ETAP Page: 1
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
Short-Circuit Analysis
ANSI Standard
3-Phase, LG, LL, & LLG Fault Currents
30-Cycle Network
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Apply Individual
Temperature Correction Adjustments /Global Degree C
BUS GIS BNDRA NUSA DUA Load 150.000 150.000 1 100.00 0.00
75 Buses Total
Ohms or Siemens per 1000 m per Conductor (Cable) or per Phase (Line)
Line/Cable Length
GIS PSGGRN-GI PSGGRN 1 150MCUN3 1000 150.0 0.0 1 75 0.00336 0.0156 0.0000127 0.2016 0.17466
GIS PSGGRN-GI PSGGRN 6 150MCUN3 1000 150.0 0.0 1 75 0.00336 0.0156 0.0000127 0.2016 0.17466
PKLOD GIS BNDARA 150NCUN3 1000 2300.0 0.0 1 75 0.0224 0.104 0.0000843 0.1724 0.312
SKLT 1 150NCUS3 300 4470.0 0.0 1 75 0.087 0.131 0.0000752 0.237 0.393
SKLT_2 150NCUS3 300 4470.0 0.0 1 75 0.38889 0.58557 0.000336 1.05939 1.75671
SKLT 3 150NCUN3 400 6500.0 0.0 1 75 0.0565 0.1125 0.00008 0.2065 0.3375
SKLT 4 150NCUN3 400 6500.0 0.0 1 75 0.918125 1.828125 0.0013 3.355625 5.484375
XLPE 170NCUN3 1200 7075.0 0.0 1 75 0.0026148 0.0230389 0.0000021 0.029241 0.0529187
GIANYAR SANUR 1 240 16500.0 0.0 1 75 0.137 0.4764 0.0000035 0.287 1.4292
GIANYAR SANUR 3 240 16500.0 0.0 1 75 0.137 0.4764 0.0000035 0.287 1.4292
GIS BNDRA NUSA DUA 240 7200.0 0.0 1 75 0.1266889 0.4652403 0.0000035 0.31 0.8607598
GNYAR -AMLPURA 1 240 33760.0 0.0 1 75 2.873917 9.993638 0.0000725 6.020534 29.98097
GNYAR -AMLPURA 3 240 33760.0 0.0 1 75 2.873917 9.993638 0.0000725 6.020534 29.98097
KAPAL PKLOD 2 310 11200.0 0.0 1 75 0.0896 0.4942071 0.0000034 0.2396 1.482625
Ohms or Siemens per 1000 m per Conductor (Cable) or per Phase (Line)
Line/Cable Length
PKLOD GIS PENGGARAN 310 4700.0 0.0 1 75 0.42112 2.32277 0.0000157 1.12612 6.96833
PMRON BATURITI 1 160 20430.0 0.0 1 75 4.37202 10.0025 0.0000689 7.43652 30.0072
PMRON BATURITI 3 160 20430.0 0.0 1 75 4.37202 10.0025 0.0000689 7.43652 30.0072
SANUR PESNGGARAN 2 135 7750.0 0.0 1 75 1.6554 3.7944 0.0000257 2.8179 11.3832
SANUR PESNGGARAN 3 135 7750.0 0.0 1 75 1.6554 3.7944 0.0000257 2.8179 11.3832
TRAF PLTDG 1 70.000 11.000 150.000 12.50 45.00 0 0 0 0 0 12.5000 YNd 30.000
TRAFO AMLPURA 1 20.000 150.000 20.000 10.00 20.00 0 0 0 0 0 10.0000 Dyn 30.000
TRAFO AMLPURA 2 30.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO ASARI 1 20.000 150.000 20.000 10.00 20.00 0 0 0 0 0 10.0000 Dyn 30.000
TRAFO ASARI 2 30.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO BANDARA 1 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO BANDARA 2 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO BATURITI 1 16.000 150.000 20.000 10.00 20.00 0 0 0 0 0 10.0000 Dyn 30.000
TRAFO BATURITI 2 15.000 150.000 20.000 10.00 20.00 0 0 0 0 0 10.0000 Dyn 30.000
TRAFO BOO 70.000 11.000 150.000 12.50 45.00 0 0 0 0 0 12.5000 YNd -30.000
TRAFO GIANYAR 1 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO GIANYAR 2 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO GIS PESANGGARAN 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
1
TRAFO GIS PESANGGARAN 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
2
TRAFO GIS PESANGGARAN 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
3
TRAFO GLNUK 1 30.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO GLNUK 2 10.000 150.000 20.000 8.35 13.00 0 0 0 0 0 8.3500 Dyn 30.000
TRAFO KAPAL 1 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO KAPAL 2 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO KAPAL 3 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO KAPAL 4 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO NEGARA 1 30.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO NEGARA 2 30.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO NSADUA 1 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO NSADUA 2 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO NSADUA 3 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO PANYNGN 2 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO PBIAN 1 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO PBIAN 2 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO PEMARON 2 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO PKLOD 1 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO PKLOD 2 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO PKLOD 3 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO PLTDG 2 70.000 11.000 150.000 12.50 45.00 0 0 0 0 0 12.5000 YNd -30.000
Project:
ETAP Page: 9
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
TRAFO PLTDG 3 70.000 11.000 150.000 12.50 45.00 0 0 0 0 0 12.5000 YNd -30.000
TRAFO PLTDG 4 70.000 11.000 150.000 12.50 45.00 0 0 0 0 0 12.5000 YNd -30.000
TRAFO PLTU 1 180.000 11.000 150.000 12.50 45.00 0 0 0 0 0 12.5000 YNd -30.000
TRAFO PLTU 2 180.000 11.000 150.000 12.50 45.00 0 0 0 0 0 12.5000 YNd -30.000
TRAFO PLTU 3 180.000 11.000 150.000 12.50 45.00 0 0 0 0 0 12.5000 YNd -30.000
TRAFO PMRON 1 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO SANUR 1 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO SANUR 2 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO SANUR 3 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAFO SANUR 4 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
TRAGO PYNGN 1 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
Grounding
Grounding
Branch Connections
TRAFO BANDARA 1 2W XFMR GIS BANDARA BUS GIS BANDARA 1 0.46 20.83 20.83
TRAFO BANDARA 2 2W XFMR GIS BANDARA BUS GIS BANDARA 2 0.46 20.83 20.83
TRAFO BOO 2W XFMR BSU BOO GIS PESANGGARAN 0.40 17.85 17.86
TRAFO GIS PESANGGARAN 2W XFMR GIS PESANGGARAN BUS GIS PSNGGRAN 1 0.46 20.83 20.83
1
TRAFO GIS PESANGGARAN 2W XFMR GIS PESANGGARAN BUS GIS PSNGGRAN 2 0.46 20.83 20.83
2
TRAFO GIS PESANGGARAN 2W XFMR GIS PESANGGARAN BUS GIS PSNGGRAN3 0.46 20.83 20.83
3
TRAFO GLNUK 1 2W XFMR GI GLMNUK BUS GLNUK 1 0.93 41.66 41.67
TRAFO NSADUA 1 2W XFMR GI NUSA DUA BUS NUSA DUA 1 0.46 20.83 20.83
TRAFO NSADUA 2 2W XFMR GI NUSA DUA BUS NUSA DUA 2 0.46 20.83 20.83
TRAFO NSADUA 3 2W XFMR GI NUSA DUA BUS NUSA DUA 3 0.46 20.83 20.83
TRAFO PLTDG 3 2W XFMR BUS PLTGD 3 GIS PESANGGARAN 0.40 17.85 17.86
Project:
ETAP Page: 12
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
TRAFO PLTDG 4 2W XFMR BUS PLTG 4 GIS PESANGGARAN 0.40 17.85 17.86
TRAFO PLTU 1 2W XFMR Bus PLTU 1 GI CLKN BAWANG 0.15 6.94 6.94
TRAFO PLTU 2 2W XFMR BUS PLTU 2 GI CLKN BAWANG 0.15 6.94 6.94
TRAFO PLTU 3 2W XFMR BUS PLTU 3 GI CLKN BAWANG 0.15 6.94 6.94
GIS BDRA NUSA DUA Cable GIS BANDARA BUS GIS BNDRA NUSA DUA 0.05 0.24 0.25 10.0395000
GIS PSGGRN-GI PSGGRN 1 Cable GI PENSGGARAN GIS PESANGGARAN 0.00 0.00 0.00 0.0428625
GIS PSGGRN-GI PSGGRN 6 Cable GI PENSGGARAN GIS PESANGGARAN 0.00 0.00 0.00 0.0428625
PKLOD GIS BNDARA Cable BUS PKLOD GIS BANDARA GIS BANDARA 0.02 0.11 0.11 4.3650000
XLPE Cable NUSA DUA-PSANGGARAN GIS PESANGGARAN 0.01 0.07 0.07 0.3420000
CLBWANG-PMRON A Line GI CLKN BAWANG BUS CLBWNG PRMON 0.47 4.08 4.10 2.9557800
CLBWANG-PMRON A2 Line GI PEMARON BUS GLMNK PMRON 0.47 4.08 4.10 2.9557800
CLBWG-PMRON B Line GI PEMARON BUS CLBWNG PRMON 0.03 0.17 0.17 0.1020481
GIS BNDRA NUSA DUA Line BUS GIS BNDRA NUSA DUA GI NUSA DUA 0.41 1.49 1.54 0.5734801
GLNK-PMRON A Line BUS GLMNK PMRON GI GLMNUK 2.38 7.95 8.30 5.3536050
GLNUK-CLBWNG Line GI CLKN BAWANG Node GLMNK-CLBWNG 0.03 0.17 0.17 0.1020481
PKLOD GIS PENGGARAN Line GI PKLOD GIS PESANGGARAN 0.88 4.85 4.93 1.6652350
SANUR PESNGGARAN 2 Line GI SANUR GIS PESANGGARAN 5.70 13.07 14.26 4.4855880
SANUR PESNGGARAN 3 Line GI SANUR GIS PESANGGARAN 5.70 13.07 14.26 4.4855880
XLPE-SUTT Line GI NUSA DUA NUSA DUA-PSANGGARAN 0.41 1.49 1.54 0.5734800
PSNGRN-NUSDUA
Project:
ETAP Page: 14
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BOO Turbo 11.765 11.000 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00
PLTDG 2 Turbo 17.882 11.000 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00
PLTDG 4 Turbo 17.882 11.000 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00
PLTDG 5 Turbo 17.882 11.000 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00
PLTDG 6 Turbo 17.882 11.000 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00
PLTDG 8 Turbo 17.882 11.000 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00
PLTDG 9 Turbo 17.882 11.000 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00
PLTDG 10 Turbo 17.882 11.000 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00
PLTDG 11 Turbo 17.882 11.000 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00
PLTU 1 Turbo 147.059 15.370 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00
PLTU 2 Turbo 147.059 15.000 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00
PLTU 3 Turbo 152.941 15.000 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00
Imp.
Lumped Load Rating % Load Loading X/R Ratio (Machine Base) Grounding
ID kVA kV MTR STAT kW kvar X"/R X'/R %R % X" % X' Conn. Type Amp.
