Sie sind auf Seite 1von 97

Project:

ETAP Page: 1
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Electrical Transient Analyzer Program

Short-Circuit Analysis

ANSI Standard
3-Phase, LG, LL, & LLG Fault Currents
30-Cycle Network

Swing V-Control Load Total


Number of Buses: 1 8 66 75

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 45 0 0 50 0 0 95

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total
Number of Machines: 12 1 0 0 37 50

System Frequency: 50.00 Hz

Unit System: Metric

Project Filename: BUDI1

Output Filename: C:\Users\user\Videos\FORMAT\BUDI1\Untitled.SA2


Project:
ETAP Page: 2
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: Yes Individual

Transmission Line Length: Yes Individual

Cable Length: Yes Individual

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


Project:
ETAP Page: 3
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

BSU BOO Gen. 11.000 11.000 1 100.00 30.00

BUS AMLPURA 1 Load 20.000 20.000 1 100.00 -30.00

BUS AMLPURA 2 Load 20.000 20.000 1 100.00 -30.00

BUS ASARI 1 Load 20.000 20.000 1 100.00 -30.00

BUS ASARI 2 Load 20.000 20.000 1 100.00 -30.00

BUS BATURITI 1 Load 20.000 20.000 1 100.00 -30.00

BUS BATURITI 2 Load 20.000 20.000 1 100.00 -30.00

BUS CLBWNG PRMON Load 150.000 150.000 1 100.00 0.00

BUS GIANYAR 1 Load 20.000 20.000 1 100.00 -30.00

BUS GIANYAR 2 Load 20.000 20.000 1 100.00 -30.00

BUS GIS BANDARA 1 Load 20.000 20.000 1 100.00 -30.00

BUS GIS BANDARA 2 Load 20.000 20.000 1 100.00 -30.00

BUS GIS BNDRA NUSA DUA Load 150.000 150.000 1 100.00 0.00

BUS GIS PSNGGRAN 1 Load 20.000 20.000 1 100.00 -30.00

BUS GIS PSNGGRAN 2 Load 20.000 20.000 1 100.00 -30.00

BUS GIS PSNGGRAN3 Load 20.000 20.000 1 100.00 -30.00

BUS GLMNK PMRON Load 150.000 150.000 1 100.00 0.00

BUS GLNUK 1 Load 20.000 20.000 1 100.00 -30.00

BUS GLNUK 2 Load 20.000 20.000 1 100.00 -30.00

BUS KAPAL 1 Load 20.000 20.000 1 100.00 -30.00

BUS KAPAL 2 Load 20.000 20.000 1 100.00 -30.00

BUS KAPAL 3 Load 20.000 20.000 1 100.00 -30.00

BUS KAPAL 4 Load 20.000 20.000 1 100.00 -30.00

BUS NEGAR 2 Load 20.000 20.000 1 100.00 -30.00

BUS NEGARA 1 Load 20.000 20.000 1 100.00 -30.00

BUS NUSA DUA 1 Load 20.000 20.000 1 100.00 -30.00

BUS NUSA DUA 2 Load 20.000 20.000 1 100.00 -30.00

BUS NUSA DUA 3 Load 20.000 20.000 1 100.00 -30.00

BUS PADNGSMBIAN 2 Load 20.000 20.000 1 100.00 -30.00

BUS PANYNGAN 2 Load 20.000 20.000 1 100.00 -30.00

BUS PDNGSMBIAN 1 Load 20.000 20.000 1 100.00 -30.00

BUS PEMARON 2 Load 20.000 20.000 1 100.00 -30.00

BUS PEMRON 1 Load 20.000 20.000 1 100.00 -30.00

BUS PKLOD GIS BANDARA Load 150.000 150.000 1 100.00 0.00

BUS PLTDG 1 Gen. 11.000 11.000 1 100.00 -30.00


Project:
ETAP Page: 4
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

BUS PLTDG 2 Gen. 11.000 11.000 1 100.00 30.00

BUS PLTG 4 Gen. 11.000 11.000 1 100.00 30.00

BUS PLTGD 3 Gen. 11.000 11.000 1 100.00 30.00

Bus PLTU 1 Gen. 15.000 11.000 1 102.47 30.00

BUS PLTU 2 Gen. 15.000 11.000 1 100.00 30.00

BUS PLTU 3 Gen. 15.000 11.000 1 100.00 30.00

BUS SANUR 1 Load 20.000 20.000 1 100.00 -30.00

BUS SANUR 2 Load 20.000 20.000 1 100.00 -30.00

BUS SANUR 3 Load 20.000 20.000 1 100.00 -30.00

BUS SANUR 4 Load 20.000 20.000 1 100.00 -30.00

Bus1 Load 150.000 150.000 1 100.00 0.00

Bus2 Load 150.000 150.000 1 100.00 0.00

Bus38 Load 20.000 20.000 1 100.00 -30.00

Bus39 Load 20.000 20.000 1 100.00 -30.00

Bus40 Load 20.000 20.000 1 100.00 -30.00

Bus70 Load 20.000 20.000 1 100.00 -30.00

GI AMLPURA Load 150.000 150.000 1 100.00 0.00

GI ASARI Load 150.000 150.000 1 100.00 0.00

GI BATURITI Load 150.000 150.000 1 100.00 0.00

GI BAYUWANGI SWNG 150.000 150.000 1 100.00 0.00

GI CLKN BAWANG Load 150.000 150.000 1 100.00 0.00

GI GIANYAR Load 150.000 150.000 1 100.00 0.00

GI GLMNUK Load 150.000 150.000 1 100.00 0.00

GI KAPAL Load 150.000 150.000 1 100.00 0.00

GI NEGARA Load 150.000 150.000 1 100.00 0.00

GI NUSA DUA Load 150.000 150.000 1 100.00 0.00

GI PADANGSAMBIAN Load 150.000 150.000 1 100.00 0.00

GI PAYANGAN Load 150.000 150.000 1 100.00 0.00

GI PEMARON Load 150.000 150.000 1 100.00 0.00

GI PENSGGARAN Load 150.000 150.000 1 100.00 0.00

GI PKLOD Load 150.000 150.000 1 100.00 0.00

GI SANUR Load 150.000 150.000 1 100.00 0.00

GIS BANDARA Load 150.000 150.000 1 100.00 0.00

GIS PESANGGARAN Load 150.000 150.000 1 100.00 0.00

GLMNUK-BNYUWNGI 1 Load 150.000 150.000 1 100.00 0.00

GLMNUK-BNYUWNGI 2 Load 150.000 150.000 1 100.00 0.00

GLMNUK-BNYUWNGI 3 Load 150.000 150.000 1 100.00 0.00


Project:
ETAP Page: 5
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

GLMNUK-BNYUWNGI 4 Load 150.000 150.000 1 100.00 0.00

Node GLMNK-CLBWNG Load 150.000 150.000 1 100.00 0.00

NUSA DUA-PSANGGARAN Load 150.000 150.000 1 100.00 0.00

75 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP .
Project:
ETAP Page: 6
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Line/Cable Input Data

Ohms or Siemens per 1000 m per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R1 X1 Y1 R0 X0 Y0


GIS BDRA NUSA DUA 150MCUN3 1000 2300.0 0.0 1 75 0.05152 0.2392 0.000194 0.39652 0.7176

GIS PSGGRN-GI PSGGRN 1 150MCUN3 1000 150.0 0.0 1 75 0.00336 0.0156 0.0000127 0.2016 0.17466

GIS PSGGRN-GI PSGGRN 6 150MCUN3 1000 150.0 0.0 1 75 0.00336 0.0156 0.0000127 0.2016 0.17466

PKLOD GIS BNDARA 150NCUN3 1000 2300.0 0.0 1 75 0.0224 0.104 0.0000843 0.1724 0.312

SKLT 1 150NCUS3 300 4470.0 0.0 1 75 0.087 0.131 0.0000752 0.237 0.393

SKLT_2 150NCUS3 300 4470.0 0.0 1 75 0.38889 0.58557 0.000336 1.05939 1.75671

SKLT 3 150NCUN3 400 6500.0 0.0 1 75 0.0565 0.1125 0.00008 0.2065 0.3375

SKLT 4 150NCUN3 400 6500.0 0.0 1 75 0.918125 1.828125 0.0013 3.355625 5.484375

XLPE 170NCUN3 1200 7075.0 0.0 1 75 0.0026148 0.0230389 0.0000021 0.029241 0.0529187

ASARI-KAPAL 1 240 23300.0 0.0 1 75 3.19347 11.1048 0.0001534 6.68997 33.3144

BATURITI-PYNGN 160 21910.0 0.0 1 75 0.2140977 0.4565267 0.0000034 0.3641661 1.469466

BNYWNGI-GLNUK 281. 7990.0 0.0 1 75 0.137 0.4759199 0.0000035 0.287 1.42776

BTRITI-KAPAL 160 38170.0 0.0 1 75 8.16838 18.688 0.0001287 13.8938 56.064

CLBWANG-KAPL 2 820 70400.0 0.0 1 75 4.45632 21.8042 0.0002617 15.0163 65.4128

CLBWANG-KAPL 3 820 70400.0 0.0 1 75 4.45632 21.8042 0.0002617 15.0163 65.4128

CLBWANG-PMRON A 480 27230.0 0.0 1 75 0.0387 0.3368399 0.0000048 0.1887 1.010518

CLBWANG-PMRON A2 480 27230.0 0.0 1 75 0.0387 0.3368399 0.0000048 0.1887 1.010518

CLBWG-PMRON B 820 1220.0 0.0 1 75 0.0632951 0.3096393 0.0000037 0.2132951 0.9291639

GIANYAR SANUR 1 240 16500.0 0.0 1 75 0.137 0.4764 0.0000035 0.287 1.4292

GIANYAR SANUR 3 240 16500.0 0.0 1 75 0.137 0.4764 0.0000035 0.287 1.4292

GIS BNDRA NUSA DUA 240 7200.0 0.0 1 75 0.1266889 0.4652403 0.0000035 0.31 0.8607598

GLMNUK-NEGARA 1 240 38000.0 0.0 1 75 3.238264 11.26061 0.0000804 6.783758 33.7819

GLMNUK-NEGARA 2 240 38000.0 0.0 1 75 3.238264 11.26061 0.0000804 6.783758 33.7819

GLNK-CLBWNG A 620 48600.0 0.0 1 75 0.1103586 0.3678477 0.0000049 0.2603745 1.103185

GLNK-PMRON A 620 48600.0 0.0 1 75 0.1103586 0.3678477 0.0000049 0.2603745 1.103185

GLNUK-CLBWNG 820 1220.0 0.0 1 75 0.0632951 0.3096393 0.0000037 0.2132951 0.9291639

GNYAR -AMLPURA 1 240 33760.0 0.0 1 75 2.873917 9.993638 0.0000725 6.020534 29.98097

GNYAR -AMLPURA 3 240 33760.0 0.0 1 75 2.873917 9.993638 0.0000725 6.020534 29.98097

KAPAL PKLOD 2 310 11200.0 0.0 1 75 0.0896 0.4942071 0.0000034 0.2396 1.482625

KAPAL-GIANYAR 1 240 19220.0 0.0 1 75 2.63314 9.15641 0.0000666 5.51614 27.4692

KAPAL-GIANYAR 4 240 19220.0 0.0 1 75 2.63314 9.15641 0.0000666 5.51614 27.4692

KAPAL-PAYNGAN 160 21480.0 0.0 1 75 2.85627 6.534712 0.000045 4.858327 19.60414

KAPAL-PKLOD 1 310 11200.0 0.0 1 75 0.6235585 3.439364 0.0000233 1.667462 10.31812


Project:
ETAP Page: 7
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Ohms or Siemens per 1000 m per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R1 X1 Y1 R0 X0 Y0


