Sie sind auf Seite 1von 10

HAZARD AND VULNERABILITY ASSESSMENT TOOL

NATURALLY OCCURRING EVENTS


SEVERITY = (MAGNITUDE - MITIGATION)
PROBABILITY HUMAN PROPERTY BUSINESS PREPARED- INTERNAL
EVENT IMPACT IMPACT IMPACT NESS RESPONSE

Physical Time,
Likelihood this will Possibility of Interuption of
losses and Preplanning effectivness,
occur death or injury services
damages resouces

0 = N/A 0 = N/A
0 = N/A 0 = N/A
0 = N/A 1= 1 = Low 0 = N/A 1 = High
1 = Low 1 = Low
SCORE Low 2= 2= 1 = High 2=
2= 2=
Moderate 3= Moderate 2 = Moderate Moderate
Moderate Moderate
High 3 = High 3 = Low or none 3 = Low or
3 = High 3 = High
none
Hurricane 0 0 0 0 0 0
Tornado 1 0 1 0 0 0
Severe
0 0 0 0 0 0
Thunderstorm
Snow Fall 0 0 0 0 0 0
Blizzard 0 0 0 0 0 0
Ice Storm 0 0 0 0 0 0
Earthquake 1 0 0 1 0 0
Tidal Wave 0 0 0 0 0 0
Temperature
0 0 0 0 0 0
Extremes
Drought 2 0 1 1 3 2

Flood, External 2 1 1 1 3 2

Wild Fire 0 0 0 0 0 0
Landslide 0 0 0 0 0 0

Dam Inundation 0 0 0 0 0 0

Volcano 2 1 1 1 3 2
Epidemic 2 2 1 1 3 2
AVERAGE
0.60 0.20 0.30 0.30 0.70 0.50
SCORE
*Threat increases with percentage.
0 RISK = PROBABILITY * SEVERITY
0 0.00 0.00 0.00
T TOOL

TION)
EXTERNAL RISK
RESPONSE
Community/
Mutual Aid
Relative threat*
staff and
supplies

0 = N/A
1 = High
2= 0 - 100%
Moderate
3 = Low or none

0 0%
0 1%

0 0%

0 0%
0 0%
0 0%
0 1%
0 0%

0 0%

3 20%

3 20%

0 0%
0 0%

0 0%

3 22%
3 24%

0.70 6%
HAZARD AND VULNERABILITY ASSESSMENT TOOL
TECHNOLOGIC EVENTS
SEVERITY = (MAGNITUDE - MITIGATION)
PROBABILITY HUMAN PROPERTY BUSINES PREPARED- INTERNAL EXTERNAL
EVENT IMPACT IMPACT S IMPACT NESS RESPONSE RESPONSE

Possibility of Physical Time, Community/


Likelihood this Interuption
death or losses and Preplanning effectivness, Mutual Aid staff
will occur of services
injury damages resouces and supplies
0 = N/A 0 = N/A
1= 0 = N/A 1 = 0 = N/A 0 = N/A 0 = N/A
0 = N/A
Low 1 = Low Low 1 = High 1 = High 1 = High
SCORE 1 = Low
2= 2= 2= 2 = Moderate 2 = Moderate 2=
2 = Moderate
Moderate Moderate Moderate 3 = Low or 3 = Low or Moderate
3 = High
3= 3 = High 3= none none 3 = Low or none
High High
Electrical Failure 1 0 1 1 3 1 0

Generator
1 0 1 1 3 1 1
Failure
Transportation
1 1 0 2 3 0 0
Failure
Fuel Shortage 1 0 1 1 0 1 3
Natural Gas
0 0 0 0 0 0 0
Failure
Water Failure 2 0 0 3 3 1 1
Sewer Failure 1 0 0 0 0 0 0
Steam Failure 1 1 0 0 0 0 0
Fire Alarm
3 3 3 3 2 2 1
Failure
Communications
2 0 0 2 2 2 2
Failure
Medical Gas
1 1 1 1 3 3 3
Failure
Medical Vacuum
1 0 0 0 0 1 0
Failure
HVAC Failure 1 0 1 1 3 3 1
Information
1 0 1 1 3 3 1
Systems Failure
Fire, Internal 3 2 3 3 2 1 1
Flood, Internal 0 0 0 0 0 0 0
Hazmat
Exposure, 1 1 0 0 3 1 3
Internal
Supply Shortage 1 0 0 0 0 0 3
Structural
1 1 1 1 3 1 3
Damage
AVERAGE SCORE 1.10 0.50 0.60 1.00 1.60 1.10 0.90
*Threat increases with percentage.
0 RISK = PROBABILITY * SEVERITY
0 0.00 0.00 0.00
RISK