AMLPURA 1 13245.0 20.000 80 20 9006.6 5581.8 10.00 10.00 1.538 15.38 23.08 Delta
AMLPURA 2 15890.0 20.000 80 20 10805.2 6696.5 10.00 10.00 1.538 15.38 23.08 Delta
ASARI 1 7500.0 20.000 80 20 5100.0 3160.7 10.00 10.00 1.538 15.38 23.08 Delta
ASARI 2 12600.0 20.000 80 20 8568.0 5310.0 10.00 10.00 1.538 15.38 23.08 Delta
BATURITI 1 8925.0 20.000 80 20 6069.0 3761.2 10.00 10.00 1.538 15.38 23.08 Delta
BATURITI 2 4256.0 20.000 80 20 2894.1 1793.6 10.00 10.00 1.538 15.38 23.08 Delta
GIANAR 2 33875.0 20.000 80 20 23035.0 14275.8 10.00 10.00 1.538 15.38 23.08 Delta
GIANYAR 1 34873.0 20.000 80 20 23713.6 14696.4 10.00 10.00 1.538 15.38 23.08 Delta
GIS BANDARA 1 19006.0 20.000 80 20 12924.1 8009.6 10.00 10.00 1.538 15.38 23.08 Delta
GIS BANDARA 2 20090.0 20.000 80 20 13661.2 8466.5 10.00 10.00 1.538 15.38 23.08 Delta
GLMNUK 2 4054.0 20.000 100 0 4049.8 185.1 10.00 10.00 1.538 15.38 23.08 Delta
GMNUK 1 8601.0 20.000 100 0 7609.7 4008.7 10.00 10.00 1.538 15.38 23.08 Delta
KAPAL 1 16700.0 20.000 80 20 11356.0 7037.8 10.00 10.00 1.538 15.38 23.08 Delta
KAPAL 2 26710.0 20.000 80 20 18162.8 11256.3 10.00 10.00 1.538 15.38 23.08 Delta
KAPAL 3 28850.0 20.000 80 20 19618.0 12158.1 10.00 10.00 1.538 15.38 23.08 Delta
KAPAL 4 39110.0 20.000 80 20 26594.8 16482.0 10.00 10.00 1.538 15.38 23.08 Delta
NEGAR 2 11039.0 20.000 80 20 7506.5 4652.1 10.00 10.00 1.538 15.38 23.08 Delta
NEGARA 1 10754.0 20.000 80 20 7312.7 4532.0 10.00 10.00 1.538 15.38 23.08 Delta
NUSA DUA 1 24123.0 20.000 80 20 16403.6 10166.1 10.00 10.00 1.538 15.38 23.08 Delta
NUSA DUA 2 28670.0 20.000 80 20 19495.6 12082.3 10.00 10.00 1.538 15.38 23.08 Delta
NUSA DUA 3 27103.0 20.000 80 20 18430.0 11421.9 10.00 10.00 1.538 15.38 23.08 Delta
PAYANGAN 2 15682.0 20.000 80 20 10663.8 6608.8 10.00 10.00 1.538 15.38 23.08 Delta
PDNGSMBIAN 1 48108.0 20.000 100 0 40891.8 25342.5 10.00 10.00 1.538 15.38 23.08 Delta
PDNGSMBIAN 2 29408.0 20.000 100 0 24996.8 15491.6 10.00 10.00 1.538 15.38 23.08 Delta
PENGGRAN 1 27510.0 20.000 80 20 18706.8 11593.4 10.00 10.00 1.538 15.38 23.08 Delta
PENGGRAN 2 25101.0 20.000 80 20 17068.7 10578.2 10.00 10.00 1.538 15.38 23.08 Delta
PENGGRAN 3 30965.0 20.000 80 20 21056.2 13049.5 10.00 10.00 1.538 15.38 23.08 Delta
PKLOD 1 29500.0 20.000 80 20 20060.0 12432.1 10.00 10.00 1.538 15.38 23.08 Delta
PKLOD 2 30600.0 20.000 80 20 20808.0 12895.6 10.00 10.00 1.538 15.38 23.08 Delta
PKLOD 3 43710.0 20.000 80 20 29722.8 18420.5 10.00 10.00 1.538 15.38 23.08 Delta
PMRON 1 27775.0 20.000 80 20 18887.0 11705.1 10.00 10.00 1.538 15.38 23.08 Delta
Project:
ETAP Page: 16
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
Imp.
Lumped Load Rating % Load Loading X/R Ratio (Machine Base) Grounding
ID kVA kV MTR STAT kW kvar X"/R X'/R %R % X" % X' Conn. Type Amp.
PMRON 2 19090.0 20.000 80 20 12981.2 8045.0 10.00 10.00 1.538 15.38 23.08 Delta
PYNGAN 1 19473.0 20.000 80 20 13241.6 8206.4 10.00 10.00 1.538 15.38 23.08 Delta
SANUR 1 9758.0 20.000 80 20 6635.4 4112.3 10.00 10.00 1.538 15.38 23.08 Delta
SANUR 2 32202.0 20.000 80 20 21897.4 13570.8 10.00 10.00 1.538 15.38 23.08 Delta
SANUR 3 33515.0 20.000 80 20 22790.2 14124.1 10.00 10.00 1.538 15.38 23.08 Delta
SANUR 4 19932.0 20.000 80 20 13553.8 8399.9 10.00 10.00 1.538 15.38 23.08 Delta
BSU BOO Total 0.00 16.640 0.00 111.04 114.37 13.343 13.343 1.97E+000 3.15E+001 8.50E+000 5.95E+001
GIS PESANGGARAN BSU BOO 49.12 14.437 81.56 82.19 96.28 7.543 0.000 2.42E+000 3.63E+001
BOO BSU BOO 100.00 2.204 100.00 100.00 100.00 5.800 13.343 8.50E+000 2.38E+002 8.50E+000 5.95E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 18
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS AMLPURA 1 Total 0.00 1.907 0.00 90.78 85.64 2.487 2.487 2.85E+001 1.49E+002 2.50E+000 4.99E+001
GI AMLPURA BUS AMLPURA 1 33.03 1.907 65.47 98.82 58.13 2.487 2.487 * 2.85E+001 1.49E+002 2.50E+000 4.99E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 19
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS AMLPURA 2 Total 0.00 2.020 0.00 90.44 84.79 2.682 2.682 2.69E+001 1.40E+002 9.26E-001 4.17E+001
GI AMLPURA BUS AMLPURA 2 29.15 2.020 63.68 98.72 55.37 2.682 2.682 * 2.69E+001 1.40E+002 9.26E-001 4.17E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 20
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS ASARI 1 Total 0.00 2.924 0.00 93.51 88.59 3.537 3.537 1.55E+001 9.75E+001 2.50E+000 4.99E+001
GI ASARI BUS ASARI 1 50.65 2.924 75.60 99.05 69.42 3.537 3.537 * 1.55E+001 9.75E+001 2.50E+000 4.99E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 21
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS ASARI 2 Total 0.00 3.197 0.00 93.13 87.35 3.943 3.943 1.39E+001 8.92E+001 9.26E-001 4.17E+001
GI ASARI BUS ASARI 2 46.15 3.197 73.47 98.94 66.00 3.943 3.943 * 1.39E+001 8.92E+001 9.26E-001 4.17E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 22
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS BATURITI 1 Total 0.00 2.939 0.00 96.21 90.40 3.376 3.376 1.62E+001 9.69E+001 3.12E+000 6.24E+001
GI BATURITI BUS BATURITI 1 63.64 2.939 83.72 99.18 76.97 3.376 3.376 * 1.62E+001 9.69E+001 3.12E+000 6.24E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 23
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS BATURITI 2 Total 0.00 2.820 0.00 96.39 90.78 3.220 3.220 1.64E+001 1.01E+002 3.33E+000 6.66E+001
GI BATURITI BUS BATURITI 2 65.13 2.820 84.46 99.22 77.99 3.220 3.220 * 1.64E+001 1.01E+002 3.33E+000 6.66E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 24
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS CLBWNG PRMON Total 0.00 2.994 0.00 99.51 92.05 3.262 3.262 4.10E+000 1.22E+001 1.97E+000 1.20E+001
GI CLKN BAWANG BUS CLBWNG 22.15 2.078 44.51 89.34 83.68 2.403 2.612 3.59E+000 1.82E+001 2.33E+000 1.50E+001
PRMON
GI PEMARON BUS CLBWNG 0.43 0.971 0.59 99.47 91.95 0.887 0.650 2.25E+001 3.26E+001 1.21E+001 5.97E+001
PRMON
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 25
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS GIANYAR 1 Total 0.00 6.437 0.00 90.37 86.09 8.147 8.147 4.93E+000 4.46E+001 4.63E-001 2.08E+001
GI GIANYAR BUS GIANYAR 1 46.45 6.437 72.65 96.09 67.26 8.147 8.147 * 4.93E+000 4.46E+001 4.63E-001 2.08E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 26
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS GIANYAR 2 Total 0.00 6.437 0.00 90.37 86.09 8.147 8.147 4.93E+000 4.46E+001 4.63E-001 2.08E+001
GI GIANYAR BUS GIANYAR 2 46.45 6.437 72.65 96.09 67.26 8.147 8.147 * 4.93E+000 4.46E+001 4.63E-001 2.08E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 27
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS GIS BANDARA 1 Total 0.00 6.999 0.00 90.05 87.31 8.743 8.743 3.11E+000 4.11E+001 4.63E-001 2.08E+001
GIS BANDARA BUS GIS BANDARA 1 50.51 6.999 74.29 95.71 70.94 8.743 8.743 * 3.11E+000 4.11E+001 4.63E-001 2.08E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 28
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS GIS BANDARA 2 Total 0.00 6.999 0.00 90.05 87.31 8.743 8.743 3.11E+000 4.11E+001 4.63E-001 2.08E+001
GIS BANDARA BUS GIS BANDARA 2 50.51 6.999 74.29 95.71 70.94 8.743 8.743 * 3.11E+000 4.11E+001 4.63E-001 2.08E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 29
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS GIS BNDRA Total 0.00 1.901 0.00 82.68 85.83 2.540 2.540 2.60E+000 2.01E+001 2.10E+000 8.98E+000
NUSA DUA
GIS BANDARA BUS GIS BNDRA 0.05 0.082 0.11 82.68 85.80 0.101 0.088 9.01E+001 4.59E+002 5.96E+001 2.59E+002
NUSA DUA
GI NUSA DUA BUS GIS BNDRA 7.29 1.819 12.71 82.37 84.13 2.439 2.452 2.65E+000 2.10E+001 2.17E+000 9.30E+000
NUSA DUA
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 30