Line2 281. 12858.7 0.0 1 75 0.0851278 0.2957229 0.0000021 0.1783335 0.8871687

Line3 240 11500.0 0.0 1 75 0.1266904 0.46524 0.0000035 0.31 0.86076

Line4 160 11500.0 0.0 1 75 0.9053006 3.324497 0.0000253 2.215189 6.150792

Line5 240 1720.0 0.0 1 75 0.137 0.4759186 0.0000034 0.287 1.427756

Line6 160 1720.0 0.0 1 75 0.137 0.4759186 0.0000034 0.287 1.427756

Line23 240 23300.0 0.0 1 75 3.19347 11.1048 0.0001534 6.68997 33.3144

Line40 310 9970.0 0.0 1 75 0.89331 4.92725 0.0000334 2.38881 14.7817

NEGARA-ASARI 1 240 44400.0 0.0 1 75 0.137 0.4764009 0.0000035 0.287 1.4292

NEGARA-ASARI 2 240 44400.0 0.0 1 75 0.137 0.4764009 0.0000035 0.287 1.4292

PDNGSMBIAN-GISPSNGGRA 310 7760.0 0.0 1 75 0.69529 3.83504 0.000026 1.85929 11.5052


N
PKLOD GIS BANDARA 240 19900.0 0.0 1 75 2.52113 9.25828 0.0000704 6.169 17.129

PKLOD GIS PENGGARAN 310 4700.0 0.0 1 75 0.42112 2.32277 0.0000157 1.12612 6.96833

PMRON BATURITI 1 160 20430.0 0.0 1 75 4.37202 10.0025 0.0000689 7.43652 30.0072

PMRON BATURITI 3 160 20430.0 0.0 1 75 4.37202 10.0025 0.0000689 7.43652 30.0072

SANUR PESNGGARAN 2 135 7750.0 0.0 1 75 1.6554 3.7944 0.0000257 2.8179 11.3832

SANUR PESNGGARAN 3 135 7750.0 0.0 1 75 1.6554 3.7944 0.0000257 2.8179 11.3832

XLPE-SUTT 240 7400.0 0.0 1 75 0.1232649 0.4526662 0.0000034 0.3016216 0.8374959


PSNGRN-NUSDUA

Line / Cable resistances are listed at the specified temperatures.


Project:
ETAP Page: 8
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

TRAF PLTDG 1 70.000 11.000 150.000 12.50 45.00 0 0 0 0 0 12.5000 YNd 30.000

TRAFO AMLPURA 1 20.000 150.000 20.000 10.00 20.00 0 0 0 0 0 10.0000 Dyn 30.000

TRAFO AMLPURA 2 30.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO ASARI 1 20.000 150.000 20.000 10.00 20.00 0 0 0 0 0 10.0000 Dyn 30.000

TRAFO ASARI 2 30.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO BANDARA 1 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO BANDARA 2 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO BATURITI 1 16.000 150.000 20.000 10.00 20.00 0 0 0 0 0 10.0000 Dyn 30.000

TRAFO BATURITI 2 15.000 150.000 20.000 10.00 20.00 0 0 0 0 0 10.0000 Dyn 30.000

TRAFO BOO 70.000 11.000 150.000 12.50 45.00 0 0 0 0 0 12.5000 YNd -30.000

TRAFO GIANYAR 1 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO GIANYAR 2 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO GIS PESANGGARAN 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
1
TRAFO GIS PESANGGARAN 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
2
TRAFO GIS PESANGGARAN 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000
3
TRAFO GLNUK 1 30.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO GLNUK 2 10.000 150.000 20.000 8.35 13.00 0 0 0 0 0 8.3500 Dyn 30.000

TRAFO KAPAL 1 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO KAPAL 2 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO KAPAL 3 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO KAPAL 4 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO NEGARA 1 30.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO NEGARA 2 30.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO NSADUA 1 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO NSADUA 2 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO NSADUA 3 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO PANYNGN 2 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO PBIAN 1 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO PBIAN 2 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO PEMARON 2 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO PKLOD 1 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO PKLOD 2 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO PKLOD 3 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO PLTDG 2 70.000 11.000 150.000 12.50 45.00 0 0 0 0 0 12.5000 YNd -30.000
Project:
ETAP Page: 9
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

TRAFO PLTDG 3 70.000 11.000 150.000 12.50 45.00 0 0 0 0 0 12.5000 YNd -30.000

TRAFO PLTDG 4 70.000 11.000 150.000 12.50 45.00 0 0 0 0 0 12.5000 YNd -30.000

TRAFO PLTU 1 180.000 11.000 150.000 12.50 45.00 0 0 0 0 0 12.5000 YNd -30.000

TRAFO PLTU 2 180.000 11.000 150.000 12.50 45.00 0 0 0 0 0 12.5000 YNd -30.000

TRAFO PLTU 3 180.000 11.000 150.000 12.50 45.00 0 0 0 0 0 12.5000 YNd -30.000

TRAFO PMRON 1 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO SANUR 1 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO SANUR 2 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO SANUR 3 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAFO SANUR 4 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

TRAGO PYNGN 1 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 30.000

2-Winding Transformer Grounding Input Data

Grounding

Transformer Rating Conn. Primary Secondary


ID MVA Prim. kV Sec. kV Type Type kV Amp Ohm Type kV Amp Ohm

TRAF PLTDG 1 70.000 11.000 150.000 D/Y Solid

TRAFO AMLPURA 1 20.000 150.000 20.000 D/Y Solid

TRAFO AMLPURA 2 30.000 150.000 20.000 D/Y Solid

TRAFO ASARI 1 20.000 150.000 20.000 D/Y Solid

TRAFO ASARI 2 30.000 150.000 20.000 D/Y Solid

TRAFO BANDARA 1 60.000 150.000 20.000 D/Y Solid

TRAFO BANDARA 2 60.000 150.000 20.000 D/Y Solid

TRAFO BATURITI 1 16.000 150.000 20.000 D/Y Solid

TRAFO BATURITI 2 15.000 150.000 20.000 D/Y Solid

TRAFO BOO 70.000 11.000 150.000 D/Y Solid

TRAFO GIANYAR 1 60.000 150.000 20.000 D/Y Solid

TRAFO GIANYAR 2 60.000 150.000 20.000 D/Y Solid

TRAFO GIS PESANGGARAN 60.000 150.000 20.000 D/Y Solid


1
TRAFO GIS PESANGGARAN 60.000 150.000 20.000 D/Y Solid
2
TRAFO GIS PESANGGARAN 60.000 150.000 20.000 D/Y Solid
3
TRAFO GLNUK 1 30.000 150.000 20.000 D/Y Solid

TRAFO GLNUK 2 10.000 150.000 20.000 D/Y Solid

TRAFO KAPAL 1 60.000 150.000 20.000 D/Y Solid


Project:
ETAP Page: 10
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

2-Winding Transformer Grounding Input Data

Grounding

Transformer Rating Conn. Primary Secondary


ID MVA Prim. kV Sec. kV Type Type kV Amp Ohm Type kV Amp Ohm

TRAFO KAPAL 2 60.000 150.000 20.000 D/Y Solid

TRAFO KAPAL 3 60.000 150.000 20.000 D/Y Solid

TRAFO KAPAL 4 60.000 150.000 20.000 D/Y Solid

TRAFO NEGARA 1 30.000 150.000 20.000 D/Y Solid

TRAFO NEGARA 2 30.000 150.000 20.000 D/Y Solid

TRAFO NSADUA 1 60.000 150.000 20.000 D/Y Solid

TRAFO NSADUA 2 60.000 150.000 20.000 D/Y Solid

TRAFO NSADUA 3 60.000 150.000 20.000 D/Y Solid

TRAFO PANYNGN 2 60.000 150.000 20.000 D/Y Solid

TRAFO PBIAN 1 60.000 150.000 20.000 D/Y Solid

TRAFO PBIAN 2 60.000 150.000 20.000 D/Y Solid

TRAFO PEMARON 2 60.000 150.000 20.000 D/Y Solid

TRAFO PKLOD 1 60.000 150.000 20.000 D/Y Solid

TRAFO PKLOD 2 60.000 150.000 20.000 D/Y Solid

TRAFO PKLOD 3 60.000 150.000 20.000 D/Y Solid

TRAFO PLTDG 2 70.000 11.000 150.000 D/Y Solid

TRAFO PLTDG 3 70.000 11.000 150.000 D/Y Solid

TRAFO PLTDG 4 70.000 11.000 150.000 D/Y Solid

TRAFO PLTU 1 180.000 11.000 150.000 D/Y Solid

TRAFO PLTU 2 180.000 11.000 150.000 D/Y Solid

TRAFO PLTU 3 180.000 11.000 150.000 D/Y Solid

TRAFO PMRON 1 60.000 150.000 20.000 D/Y Solid

TRAFO SANUR 1 60.000 150.000 20.000 D/Y Solid

TRAFO SANUR 2 60.000 150.000 20.000 D/Y Solid

TRAFO SANUR 3 60.000 150.000 20.000 D/Y Solid

TRAFO SANUR 4 60.000 150.000 20.000 D/Y Solid

TRAGO PYNGN 1 60.000 150.000 20.000 D/Y Solid


Project:
ETAP Page: 11
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

TRAF PLTDG 1 2W XFMR BUS PLTDG 1 GI PENSGGARAN 0.40 17.85 17.86

TRAFO AMLPURA 1 2W XFMR GI AMLPURA BUS AMLPURA 1 2.50 49.94 50.00

TRAFO AMLPURA 2 2W XFMR GI AMLPURA BUS AMLPURA 2 0.93 41.66 41.67

TRAFO ASARI 1 2W XFMR GI ASARI BUS ASARI 1 2.50 49.94 50.00

TRAFO ASARI 2 2W XFMR GI ASARI BUS ASARI 2 0.93 41.66 41.67

TRAFO BANDARA 1 2W XFMR GIS BANDARA BUS GIS BANDARA 1 0.46 20.83 20.83

TRAFO BANDARA 2 2W XFMR GIS BANDARA BUS GIS BANDARA 2 0.46 20.83 20.83

TRAFO BATURITI 1 2W XFMR GI BATURITI BUS BATURITI 1 3.12 62.42 62.50

TRAFO BATURITI 2 2W XFMR GI BATURITI BUS BATURITI 2 3.33 66.58 66.67

TRAFO BOO 2W XFMR BSU BOO GIS PESANGGARAN 0.40 17.85 17.86

TRAFO GIANYAR 1 2W XFMR GI GIANYAR BUS GIANYAR 1 0.46 20.83 20.83

TRAFO GIANYAR 2 2W XFMR GI GIANYAR BUS GIANYAR 2 0.46 20.83 20.83

TRAFO GIS PESANGGARAN 2W XFMR GIS PESANGGARAN BUS GIS PSNGGRAN 1 0.46 20.83 20.83
1
TRAFO GIS PESANGGARAN 2W XFMR GIS PESANGGARAN BUS GIS PSNGGRAN 2 0.46 20.83 20.83
2
TRAFO GIS PESANGGARAN 2W XFMR GIS PESANGGARAN BUS GIS PSNGGRAN3 0.46 20.83 20.83
3
TRAFO GLNUK 1 2W XFMR GI GLMNUK BUS GLNUK 1 0.93 41.66 41.67

