monday Tuesday
Tuesday Wednesda
WednesdaThursday Thursday FridayFriday Saturday
Saturda Sunday
Sunday
y y y
AtAtCollege
College8.45
8.45– –4pm
4pm No Film in No
No
Continu Continu
Complete CompleteContinue
Complete ContinuComplete Complete
Complete college
London college
college
e editing
any work eany
editing
work editing
any work e editing
any workanyanywork work for
that that that hasn’t that thatthat music
hasn’t hasn’t been hasn’t hasn’thasn’t video
been been complete been beenbeen
complete complete d complete complete
complete
d art d d d d
editing At home Complete Complete
Continu Continu At home Continu Finish
Continue anyLook
work Complete
any work
e editing eComplete
Complete editing editing
Complete e editing
Complete weekly
Finish thatover anythat
work
any work any work any work any workblogweekly hasn’t footag hasn’t
that
that that that hasn’t that blog been
e hasn’t
been
hasn’t hasn’t been hasn’t complete complete
been
been been complete been d complete
d
complete complete d complete d
d d d
WEEK 76 (18/10/19-24/10/19)
(11/10/19-17/10/19)
Monday
Monday Tuesday
Tuesday Wednesda
Wednesd Thursday
Thursday FridayFriday Saturday
Saturday Sunday
Sunday
yay
At
AtCollege
College8.45
8.45––4pm
4pm NoNo No
No
Start
Complet Continu
Complet Continue
Complete Continu Complet college
Complet Complete college college
college
editing
e any eeediting
any editing
any work eeediting
any any
e work
any
work that work that that work that that
work that
hasn’t hasn’t hasn’t hasn’t hasn’t
hasn’t
been been been been been
been
complete complete complete completecomplete complete
d art d d d d d
editing At home Complete Complete
Continu Continu At home Continu Finish
Continue any
Complet
work any
Complet
work
e editing eComplet
Complet editing editing
Complete eComplet
editing weekly
Finish thate any ethat
any
e any e any any work e any blog
weekly hasn’t
work that work
hasn’t
that
work that work that that work that blog been
hasn’t been
hasn’t
hasn’t hasn’t hasn’t hasn’t complete
been complete
been
been been been been d complete complete
d
complete complete complete complete d d
d d d d
Pre-production booklet:
Location recces:

Insert photo of location (do not draw) Type of room/area: South


Bank

Location Address Southbank


Centre
Belvedere Road

Sat Nav details (Post


code): SE1 8XX

Nearest Train Station: South


bank station

Nearest Bus stop: 77,26,59,68

Lighting Information: Solutions:


I will be filming during the day so it may be If it is cloudy and raining on the day I will need
raining or cloudy and will affect my filming. to change location my script to fit with the
weather and also may have to change the
lighting effects on my camera to suit the
lighting outside south bank
Sound Information: Solutions:
The sound won’t be an issue as I will be I will make sure my actors know the script
replacing the audio with sounds to fit the short before so that they are aware of what they
film, the actors won’t have to say any dialogue have to do beforehand.
as well so sound won’t be an issue. It may be
busy by the south bank so the actors may not
be able to hear what they have to do.
Power Information: Solutions:
I will be using my camera so there may be I will make sure that my camera is fully charged
issues with storage space on my SD card, the before going out to film, I will also bring a spare
battery of my camera. battery with me in case the first on runs out. I
will also make sure that my SD card has enough
space on it for me to film for my production.
Hazards: Solutions:
Public may get in the way of me filming with my I will make sure I’m not in anyone’s way whilst I
actors, equipment may get stolen or broken by am filming, I will also make sure my equipment
public, keeping my actors safe is my is with me at all times so that it can’t be taken
responsibility. or broken by anyone, I will also make sure that
my actors are with me and are safe at all times.
Insert photo of location (do not draw) Type of room/area: Hyde Park

Location Address: London

Sat Nav details (Post code):


SW7 1NR

Nearest Train Station: Hyde


park corner

Nearest Bus stop: 19

Hyde park corner

Lighting Information: Solutions:


I will be filming during the day so it may be If it is cloudy and raining on the day I will need
raining or cloudy and will affect my filming. to change location my script to fit with the
weather and also may have to change the
lighting effects on my camera to suit the
lighting at the park so that the actors facial
expressions are still visible on camera.
Sound Information: Solutions:
The sound won’t be an issue as I will be I will make sure my actors know the script
replacing the audio with sounds to fit the short before so that they are aware of what they
film, the actors won’t have to say any dialogue have to do beforehand.
as well so sound won’t be an issue. It may be
busy by Hyde park so the actors may not be
able to hear what they have to do.
Power Information: Solutions:
I will be using my camera so there may be I will make sure that my camera is fully charged
issues with storage space on my SD card, the before going out to film, I will also bring a spare
battery of my camera. battery with me in case the first on runs out. I
will also make sure that my SD card has enough
space on it for me to film for my production.
Hazards: Solutions:
Public may get in the way of me filming with my I will make sure I’m not in anyone’s way whilst I
actors, equipment may get stolen or broken by am filming, I will also make sure my equipment
public, keeping my actors safe is my is with me at all times so that it can’t be taken
responsibility. or broken by anyone, I will also make sure that
my actors are with me and are safe at all times.
Insert photo of location (do not draw) Type of room/area: London
eye

Location Address: Lambeth,


London

Sat Nav details (Post code):


SE1 7PB

Nearest Train Station:


Waterloo station

Nearest Bus stop: 211,77,381

Lighting Information: Solutions:


I will be filming during the day so it may be If it is cloudy and raining on the day I will need
raining or cloudy and will affect my filming. to change location my script to fit with the
weather and also may have to change the
lighting effects on my camera to suit the
lighting outside the London eye so that the
actors facial expressions are still visible on
camera.
Sound Information: Solutions:
The sound won’t be an issue as I will be I will make sure my actors know the script
replacing the audio with the chosen song of my before so that they are aware of what they
music video, the actors won’t have to say any have to do beforehand.
dialogue as well so sound won’t be an issue. It
may be busy the London eye so the actors may
not be able to hear what they have to do.
Power Information: Solutions:
I will be using my camera so there may be I will make sure that my camera is fully charged
issues with storage space on my SD card, the before going out to film, I will also bring a spare
battery of my camera. battery with me in case the first on runs out. I
will also make sure that my SD card has enough
space on it for me to film for my production.
Hazards: Solutions:
Public may get in the way of me filming with my I will make sure I’m not in anyone’s way whilst I
actors, equipment may get stolen or broken by am filming, I will also make sure my equipment
public, keeping my actors safe is my is with me at all times so that it can’t be taken
responsibility. or broken by anyone, I will also make sure that
my actors are with me and are safe at all times.
Insert photo of location (do not draw) Type of room/area: Train
station

Location Address: Praed St,


Paddington, London

Sat Nav details (Post code):


W2 1HB

Nearest Train Station:


Paddington station

Nearest Bus stop:


36,23,27,7,46,332

Lighting Information: Solutions:


I will be filming during the day so it may be If it is cloudy and raining on the day I will need
raining or cloudy and will affect my filming. The to change location my script to fit with the
station is also covered so if it is cloudy there weather and also may have to change the
will be lights on in the station lighting effects on my camera to suit the
lighting inside the station so that the actors
facial expressions are still visible on camera.
Sound Information: Solutions:
The sound won’t be an issue as I will be I will make sure my actors know the script
replacing the audio with the chosen song of my before so that they are aware of what they
music video, the actors won’t have to say any have to do beforehand.
dialogue as well so sound won’t be an issue. It
may be busy in the station so the actors may
not be able to hear what they have to do.
Power Information: Solutions:
I will be using my camera so there may be I will make sure that my camera is fully charged
issues with storage space on my SD card, the before going out to film, I will also bring a spare
battery of my camera. battery with me in case the first on runs out. I
will also make sure that my SD card has enough
space on it for me to film for my production.
Hazards: Solutions:
Public may get in the way of me filming with my I will make sure I’m not in anyone’s way whilst I
actors, equipment may get stolen or broken by am filming, I will also make sure my equipment
public, keeping my actors safe is my is with me at all times so that it can’t be taken
responsibility. or broken by anyone, I will also make sure that
my actors are with me and are safe at all times.
Insert photo of location (do not draw) Type of room/area: Trafalgar
square