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS GIS PSNGGRAN 1 Total 0.00 7.579 0.00 90.24 88.21 9.339 9.339 2.26E+000 3.80E+001 4.63E-001 2.08E+001
GIS PESANGGARAN BUS GIS PSNGGRAN 54.70 7.579 76.57 95.40 74.17 9.339 9.339 * 2.26E+000 3.80E+001 4.63E-001 2.08E+001
1
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 31
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS GIS PSNGGRAN 2 Total 0.00 7.579 0.00 90.24 88.21 9.339 9.339 2.26E+000 3.80E+001 4.63E-001 2.08E+001
GIS PESANGGARAN BUS GIS PSNGGRAN 54.70 7.579 76.57 95.40 74.17 9.339 9.339 * 2.26E+000 3.80E+001 4.63E-001 2.08E+001
2
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 32
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS GIS PSNGGRAN3 Total 0.00 7.579 0.00 90.24 88.21 9.339 9.339 2.26E+000 3.80E+001 4.63E-001 2.08E+001
GIS PESANGGARAN BUS GIS 54.70 7.579 76.57 95.40 74.17 9.339 9.339 * 2.26E+000 3.80E+001 4.63E-001 2.08E+001
PSNGGRAN3
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 33
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS GLMNK PMRON Total 0.00 2.650 0.00 107.01 98.41 2.557 2.557 5.13E+000 1.36E+001 3.35E+000 1.82E+001
GI PEMARON BUS GLMNK PMRON 16.98 1.593 29.18 99.06 92.11 1.593 1.687 4.06E+000 2.38E+001 4.66E+000 2.77E+001
GI GLMNUK BUS GLMNK PMRON 24.33 1.129 33.63 101.75 91.80 0.994 0.871 2.02E+001 2.75E+001 1.14E+001 5.32E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 34
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS GLNUK 1 Total 0.00 5.363 0.00 98.08 92.83 5.878 5.878 7.40E+000 5.33E+001 9.26E-001 4.17E+001
GI GLMNUK BUS GLNUK 1 77.40 5.363 91.32 98.78 85.66 5.878 5.878 * 7.40E+000 5.33E+001 9.26E-001 4.17E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 35
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS GLNUK 2 Total 0.00 3.014 0.00 98.81 96.14 3.170 3.170 1.29E+001 9.49E+001 6.40E+000 8.33E+001
GI GLMNUK BUS GLNUK 2 87.17 3.014 95.05 99.34 92.28 3.170 3.170 * 1.29E+001 9.49E+001 6.40E+000 8.33E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 36
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS KAPAL 1 Total 0.00 7.127 0.00 90.63 87.67 8.833 8.833 3.33E+000 4.04E+001 4.63E-001 2.08E+001
GI KAPAL BUS KAPAL 1 51.43 7.127 74.99 96.15 71.38 8.833 8.833 * 3.33E+000 4.04E+001 4.63E-001 2.08E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 37
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS KAPAL 2 Total 0.00 7.127 0.00 90.63 87.67 8.833 8.833 3.33E+000 4.04E+001 4.63E-001 2.08E+001
GI KAPAL BUS KAPAL 2 51.43 7.127 74.99 96.15 71.38 8.833 8.833 * 3.33E+000 4.04E+001 4.63E-001 2.08E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 38
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS KAPAL 3 Total 0.00 7.127 0.00 90.63 87.67 8.833 8.833 3.33E+000 4.04E+001 4.63E-001 2.08E+001
GI KAPAL BUS KAPAL 3 51.43 7.127 74.99 96.15 71.38 8.833 8.833 * 3.33E+000 4.04E+001 4.63E-001 2.08E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 39
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS KAPAL 4 Total 0.00 7.127 0.00 90.63 87.67 8.833 8.833 3.33E+000 4.04E+001 4.63E-001 2.08E+001
GI KAPAL BUS KAPAL 4 51.43 7.127 74.99 96.15 71.38 8.833 8.833 * 3.33E+000 4.04E+001 4.63E-001 2.08E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 40
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS NEGAR 2 Total 0.00 3.170 0.00 93.14 87.28 3.915 3.915 1.43E+001 8.99E+001 9.26E-001 4.17E+001
GI NEGARA BUS NEGAR 2 45.76 3.170 73.30 98.98 65.69 3.915 3.915 * 1.43E+001 8.99E+001 9.26E-001 4.17E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 41
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS NEGARA 1 Total 0.00 3.170 0.00 93.14 87.28 3.915 3.915 1.43E+001 8.99E+001 9.26E-001 4.17E+001
GI NEGARA BUS NEGARA 1 45.76 3.170 73.30 98.98 65.69 3.915 3.915 * 1.43E+001 8.99E+001 9.26E-001 4.17E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 42
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS NUSA DUA 1 Total 0.00 7.287 0.00 90.15 87.75 9.041 9.041 2.67E+000 3.95E+001 4.63E-001 2.08E+001
GI NUSA DUA BUS NUSA DUA 1 52.59 7.287 75.43 95.56 72.54 9.041 9.041 * 2.67E+000 3.95E+001 4.63E-001 2.08E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 43
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS NUSA DUA 2 Total 0.00 7.287 0.00 90.15 87.75 9.041 9.041 2.67E+000 3.95E+001 4.63E-001 2.08E+001
GI NUSA DUA BUS NUSA DUA 2 52.59 7.287 75.43 95.56 72.54 9.041 9.041 * 2.67E+000 3.95E+001 4.63E-001 2.08E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 44
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS NUSA DUA 3 Total 0.00 7.287 0.00 90.15 87.75 9.041 9.041 2.67E+000 3.95E+001 4.63E-001 2.08E+001
GI NUSA DUA BUS NUSA DUA 3 52.59 7.287 75.43 95.56 72.54 9.041 9.041 * 2.67E+000 3.95E+001 4.63E-001 2.08E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 45
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS PADNGSMBIAN 2 Total 0.00 6.250 0.00 89.63 86.65 7.937 7.937 3.93E+000 4.60E+001 4.63E-001 2.08E+001
GI PADANGSAMBIAN BUS PADNGSMBIAN 45.11 6.250 71.00 96.27 67.20 7.937 7.937 * 3.93E+000 4.60E+001 4.63E-001 2.08E+001
2
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 46
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS PANYNGAN 2 Total 0.00 4.966 0.00 92.40 84.07 6.438 6.438 1.39E+001 5.64E+001 4.63E-001 2.08E+001
GI PAYANGAN BUS PANYNGAN 2 35.84 4.966 69.10 98.41 57.49 6.438 6.438 * 1.39E+001 5.64E+001 4.63E-001 2.08E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 47
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS PDNGSMBIAN 1 Total 0.00 6.250 0.00 89.63 86.65 7.937 7.937 3.93E+000 4.60E+001 4.63E-001 2.08E+001
GI PADANGSAMBIAN BUS PDNGSMBIAN 1 45.11 6.250 71.00 96.27 67.20 7.937 7.937 * 3.93E+000 4.60E+001 4.63E-001 2.08E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 48
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS PEMARON 2 Total 0.00 8.646 0.00 94.28 89.57 10.158 10.158 4.60E+000 3.31E+001 4.63E-001 2.08E+001
GI PEMARON BUS PEMARON 2 62.40 8.646 82.67 97.38 77.25 10.158 10.158 * 4.60E+000 3.31E+001 4.63E-001 2.08E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 49
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS PEMRON 1 Total 0.00 8.646 0.00 94.28 89.57 10.158 10.158 4.60E+000 3.31E+001 4.63E-001 2.08E+001
GI PEMARON BUS PEMRON 1 62.40 8.646 82.67 97.38 77.25 10.158 10.158 * 4.60E+000 3.31E+001 4.63E-001 2.08E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 50
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS PKLOD GIS Total 0.00 1.871 0.00 83.09 87.68 2.449 2.449 2.67E+000 2.04E+001 2.63E+000 9.95E+000
BANDARA
GIS BANDARA BUS PKLOD GIS 0.50 1.783 1.17 83.11 87.29 2.340 2.347 2.73E+000 2.14E+001 2.76E+000 1.04E+001
BANDARA
GI PKLOD BUS PKLOD GIS 19.45 0.088 30.64 83.66 83.73 0.109 0.101 8.41E+001 4.28E+002 5.64E+001 2.42E+002
BANDARA
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 51
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS PLTDG 1 Total 0.00 17.534 0.00 101.57 104.84 16.752 16.752 1.87E+000 2.99E+001 5.59E+000 3.91E+001
GI PENSGGARAN BUS PLTDG 1 48.26 14.186 78.76 95.28 77.77 8.747 0.000 2.54E+000 3.69E+001
PLTDG 2 BUS PLTDG 1 100.00 3.350 100.00 100.00 100.00 8.005 16.752 5.59E+000 1.57E+002 5.59E+000 3.91E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 52
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS PLTDG 2 Total 0.00 22.933 0.00 84.83 86.93 29.553 29.553 1.41E+000 2.28E+001 1.86E+000 1.30E+001
GI PENSGGARAN BUS PLTDG 2 43.85 12.890 68.10 70.37 91.81 10.356 0.000 3.32E+000 4.06E+001
PLTDG 4 BUS PLTDG 2 100.00 3.350 100.00 100.00 100.00 6.399 9.851 5.59E+000 1.57E+002 5.59E+000 3.91E+001
PLTDG 5 BUS PLTDG 2 100.00 3.350 100.00 100.00 100.00 6.399 9.851 5.59E+000 1.57E+002 5.59E+000 3.91E+001