TRAFO GLNUK 2 2W XFMR GI GLMNUK BUS GLNUK 2 6.40 83.25 83.50

TRAFO KAPAL 1 2W XFMR GI KAPAL BUS KAPAL 1 0.46 20.83 20.83

TRAFO KAPAL 2 2W XFMR GI KAPAL BUS KAPAL 2 0.46 20.83 20.83

TRAFO KAPAL 3 2W XFMR GI KAPAL BUS KAPAL 3 0.46 20.83 20.83

TRAFO KAPAL 4 2W XFMR GI KAPAL BUS KAPAL 4 0.46 20.83 20.83

TRAFO NEGARA 1 2W XFMR GI NEGARA BUS NEGARA 1 0.93 41.66 41.67

TRAFO NEGARA 2 2W XFMR GI NEGARA BUS NEGAR 2 0.93 41.66 41.67

TRAFO NSADUA 1 2W XFMR GI NUSA DUA BUS NUSA DUA 1 0.46 20.83 20.83

TRAFO NSADUA 2 2W XFMR GI NUSA DUA BUS NUSA DUA 2 0.46 20.83 20.83

TRAFO NSADUA 3 2W XFMR GI NUSA DUA BUS NUSA DUA 3 0.46 20.83 20.83

TRAFO PANYNGN 2 2W XFMR GI PAYANGAN BUS PANYNGAN 2 0.46 20.83 20.83

TRAFO PBIAN 1 2W XFMR GI PADANGSAMBIAN BUS PDNGSMBIAN 1 0.46 20.83 20.83

TRAFO PBIAN 2 2W XFMR GI PADANGSAMBIAN BUS PADNGSMBIAN 2 0.46 20.83 20.83

TRAFO PEMARON 2 2W XFMR GI PEMARON BUS PEMARON 2 0.46 20.83 20.83

TRAFO PKLOD 1 2W XFMR GI PKLOD Bus38 0.46 20.83 20.83

TRAFO PKLOD 2 2W XFMR GI PKLOD Bus39 0.46 20.83 20.83

TRAFO PKLOD 3 2W XFMR GI PKLOD Bus40 0.46 20.83 20.83

TRAFO PLTDG 2 2W XFMR BUS PLTDG 2 GI PENSGGARAN 0.40 17.85 17.86

TRAFO PLTDG 3 2W XFMR BUS PLTGD 3 GIS PESANGGARAN 0.40 17.85 17.86
Project:
ETAP Page: 12
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

TRAFO PLTDG 4 2W XFMR BUS PLTG 4 GIS PESANGGARAN 0.40 17.85 17.86

TRAFO PLTU 1 2W XFMR Bus PLTU 1 GI CLKN BAWANG 0.15 6.94 6.94

TRAFO PLTU 2 2W XFMR BUS PLTU 2 GI CLKN BAWANG 0.15 6.94 6.94

TRAFO PLTU 3 2W XFMR BUS PLTU 3 GI CLKN BAWANG 0.15 6.94 6.94

TRAFO PMRON 1 2W XFMR GI PEMARON BUS PEMRON 1 0.46 20.83 20.83

TRAFO SANUR 1 2W XFMR GI SANUR BUS SANUR 1 0.46 20.83 20.83

TRAFO SANUR 2 2W XFMR GI SANUR BUS SANUR 2 0.46 20.83 20.83

TRAFO SANUR 3 2W XFMR GI SANUR BUS SANUR 3 0.46 20.83 20.83

TRAFO SANUR 4 2W XFMR GI SANUR BUS SANUR 4 0.46 20.83 20.83

TRAGO PYNGN 1 2W XFMR GI PAYANGAN Bus70 0.46 20.83 20.83

GIS BDRA NUSA DUA Cable GIS BANDARA BUS GIS BNDRA NUSA DUA 0.05 0.24 0.25 10.0395000

GIS PSGGRN-GI PSGGRN 1 Cable GI PENSGGARAN GIS PESANGGARAN 0.00 0.00 0.00 0.0428625

GIS PSGGRN-GI PSGGRN 6 Cable GI PENSGGARAN GIS PESANGGARAN 0.00 0.00 0.00 0.0428625

PKLOD GIS BNDARA Cable BUS PKLOD GIS BANDARA GIS BANDARA 0.02 0.11 0.11 4.3650000

SKLT 1 Cable GLMNUK-BNYUWNGI 1 Bus1 0.17 0.26 0.31 7.5600000

SKLT_2 Cable GLMNUK-BNYUWNGI 2 Bus2 0.77 1.16 1.40 33.7932000

SKLT 3 Cable GLMNUK-BNYUWNGI 3 GI GLMNUK 0.16 0.33 0.36 11.7000000

SKLT 4 Cable GLMNUK-BNYUWNGI 4 GI GLMNUK 2.65 5.28 5.91 190.1250000

XLPE Cable NUSA DUA-PSANGGARAN GIS PESANGGARAN 0.01 0.07 0.07 0.3420000

ASARI-KAPAL 1 Line GI ASARI GI KAPAL 33.07 115.00 119.66 80.4440700

BATURITI-PYNGN Line GI BATURITI GI PAYANGAN 2.08 4.45 4.91 1.6624800

BNYWNGI-GLNUK Line GI BAYUWANGI GLMNUK-BNYUWNGI 1 0.49 1.69 1.76 0.6213015

BTRITI-KAPAL Line GI BATURITI GI KAPAL 138.57 317.03 345.99 110.4990000

CLBWANG-KAPL 2 Line GI CLKN BAWANG GI KAPAL 139.43 682.23 696.33 414.5629000

CLBWANG-KAPL 3 Line GI CLKN BAWANG GI KAPAL 139.43 682.23 696.33 414.5629000

CLBWANG-PMRON A Line GI CLKN BAWANG BUS CLBWNG PRMON 0.47 4.08 4.10 2.9557800

CLBWANG-PMRON A2 Line GI PEMARON BUS GLMNK PMRON 0.47 4.08 4.10 2.9557800

CLBWG-PMRON B Line GI PEMARON BUS CLBWNG PRMON 0.03 0.17 0.17 0.1020481

GIANYAR SANUR 1 Line GI GIANYAR GI SANUR 1.00 3.49 3.64 1.2830400

GIANYAR SANUR 3 Line GI GIANYAR GI SANUR 1.00 3.49 3.64 1.2830400

GIS BNDRA NUSA DUA Line BUS GIS BNDRA NUSA DUA GI NUSA DUA 0.41 1.49 1.54 0.5734801

GLMNUK-NEGARA 1 Line GI GLMNUK GI NEGARA 54.69 190.18 197.89 68.7041500

GLMNUK-NEGARA 2 Line GI GLMNUK GI NEGARA 54.69 190.18 197.89 68.7041500

GLNK-CLBWNG A Line Node GLMNK-CLBWNG GI GLMNUK 2.38 7.95 8.30 5.3536050

GLNK-PMRON A Line BUS GLMNK PMRON GI GLMNUK 2.38 7.95 8.30 5.3536050

GLNUK-CLBWNG Line GI CLKN BAWANG Node GLMNK-CLBWNG 0.03 0.17 0.17 0.1020481

GNYAR -AMLPURA 1 Line GI AMLPURA GI GIANYAR 43.12 149.95 156.03 55.0698500

GNYAR -AMLPURA 3 Line GI AMLPURA GI GIANYAR 43.12 149.95 156.03 55.0698500

KAPAL PKLOD 2 Line GI KAPAL GI PKLOD 0.45 2.46 2.50 0.8443013


Project:
ETAP Page: 13
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

KAPAL-GIANYAR 1 Line GI KAPAL GI GIANYAR 22.49 78.22 81.39 28.8196400

KAPAL-GIANYAR 4 Line GI KAPAL GI GIANYAR 22.49 78.22 81.39 28.8196400

KAPAL-PAYNGAN Line GI PAYANGAN GI KAPAL 27.27 62.38 68.08 21.7437900

KAPAL-PKLOD 1 Line GI KAPAL GI PKLOD 3.10 17.12 17.40 5.8757950

Line2 Line GI BAYUWANGI GLMNUK-BNYUWNGI 2 0.49 1.69 1.76 0.6213015

Line3 Line GI BAYUWANGI GLMNUK-BNYUWNGI 3 0.65 2.38 2.46 0.9157500

Line4 Line GI BAYUWANGI GLMNUK-BNYUWNGI 4 4.63 16.99 17.61 6.5437380

Line5 Line Bus1 GI GLMNUK 0.10 0.36 0.38 0.1304500

Line6 Line Bus2 GI GLMNUK 0.10 0.36 0.38 0.1304500

Line23 Line GI ASARI GI KAPAL 33.07 115.00 119.66 80.4440700

Line40 Line GI KAPAL GI PADANGSAMBIAN 3.96 21.83 22.19 7.4932180

NEGARA-ASARI 1 Line GI NEGARA GI ASARI 2.70 9.40 9.78 3.4525350

NEGARA-ASARI 2 Line GI NEGARA GI ASARI 2.70 9.40 9.78 3.4525350

PDNGSMBIAN-GISPSNGGRA Line GI PADANGSAMBIAN GIS PESANGGARAN 2.40 13.23 13.44 4.5394430


N
PKLOD GIS BANDARA Line GI PKLOD BUS PKLOD GIS BANDARA 22.30 81.88 84.87 31.5421900

PKLOD GIS PENGGARAN Line GI PKLOD GIS PESANGGARAN 0.88 4.85 4.93 1.6652350

PMRON BATURITI 1 Line GI PEMARON GI BATURITI 39.70 90.82 99.12 31.6557500

PMRON BATURITI 3 Line GI PEMARON GI BATURITI 39.70 90.82 99.12 31.6557500

SANUR PESNGGARAN 2 Line GI SANUR GIS PESANGGARAN 5.70 13.07 14.26 4.4855880

SANUR PESNGGARAN 3 Line GI SANUR GIS PESANGGARAN 5.70 13.07 14.26 4.4855880

XLPE-SUTT Line GI NUSA DUA NUSA DUA-PSANGGARAN 0.41 1.49 1.54 0.5734800
PSNGRN-NUSDUA
Project:
ETAP Page: 14
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Power Grid Input Data