Location Address: Trafalgar


Square, Charing Cross,
London

Sat Nav details (Post code):


WC2N 5DN

Nearest Train Station: Charing


cross

Nearest Bus stop: 24,87,88,91

Lighting Information: Solutions:


I will be filming during the day so it may be If it is cloudy and raining on the day I will need
raining or cloudy and will affect my filming. to change location my script to fit with the
weather and also may have to change the
lighting effects on my camera to suit the
lighting so that the actors facial expressions are
still visible on camera.
Sound Information: Solutions:
The sound won’t be an issue as I will be I will make sure my actors know the script
replacing the audio with the chosen song of my before so that they are aware of what they
music video, the actors won’t have to say any have to do beforehand.
dialogue as well so sound won’t be an issue. It
may be busy in Trafalgar square so the actors
may not be able to hear what they have to do.
Power Information: Solutions:
I will be using my camera so there may be I will make sure that my camera is fully charged
issues with storage space on my SD card, the before going out to film, I will also bring a spare
battery of my camera. battery with me in case the first on runs out. I
will also make sure that my SD card has enough
space on it for me to film for my production.
Hazards: Solutions:
Public may get in the way of me filming with my I will make sure I’m not in anyone’s way whilst I
actors, equipment may get stolen or broken by am filming, I will also make sure my equipment
public, keeping my actors safe is my is with me at all times so that it can’t be taken
responsibility. or broken by anyone, I will also make sure that
my actors are with me and are safe at all times.
Pre-production booklet:
Crew list:
Person: Role: Dates needed:

Haajrah Ahmed Girl 22nd October

Troy smith Boy 22nd October


Script:

Description of visuals: Sounds:


Both the boy and girl are on the Sound of the train tracks, and
train and they make eye-contact announcement of the train
with each other and smile at
each other when the train
announcements go off to say
you’re approaching the next stop
where he gets off the train.
She gets upset that he’s gone Sound of pages fluttering
but notices that he’s left a
book of his and goes and picks
it up and looks through it. And
finds his favourite places he
likes to go to around London
which shows that he lives near
London.
She tries to think of way to get Background music
his book album to him and goes
to the first place which comes
up in the
She writes a note saying she Sound of the train tracks
found his album and leaves a
clue for him to find her at
another location. She’s writing
the note on the train as she’s
going to the first location.
She walks to the first location Sound of Big ben in the
and puts the clue somewhere for background
him to find it.
He can’t find his album and Sound of remerging through bag
starts searching through his bag
but still can’t find it when he
realises he’s left it somewhere.
He decides to retrace his steps Sound of footsteps and wind.
and goes to the first place that
was in the album in the off
chance he’s left it there and
finds the note which she’s left.
The note which she’s left says
that she’s found his album and
leaves a clue to where the next
note will be.
He goes to the next location and Sound of footsteps and wind.
find the next note and clue and
continues to do this for the
next 2 locations
The last location has a note Sound of pen writing on paper
saying she’ll be waiting with
the album by the fountain.
They see each other where he Romantic background music
realises he saw her on the train
that day and they smile at each
other and say ‘hi’
Pre-production booklet:
Props list:

Item Item Description Who uses it When it is used

Album Book filled with pictures of Boy and girl At the


places he goes to in beginning of the
London short film
Bag Bag which is used to look Boy At the
through for album beginning of the
short film
Pen and paper Pen and paper used to Girl Throughout the
write note and clues short film
Pre-production booklet:
Actor conformations:

Das könnte Ihnen auch gefallen