PLTDG 6 BUS PLTDG 2 100.00 3.350 100.00 100.00 100.00 6.399 9.851 5.59E+000 1.57E+002 5.59E+000 3.91E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 53
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS PLTG 4 Total 0.00 20.200 0.00 89.72 92.34 23.847 23.847 1.61E+000 2.59E+001 2.80E+000 1.96E+001
GIS PESANGGARAN BUS PLTG 4 45.94 13.504 71.63 73.37 93.27 10.075 0.000 2.92E+000 3.88E+001
PLTDG 10 BUS PLTG 4 100.00 3.350 100.00 100.00 100.00 6.886 11.924 5.59E+000 1.57E+002 5.59E+000 3.91E+001
PLTDG 11 BUS PLTG 4 100.00 3.350 100.00 100.00 100.00 6.886 11.924 5.59E+000 1.57E+002 5.59E+000 3.91E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 54
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS PLTGD 3 Total 0.00 20.200 0.00 89.72 92.34 23.847 23.847 1.61E+000 2.59E+001 2.80E+000 1.96E+001
GIS PESANGGARAN BUS PLTGD 3 45.94 13.504 71.63 73.37 93.27 10.075 0.000 2.92E+000 3.88E+001
PLTDG 8 BUS PLTGD 3 100.00 3.350 100.00 100.00 100.00 6.886 11.924 5.59E+000 1.57E+002 5.59E+000 3.91E+001
PLTDG 9 BUS PLTGD 3 100.00 3.350 100.00 100.00 100.00 6.886 11.924 5.59E+000 1.57E+002 5.59E+000 3.91E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 55
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
Bus PLTU 1 Total 0.00 54.450 0.00 90.43 88.59 65.907 65.907 2.45E+000 1.29E+001 1.33E+000 9.29E+000
GI CLKN BAWANG Bus PLTU 1 47.03 35.549 85.32 94.78 125.28 27.159 0.000 5.36E+000 1.94E+001
PLTU 1 Bus PLTU 1 97.59 19.242 97.59 97.59 97.59 38.849 65.907 1.33E+000 3.72E+001 1.33E+000 9.29E+000
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 56
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS PLTU 2 Total 0.00 55.119 0.00 89.74 87.89 67.500 67.500 2.41E+000 1.28E+001 1.26E+000 8.85E+000
GI CLKN BAWANG BUS PLTU 2 46.68 35.279 84.56 94.23 125.01 27.219 0.000 5.48E+000 1.95E+001
PLTU 2 BUS PLTU 2 100.00 20.202 100.00 100.00 100.00 40.392 67.500 1.26E+000 3.54E+001 1.26E+000 8.85E+000
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 57
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS PLTU 3 Total 0.00 55.683 0.00 89.20 87.35 68.817 68.817 2.38E+000 1.26E+001 1.22E+000 8.51E+000
GI CLKN BAWANG BUS PLTU 3 46.38 35.054 83.94 93.79 124.79 27.254 0.000 5.58E+000 1.96E+001
PLTU 3 BUS PLTU 3 100.00 21.011 100.00 100.00 100.00 41.684 68.817 1.22E+000 3.40E+001 1.22E+000 8.51E+000
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 58
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS SANUR 1 Total 0.00 6.613 0.00 90.45 86.29 8.335 8.335 4.62E+000 4.34E+001 4.63E-001 2.08E+001
GI SANUR BUS SANUR 1 47.72 6.613 73.38 95.98 68.18 8.335 8.335 * 4.62E+000 4.34E+001 4.63E-001 2.08E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 59
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS SANUR 2 Total 0.00 6.613 0.00 90.45 86.29 8.335 8.335 4.62E+000 4.34E+001 4.63E-001 2.08E+001
GI SANUR BUS SANUR 2 47.72 6.613 73.38 95.98 68.18 8.335 8.335 * 4.62E+000 4.34E+001 4.63E-001 2.08E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 60
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS SANUR 3 Total 0.00 6.613 0.00 90.45 86.29 8.335 8.335 4.62E+000 4.34E+001 4.63E-001 2.08E+001
GI SANUR BUS SANUR 3 47.72 6.613 73.38 95.98 68.18 8.335 8.335 * 4.62E+000 4.34E+001 4.63E-001 2.08E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 61
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS SANUR 4 Total 0.00 6.613 0.00 90.45 86.29 8.335 8.335 4.62E+000 4.34E+001 4.63E-001 2.08E+001
GI SANUR BUS SANUR 4 47.72 6.613 73.38 95.98 68.18 8.335 8.335 * 4.62E+000 4.34E+001 4.63E-001 2.08E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 62
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
Bus1 Total 0.00 2.827 0.00 113.15 97.15 2.634 2.634 6.63E+000 1.19E+001 3.81E+000 1.88E+001
GLMNUK-BNYUWNG Bus1 0.52 0.646 0.52 113.17 97.07 0.467 0.277 5.12E+001 3.05E+001 5.12E+001 1.75E+002
I1
GI GLMNUK Bus1 2.25 2.291 3.67 111.96 96.40 2.219 2.358 6.02E+000 1.57E+001 4.05E+000 2.10E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 63
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
Bus2 Total 0.00 2.821 0.00 113.07 97.19 2.629 2.629 6.62E+000 1.19E+001 3.82E+000 1.88E+001
GLMNUK-BNYUWNG Bus2 1.73 0.477 1.78 113.08 96.89 0.351 0.221 7.06E+001 3.90E+001 7.47E+001 2.15E+002
I2
GI GLMNUK Bus2 2.39 2.430 3.81 111.89 96.42 2.320 2.410 6.19E+000 1.46E+001 3.92E+000 2.05E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 64
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
Bus38 Total 0.00 7.188 0.00 90.45 87.74 8.909 8.909 3.05E+000 4.00E+001 4.63E-001 2.08E+001
GI PKLOD Bus38 51.87 7.188 75.13 95.97 71.84 8.909 8.909 * 3.05E+000 4.00E+001 4.63E-001 2.08E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 65
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
Bus39 Total 0.00 7.188 0.00 90.45 87.74 8.909 8.909 3.05E+000 4.00E+001 4.63E-001 2.08E+001
GI PKLOD Bus39 51.87 7.188 75.13 95.97 71.84 8.909 8.909 * 3.05E+000 4.00E+001 4.63E-001 2.08E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 66
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
Bus40 Total 0.00 7.188 0.00 90.45 87.74 8.909 8.909 3.05E+000 4.00E+001 4.63E-001 2.08E+001
GI PKLOD Bus40 51.87 7.188 75.13 95.97 71.84 8.909 8.909 * 3.05E+000 4.00E+001 4.63E-001 2.08E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 67
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
Bus70 Total 0.00 4.966 0.00 92.40 84.07 6.438 6.438 1.39E+001 5.64E+001 4.63E-001 2.08E+001
GI PAYANGAN Bus70 35.84 4.966 69.10 98.41 57.49 6.438 6.438 * 1.39E+001 5.64E+001 4.63E-001 2.08E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 68
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
GI AMLPURA Total 0.00 0.377 0.00 121.87 118.24 0.254 0.254 2.60E+001 9.87E+001 5.01E+001 2.49E+002
GI GIANYAR GI AMLPURA 76.41 0.189 84.80 99.73 99.53 0.127 0.127 5.20E+001 1.97E+002 1.00E+002 4.99E+002
GI GIANYAR GI AMLPURA 76.41 0.189 84.80 99.73 99.53 0.127 0.127 5.20E+001 1.97E+002 1.00E+002 4.99E+002
BUS AMLPURA 1 GI AMLPURA 0.00 0.000 68.27 70.36 99.10 0.000 0.000
BUS AMLPURA 2 GI AMLPURA 0.00 0.000 68.27 70.36 99.10 0.000 0.000
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 69
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
GI ASARI Total 0.00 0.781 0.00 121.74 117.74 0.531 0.531 1.30E+001 4.75E+001 2.35E+001 1.19E+002
GI KAPAL GI ASARI 72.08 0.232 83.50 98.83 98.57 0.161 0.166 3.92E+001 1.61E+002 7.45E+001 3.80E+002
GI KAPAL GI ASARI 72.08 0.232 83.50 98.83 98.57 0.161 0.166 3.92E+001 1.61E+002 7.45E+001 3.80E+002
GI NEGARA GI ASARI 4.03 0.159 4.28 120.61 116.72 0.104 0.099 7.38E+001 2.31E+002 1.28E+002 6.37E+002
GI NEGARA GI ASARI 4.03 0.159 4.28 120.61 116.72 0.104 0.099 7.38E+001 2.31E+002 1.28E+002 6.37E+002
BUS ASARI 1 GI ASARI 0.00 0.000 67.98 70.29 98.93 0.000 0.000
BUS ASARI 2 GI ASARI 0.00 0.000 67.98 70.29 98.93 0.000 0.000
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 70
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
GI BATURITI Total 0.00 1.045 0.00 121.63 114.38 0.740 0.740 1.31E+001 3.44E+001 1.97E+001 8.24E+001
GI PAYANGAN GI BATURITI 4.78 0.375 5.72 119.77 112.96 0.269 0.273 3.28E+001 9.73E+001 5.31E+001 2.23E+002
GI KAPAL GI BATURITI 71.05 0.079 82.45 98.38 98.25 0.057 0.058 1.55E+002 4.62E+002 2.51E+002 1.05E+003
GI PEMARON GI BATURITI 76.17 0.296 85.31 99.37 98.40 0.207 0.204 4.97E+001 1.20E+002 7.17E+001 2.98E+002
GI PEMARON GI BATURITI 76.17 0.296 85.31 99.37 98.40 0.207 0.204 4.97E+001 1.20E+002 7.17E+001 2.98E+002
BUS BATURITI 1 GI BATURITI 0.00 0.000 66.04 70.22 98.66 0.000 0.000
BUS BATURITI 2 GI BATURITI 0.00 0.000 66.04 70.22 98.66 0.000 0.000