Relative threat*

0 - 100%

6%

7%

6%

6%

0%

16%
1%
1%

42%

16%

12%

1%

9%

9%

36%
0%

8%

3%

10%

9%
HAZARD AND VULNERABILITY ASSESSMENT TOOL
HUMAN RELATED EVENTS
SEVERITY = (MAGNITUDE - MITIGATION)
PROBABI EXTERNA RISK
LITY INTERNAL
HUMAN PROPERT BUSINES PREPARED L
RESPONS
IMPACT Y IMPACT S IMPACT -NESS RESPONS
E
EVENT E

Community/
Likelihood Possibility of Physical Time,
Interuption Mutual Aid Relative
this will death or losses and Preplanning effectivness,
of services staff and threat*
occur injury damages resouces
supplies

0 = N/A 0 = N/A 0 = N/A 0 = N/A 0 = N/A


0 = N/A 0 = N/A
1= 1= 1= 1= 1=
1 = High 1 = High
Low Low Low Low High
SCORE 2= 2
2= 2= 2= 2=
Moderate = Moderate
2= 0 - 100%
Moderate Moderate Moderate Moderate Moderate
3 = Low or 3 = Low
3= 3= 3= 3= 3 = Low or
none or none
High High High High none
Mass Casualty
1 1 0 0 2 2 1 6%
Incident (trauma)
Mass Casualty
Incident
2 1 0 0 1 2 1 10%
(medical/infectiou
s)
Terrorism,
0 0 0 0 0 0 0 0%
Biological
VIP Situation 0 0 0 0 0 0 0 0%
Infant Abduction 0 0 0 0 0 0 0 0%

Hostage Situation 0 0 0 0 0 0 0 0%

Civil Disturbance 0 0 0 0 0 0 0 0%
Labor Action 0 0 0 0 0 0 0 0%
Forensic
0 0 0 0 0 0 0%
Admission
Bomb Threat 0 0 0 0 0 0 0%
AVERAGE 0.30 0.20 0.00 0.00 0.30 0.40 0.20 2%
*Threat increases with percentage.
0 RISK = PROBABILITY * SEVERITY
0 0.00 0.00 0.00
HAZARD AND VULNERABILITY ASSESSMENT TOOL
EVENTS INVOLVING HAZARDOUS MATERIALS
SEVERITY = (MAGNITUDE - MITIGATION)
PROBABI EXTERNA RISK
LITY INTERNAL
HUMAN PROPERT BUSINES PREPARE L
RESPONS
IMPACT Y IMPACT S IMPACT D-NESS RESPONS
E
EVENT E

Community/
Likelihood Possibility of Physical Time,
Interuption Mutual Aid Relative
this will death or losses and Preplanning effectivness,
of services staff and threat*
occur injury damages resouces
supplies

0 = N/A 0 = N/A 0 = N/A 0 = N/A 0 = N/A 0 = N/A


0 = N/A
1= 1= 1= 1= 1= 1=
1 = High
Low Low Low Low High High
SCORE 2
2= 2= 2= 2= 2=
= Moderate
2= 0 - 100%
Moderate Moderate Moderate Moderate Moderate Moderate
3 = Low
3= 3= 3= 3= 3 = Low or 3 = Low
or none
High High High High none or none

Mass Casualty
Hazmat 0 0 0 0 0 0 0 0%
Incident (From
historic events at
your MC with >=
5 victims)

Small Casualty
Hazmat 0 0 0 0 0 0 0 0%
Incident (From
historic events at
your MC with < 5
victims)

Chemical
Exposure, 0 0 0 0 0 0 0 0%
External
Small-Medium
Sized Internal 1 1 1 0 2 1 0 5%
Spill
Large Internal
0 0 0 0 0 0 0 0%
Spill
Terrorism,
0 0 0 0 0 0 0 0%
Chemical
Radiologic
Exposure, 1 1 0 0 2 1 0 4%
Internal
Radiologic
Exposure, 0 0 0 0 0 0 0 0%
External
Terrorism, 0 0 0 0 0 0 0 0%
Radiologic
AVERAGE 0.20 0.20 0.10 0.00 0.40 0.20 0.00 1%

*Threat increases with percentage.


0 RISK = PROBABILITY * SEVERITY
0 0.00 0.00 0.00
SUMMARY OF MEDICAL CENTER HAZARDS ANALYSIS

Technological

Total for
Hazmat

Facility
Natural

Human
Probabilit 0.60 1.10 0.30 0.20 2.20
Severity 2.70 5.70 1.40 0.90 10.70

Hazard
Specific
Relative
1.50 6.30 0.40 0.20 8.40
Risk:
Relative Impact on Facility

Probability and Severity of Hazards to Medical Center

0.9

0.8

0.7

0.6

0.5

0.4

0.3

0.2

0.1

0
Relative Threat to Facility

Hazard Specific Relative Risk to Medical Center

0.9

0.8

0.7

0.6

0.5

0.4
0.9

0.8

0.7

0.6

0.5

0.4

0.3

0.2

0.1

Das könnte Ihnen auch gefallen