% Positive Seq. Impedance % Zero Seq. Impedance


Power Grid Connected Bus Rating 100 MVA Base Grounding 100 MVA Base
ID ID MVASC kV X/R R X Type X/R R0 X0

U1 GI BAYUWANGI 300.000 150.000 0.20 32.68602 6.53721 Delta 0.20

Total Power Grids (= 1 ) 300.000 MVA

Synchronous Generator Input Data


Positive Seq. Impedance
Synchronous Generator Rating % Xd" Grounding Zero Seq. Impedanc
ID Type MVA kV RPM X"/R %R Adj. Tol. % Xd' Conn. Type Amp X/R % R0 % X0

BOO Turbo 11.765 11.000 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00

PLTDG 2 Turbo 17.882 11.000 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00

PLTDG 4 Turbo 17.882 11.000 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00

PLTDG 5 Turbo 17.882 11.000 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00

PLTDG 6 Turbo 17.882 11.000 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00

PLTDG 8 Turbo 17.882 11.000 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00

PLTDG 9 Turbo 17.882 11.000 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00

PLTDG 10 Turbo 17.882 11.000 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00

PLTDG 11 Turbo 17.882 11.000 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00

PLTU 1 Turbo 147.059 15.370 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00

PLTU 2 Turbo 147.059 15.000 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00

PLTU 3 Turbo 152.941 15.000 1500 19.00 1.000 19.00 0.0 28.00 Wye Solid 19.00 0.368 7.00

Total Connected Synchronous Generators ( = 12 ): 601.882 MVA


Project:
ETAP Page: 15
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Lumped Load Input Data

Lumped Load Motor Loads

Imp.
Lumped Load Rating % Load Loading X/R Ratio (Machine Base) Grounding
ID kVA kV MTR STAT kW kvar X"/R X'/R %R % X" % X' Conn. Type Amp.

AMLPURA 1 13245.0 20.000 80 20 9006.6 5581.8 10.00 10.00 1.538 15.38 23.08 Delta

AMLPURA 2 15890.0 20.000 80 20 10805.2 6696.5 10.00 10.00 1.538 15.38 23.08 Delta

ASARI 1 7500.0 20.000 80 20 5100.0 3160.7 10.00 10.00 1.538 15.38 23.08 Delta

ASARI 2 12600.0 20.000 80 20 8568.0 5310.0 10.00 10.00 1.538 15.38 23.08 Delta

BATURITI 1 8925.0 20.000 80 20 6069.0 3761.2 10.00 10.00 1.538 15.38 23.08 Delta

BATURITI 2 4256.0 20.000 80 20 2894.1 1793.6 10.00 10.00 1.538 15.38 23.08 Delta

GIANAR 2 33875.0 20.000 80 20 23035.0 14275.8 10.00 10.00 1.538 15.38 23.08 Delta

GIANYAR 1 34873.0 20.000 80 20 23713.6 14696.4 10.00 10.00 1.538 15.38 23.08 Delta

GIS BANDARA 1 19006.0 20.000 80 20 12924.1 8009.6 10.00 10.00 1.538 15.38 23.08 Delta

GIS BANDARA 2 20090.0 20.000 80 20 13661.2 8466.5 10.00 10.00 1.538 15.38 23.08 Delta

GLMNUK 2 4054.0 20.000 100 0 4049.8 185.1 10.00 10.00 1.538 15.38 23.08 Delta

GMNUK 1 8601.0 20.000 100 0 7609.7 4008.7 10.00 10.00 1.538 15.38 23.08 Delta

KAPAL 1 16700.0 20.000 80 20 11356.0 7037.8 10.00 10.00 1.538 15.38 23.08 Delta

KAPAL 2 26710.0 20.000 80 20 18162.8 11256.3 10.00 10.00 1.538 15.38 23.08 Delta

KAPAL 3 28850.0 20.000 80 20 19618.0 12158.1 10.00 10.00 1.538 15.38 23.08 Delta

KAPAL 4 39110.0 20.000 80 20 26594.8 16482.0 10.00 10.00 1.538 15.38 23.08 Delta

NEGAR 2 11039.0 20.000 80 20 7506.5 4652.1 10.00 10.00 1.538 15.38 23.08 Delta

NEGARA 1 10754.0 20.000 80 20 7312.7 4532.0 10.00 10.00 1.538 15.38 23.08 Delta

NUSA DUA 1 24123.0 20.000 80 20 16403.6 10166.1 10.00 10.00 1.538 15.38 23.08 Delta

NUSA DUA 2 28670.0 20.000 80 20 19495.6 12082.3 10.00 10.00 1.538 15.38 23.08 Delta

NUSA DUA 3 27103.0 20.000 80 20 18430.0 11421.9 10.00 10.00 1.538 15.38 23.08 Delta

PAYANGAN 2 15682.0 20.000 80 20 10663.8 6608.8 10.00 10.00 1.538 15.38 23.08 Delta

PDNGSMBIAN 1 48108.0 20.000 100 0 40891.8 25342.5 10.00 10.00 1.538 15.38 23.08 Delta

PDNGSMBIAN 2 29408.0 20.000 100 0 24996.8 15491.6 10.00 10.00 1.538 15.38 23.08 Delta

PENGGRAN 1 27510.0 20.000 80 20 18706.8 11593.4 10.00 10.00 1.538 15.38 23.08 Delta

PENGGRAN 2 25101.0 20.000 80 20 17068.7 10578.2 10.00 10.00 1.538 15.38 23.08 Delta

PENGGRAN 3 30965.0 20.000 80 20 21056.2 13049.5 10.00 10.00 1.538 15.38 23.08 Delta

PKLOD 1 29500.0 20.000 80 20 20060.0 12432.1 10.00 10.00 1.538 15.38 23.08 Delta

PKLOD 2 30600.0 20.000 80 20 20808.0 12895.6 10.00 10.00 1.538 15.38 23.08 Delta

PKLOD 3 43710.0 20.000 80 20 29722.8 18420.5 10.00 10.00 1.538 15.38 23.08 Delta

PMRON 1 27775.0 20.000 80 20 18887.0 11705.1 10.00 10.00 1.538 15.38 23.08 Delta
Project:
ETAP Page: 16
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Lumped Load Motor Loads

Imp.
Lumped Load Rating % Load Loading X/R Ratio (Machine Base) Grounding
ID kVA kV MTR STAT kW kvar X"/R X'/R %R % X" % X' Conn. Type Amp.

PMRON 2 19090.0 20.000 80 20 12981.2 8045.0 10.00 10.00 1.538 15.38 23.08 Delta

PYNGAN 1 19473.0 20.000 80 20 13241.6 8206.4 10.00 10.00 1.538 15.38 23.08 Delta

SANUR 1 9758.0 20.000 80 20 6635.4 4112.3 10.00 10.00 1.538 15.38 23.08 Delta

SANUR 2 32202.0 20.000 80 20 21897.4 13570.8 10.00 10.00 1.538 15.38 23.08 Delta

SANUR 3 33515.0 20.000 80 20 22790.2 14124.1 10.00 10.00 1.538 15.38 23.08 Delta

SANUR 4 19932.0 20.000 80 20 13553.8 8399.9 10.00 10.00 1.538 15.38 23.08 Delta

Total Connected Lumped Loads ( = 37 ): 838303.0 kVA


Project:
ETAP Page: 17
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

SHORT- CIRCUIT REPORT

Fault at bus: BSU BOO

Prefault voltage = 11.000 kV = 100.00 % of nominal bus kV ( 11.000 kV)


= 100.00 % of base kV ( 11.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BSU BOO Total 0.00 16.640 0.00 111.04 114.37 13.343 13.343 1.97E+000 3.15E+001 8.50E+000 5.95E+001

GIS PESANGGARAN BSU BOO 49.12 14.437 81.56 82.19 96.28 7.543 0.000 2.42E+000 3.63E+001
BOO BSU BOO 100.00 2.204 100.00 100.00 100.00 5.800 13.343 8.50E+000 2.38E+002 8.50E+000 5.95E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 18
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS AMLPURA 1

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS AMLPURA 1 Total 0.00 1.907 0.00 90.78 85.64 2.487 2.487 2.85E+001 1.49E+002 2.50E+000 4.99E+001

GI AMLPURA BUS AMLPURA 1 33.03 1.907 65.47 98.82 58.13 2.487 2.487 * 2.85E+001 1.49E+002 2.50E+000 4.99E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 19
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS AMLPURA 2

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS AMLPURA 2 Total 0.00 2.020 0.00 90.44 84.79 2.682 2.682 2.69E+001 1.40E+002 9.26E-001 4.17E+001

GI AMLPURA BUS AMLPURA 2 29.15 2.020 63.68 98.72 55.37 2.682 2.682 * 2.69E+001 1.40E+002 9.26E-001 4.17E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 20
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS ASARI 1

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS ASARI 1 Total 0.00 2.924 0.00 93.51 88.59 3.537 3.537 1.55E+001 9.75E+001 2.50E+000 4.99E+001

GI ASARI BUS ASARI 1 50.65 2.924 75.60 99.05 69.42 3.537 3.537 * 1.55E+001 9.75E+001 2.50E+000 4.99E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 21
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS ASARI 2

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS ASARI 2 Total 0.00 3.197 0.00 93.13 87.35 3.943 3.943 1.39E+001 8.92E+001 9.26E-001 4.17E+001

GI ASARI BUS ASARI 2 46.15 3.197 73.47 98.94 66.00 3.943 3.943 * 1.39E+001 8.92E+001 9.26E-001 4.17E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 22
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS BATURITI 1

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS BATURITI 1 Total 0.00 2.939 0.00 96.21 90.40 3.376 3.376 1.62E+001 9.69E+001 3.12E+000 6.24E+001

GI BATURITI BUS BATURITI 1 63.64 2.939 83.72 99.18 76.97 3.376 3.376 * 1.62E+001 9.69E+001 3.12E+000 6.24E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 23
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS BATURITI 2

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS BATURITI 2 Total 0.00 2.820 0.00 96.39 90.78 3.220 3.220 1.64E+001 1.01E+002 3.33E+000 6.66E+001

GI BATURITI BUS BATURITI 2 65.13 2.820 84.46 99.22 77.99 3.220 3.220 * 1.64E+001 1.01E+002 3.33E+000 6.66E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 24
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS CLBWNG PRMON

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS CLBWNG PRMON Total 0.00 2.994 0.00 99.51 92.05 3.262 3.262 4.10E+000 1.22E+001 1.97E+000 1.20E+001

GI CLKN BAWANG BUS CLBWNG 22.15 2.078 44.51 89.34 83.68 2.403 2.612 3.59E+000 1.82E+001 2.33E+000 1.50E+001
PRMON
GI PEMARON BUS CLBWNG 0.43 0.971 0.59 99.47 91.95 0.887 0.650 2.25E+001 3.26E+001 1.21E+001 5.97E+001
PRMON

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 25
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS GIANYAR 1

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS GIANYAR 1 Total 0.00 6.437 0.00 90.37 86.09 8.147 8.147 4.93E+000 4.46E+001 4.63E-001 2.08E+001