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 71
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
GI BAYUWANGI Total 0.00 2.778 0.00 114.94 97.97 2.533 2.533 7.13E+000 1.19E+001 4.36E+000 2.00E+001
GLMNUK-BNYUWNG GI BAYUWANGI 3.73 0.817 5.91 112.91 96.66 0.773 0.826 5.85E+000 4.67E+001 7.99E+000 6.22E+001
I1
GLMNUK-BNYUWNG GI BAYUWANGI 2.60 0.570 4.13 113.41 97.21 0.540 0.578 1.39E+001 6.61E+001 1.95E+001 8.74E+001
I2
GLMNUK-BNYUWNG GI BAYUWANGI 4.52 0.706 6.80 112.70 96.60 0.756 1.019 5.29E+000 5.43E+001 1.37E+001 4.90E+001
I3
GLMNUK-BNYUWNG GI BAYUWANGI 3.89 0.085 5.60 113.12 97.00 0.088 0.114 5.49E+001 4.49E+002 1.36E+002 4.33E+002
I4
U1 GI BAYUWANGI 100.00 1.155 100.00 100.00 100.00 0.651 0.000 3.27E+001 6.54E+000
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 72
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
GI CLKN BAWANG Total 0.00 3.678 0.00 81.36 73.81 5.611 5.611 3.21E+000 9.96E+000 5.63E-002 2.29E+000
GI KAPAL GI CLKN BAWANG 68.95 0.038 73.14 89.49 90.36 0.037 0.005 1.48E+002 9.99E+002 5.04E+002 2.28E+003
GI KAPAL GI CLKN BAWANG 68.95 0.038 73.14 89.49 90.36 0.037 0.005 1.48E+002 9.99E+002 5.04E+002 2.28E+003
BUS CLBWNG PRMON GI CLKN BAWANG 5.51 0.517 5.37 83.39 73.38 0.480 0.037 5.26E+001 5.27E+001 7.44E+001 3.39E+002
Node GI CLKN BAWANG 0.33 0.743 0.30 81.50 73.76 0.673 0.021 4.59E+001 2.39E+001 1.29E+002 5.87E+002
GLMNK-CLBWNG
Bus PLTU 1 GI CLKN BAWANG 11.54 0.872 37.87 63.79 34.81 1.526 1.848 * 1.48E+000 4.41E+001 1.54E-001 6.94E+000
BUS PLTU 2 GI CLKN BAWANG 12.02 0.908 38.07 63.80 35.03 1.563 1.848 * 1.42E+000 4.23E+001 1.54E-001 6.94E+000
BUS PLTU 3 GI CLKN BAWANG 12.42 0.939 38.24 63.80 35.21 1.593 1.848 * 1.37E+000 4.10E+001 1.54E-001 6.94E+000
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 73
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
GI GIANYAR Total 0.00 1.593 0.00 98.25 97.14 1.672 1.672 4.46E+000 2.37E+001 4.93E+000 2.43E+001
GI SANUR GI GIANYAR 6.13 0.649 10.79 95.71 95.00 0.690 0.702 1.15E+001 5.82E+001 1.21E+001 5.79E+001
GI SANUR GI GIANYAR 6.13 0.649 10.79 95.71 95.00 0.690 0.702 1.15E+001 5.82E+001 1.21E+001 5.79E+001
GI AMLPURA GI GIANYAR 0.00 0.000 0.00 98.25 97.14 0.000 0.000
GI AMLPURA GI GIANYAR 0.00 0.000 0.00 98.25 97.14 0.000 0.000
GI KAPAL GI GIANYAR 31.17 0.147 49.38 89.39 89.78 0.147 0.135 3.77E+001 2.58E+002 5.25E+001 3.04E+002
GI KAPAL GI GIANYAR 31.17 0.147 49.38 89.39 89.78 0.147 0.135 3.77E+001 2.58E+002 5.25E+001 3.04E+002
BUS GIANYAR 1 GI GIANYAR 0.00 0.000 56.08 56.72 94.06 0.000 0.000
BUS GIANYAR 2 GI GIANYAR 0.00 0.000 56.08 56.72 94.06 0.000 0.000
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 74
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
GI GLMNUK Total 0.00 2.886 0.00 112.28 96.33 2.730 2.730 6.47E+000 1.17E+001 3.61E+000 1.78E+001
GLMNUK-BNYUWNG GI GLMNUK 0.35 0.369 0.20 112.39 96.34 0.215 0.000 1.01E+002 2.69E+001
I3
GLMNUK-BNYUWNG GI GLMNUK 0.68 0.044 0.40 112.49 96.35 0.026 0.000 8.41E+002 2.03E+002
I4
GI NEGARA GI GLMNUK 44.13 0.086 50.27 102.03 94.96 0.067 0.049 8.95E+001 4.39E+002 1.95E+002 9.99E+002
GI NEGARA GI GLMNUK 44.13 0.086 50.27 102.03 94.96 0.067 0.049 8.95E+001 4.39E+002 1.95E+002 9.99E+002
Node GI GLMNUK 29.71 1.378 55.25 92.18 86.90 1.454 1.746 3.97E+000 2.76E+001 5.85E+000 2.78E+001
GLMNK-CLBWNG
BUS GLMNK PMRON GI GLMNUK 16.03 0.744 28.48 101.67 90.61 0.761 0.887 4.11E+000 5.16E+001 1.03E+001 5.49E+001
Bus1 GI GLMNUK 0.42 0.428 0.24 112.41 96.32 0.249 0.000 8.76E+001 2.08E+001
Bus2 GI GLMNUK 0.29 0.298 0.17 112.37 96.32 0.174 0.000 1.28E+002 1.94E+001
BUS GLNUK 1 GI GLMNUK 0.00 0.000 55.61 64.83 95.24 0.000 0.000
BUS GLNUK 2 GI GLMNUK 0.00 0.000 55.61 64.83 95.24 0.000 0.000
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 75
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
GI KAPAL Total 0.00 1.949 0.00 94.15 93.19 2.196 2.196 2.86E+000 1.95E+001 2.54E+000 1.66E+001
GI ASARI GI KAPAL 29.78 0.096 31.62 95.16 94.08 0.078 0.036 1.25E+002 3.82E+002 1.99E+002 1.00E+003
GI BATURITI GI KAPAL 44.23 0.049 47.30 95.24 94.62 0.041 0.020 3.18E+002 7.15E+002 4.45E+002 1.83E+003
GI CLKN BAWANG GI KAPAL 83.39 0.046 89.43 96.18 95.76 0.038 0.017 1.75E+002 8.17E+002 4.71E+002 2.08E+003
GI CLKN BAWANG GI KAPAL 83.39 0.046 89.43 96.18 95.76 0.038 0.017 1.75E+002 8.17E+002 4.71E+002 2.08E+003
GI PKLOD GI KAPAL 5.98 0.921 13.05 90.94 90.21 1.145 1.303 2.16E+000 4.17E+001 4.01E+000 2.81E+001
GI GIANYAR GI KAPAL 15.40 0.073 33.27 86.82 86.16 0.091 0.103 8.84E+001 5.21E+002 6.27E+001 3.53E+002
GI GIANYAR GI KAPAL 15.40 0.073 33.27 86.82 86.16 0.091 0.103 8.84E+001 5.21E+002 6.27E+001 3.53E+002
GI PAYANGAN GI KAPAL 41.25 0.233 44.06 95.21 94.53 0.192 0.093 6.74E+001 1.51E+002 9.44E+001 3.88E+002
GI PKLOD GI KAPAL 5.98 0.132 13.05 90.94 90.21 0.165 0.187 1.50E+001 2.90E+002 2.79E+001 1.95E+002
GI ASARI GI KAPAL 29.78 0.096 31.62 95.16 94.08 0.078 0.036 1.25E+002 3.82E+002 1.99E+002 1.00E+003
GI PADANGSAMBIAN GI KAPAL 11.69 0.203 25.17 88.44 87.67 0.250 0.281 9.21E+000 1.90E+002 1.73E+001 1.30E+002
BUS KAPAL 1 GI KAPAL 0.00 0.000 53.80 54.36 92.87 0.000 0.000
BUS KAPAL 2 GI KAPAL 0.00 0.000 53.80 54.36 92.87 0.000 0.000
BUS KAPAL 3 GI KAPAL 0.00 0.000 53.80 54.36 92.87 0.000 0.000
BUS KAPAL 4 GI KAPAL 0.00 0.000 53.80 54.36 92.87 0.000 0.000
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 76
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
GI NEGARA Total 0.00 0.768 0.00 122.08 117.96 0.519 0.519 1.34E+001 4.83E+001 2.42E+001 1.22E+002
GI GLMNUK GI NEGARA 85.32 0.166 90.61 100.35 99.18 0.109 0.104 7.08E+001 2.21E+002 1.22E+002 6.09E+002
GI GLMNUK GI NEGARA 85.32 0.166 90.61 100.35 99.18 0.109 0.104 7.08E+001 2.21E+002 1.22E+002 6.09E+002
GI ASARI GI NEGARA 5.55 0.218 6.38 120.13 116.25 0.151 0.156 4.20E+001 1.71E+002 8.02E+001 4.08E+002
GI ASARI GI NEGARA 5.55 0.218 6.38 120.13 116.25 0.151 0.156 4.20E+001 1.71E+002 8.02E+001 4.08E+002
BUS NEGARA 1 GI NEGARA 0.00 0.000 68.11 70.48 98.99 0.000 0.000
BUS NEGAR 2 GI NEGARA 0.00 0.000 68.11 70.48 98.99 0.000 0.000
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 77
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
GI NUSA DUA Total 0.00 2.045 0.00 80.53 81.79 2.895 2.895 2.21E+000 1.87E+001 1.16E+000 6.37E+000
BUS GIS BNDRA GI NUSA DUA 0.22 0.054 0.33 80.55 81.77 0.067 0.053 1.59E+002 6.90E+002 6.39E+001 3.45E+002
NUSA DUA
NUSA GI NUSA DUA 7.98 1.991 14.74 80.50 79.94 2.828 2.842 2.21E+000 1.92E+001 1.18E+000 6.49E+000
DUA-PSANGGARAN
BUS NUSA DUA 1 GI NUSA DUA 0.00 0.000 47.22 46.50 89.41 0.000 0.000
BUS NUSA DUA 2 GI NUSA DUA 0.00 0.000 47.22 46.50 89.41 0.000 0.000
BUS NUSA DUA 3 GI NUSA DUA 0.00 0.000 47.22 46.50 89.41 0.000 0.000
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 78
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
GI PADANGSAMBIAN Total 0.00 1.514 0.00 101.31 100.72 1.498 1.498 3.47E+000 2.52E+001 4.44E+000 2.99E+001
GI KAPAL GI 31.33 0.543 48.93 92.08 91.42 0.520 0.495 1.13E+001 6.99E+001 1.38E+001 9.05E+001
PADANGSAMBIAN
GIS PESANGGARAN GI 33.89 0.970 57.37 89.46 88.97 0.978 1.003 4.89E+000 3.94E+001 6.54E+000 4.48E+001
PADANGSAMBIAN
BUS PDNGSMBIAN 1 GI 0.00 0.000 58.15 58.49 94.76 0.000 0.000
PADANGSAMBIAN
BUS PADNGSMBIAN 2 GI 0.00 0.000 58.15 58.49 94.76 0.000 0.000
PADANGSAMBIAN
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 79
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
GI PAYANGAN Total 0.00 1.011 0.00 121.74 114.52 0.714 0.714 1.35E+001 3.56E+001 2.05E+001 8.56E+001
GI BATURITI GI PAYANGAN 7.82 0.613 9.01 119.01 112.42 0.428 0.421 2.37E+001 5.81E+001 3.50E+001 1.45E+002
GI KAPAL GI PAYANGAN 70.47 0.398 82.02 98.43 98.28 0.286 0.294 3.06E+001 9.16E+001 4.95E+001 2.08E+002
