Flow chart for installation of Rooftop Solar PV System under

Net Metering arrangement

Application
Acknowledge Site Approval for Signing of Submission Commissioni
for Installation of Work
ment for Verification/T installation of Net Metering of safety ng of Rooftop
installation of Rooftop Solar Completion
receipt of echnical Rooftop Solar Agreement certificate by Solar PV
Rooftop Solar PV System Report
application Feasibility PV System with Nigam consumer System
PV System

•Applicant shall •Acknowledgement •Site verification •Approval shall be •Agreement shall be •After approval of •For PV system upto •Applicant shall •Applicant may
tender an of receipt of shall be carried out granted by SDO signed by consumer installation, 20 kWp installation submit the “work procured the meter
application to SDO application shall be by SDO (OP), (OP) within 15 days and concerned consumer shall certificate by completion report” from empanelled
with a processing given by within 3 working from date of SDO, within 3 days install Rooftop empanelled agency along with firm, if meter is not
fees of Rs 1000/- for subdivision office days from the submission of after submission Solar PV System is suffice. enclosures available in Nigam
seeking permission to consumer on receipt of application by duly filled from •For PV system •(Annexure-VII) Store. Meter shall
for installation of same day. application consumer. agreement by the companies/firms more than 20 kWp comply the
Rooftop Solar PV • (Annexure-II) •(Annexure-III) •System feasibility consumer empanelled with and upto 100 kWp, specifications
System check shall be done •(Annexure-V) MNRE. safety certificate issued by Nigam.
•(Annexure-I) within a week for •Installation of Solar issued by Charted •SDO (OP) and
5kWp above Rooftop shall be Engineer shall be M&P team will
capacity plant, done in 180days required connect the Rooftop
however same is from date of •For PV system Solar PV System
not req. for plant approval given by above 100kVA. with the Gird.
having capacity concerned inspection of •After submission of
upto 5kWp SDO/OP. Electrical Inspector work completion
•(Annexure-IV) shall be required report and safety
before certificate by
commissioning. applicant,
•(Annexure-VI) commissioning of
system shall be
done within 3 days.
•(Annexure-VIII)