GI GIANYAR BUS GIANYAR 1 46.45 6.437 72.65 96.09 67.26 8.147 8.147 * 4.93E+000 4.46E+001 4.63E-001 2.08E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 26
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS GIANYAR 2

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS GIANYAR 2 Total 0.00 6.437 0.00 90.37 86.09 8.147 8.147 4.93E+000 4.46E+001 4.63E-001 2.08E+001

GI GIANYAR BUS GIANYAR 2 46.45 6.437 72.65 96.09 67.26 8.147 8.147 * 4.93E+000 4.46E+001 4.63E-001 2.08E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 27
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS GIS BANDARA 1

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS GIS BANDARA 1 Total 0.00 6.999 0.00 90.05 87.31 8.743 8.743 3.11E+000 4.11E+001 4.63E-001 2.08E+001

GIS BANDARA BUS GIS BANDARA 1 50.51 6.999 74.29 95.71 70.94 8.743 8.743 * 3.11E+000 4.11E+001 4.63E-001 2.08E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 28
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS GIS BANDARA 2

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS GIS BANDARA 2 Total 0.00 6.999 0.00 90.05 87.31 8.743 8.743 3.11E+000 4.11E+001 4.63E-001 2.08E+001

GIS BANDARA BUS GIS BANDARA 2 50.51 6.999 74.29 95.71 70.94 8.743 8.743 * 3.11E+000 4.11E+001 4.63E-001 2.08E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 29
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS GIS BNDRA NUSA DUA

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS GIS BNDRA Total 0.00 1.901 0.00 82.68 85.83 2.540 2.540 2.60E+000 2.01E+001 2.10E+000 8.98E+000
NUSA DUA

GIS BANDARA BUS GIS BNDRA 0.05 0.082 0.11 82.68 85.80 0.101 0.088 9.01E+001 4.59E+002 5.96E+001 2.59E+002
NUSA DUA
GI NUSA DUA BUS GIS BNDRA 7.29 1.819 12.71 82.37 84.13 2.439 2.452 2.65E+000 2.10E+001 2.17E+000 9.30E+000
NUSA DUA

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 30
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS GIS PSNGGRAN 1

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS GIS PSNGGRAN 1 Total 0.00 7.579 0.00 90.24 88.21 9.339 9.339 2.26E+000 3.80E+001 4.63E-001 2.08E+001

GIS PESANGGARAN BUS GIS PSNGGRAN 54.70 7.579 76.57 95.40 74.17 9.339 9.339 * 2.26E+000 3.80E+001 4.63E-001 2.08E+001
1

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 31
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS GIS PSNGGRAN 2

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS GIS PSNGGRAN 2 Total 0.00 7.579 0.00 90.24 88.21 9.339 9.339 2.26E+000 3.80E+001 4.63E-001 2.08E+001

GIS PESANGGARAN BUS GIS PSNGGRAN 54.70 7.579 76.57 95.40 74.17 9.339 9.339 * 2.26E+000 3.80E+001 4.63E-001 2.08E+001
2

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 32
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS GIS PSNGGRAN3

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS GIS PSNGGRAN3 Total 0.00 7.579 0.00 90.24 88.21 9.339 9.339 2.26E+000 3.80E+001 4.63E-001 2.08E+001

GIS PESANGGARAN BUS GIS 54.70 7.579 76.57 95.40 74.17 9.339 9.339 * 2.26E+000 3.80E+001 4.63E-001 2.08E+001
PSNGGRAN3

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 33
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS GLMNK PMRON

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS GLMNK PMRON Total 0.00 2.650 0.00 107.01 98.41 2.557 2.557 5.13E+000 1.36E+001 3.35E+000 1.82E+001

GI PEMARON BUS GLMNK PMRON 16.98 1.593 29.18 99.06 92.11 1.593 1.687 4.06E+000 2.38E+001 4.66E+000 2.77E+001
GI GLMNUK BUS GLMNK PMRON 24.33 1.129 33.63 101.75 91.80 0.994 0.871 2.02E+001 2.75E+001 1.14E+001 5.32E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 34
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS GLNUK 1

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS GLNUK 1 Total 0.00 5.363 0.00 98.08 92.83 5.878 5.878 7.40E+000 5.33E+001 9.26E-001 4.17E+001

GI GLMNUK BUS GLNUK 1 77.40 5.363 91.32 98.78 85.66 5.878 5.878 * 7.40E+000 5.33E+001 9.26E-001 4.17E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 35
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS GLNUK 2

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS GLNUK 2 Total 0.00 3.014 0.00 98.81 96.14 3.170 3.170 1.29E+001 9.49E+001 6.40E+000 8.33E+001

GI GLMNUK BUS GLNUK 2 87.17 3.014 95.05 99.34 92.28 3.170 3.170 * 1.29E+001 9.49E+001 6.40E+000 8.33E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 36
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS KAPAL 1

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS KAPAL 1 Total 0.00 7.127 0.00 90.63 87.67 8.833 8.833 3.33E+000 4.04E+001 4.63E-001 2.08E+001

GI KAPAL BUS KAPAL 1 51.43 7.127 74.99 96.15 71.38 8.833 8.833 * 3.33E+000 4.04E+001 4.63E-001 2.08E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 37
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS KAPAL 2

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS KAPAL 2 Total 0.00 7.127 0.00 90.63 87.67 8.833 8.833 3.33E+000 4.04E+001 4.63E-001 2.08E+001

GI KAPAL BUS KAPAL 2 51.43 7.127 74.99 96.15 71.38 8.833 8.833 * 3.33E+000 4.04E+001 4.63E-001 2.08E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 38
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS KAPAL 3

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS KAPAL 3 Total 0.00 7.127 0.00 90.63 87.67 8.833 8.833 3.33E+000 4.04E+001 4.63E-001 2.08E+001

GI KAPAL BUS KAPAL 3 51.43 7.127 74.99 96.15 71.38 8.833 8.833 * 3.33E+000 4.04E+001 4.63E-001 2.08E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 39
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS KAPAL 4

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS KAPAL 4 Total 0.00 7.127 0.00 90.63 87.67 8.833 8.833 3.33E+000 4.04E+001 4.63E-001 2.08E+001

GI KAPAL BUS KAPAL 4 51.43 7.127 74.99 96.15 71.38 8.833 8.833 * 3.33E+000 4.04E+001 4.63E-001 2.08E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 40
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS NEGAR 2

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS NEGAR 2 Total 0.00 3.170 0.00 93.14 87.28 3.915 3.915 1.43E+001 8.99E+001 9.26E-001 4.17E+001

GI NEGARA BUS NEGAR 2 45.76 3.170 73.30 98.98 65.69 3.915 3.915 * 1.43E+001 8.99E+001 9.26E-001 4.17E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 41
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS NEGARA 1

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS NEGARA 1 Total 0.00 3.170 0.00 93.14 87.28 3.915 3.915 1.43E+001 8.99E+001 9.26E-001 4.17E+001

GI NEGARA BUS NEGARA 1 45.76 3.170 73.30 98.98 65.69 3.915 3.915 * 1.43E+001 8.99E+001 9.26E-001 4.17E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 42
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS NUSA DUA 1

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS NUSA DUA 1 Total 0.00 7.287 0.00 90.15 87.75 9.041 9.041 2.67E+000 3.95E+001 4.63E-001 2.08E+001

GI NUSA DUA BUS NUSA DUA 1 52.59 7.287 75.43 95.56 72.54 9.041 9.041 * 2.67E+000 3.95E+001 4.63E-001 2.08E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 43
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS NUSA DUA 2

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS NUSA DUA 2 Total 0.00 7.287 0.00 90.15 87.75 9.041 9.041 2.67E+000 3.95E+001 4.63E-001 2.08E+001

GI NUSA DUA BUS NUSA DUA 2 52.59 7.287 75.43 95.56 72.54 9.041 9.041 * 2.67E+000 3.95E+001 4.63E-001 2.08E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 44
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS NUSA DUA 3

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS NUSA DUA 3 Total 0.00 7.287 0.00 90.15 87.75 9.041 9.041 2.67E+000 3.95E+001 4.63E-001 2.08E+001

GI NUSA DUA BUS NUSA DUA 3 52.59 7.287 75.43 95.56 72.54 9.041 9.041 * 2.67E+000 3.95E+001 4.63E-001 2.08E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 45
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS PADNGSMBIAN 2

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS PADNGSMBIAN 2 Total 0.00 6.250 0.00 89.63 86.65 7.937 7.937 3.93E+000 4.60E+001 4.63E-001 2.08E+001

GI PADANGSAMBIAN BUS PADNGSMBIAN 45.11 6.250 71.00 96.27 67.20 7.937 7.937 * 3.93E+000 4.60E+001 4.63E-001 2.08E+001
2

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 46
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS PANYNGAN 2

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS PANYNGAN 2 Total 0.00 4.966 0.00 92.40 84.07 6.438 6.438 1.39E+001 5.64E+001 4.63E-001 2.08E+001

GI PAYANGAN BUS PANYNGAN 2 35.84 4.966 69.10 98.41 57.49 6.438 6.438 * 1.39E+001 5.64E+001 4.63E-001 2.08E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 47
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS PDNGSMBIAN 1

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS PDNGSMBIAN 1 Total 0.00 6.250 0.00 89.63 86.65 7.937 7.937 3.93E+000 4.60E+001 4.63E-001 2.08E+001

GI PADANGSAMBIAN BUS PDNGSMBIAN 1 45.11 6.250 71.00 96.27 67.20 7.937 7.937 * 3.93E+000 4.60E+001 4.63E-001 2.08E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 48
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS PEMARON 2

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS PEMARON 2 Total 0.00 8.646 0.00 94.28 89.57 10.158 10.158 4.60E+000 3.31E+001 4.63E-001 2.08E+001

GI PEMARON BUS PEMARON 2 62.40 8.646 82.67 97.38 77.25 10.158 10.158 * 4.60E+000 3.31E+001 4.63E-001 2.08E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 49
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS PEMRON 1

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS PEMRON 1 Total 0.00 8.646 0.00 94.28 89.57 10.158 10.158 4.60E+000 3.31E+001 4.63E-001 2.08E+001

GI PEMARON BUS PEMRON 1 62.40 8.646 82.67 97.38 77.25 10.158 10.158 * 4.60E+000 3.31E+001 4.63E-001 2.08E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 50
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS PKLOD GIS BANDARA

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS PKLOD GIS Total 0.00 1.871 0.00 83.09 87.68 2.449 2.449 2.67E+000 2.04E+001 2.63E+000 9.95E+000
BANDARA

GIS BANDARA BUS PKLOD GIS 0.50 1.783 1.17 83.11 87.29 2.340 2.347 2.73E+000 2.14E+001 2.76E+000 1.04E+001
BANDARA
GI PKLOD BUS PKLOD GIS 19.45 0.088 30.64 83.66 83.73 0.109 0.101 8.41E+001 4.28E+002 5.64E+001 2.42E+002
BANDARA

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 51
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS PLTDG 1

Prefault voltage = 11.000 kV = 100.00 % of nominal bus kV ( 11.000 kV)


= 100.00 % of base kV ( 11.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS PLTDG 1 Total 0.00 17.534 0.00 101.57 104.84 16.752 16.752 1.87E+000 2.99E+001 5.59E+000 3.91E+001