BUS PANYNGAN 2 GI PAYANGAN 0.00 0.000 66.12 70.28 98.68 0.000 0.000
Bus70 GI PAYANGAN 0.00 0.000 66.12 70.28 98.68 0.000 0.000
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 80
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
GI PEMARON Total 0.00 2.979 0.00 99.94 92.47 3.221 3.221 4.14E+000 1.22E+001 2.05E+000 1.23E+001
BUS GLMNK PMRON GI PEMARON 8.01 0.751 11.25 98.87 90.19 0.697 0.549 3.23E+001 3.98E+001 1.40E+001 7.17E+001
BUS CLBWNG PRMON GI PEMARON 0.91 2.044 1.81 99.47 92.04 2.348 2.554 3.64E+000 1.85E+001 2.45E+000 1.55E+001
GI BATURITI GI PEMARON 31.94 0.124 35.99 97.27 93.13 0.104 0.060 1.07E+002 2.91E+002 1.57E+002 6.54E+002
GI BATURITI GI PEMARON 31.94 0.124 35.99 97.27 93.13 0.104 0.060 1.07E+002 2.91E+002 1.57E+002 6.54E+002
BUS PEMARON 2 GI PEMARON 0.00 0.000 53.39 57.70 93.49 0.000 0.000
BUS PEMRON 1 GI PEMARON 0.00 0.000 53.39 57.70 93.49 0.000 0.000
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 81
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
GI PENSGGARAN Total 0.00 2.227 0.00 78.72 75.88 3.414 3.414 1.80E+000 1.72E+001 9.33E-002 3.51E+000
GIS PESANGGARAN GI PENSGGARAN 0.00 0.730 0.02 78.73 75.86 1.082 1.037 7.47E+000 5.22E+001 3.40E-001 1.15E+001
GIS PESANGGARAN GI PENSGGARAN 0.00 0.730 0.02 78.73 75.86 1.082 1.037 7.47E+000 5.22E+001 3.40E-001 1.15E+001
BUS PLTDG 1 GI PENSGGARAN 10.23 0.221 46.00 48.43 86.90 0.461 0.671 * 5.99E+000 1.74E+002 3.97E-001 1.79E+001
BUS PLTDG 2 GI PENSGGARAN 25.48 0.549 55.34 87.13 52.51 0.792 0.671 * 2.26E+000 7.00E+001 3.97E-001 1.79E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 82
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
GI PKLOD Total 0.00 1.985 0.00 90.73 89.99 2.370 2.370 2.59E+000 1.92E+001 2.00E+000 1.37E+001
GI KAPAL GI PKLOD 4.20 0.647 6.16 90.27 89.39 0.643 0.459 1.53E+001 5.75E+001 1.17E+001 7.05E+001
GI KAPAL GI PKLOD 4.20 0.093 6.16 90.27 89.39 0.092 0.066 1.06E+002 4.00E+002 8.14E+001 4.91E+002
BUS PKLOD GIS GI PKLOD 14.62 0.066 32.67 84.54 83.74 0.103 0.149 8.18E+001 5.75E+002 6.74E+001 2.10E+002
BANDARA
GIS PESANGGARAN GI PKLOD 15.22 1.188 34.10 84.33 83.47 1.536 1.698 1.79E+000 3.23E+001 2.39E+000 1.92E+001
Bus38 GI PKLOD 0.00 0.000 51.96 52.38 92.00 0.000 0.000
Bus39 GI PKLOD 0.00 0.000 51.96 52.38 92.00 0.000 0.000
Bus40 GI PKLOD 0.00 0.000 51.96 52.38 92.00 0.000 0.000
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 83
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
GI SANUR Total 0.00 1.676 0.00 95.65 94.81 1.838 1.838 4.16E+000 2.26E+001 4.23E+000 2.06E+001
GI GIANYAR GI SANUR 1.20 0.127 1.95 95.29 94.50 0.131 0.117 3.94E+001 2.99E+002 5.42E+001 3.25E+002
GI GIANYAR GI SANUR 1.20 0.127 1.95 95.29 94.50 0.131 0.117 3.94E+001 2.99E+002 5.42E+001 3.25E+002
GIS PESANGGARAN GI SANUR 26.34 0.711 47.21 86.27 87.42 0.788 0.802 1.03E+001 5.32E+001 9.96E+000 4.71E+001
GIS PESANGGARAN GI SANUR 26.34 0.711 47.21 86.27 87.42 0.788 0.802 1.03E+001 5.32E+001 9.96E+000 4.71E+001
BUS SANUR 1 GI SANUR 0.00 0.000 54.74 55.22 93.45 0.000 0.000
BUS SANUR 2 GI SANUR 0.00 0.000 54.74 55.22 93.45 0.000 0.000
BUS SANUR 3 GI SANUR 0.00 0.000 54.74 55.22 93.45 0.000 0.000
BUS SANUR 4 GI SANUR 0.00 0.000 54.74 55.22 93.45 0.000 0.000
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 84
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
GIS BANDARA Total 0.00 1.880 0.00 82.96 87.14 2.476 2.476 2.64E+000 2.03E+001 2.47E+000 9.66E+000
BUS GIS BNDRA GIS BANDARA 1.17 1.794 2.72 83.02 86.23 2.369 2.378 2.71E+000 2.13E+001 2.58E+000 1.00E+001
NUSA DUA
BUS PKLOD GIS GIS BANDARA 0.02 0.086 0.05 82.96 87.12 0.107 0.097 8.58E+001 4.37E+002 5.72E+001 2.47E+002
BANDARA
BUS GIS BANDARA 1 GIS BANDARA 0.00 0.000 50.31 47.89 90.99 0.000 0.000
BUS GIS BANDARA 2 GIS BANDARA 0.00 0.000 50.31 47.89 90.99 0.000 0.000
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 85
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
GIS PESANGGARAN Total 0.00 2.227 0.00 78.72 75.87 3.415 3.415 1.80E+000 1.72E+001 9.19E-002 3.50E+000
GI PENSGGARAN GIS PESANGGARAN 0.00 0.385 0.01 78.73 75.86 0.626 0.670 3.29E+000 1.00E+002 4.10E-001 1.79E+001
GI PENSGGARAN GIS PESANGGARAN 0.00 0.385 0.01 78.73 75.86 0.626 0.670 3.29E+000 1.00E+002 4.10E-001 1.79E+001
NUSA GIS PESANGGARAN 0.00 0.021 0.00 78.72 75.87 0.020 0.004 7.35E+002 1.69E+003 1.14E+003 2.80E+003
DUA-PSANGGARAN
GI PADANGSAMBIAN GIS PESANGGARAN 2.65 0.076 2.74 79.25 76.18 0.072 0.009 1.62E+002 4.80E+002 2.64E+002 1.27E+003
GI PKLOD GIS PESANGGARAN 4.79 0.374 4.95 79.69 76.44 0.356 0.045 3.27E+001 9.75E+001 5.28E+001 2.60E+002
GI SANUR GIS PESANGGARAN 1.01 0.027 1.04 78.89 76.04 0.026 0.003 6.06E+002 1.27E+003 8.71E+002 3.41E+003
GI SANUR GIS PESANGGARAN 1.01 0.027 1.04 78.89 76.04 0.026 0.003 6.06E+002 1.27E+003 8.71E+002 3.41E+003
BSU BOO GIS PESANGGARAN 6.98 0.150 47.30 87.01 45.06 0.387 0.670 * 8.90E+000 2.56E+002 3.97E-001 1.79E+001
BUS GIS PSNGGRAN 1 GIS PESANGGARAN 0.00 0.000 43.80 45.45 87.45 0.000 0.000
BUS GIS PSNGGRAN 2 GIS PESANGGARAN 0.00 0.000 43.80 45.45 87.45 0.000 0.000
BUS GIS PSNGGRAN3 GIS PESANGGARAN 0.00 0.000 43.80 45.45 87.45 0.000 0.000
BUS PLTGD 3 GIS PESANGGARAN 18.56 0.400 51.93 86.88 49.18 0.645 0.670 * 3.19E+000 9.61E+001 3.97E-001 1.79E+001
BUS PLTG 4 GIS PESANGGARAN 18.56 0.400 51.93 86.88 49.18 0.645 0.670 * 3.19E+000 9.61E+001 3.97E-001 1.79E+001
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 86
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
GLMNUK-BNYUWNG Total 0.00 2.794 0.00 113.52 97.79 2.579 2.579 6.77E+000 1.20E+001 4.14E+000 1.93E+001
I1
Bus1 GLMNUK-BNYUWN 1.66 2.040 2.67 112.93 96.94 1.963 2.094 7.07E+000 1.75E+001 5.48E+000 2.37E+001
GI 1
GI BAYUWANGI GLMNUK-BNYUWN 3.73 0.815 4.34 113.05 96.94 0.637 0.486 3.53E+001 3.14E+001 1.48E+001 1.04E+002
GI 1
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 87
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
GLMNUK-BNYUWNG Total 0.00 2.706 0.00 114.37 99.13 2.446 2.446 7.08E+000 1.23E+001 4.79E+000 2.07E+001
I2
Bus2 GLMNUK-BNYUWN 5.56 1.534 8.69 112.26 96.63 1.434 1.511 1.13E+001 2.24E+001 1.06E+001 3.27E+001
GI 2
GI BAYUWANGI GLMNUK-BNYUWN 5.38 1.177 7.44 112.90 97.34 1.012 0.949 1.82E+001 2.72E+001 4.91E+000 5.46E+001
GI 2
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 88
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
GLMNUK-BNYUWNG Total 0.00 2.829 0.00 112.72 97.49 2.635 2.635 6.65E+000 1.19E+001 4.11E+000 1.87E+001
I3
GI GLMNUK GLMNUK-BNYUWN 2.21 2.342 3.69 111.99 96.25 2.241 2.331 6.62E+000 1.50E+001 5.21E+000 2.10E+001
GI 3
GI BAYUWANGI GLMNUK-BNYUWN 3.49 0.545 3.13 113.14 96.82 0.411 0.311 5.67E+001 4.20E+001 2.39E+000 1.62E+002
GI 3
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 89
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
GLMNUK-BNYUWNG Total 0.00 2.174 0.00 114.52 105.66 1.825 1.825 8.36E+000 1.56E+001 9.27E+000 2.87E+001
I4
GI GLMNUK GLMNUK-BNYUWN 25.04 1.631 33.45 108.44 96.63 1.316 1.208 1.18E+001 2.04E+001 1.70E+001 4.23E+001
GI 4
GI BAYUWANGI GLMNUK-BNYUWN 25.02 0.547 32.00 109.46 97.21 0.513 0.626 2.70E+001 6.50E+001 1.55E+001 8.66E+001
GI 4
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 90
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
Node Total 0.00 3.634 0.00 82.44 74.92 5.409 5.409 3.28E+000 1.01E+001 1.71E-001 2.78E+000
GLMNK-CLBWNG
GI GLMNUK Node 16.36 0.759 15.43 88.90 73.13 0.683 0.060 4.45E+001 2.43E+001 3.01E+001 2.49E+002
GLMNK-CLBWNG
GI CLKN BAWANG Node 1.39 3.126 3.79 81.91 74.62 4.927 5.349 1.80E+000 1.22E+001 1.71E-001 2.81E+000
GLMNK-CLBWNG
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 91
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
