1 Sprint goal success The rate at which the DT achieves DT: Estimate, Self-organize (70)

rate their Sprint Goal. This metric reflects


the DT’s ability to understand and SM: Observe, coach DT and PO (30)
predict its capabilities.

Measurement: Compare the number


of stories committed to in sprint
planning with the stories identified as
completed in the sprint review.

2 Defects The known problems and issues DT: Create defects, Detect (60)
detected at the end of each sprint.
SM: Process to reduce defects (20)
Measurement: It is usually
measured by the number of PO: Detect, prioritize (20)
detected/resolved defects.

3 Productivity Productivity is the efficiency of DT: Perform the work, Grow (60)
software development, i.e. the rate at
which the DT produces increments. SM: Coach, remove impediments
The productivity of the DT should (40)
increase sprint by sprint. Velocity is a
measure of productivity in terms of
the work that the DT completes during
a single Sprint.

Increase of velocity is the result of:


+ Increase of competence of each
members individually

+ Increase of collaboration between


members

+ Increase of effectiveness of
engineering practices applied to the
DT

+ Increase of capacity by adding new


member(s)

Measurement: Total number of story


points completed in a Sprint.

4 Development Scrum Team deliver the right product PO: Define what to build, what to
Effectiveness at the right time. release (70)

For internal project, building the DT: Build fast, build good product
product that fulfills the requirements (30)
within the time constraint is the
primary measure of Development
Effectiveness.

Measurement: Reach deadline,


release the right feature.
5 Continuous The scrum team’s ability to revise its SM: Process, experiment, guidance
Improvement development process to make it more (60)
effective and enjoyable for the next
sprint. PO: Try (20)

Measurement: The count of DT: Try (20)


retrospective items identified, the
retrospective items the team
committed to addressing and the
items resolved by the end of the
sprint.