GI PENSGGARAN BUS PLTDG 1 48.26 14.186 78.76 95.28 77.77 8.747 0.000 2.54E+000 3.69E+001
PLTDG 2 BUS PLTDG 1 100.00 3.350 100.00 100.00 100.00 8.005 16.752 5.59E+000 1.57E+002 5.59E+000 3.91E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 52
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS PLTDG 2

Prefault voltage = 11.000 kV = 100.00 % of nominal bus kV ( 11.000 kV)


= 100.00 % of base kV ( 11.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS PLTDG 2 Total 0.00 22.933 0.00 84.83 86.93 29.553 29.553 1.41E+000 2.28E+001 1.86E+000 1.30E+001

GI PENSGGARAN BUS PLTDG 2 43.85 12.890 68.10 70.37 91.81 10.356 0.000 3.32E+000 4.06E+001
PLTDG 4 BUS PLTDG 2 100.00 3.350 100.00 100.00 100.00 6.399 9.851 5.59E+000 1.57E+002 5.59E+000 3.91E+001
PLTDG 5 BUS PLTDG 2 100.00 3.350 100.00 100.00 100.00 6.399 9.851 5.59E+000 1.57E+002 5.59E+000 3.91E+001
PLTDG 6 BUS PLTDG 2 100.00 3.350 100.00 100.00 100.00 6.399 9.851 5.59E+000 1.57E+002 5.59E+000 3.91E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 53
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS PLTG 4

Prefault voltage = 11.000 kV = 100.00 % of nominal bus kV ( 11.000 kV)


= 100.00 % of base kV ( 11.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS PLTG 4 Total 0.00 20.200 0.00 89.72 92.34 23.847 23.847 1.61E+000 2.59E+001 2.80E+000 1.96E+001

GIS PESANGGARAN BUS PLTG 4 45.94 13.504 71.63 73.37 93.27 10.075 0.000 2.92E+000 3.88E+001
PLTDG 10 BUS PLTG 4 100.00 3.350 100.00 100.00 100.00 6.886 11.924 5.59E+000 1.57E+002 5.59E+000 3.91E+001
PLTDG 11 BUS PLTG 4 100.00 3.350 100.00 100.00 100.00 6.886 11.924 5.59E+000 1.57E+002 5.59E+000 3.91E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 54
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS PLTGD 3

Prefault voltage = 11.000 kV = 100.00 % of nominal bus kV ( 11.000 kV)


= 100.00 % of base kV ( 11.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS PLTGD 3 Total 0.00 20.200 0.00 89.72 92.34 23.847 23.847 1.61E+000 2.59E+001 2.80E+000 1.96E+001

GIS PESANGGARAN BUS PLTGD 3 45.94 13.504 71.63 73.37 93.27 10.075 0.000 2.92E+000 3.88E+001
PLTDG 8 BUS PLTGD 3 100.00 3.350 100.00 100.00 100.00 6.886 11.924 5.59E+000 1.57E+002 5.59E+000 3.91E+001
PLTDG 9 BUS PLTGD 3 100.00 3.350 100.00 100.00 100.00 6.886 11.924 5.59E+000 1.57E+002 5.59E+000 3.91E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 55
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: Bus PLTU 1

Prefault voltage = 15.000 kV = 100.00 % of nominal bus kV ( 15.000 kV)


= 136.36 % of base kV ( 11.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus PLTU 1 Total 0.00 54.450 0.00 90.43 88.59 65.907 65.907 2.45E+000 1.29E+001 1.33E+000 9.29E+000

GI CLKN BAWANG Bus PLTU 1 47.03 35.549 85.32 94.78 125.28 27.159 0.000 5.36E+000 1.94E+001
PLTU 1 Bus PLTU 1 97.59 19.242 97.59 97.59 97.59 38.849 65.907 1.33E+000 3.72E+001 1.33E+000 9.29E+000

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 56
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS PLTU 2

Prefault voltage = 15.000 kV = 100.00 % of nominal bus kV ( 15.000 kV)


= 136.36 % of base kV ( 11.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS PLTU 2 Total 0.00 55.119 0.00 89.74 87.89 67.500 67.500 2.41E+000 1.28E+001 1.26E+000 8.85E+000

GI CLKN BAWANG BUS PLTU 2 46.68 35.279 84.56 94.23 125.01 27.219 0.000 5.48E+000 1.95E+001
PLTU 2 BUS PLTU 2 100.00 20.202 100.00 100.00 100.00 40.392 67.500 1.26E+000 3.54E+001 1.26E+000 8.85E+000

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 57
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS PLTU 3

Prefault voltage = 15.000 kV = 100.00 % of nominal bus kV ( 15.000 kV)


= 136.36 % of base kV ( 11.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS PLTU 3 Total 0.00 55.683 0.00 89.20 87.35 68.817 68.817 2.38E+000 1.26E+001 1.22E+000 8.51E+000

GI CLKN BAWANG BUS PLTU 3 46.38 35.054 83.94 93.79 124.79 27.254 0.000 5.58E+000 1.96E+001
PLTU 3 BUS PLTU 3 100.00 21.011 100.00 100.00 100.00 41.684 68.817 1.22E+000 3.40E+001 1.22E+000 8.51E+000

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 58
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS SANUR 1

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS SANUR 1 Total 0.00 6.613 0.00 90.45 86.29 8.335 8.335 4.62E+000 4.34E+001 4.63E-001 2.08E+001

GI SANUR BUS SANUR 1 47.72 6.613 73.38 95.98 68.18 8.335 8.335 * 4.62E+000 4.34E+001 4.63E-001 2.08E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 59
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS SANUR 2

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS SANUR 2 Total 0.00 6.613 0.00 90.45 86.29 8.335 8.335 4.62E+000 4.34E+001 4.63E-001 2.08E+001

GI SANUR BUS SANUR 2 47.72 6.613 73.38 95.98 68.18 8.335 8.335 * 4.62E+000 4.34E+001 4.63E-001 2.08E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 60
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS SANUR 3

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS SANUR 3 Total 0.00 6.613 0.00 90.45 86.29 8.335 8.335 4.62E+000 4.34E+001 4.63E-001 2.08E+001

GI SANUR BUS SANUR 3 47.72 6.613 73.38 95.98 68.18 8.335 8.335 * 4.62E+000 4.34E+001 4.63E-001 2.08E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 61
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: BUS SANUR 4

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS SANUR 4 Total 0.00 6.613 0.00 90.45 86.29 8.335 8.335 4.62E+000 4.34E+001 4.63E-001 2.08E+001

GI SANUR BUS SANUR 4 47.72 6.613 73.38 95.98 68.18 8.335 8.335 * 4.62E+000 4.34E+001 4.63E-001 2.08E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 62
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: Bus1

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus1 Total 0.00 2.827 0.00 113.15 97.15 2.634 2.634 6.63E+000 1.19E+001 3.81E+000 1.88E+001

GLMNUK-BNYUWNG Bus1 0.52 0.646 0.52 113.17 97.07 0.467 0.277 5.12E+001 3.05E+001 5.12E+001 1.75E+002
I1
GI GLMNUK Bus1 2.25 2.291 3.67 111.96 96.40 2.219 2.358 6.02E+000 1.57E+001 4.05E+000 2.10E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 63
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: Bus2

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus2 Total 0.00 2.821 0.00 113.07 97.19 2.629 2.629 6.62E+000 1.19E+001 3.82E+000 1.88E+001

GLMNUK-BNYUWNG Bus2 1.73 0.477 1.78 113.08 96.89 0.351 0.221 7.06E+001 3.90E+001 7.47E+001 2.15E+002
I2
GI GLMNUK Bus2 2.39 2.430 3.81 111.89 96.42 2.320 2.410 6.19E+000 1.46E+001 3.92E+000 2.05E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 64
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: Bus38

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus38 Total 0.00 7.188 0.00 90.45 87.74 8.909 8.909 3.05E+000 4.00E+001 4.63E-001 2.08E+001

GI PKLOD Bus38 51.87 7.188 75.13 95.97 71.84 8.909 8.909 * 3.05E+000 4.00E+001 4.63E-001 2.08E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 65
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: Bus39

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus39 Total 0.00 7.188 0.00 90.45 87.74 8.909 8.909 3.05E+000 4.00E+001 4.63E-001 2.08E+001

GI PKLOD Bus39 51.87 7.188 75.13 95.97 71.84 8.909 8.909 * 3.05E+000 4.00E+001 4.63E-001 2.08E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 66
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: Bus40

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus40 Total 0.00 7.188 0.00 90.45 87.74 8.909 8.909 3.05E+000 4.00E+001 4.63E-001 2.08E+001

GI PKLOD Bus40 51.87 7.188 75.13 95.97 71.84 8.909 8.909 * 3.05E+000 4.00E+001 4.63E-001 2.08E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 67
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: Bus70

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus70 Total 0.00 4.966 0.00 92.40 84.07 6.438 6.438 1.39E+001 5.64E+001 4.63E-001 2.08E+001

GI PAYANGAN Bus70 35.84 4.966 69.10 98.41 57.49 6.438 6.438 * 1.39E+001 5.64E+001 4.63E-001 2.08E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 68
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: GI AMLPURA

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GI AMLPURA Total 0.00 0.377 0.00 121.87 118.24 0.254 0.254 2.60E+001 9.87E+001 5.01E+001 2.49E+002

GI GIANYAR GI AMLPURA 76.41 0.189 84.80 99.73 99.53 0.127 0.127 5.20E+001 1.97E+002 1.00E+002 4.99E+002
GI GIANYAR GI AMLPURA 76.41 0.189 84.80 99.73 99.53 0.127 0.127 5.20E+001 1.97E+002 1.00E+002 4.99E+002
BUS AMLPURA 1 GI AMLPURA 0.00 0.000 68.27 70.36 99.10 0.000 0.000
BUS AMLPURA 2 GI AMLPURA 0.00 0.000 68.27 70.36 99.10 0.000 0.000

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 69
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: GI ASARI

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GI ASARI Total 0.00 0.781 0.00 121.74 117.74 0.531 0.531 1.30E+001 4.75E+001 2.35E+001 1.19E+002

GI KAPAL GI ASARI 72.08 0.232 83.50 98.83 98.57 0.161 0.166 3.92E+001 1.61E+002 7.45E+001 3.80E+002
GI KAPAL GI ASARI 72.08 0.232 83.50 98.83 98.57 0.161 0.166 3.92E+001 1.61E+002 7.45E+001 3.80E+002
GI NEGARA GI ASARI 4.03 0.159 4.28 120.61 116.72 0.104 0.099 7.38E+001 2.31E+002 1.28E+002 6.37E+002
GI NEGARA GI ASARI 4.03 0.159 4.28 120.61 116.72 0.104 0.099 7.38E+001 2.31E+002 1.28E+002 6.37E+002
BUS ASARI 1 GI ASARI 0.00 0.000 67.98 70.29 98.93 0.000 0.000
BUS ASARI 2 GI ASARI 0.00 0.000 67.98 70.29 98.93 0.000 0.000