NUSA Total 0.00 2.218 0.00 78.67 76.38 3.383 3.383 1.81E+000 1.73E+001 1.84E-001 3.67E+000
DUA-PSANGGARAN
GIS PESANGGARAN NUSA 0.42 2.196 0.96 78.81 76.12 3.360 3.376 1.78E+000 1.74E+001 1.83E-001 3.68E+000
DUA-PSANGGARAN
GI NUSA DUA NUSA 0.09 0.023 0.10 78.69 76.39 0.023 0.007 6.62E+002 1.58E+003 2.71E+002 1.70E+003
DUA-PSANGGARAN
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 92
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BSU BOO 11.00 1.040 -16.607 16.640 1.419 -13.267 13.343 15.641 1.095 15.679 -15.975 3.743 16.408
BUS AMLPURA 1 20.00 0.359 -1.873 1.907 0.425 -2.451 2.487 1.644 0.319 1.674 1.403 2.017 2.457
BUS AMLPURA 2 20.00 0.381 -1.983 2.020 0.455 -2.643 2.682 1.742 0.339 1.774 1.485 2.229 2.678
BUS ASARI 1 20.00 0.459 -2.888 2.924 0.478 -3.504 3.537 2.531 0.402 2.563 2.293 2.558 3.435
BUS ASARI 2 20.00 0.494 -3.159 3.197 0.510 -3.910 3.943 2.772 0.432 2.805 2.527 2.905 3.850
BUS BATURITI 1 20.00 0.485 -2.899 2.939 0.461 -3.344 3.376 2.538 0.423 2.573 2.331 2.344 3.306
BUS BATURITI 2 20.00 0.452 -2.784 2.820 0.427 -3.191 3.220 2.436 0.394 2.468 2.246 2.214 3.154
BUS CLBWNG PRMON 150.00 0.954 -2.838 2.994 0.844 -3.151 3.262 2.717 0.879 2.856 2.309 2.285 3.249
BUS GIANYAR 1 20.00 0.707 -6.398 6.437 0.784 -8.109 8.147 5.807 0.667 5.845 5.357 5.526 7.696
BUS GIANYAR 2 20.00 0.707 -6.398 6.437 0.784 -8.109 8.147 5.807 0.667 5.845 5.357 5.526 7.696
BUS GIS BANDARA 1 20.00 0.527 -6.979 6.999 0.582 -8.723 8.743 6.370 0.501 6.390 5.978 5.557 8.162
BUS GIS BANDARA 2 20.00 0.527 -6.979 6.999 0.582 -8.723 8.743 6.370 0.501 6.390 5.978 5.557 8.162
BUS GIS BNDRA NUSA DUA 150.00 0.244 -1.886 1.901 0.403 -2.508 2.540 1.820 0.259 1.838 -1.969 1.154 2.282
BUS GIS PSNGGRAN 1 20.00 0.451 -7.566 7.579 0.495 -9.326 9.339 6.940 0.430 6.953 6.560 5.669 8.671
BUS GIS PSNGGRAN 2 20.00 0.451 -7.566 7.579 0.495 -9.326 9.339 6.940 0.430 6.953 6.560 5.669 8.671
BUS GIS PSNGGRAN3 20.00 0.451 -7.566 7.579 0.495 -9.326 9.339 6.940 0.430 6.953 6.560 5.669 8.671
BUS GLMNK PMRON 150.00 0.936 -2.480 2.650 0.708 -2.457 2.557 2.339 0.851 2.489 2.038 1.869 2.765
BUS GLNUK 1 20.00 0.737 -5.312 5.363 0.578 -5.850 5.878 4.686 0.606 4.725 4.425 3.740 5.794
BUS GLNUK 2 20.00 0.405 -2.986 3.014 0.359 -3.150 3.170 2.613 0.341 2.635 2.438 1.974 3.137
BUS KAPAL 1 20.00 0.585 -7.102 7.127 0.626 -8.811 8.833 6.450 0.544 6.473 6.049 5.662 8.286
BUS KAPAL 2 20.00 0.585 -7.102 7.127 0.626 -8.811 8.833 6.450 0.544 6.473 6.049 5.662 8.286
BUS KAPAL 3 20.00 0.585 -7.102 7.127 0.626 -8.811 8.833 6.450 0.544 6.473 6.049 5.662 8.286
BUS KAPAL 4 20.00 0.585 -7.102 7.127 0.626 -8.811 8.833 6.450 0.544 6.473 6.049 5.662 8.286
BUS NEGAR 2 20.00 0.499 -3.131 3.170 0.516 -3.881 3.915 2.746 0.436 2.780 2.498 2.898 3.826
BUS NEGARA 1 20.00 0.499 -3.131 3.170 0.516 -3.881 3.915 2.746 0.436 2.780 2.498 2.898 3.826
BUS NUSA DUA 1 20.00 0.492 -7.271 7.287 0.541 -9.025 9.041 6.653 0.468 6.669 6.267 5.618 8.416
BUS NUSA DUA 2 20.00 0.492 -7.271 7.287 0.541 -9.025 9.041 6.653 0.468 6.669 6.267 5.618 8.416
BUS NUSA DUA 3 20.00 0.492 -7.271 7.287 0.541 -9.025 9.041 6.653 0.468 6.669 6.267 5.618 8.416
BUS PADNGSMBIAN 2 20.00 0.532 -6.227 6.250 0.598 -7.915 7.937 5.640 0.497 5.662 5.256 5.297 7.462
BUS PANYNGAN 2 20.00 1.189 -4.821 4.966 1.334 -6.298 6.438 4.253 1.053 4.381 3.565 5.326 6.409
BUS PDNGSMBIAN 1 20.00 0.532 -6.227 6.250 0.598 -7.915 7.937 5.640 0.497 5.662 5.256 5.297 7.462
Project:
ETAP Page: 93
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
BUS PEMARON 2 20.00 1.191 -8.564 8.646 1.032 -10.105 10.158 7.688 0.985 7.751 7.122 6.658 9.749
BUS PEMRON 1 20.00 1.191 -8.564 8.646 1.032 -10.105 10.158 7.688 0.985 7.751 7.122 6.658 9.749
BUS PKLOD GIS BANDARA 150.00 0.243 -1.855 1.871 0.409 -2.414 2.449 1.787 0.257 1.806 -1.953 1.067 2.225
BUS PLTDG 1 11.00 1.094 -17.500 17.534 1.692 -16.666 16.752 16.635 1.194 16.678 -17.019 5.541 17.899
BUS PLTDG 2 11.00 1.410 -22.890 22.933 2.754 -29.424 29.553 22.591 1.751 22.659 -22.819 13.154 26.339
BUS PLTG 4 11.00 1.253 -20.161 20.200 2.266 -23.739 23.847 19.584 1.476 19.640 -19.943 9.727 22.189
BUS PLTGD 3 11.00 1.253 -20.161 20.200 2.266 -23.739 23.847 19.584 1.476 19.640 -19.943 9.727 22.189
Bus PLTU 1 15.00 10.145 -53.496 54.450 11.236 -64.942 65.907 52.547 9.737 53.441 45.199 39.879 60.277
BUS PLTU 2 15.00 10.246 -54.158 55.119 11.522 -66.510 67.500 53.289 9.869 54.195 45.659 41.021 61.380
BUS PLTU 3 15.00 10.332 -54.716 55.683 11.758 -67.805 68.817 53.915 9.979 54.831 46.051 41.966 62.304
BUS SANUR 1 20.00 0.700 -6.576 6.613 0.772 -8.299 8.335 5.978 0.662 6.014 5.530 5.583 7.859
BUS SANUR 2 20.00 0.700 -6.576 6.613 0.772 -8.299 8.335 5.978 0.662 6.014 5.530 5.583 7.859
BUS SANUR 3 20.00 0.700 -6.576 6.613 0.772 -8.299 8.335 5.978 0.662 6.014 5.530 5.583 7.859
BUS SANUR 4 20.00 0.700 -6.576 6.613 0.772 -8.299 8.335 5.978 0.662 6.014 5.530 5.583 7.859
Bus1 150.00 1.376 -2.469 2.827 0.951 -2.457 2.634 2.327 1.264 2.648 1.981 2.267 3.011
Bus2 150.00 1.368 -2.467 2.821 0.947 -2.453 2.629 2.324 1.257 2.643 1.980 2.258 3.003
Bus38 20.00 0.546 -7.167 7.188 0.589 -8.889 8.909 6.524 0.511 6.544 6.132 5.643 8.333
Bus39 20.00 0.546 -7.167 7.188 0.589 -8.889 8.909 6.524 0.511 6.544 6.132 5.643 8.333
Bus40 20.00 0.546 -7.167 7.188 0.589 -8.889 8.909 6.524 0.511 6.544 6.132 5.643 8.333
Bus70 20.00 1.189 -4.821 4.966 1.334 -6.298 6.438 4.253 1.053 4.381 3.565 5.326 6.409
GI AMLPURA 150.00 0.096 -0.365 0.377 0.057 -0.248 0.254 0.322 0.086 0.333 0.302 0.177 0.350
GI ASARI 150.00 0.206 -0.753 0.781 0.120 -0.517 0.531 0.667 0.184 0.692 0.625 0.373 0.728
GI BATURITI 150.00 0.371 -0.977 1.045 0.215 -0.708 0.740 0.869 0.334 0.931 0.796 0.597 0.995
GI BAYUWANGI 150.00 1.429 -2.382 2.778 0.964 -2.342 2.533 2.238 1.311 2.594 1.896 2.259 2.950
GI CLKN BAWANG 150.00 1.127 -3.501 3.678 1.510 -5.404 5.611 3.464 1.083 3.629 2.369 4.641 5.210
GI GIANYAR 150.00 0.294 -1.565 1.593 0.334 -1.639 1.672 1.477 0.301 1.508 1.307 1.007 1.650
GI GLMNUK 150.00 1.400 -2.523 2.886 0.989 -2.545 2.730 2.382 1.290 2.709 2.019 2.337 3.088
GI KAPAL 150.00 0.283 -1.928 1.949 0.338 -2.170 2.196 1.842 0.290 1.865 1.641 1.271 2.076
GI NEGARA 150.00 0.205 -0.740 0.768 0.118 -0.506 0.519 0.656 0.183 0.681 0.614 0.368 0.716
GI NUSA DUA 150.00 0.240 -2.030 2.045 0.399 -2.868 2.895 1.978 0.259 1.995 -2.092 1.472 2.558
GI PADANGSAMBIAN 150.00 0.207 -1.499 1.514 0.219 -1.482 1.498 1.409 0.208 1.424 1.293 0.824 1.533
GI PAYANGAN 150.00 0.357 -0.946 1.011 0.208 -0.683 0.714 0.841 0.322 0.901 0.771 0.576 0.962
GI PEMARON 150.00 0.954 -2.822 2.979 0.838 -3.111 3.221 2.699 0.879 2.839 2.297 2.260 3.222
GI PENSGGARAN 150.00 0.232 -2.215 2.227 0.365 -3.395 3.414 2.184 0.256 2.198 1.833 2.489 3.091
Project:
ETAP Page: 94
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
GI PKLOD 150.00 0.265 -1.967 1.985 0.342 -2.345 2.370 1.891 0.276 1.911 1.669 1.390 2.172
GI SANUR 150.00 0.303 -1.649 1.676 0.365 -1.802 1.838 1.564 0.314 1.595 1.368 1.113 1.764
GIS BANDARA 150.00 0.243 -1.864 1.880 0.408 -2.442 2.476 1.797 0.258 1.815 -1.958 1.092 2.242
GIS PESANGGARAN 150.00 0.232 -2.215 2.227 0.365 -3.395 3.415 2.184 0.256 2.198 1.833 2.490 3.092
GLMNUK-BNYUWNGI 1 150.00 1.374 -2.433 2.794 0.947 -2.399 2.579 2.290 1.262 2.614 1.945 2.236 2.964
GLMNUK-BNYUWNGI 2 150.00 1.348 -2.347 2.706 0.918 -2.267 2.446 2.201 1.235 2.524 1.869 2.148 2.847
GLMNUK-BNYUWNGI 3 150.00 1.382 -2.468 2.829 0.972 -2.449 2.635 2.325 1.271 2.650 1.967 2.270 3.003
GLMNUK-BNYUWNGI 4 150.00 1.027 -1.916 2.174 0.714 -1.679 1.825 1.770 0.928 1.998 1.497 1.584 2.179
Node GLMNK-CLBWNG 150.00 1.125 -3.456 3.634 1.466 -5.207 5.409 3.412 1.079 3.578 2.390 4.363 4.975
NUSA DUA-PSANGGARAN 150.00 0.231 -2.205 2.218 0.369 -3.363 3.383 2.173 0.254 2.188 1.815 2.446 3.045
All fault currents are symmetrical momentary (30 Cycle network) values in rms kA
* LLG fault current is the larger of the two faulted line currents
Project:
ETAP Page: 95
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
BSU BOO 11.000 0.02386 0.38092 0.38167 0.02515 0.31894 0.31993 0.10285 0.71995 0.72726
BUS AMLPURA 1 20.000 1.14082 5.94640 6.05484 1.13737 5.77961 5.89046 0.09988 1.99750 2.00000
BUS AMLPURA 2 20.000 1.07797 5.61515 5.71768 1.07452 5.44836 5.55331 0.03703 1.66625 1.66667
BUS ASARI 1 20.000 0.62042 3.89950 3.94855 0.60453 3.80772 3.85541 0.09988 1.99750 2.00000
BUS ASARI 2 20.000 0.55757 3.56825 3.61155 0.54168 3.47647 3.51842 0.03703 1.66625 1.66667
BUS BATURITI 1 20.000 0.64772 3.87479 3.92856 0.62948 3.79289 3.84477 0.12484 2.49688 2.50000
BUS BATURITI 2 20.000 0.65604 4.04125 4.09416 0.63780 3.95935 4.01039 0.13317 2.66334 2.66667
BUS CLBWNG PRMON 150.000 9.21442 27.41644 28.92346 6.95551 22.55996 23.60785 4.44345 26.95737 27.32113
BUS GIANYAR 1 20.000 0.19703 1.78304 1.79389 0.19358 1.61625 1.62780 0.01851 0.83313 0.83333
BUS GIANYAR 2 20.000 0.19703 1.78304 1.79389 0.19358 1.61625 1.62780 0.01851 0.83313 0.83333
BUS GIS BANDARA 1 20.000 0.12430 1.64514 1.64983 0.12109 1.47513 1.48009 0.01851 0.83313 0.83333
BUS GIS BANDARA 2 20.000 0.12430 1.64514 1.64983 0.12109 1.47513 1.48009 0.01851 0.83313 0.83333
BUS GIS BNDRA NUSA DUA 150.000 5.83962 45.17500 45.55087 5.65922 35.60988 36.05677 4.71425 20.19524 20.73817
BUS GIS PSNGGRAN 1 20.000 0.09059 1.52078 1.52348 0.08747 1.35023 1.35306 0.01851 0.83313 0.83333
BUS GIS PSNGGRAN 2 20.000 0.09059 1.52078 1.52348 0.08747 1.35023 1.35306 0.01851 0.83313 0.83333
BUS GIS PSNGGRAN3 20.000 0.09059 1.52078 1.52348 0.08747 1.35023 1.35306 0.01851 0.83313 0.83333
BUS GLMNK PMRON 150.000 11.54123 30.56891 32.67504 9.05932 26.05861 27.58844 7.52941 41.01820 41.70354
BUS GLNUK 1 20.000 0.29588 2.13276 2.15319 0.24684 2.06529 2.07999 0.03703 1.66625 1.66667
BUS GLNUK 2 20.000 0.51502 3.79667 3.83144 0.46598 3.72920 3.75820 0.25617 3.33016 3.34000
BUS KAPAL 1 20.000 0.13304 1.61481 1.62028 0.12639 1.46398 1.46942 0.01851 0.83313 0.83333
BUS KAPAL 2 20.000 0.13304 1.61481 1.62028 0.12639 1.46398 1.46942 0.01851 0.83313 0.83333
BUS KAPAL 3 20.000 0.13304 1.61481 1.62028 0.12639 1.46398 1.46942 0.01851 0.83313 0.83333
BUS KAPAL 4 20.000 0.13304 1.61481 1.62028 0.12639 1.46398 1.46942 0.01851 0.83313 0.83333
BUS NEGAR 2 20.000 0.57276 3.59688 3.64220 0.55580 3.50847 3.55222 0.03703 1.66625 1.66667
BUS NEGARA 1 20.000 0.57276 3.59688 3.64220 0.55580 3.50847 3.55222 0.03703 1.66625 1.66667
BUS NUSA DUA 1 20.000 0.10690 1.58093 1.58453 0.10374 1.41063 1.41444 0.01851 0.83313 0.83333
BUS NUSA DUA 2 20.000 0.10690 1.58093 1.58453 0.10374 1.41063 1.41444 0.01851 0.83313 0.83333
BUS NUSA DUA 3 20.000 0.10690 1.58093 1.58453 0.10374 1.41063 1.41444 0.01851 0.83313 0.83333
BUS PADNGSMBIAN 2 20.000 0.15731 1.84079 1.84750 0.15283 1.67795 1.68490 0.01851 0.83313 0.83333
BUS PANYNGAN 2 20.000 0.55691 2.25753 2.32521 0.53992 2.17350 2.23956 0.01851 0.83313 0.83333
BUS PDNGSMBIAN 1 20.000 0.15731 1.84079 1.84750 0.15283 1.67795 1.68490 0.01851 0.83313 0.83333
BUS PEMARON 2 20.000 0.18404 1.32276 1.33550 0.14380 1.23680 1.24513 0.01851 0.83313 0.83333
BUS PEMRON 1 20.000 0.18404 1.32276 1.33550 0.14380 1.23680 1.24513 0.01851 0.83313 0.83333
BUS PKLOD GIS BANDARA 150.000 5.99890 45.89216 46.28258 5.81777 36.33025 36.79312 5.92007 22.38491 23.15452
BUS PLTDG 1 11.000 0.02261 0.36150 0.36220 0.02460 0.29638 0.29740 0.06766 0.47365 0.47846
Project:
ETAP Page: 96
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
BUS PLTDG 2 11.000 0.01703 0.27640 0.27693 0.02049 0.20761 0.20862 0.02255 0.15788 0.15949
BUS PLTG 4 11.000 0.01950 0.31379 0.31440 0.02258 0.24470 0.24574 0.03383 0.23683 0.23923
BUS PLTGD 3 11.000 0.01950 0.31379 0.31440 0.02258 0.24470 0.24574 0.03383 0.23683 0.23923
Bus PLTU 1 15.000 0.02963 0.15627 0.15905 0.02150 0.11972 0.12163 0.01606 0.11245 0.11359
BUS PLTU 2 15.000 0.02921 0.15438 0.15712 0.02119 0.11777 0.11966 0.01530 0.10710 0.10819
BUS PLTU 3 15.000 0.02886 0.15283 0.15553 0.02093 0.11617 0.11805 0.01471 0.10298 0.10403
BUS SANUR 1 20.000 0.18477 1.73639 1.74619 0.18147 1.56886 1.57932 0.01851 0.83313 0.83333
BUS SANUR 2 20.000 0.18477 1.73639 1.74619 0.18147 1.56886 1.57932 0.01851 0.83313 0.83333
BUS SANUR 3 20.000 0.18477 1.73639 1.74619 0.18147 1.56886 1.57932 0.01851 0.83313 0.83333
BUS SANUR 4 20.000 0.18477 1.73639 1.74619 0.18147 1.56886 1.57932 0.01851 0.83313 0.83333
Bus1 150.000 14.90940 26.76314 30.63586 12.13473 23.00357 26.00800 8.57596 42.19838 43.06101
Bus2 150.000 14.88797 26.85018 30.70153 12.11620 23.07873 26.06589 8.59213 42.24994 43.11476
Bus38 20.000 0.12203 1.60184 1.60649 0.11651 1.44498 1.44967 0.01851 0.83313 0.83333
Bus39 20.000 0.12203 1.60184 1.60649 0.11651 1.44498 1.44967 0.01851 0.83313 0.83333
Bus40 20.000 0.12203 1.60184 1.60649 0.11651 1.44498 1.44967 0.01851 0.83313 0.83333
Bus70 20.000 0.55691 2.25753 2.32521 0.53992 2.17350 2.23956 0.01851 0.83313 0.83333
GI AMLPURA 150.000 58.55322 222.12520 229.71300 58.35918 212.74340 220.60270 112.72200 560.81840 572.03460
GI ASARI 150.000 29.28043 106.98730 110.92180 28.38660 101.82460 105.70740 52.95150 267.68300 272.87000
GI BATURITI 150.000 29.41164 77.50763 82.90041 28.38581 72.90031 78.23177 44.38233 185.42970 190.66720
GI BAYUWANGI 150.000 16.04008 26.72959 31.17299 13.18848 23.16855 26.65929 9.80431 44.97363 46.02991
GI CLKN BAWANG 150.000 7.21343 22.41354 23.54571 5.11681 17.03728 17.78906 0.12658 5.14362 5.14517
GI GIANYAR 150.000 10.04151 53.43255 54.36790 9.84747 44.05083 45.13810 11.09541 54.73959 55.85276
GI GLMNUK 150.000 14.56043 26.24107 30.00999 11.80208 22.44560 25.35930 8.11214 40.00441 40.81862
GI KAPAL 150.000 6.44216 43.96967 44.43909 6.06787 35.48520 36.00026 5.72246 37.43872 37.87353
GI NEGARA 150.000 30.13495 108.59780 112.70140 29.18072 103.62470 107.65490 54.45043 274.82130 280.16350
GI NUSA DUA 150.000 4.97188 42.06360 42.35642 4.79388 32.48454 32.83636 2.60115 14.32719 14.56140
GI PADANGSAMBIAN 150.000 7.80702 56.68121 57.21633 7.55541 47.52145 48.11831 9.98260 67.38394 68.11937
GI PAYANGAN 150.000 30.28488 80.12268 85.65523 29.32919 75.39577 80.89948 46.09394 192.49690 197.93860
GI PEMARON 150.000 9.31060 27.54175 29.07293 7.04742 22.70671 23.77521 4.61438 27.62653 28.00924
GI PENSGGARAN 150.000 4.05416 38.68084 38.89272 3.87878 29.08712 29.34460 0.20996 7.88760 7.89039
GI PKLOD 150.000 5.82292 43.24026 43.63057 5.51201 34.41668 34.85527 4.48922 30.83187 31.15697
GI SANUR 150.000 9.35213 50.80855 51.66208 9.16637 41.38469 42.38768 9.52151 46.32784 47.29617
GIS BANDARA 150.000 5.95074 45.67550 46.06150 5.76983 36.11261 36.57064 5.55706 21.72437 22.42385
GIS PESANGGARAN 150.000 4.05414 38.68046 38.89234 3.87875 29.08679 29.34427 0.20675 7.88474 7.88745
GLMNUK-BNYUWNGI 1 150.000 15.23649 26.98985 30.99358 12.45799 23.26251 26.38836 9.31764 43.44511 44.43305
GLMNUK-BNYUWNGI 2 150.000 15.93523 27.74893 31.99898 13.14357 24.07655 27.43052 10.78268 46.62838 47.85887
GLMNUK-BNYUWNGI 3 150.000 14.95568 26.71598 30.61725 12.19036 22.95247 25.98886 9.24725 41.97632 42.98283
Project:
ETAP Page: 97
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal
Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
GLMNUK-BNYUWNGI 4 150.000 18.81602 35.10440 39.82915 16.04260 31.37107 35.23505 20.86760 64.54873 67.83801
Node GLMNK-CLBWNG 150.000 7.37574 22.65762 23.82791 5.26020 17.31289 18.09436 0.38451 6.26000 6.27180
NUSA DUA-PSANGGARAN 150.000 4.07323 38.84031 39.05331 3.89763 29.24728 29.50584 0.41320 8.25780 8.26813