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 70
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: GI BATURITI

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GI BATURITI Total 0.00 1.045 0.00 121.63 114.38 0.740 0.740 1.31E+001 3.44E+001 1.97E+001 8.24E+001

GI PAYANGAN GI BATURITI 4.78 0.375 5.72 119.77 112.96 0.269 0.273 3.28E+001 9.73E+001 5.31E+001 2.23E+002
GI KAPAL GI BATURITI 71.05 0.079 82.45 98.38 98.25 0.057 0.058 1.55E+002 4.62E+002 2.51E+002 1.05E+003
GI PEMARON GI BATURITI 76.17 0.296 85.31 99.37 98.40 0.207 0.204 4.97E+001 1.20E+002 7.17E+001 2.98E+002
GI PEMARON GI BATURITI 76.17 0.296 85.31 99.37 98.40 0.207 0.204 4.97E+001 1.20E+002 7.17E+001 2.98E+002
BUS BATURITI 1 GI BATURITI 0.00 0.000 66.04 70.22 98.66 0.000 0.000
BUS BATURITI 2 GI BATURITI 0.00 0.000 66.04 70.22 98.66 0.000 0.000

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 71
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: GI BAYUWANGI

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GI BAYUWANGI Total 0.00 2.778 0.00 114.94 97.97 2.533 2.533 7.13E+000 1.19E+001 4.36E+000 2.00E+001

GLMNUK-BNYUWNG GI BAYUWANGI 3.73 0.817 5.91 112.91 96.66 0.773 0.826 5.85E+000 4.67E+001 7.99E+000 6.22E+001
I1
GLMNUK-BNYUWNG GI BAYUWANGI 2.60 0.570 4.13 113.41 97.21 0.540 0.578 1.39E+001 6.61E+001 1.95E+001 8.74E+001
I2
GLMNUK-BNYUWNG GI BAYUWANGI 4.52 0.706 6.80 112.70 96.60 0.756 1.019 5.29E+000 5.43E+001 1.37E+001 4.90E+001
I3
GLMNUK-BNYUWNG GI BAYUWANGI 3.89 0.085 5.60 113.12 97.00 0.088 0.114 5.49E+001 4.49E+002 1.36E+002 4.33E+002
I4
U1 GI BAYUWANGI 100.00 1.155 100.00 100.00 100.00 0.651 0.000 3.27E+001 6.54E+000

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 72
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: GI CLKN BAWANG

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GI CLKN BAWANG Total 0.00 3.678 0.00 81.36 73.81 5.611 5.611 3.21E+000 9.96E+000 5.63E-002 2.29E+000

GI KAPAL GI CLKN BAWANG 68.95 0.038 73.14 89.49 90.36 0.037 0.005 1.48E+002 9.99E+002 5.04E+002 2.28E+003
GI KAPAL GI CLKN BAWANG 68.95 0.038 73.14 89.49 90.36 0.037 0.005 1.48E+002 9.99E+002 5.04E+002 2.28E+003
BUS CLBWNG PRMON GI CLKN BAWANG 5.51 0.517 5.37 83.39 73.38 0.480 0.037 5.26E+001 5.27E+001 7.44E+001 3.39E+002

Node GI CLKN BAWANG 0.33 0.743 0.30 81.50 73.76 0.673 0.021 4.59E+001 2.39E+001 1.29E+002 5.87E+002
GLMNK-CLBWNG
Bus PLTU 1 GI CLKN BAWANG 11.54 0.872 37.87 63.79 34.81 1.526 1.848 * 1.48E+000 4.41E+001 1.54E-001 6.94E+000
BUS PLTU 2 GI CLKN BAWANG 12.02 0.908 38.07 63.80 35.03 1.563 1.848 * 1.42E+000 4.23E+001 1.54E-001 6.94E+000
BUS PLTU 3 GI CLKN BAWANG 12.42 0.939 38.24 63.80 35.21 1.593 1.848 * 1.37E+000 4.10E+001 1.54E-001 6.94E+000

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 73
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: GI GIANYAR

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GI GIANYAR Total 0.00 1.593 0.00 98.25 97.14 1.672 1.672 4.46E+000 2.37E+001 4.93E+000 2.43E+001

GI SANUR GI GIANYAR 6.13 0.649 10.79 95.71 95.00 0.690 0.702 1.15E+001 5.82E+001 1.21E+001 5.79E+001
GI SANUR GI GIANYAR 6.13 0.649 10.79 95.71 95.00 0.690 0.702 1.15E+001 5.82E+001 1.21E+001 5.79E+001
GI AMLPURA GI GIANYAR 0.00 0.000 0.00 98.25 97.14 0.000 0.000
GI AMLPURA GI GIANYAR 0.00 0.000 0.00 98.25 97.14 0.000 0.000
GI KAPAL GI GIANYAR 31.17 0.147 49.38 89.39 89.78 0.147 0.135 3.77E+001 2.58E+002 5.25E+001 3.04E+002
GI KAPAL GI GIANYAR 31.17 0.147 49.38 89.39 89.78 0.147 0.135 3.77E+001 2.58E+002 5.25E+001 3.04E+002
BUS GIANYAR 1 GI GIANYAR 0.00 0.000 56.08 56.72 94.06 0.000 0.000
BUS GIANYAR 2 GI GIANYAR 0.00 0.000 56.08 56.72 94.06 0.000 0.000

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 74
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: GI GLMNUK

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GI GLMNUK Total 0.00 2.886 0.00 112.28 96.33 2.730 2.730 6.47E+000 1.17E+001 3.61E+000 1.78E+001

GLMNUK-BNYUWNG GI GLMNUK 0.35 0.369 0.20 112.39 96.34 0.215 0.000 1.01E+002 2.69E+001
I3
GLMNUK-BNYUWNG GI GLMNUK 0.68 0.044 0.40 112.49 96.35 0.026 0.000 8.41E+002 2.03E+002
I4
GI NEGARA GI GLMNUK 44.13 0.086 50.27 102.03 94.96 0.067 0.049 8.95E+001 4.39E+002 1.95E+002 9.99E+002
GI NEGARA GI GLMNUK 44.13 0.086 50.27 102.03 94.96 0.067 0.049 8.95E+001 4.39E+002 1.95E+002 9.99E+002

Node GI GLMNUK 29.71 1.378 55.25 92.18 86.90 1.454 1.746 3.97E+000 2.76E+001 5.85E+000 2.78E+001
GLMNK-CLBWNG
BUS GLMNK PMRON GI GLMNUK 16.03 0.744 28.48 101.67 90.61 0.761 0.887 4.11E+000 5.16E+001 1.03E+001 5.49E+001
Bus1 GI GLMNUK 0.42 0.428 0.24 112.41 96.32 0.249 0.000 8.76E+001 2.08E+001
Bus2 GI GLMNUK 0.29 0.298 0.17 112.37 96.32 0.174 0.000 1.28E+002 1.94E+001
BUS GLNUK 1 GI GLMNUK 0.00 0.000 55.61 64.83 95.24 0.000 0.000
BUS GLNUK 2 GI GLMNUK 0.00 0.000 55.61 64.83 95.24 0.000 0.000

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 75
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: GI KAPAL

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GI KAPAL Total 0.00 1.949 0.00 94.15 93.19 2.196 2.196 2.86E+000 1.95E+001 2.54E+000 1.66E+001

GI ASARI GI KAPAL 29.78 0.096 31.62 95.16 94.08 0.078 0.036 1.25E+002 3.82E+002 1.99E+002 1.00E+003
GI BATURITI GI KAPAL 44.23 0.049 47.30 95.24 94.62 0.041 0.020 3.18E+002 7.15E+002 4.45E+002 1.83E+003
GI CLKN BAWANG GI KAPAL 83.39 0.046 89.43 96.18 95.76 0.038 0.017 1.75E+002 8.17E+002 4.71E+002 2.08E+003
GI CLKN BAWANG GI KAPAL 83.39 0.046 89.43 96.18 95.76 0.038 0.017 1.75E+002 8.17E+002 4.71E+002 2.08E+003
GI PKLOD GI KAPAL 5.98 0.921 13.05 90.94 90.21 1.145 1.303 2.16E+000 4.17E+001 4.01E+000 2.81E+001
GI GIANYAR GI KAPAL 15.40 0.073 33.27 86.82 86.16 0.091 0.103 8.84E+001 5.21E+002 6.27E+001 3.53E+002
GI GIANYAR GI KAPAL 15.40 0.073 33.27 86.82 86.16 0.091 0.103 8.84E+001 5.21E+002 6.27E+001 3.53E+002
GI PAYANGAN GI KAPAL 41.25 0.233 44.06 95.21 94.53 0.192 0.093 6.74E+001 1.51E+002 9.44E+001 3.88E+002
GI PKLOD GI KAPAL 5.98 0.132 13.05 90.94 90.21 0.165 0.187 1.50E+001 2.90E+002 2.79E+001 1.95E+002
GI ASARI GI KAPAL 29.78 0.096 31.62 95.16 94.08 0.078 0.036 1.25E+002 3.82E+002 1.99E+002 1.00E+003
GI PADANGSAMBIAN GI KAPAL 11.69 0.203 25.17 88.44 87.67 0.250 0.281 9.21E+000 1.90E+002 1.73E+001 1.30E+002
BUS KAPAL 1 GI KAPAL 0.00 0.000 53.80 54.36 92.87 0.000 0.000
BUS KAPAL 2 GI KAPAL 0.00 0.000 53.80 54.36 92.87 0.000 0.000
BUS KAPAL 3 GI KAPAL 0.00 0.000 53.80 54.36 92.87 0.000 0.000
BUS KAPAL 4 GI KAPAL 0.00 0.000 53.80 54.36 92.87 0.000 0.000

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 76
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: GI NEGARA

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GI NEGARA Total 0.00 0.768 0.00 122.08 117.96 0.519 0.519 1.34E+001 4.83E+001 2.42E+001 1.22E+002

GI GLMNUK GI NEGARA 85.32 0.166 90.61 100.35 99.18 0.109 0.104 7.08E+001 2.21E+002 1.22E+002 6.09E+002
GI GLMNUK GI NEGARA 85.32 0.166 90.61 100.35 99.18 0.109 0.104 7.08E+001 2.21E+002 1.22E+002 6.09E+002
GI ASARI GI NEGARA 5.55 0.218 6.38 120.13 116.25 0.151 0.156 4.20E+001 1.71E+002 8.02E+001 4.08E+002
GI ASARI GI NEGARA 5.55 0.218 6.38 120.13 116.25 0.151 0.156 4.20E+001 1.71E+002 8.02E+001 4.08E+002
BUS NEGARA 1 GI NEGARA 0.00 0.000 68.11 70.48 98.99 0.000 0.000
BUS NEGAR 2 GI NEGARA 0.00 0.000 68.11 70.48 98.99 0.000 0.000

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 77
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: GI NUSA DUA

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GI NUSA DUA Total 0.00 2.045 0.00 80.53 81.79 2.895 2.895 2.21E+000 1.87E+001 1.16E+000 6.37E+000

BUS GIS BNDRA GI NUSA DUA 0.22 0.054 0.33 80.55 81.77 0.067 0.053 1.59E+002 6.90E+002 6.39E+001 3.45E+002
NUSA DUA
NUSA GI NUSA DUA 7.98 1.991 14.74 80.50 79.94 2.828 2.842 2.21E+000 1.92E+001 1.18E+000 6.49E+000
DUA-PSANGGARAN
BUS NUSA DUA 1 GI NUSA DUA 0.00 0.000 47.22 46.50 89.41 0.000 0.000
BUS NUSA DUA 2 GI NUSA DUA 0.00 0.000 47.22 46.50 89.41 0.000 0.000
BUS NUSA DUA 3 GI NUSA DUA 0.00 0.000 47.22 46.50 89.41 0.000 0.000

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 78
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: GI PADANGSAMBIAN

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GI PADANGSAMBIAN Total 0.00 1.514 0.00 101.31 100.72 1.498 1.498 3.47E+000 2.52E+001 4.44E+000 2.99E+001

GI KAPAL GI 31.33 0.543 48.93 92.08 91.42 0.520 0.495 1.13E+001 6.99E+001 1.38E+001 9.05E+001
PADANGSAMBIAN
GIS PESANGGARAN GI 33.89 0.970 57.37 89.46 88.97 0.978 1.003 4.89E+000 3.94E+001 6.54E+000 4.48E+001
PADANGSAMBIAN
BUS PDNGSMBIAN 1 GI 0.00 0.000 58.15 58.49 94.76 0.000 0.000
PADANGSAMBIAN
BUS PADNGSMBIAN 2 GI 0.00 0.000 58.15 58.49 94.76 0.000 0.000
PADANGSAMBIAN

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 79
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: GI PAYANGAN

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GI PAYANGAN Total 0.00 1.011 0.00 121.74 114.52 0.714 0.714 1.35E+001 3.56E+001 2.05E+001 8.56E+001

GI BATURITI GI PAYANGAN 7.82 0.613 9.01 119.01 112.42 0.428 0.421 2.37E+001 5.81E+001 3.50E+001 1.45E+002
GI KAPAL GI PAYANGAN 70.47 0.398 82.02 98.43 98.28 0.286 0.294 3.06E+001 9.16E+001 4.95E+001 2.08E+002
BUS PANYNGAN 2 GI PAYANGAN 0.00 0.000 66.12 70.28 98.68 0.000 0.000
Bus70 GI PAYANGAN 0.00 0.000 66.12 70.28 98.68 0.000 0.000

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 80
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: GI PEMARON

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GI PEMARON Total 0.00 2.979 0.00 99.94 92.47 3.221 3.221 4.14E+000 1.22E+001 2.05E+000 1.23E+001

BUS GLMNK PMRON GI PEMARON 8.01 0.751 11.25 98.87 90.19 0.697 0.549 3.23E+001 3.98E+001 1.40E+001 7.17E+001
BUS CLBWNG PRMON GI PEMARON 0.91 2.044 1.81 99.47 92.04 2.348 2.554 3.64E+000 1.85E+001 2.45E+000 1.55E+001
GI BATURITI GI PEMARON 31.94 0.124 35.99 97.27 93.13 0.104 0.060 1.07E+002 2.91E+002 1.57E+002 6.54E+002
GI BATURITI GI PEMARON 31.94 0.124 35.99 97.27 93.13 0.104 0.060 1.07E+002 2.91E+002 1.57E+002 6.54E+002
BUS PEMARON 2 GI PEMARON 0.00 0.000 53.39 57.70 93.49 0.000 0.000
BUS PEMRON 1 GI PEMARON 0.00 0.000 53.39 57.70 93.49 0.000 0.000

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 81
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: GI PENSGGARAN

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GI PENSGGARAN Total 0.00 2.227 0.00 78.72 75.88 3.414 3.414 1.80E+000 1.72E+001 9.33E-002 3.51E+000

GIS PESANGGARAN GI PENSGGARAN 0.00 0.730 0.02 78.73 75.86 1.082 1.037 7.47E+000 5.22E+001 3.40E-001 1.15E+001
GIS PESANGGARAN GI PENSGGARAN 0.00 0.730 0.02 78.73 75.86 1.082 1.037 7.47E+000 5.22E+001 3.40E-001 1.15E+001
BUS PLTDG 1 GI PENSGGARAN 10.23 0.221 46.00 48.43 86.90 0.461 0.671 * 5.99E+000 1.74E+002 3.97E-001 1.79E+001
BUS PLTDG 2 GI PENSGGARAN 25.48 0.549 55.34 87.13 52.51 0.792 0.671 * 2.26E+000 7.00E+001 3.97E-001 1.79E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 82
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: GI PKLOD

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GI PKLOD Total 0.00 1.985 0.00 90.73 89.99 2.370 2.370 2.59E+000 1.92E+001 2.00E+000 1.37E+001

GI KAPAL GI PKLOD 4.20 0.647 6.16 90.27 89.39 0.643 0.459 1.53E+001 5.75E+001 1.17E+001 7.05E+001
GI KAPAL GI PKLOD 4.20 0.093 6.16 90.27 89.39 0.092 0.066 1.06E+002 4.00E+002 8.14E+001 4.91E+002

BUS PKLOD GIS GI PKLOD 14.62 0.066 32.67 84.54 83.74 0.103 0.149 8.18E+001 5.75E+002 6.74E+001 2.10E+002
BANDARA
GIS PESANGGARAN GI PKLOD 15.22 1.188 34.10 84.33 83.47 1.536 1.698 1.79E+000 3.23E+001 2.39E+000 1.92E+001
Bus38 GI PKLOD 0.00 0.000 51.96 52.38 92.00 0.000 0.000
Bus39 GI PKLOD 0.00 0.000 51.96 52.38 92.00 0.000 0.000
Bus40 GI PKLOD 0.00 0.000 51.96 52.38 92.00 0.000 0.000

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 83
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: GI SANUR

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GI SANUR Total 0.00 1.676 0.00 95.65 94.81 1.838 1.838 4.16E+000 2.26E+001 4.23E+000 2.06E+001

GI GIANYAR GI SANUR 1.20 0.127 1.95 95.29 94.50 0.131 0.117 3.94E+001 2.99E+002 5.42E+001 3.25E+002
GI GIANYAR GI SANUR 1.20 0.127 1.95 95.29 94.50 0.131 0.117 3.94E+001 2.99E+002 5.42E+001 3.25E+002
GIS PESANGGARAN GI SANUR 26.34 0.711 47.21 86.27 87.42 0.788 0.802 1.03E+001 5.32E+001 9.96E+000 4.71E+001
GIS PESANGGARAN GI SANUR 26.34 0.711 47.21 86.27 87.42 0.788 0.802 1.03E+001 5.32E+001 9.96E+000 4.71E+001
BUS SANUR 1 GI SANUR 0.00 0.000 54.74 55.22 93.45 0.000 0.000
BUS SANUR 2 GI SANUR 0.00 0.000 54.74 55.22 93.45 0.000 0.000
BUS SANUR 3 GI SANUR 0.00 0.000 54.74 55.22 93.45 0.000 0.000
BUS SANUR 4 GI SANUR 0.00 0.000 54.74 55.22 93.45 0.000 0.000

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 84
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: GIS BANDARA

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GIS BANDARA Total 0.00 1.880 0.00 82.96 87.14 2.476 2.476 2.64E+000 2.03E+001 2.47E+000 9.66E+000

BUS GIS BNDRA GIS BANDARA 1.17 1.794 2.72 83.02 86.23 2.369 2.378 2.71E+000 2.13E+001 2.58E+000 1.00E+001
NUSA DUA
BUS PKLOD GIS GIS BANDARA 0.02 0.086 0.05 82.96 87.12 0.107 0.097 8.58E+001 4.37E+002 5.72E+001 2.47E+002
BANDARA
BUS GIS BANDARA 1 GIS BANDARA 0.00 0.000 50.31 47.89 90.99 0.000 0.000
BUS GIS BANDARA 2 GIS BANDARA 0.00 0.000 50.31 47.89 90.99 0.000 0.000

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 85
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: GIS PESANGGARAN

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GIS PESANGGARAN Total 0.00 2.227 0.00 78.72 75.87 3.415 3.415 1.80E+000 1.72E+001 9.19E-002 3.50E+000

GI PENSGGARAN GIS PESANGGARAN 0.00 0.385 0.01 78.73 75.86 0.626 0.670 3.29E+000 1.00E+002 4.10E-001 1.79E+001
GI PENSGGARAN GIS PESANGGARAN 0.00 0.385 0.01 78.73 75.86 0.626 0.670 3.29E+000 1.00E+002 4.10E-001 1.79E+001

NUSA GIS PESANGGARAN 0.00 0.021 0.00 78.72 75.87 0.020 0.004 7.35E+002 1.69E+003 1.14E+003 2.80E+003
DUA-PSANGGARAN
GI PADANGSAMBIAN GIS PESANGGARAN 2.65 0.076 2.74 79.25 76.18 0.072 0.009 1.62E+002 4.80E+002 2.64E+002 1.27E+003
GI PKLOD GIS PESANGGARAN 4.79 0.374 4.95 79.69 76.44 0.356 0.045 3.27E+001 9.75E+001 5.28E+001 2.60E+002
GI SANUR GIS PESANGGARAN 1.01 0.027 1.04 78.89 76.04 0.026 0.003 6.06E+002 1.27E+003 8.71E+002 3.41E+003
GI SANUR GIS PESANGGARAN 1.01 0.027 1.04 78.89 76.04 0.026 0.003 6.06E+002 1.27E+003 8.71E+002 3.41E+003
BSU BOO GIS PESANGGARAN 6.98 0.150 47.30 87.01 45.06 0.387 0.670 * 8.90E+000 2.56E+002 3.97E-001 1.79E+001
BUS GIS PSNGGRAN 1 GIS PESANGGARAN 0.00 0.000 43.80 45.45 87.45 0.000 0.000
BUS GIS PSNGGRAN 2 GIS PESANGGARAN 0.00 0.000 43.80 45.45 87.45 0.000 0.000
BUS GIS PSNGGRAN3 GIS PESANGGARAN 0.00 0.000 43.80 45.45 87.45 0.000 0.000
BUS PLTGD 3 GIS PESANGGARAN 18.56 0.400 51.93 86.88 49.18 0.645 0.670 * 3.19E+000 9.61E+001 3.97E-001 1.79E+001
BUS PLTG 4 GIS PESANGGARAN 18.56 0.400 51.93 86.88 49.18 0.645 0.670 * 3.19E+000 9.61E+001 3.97E-001 1.79E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 86
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: GLMNUK-BNYUWNGI 1

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GLMNUK-BNYUWNG Total 0.00 2.794 0.00 113.52 97.79 2.579 2.579 6.77E+000 1.20E+001 4.14E+000 1.93E+001
I1

Bus1 GLMNUK-BNYUWN 1.66 2.040 2.67 112.93 96.94 1.963 2.094 7.07E+000 1.75E+001 5.48E+000 2.37E+001
GI 1
GI BAYUWANGI GLMNUK-BNYUWN 3.73 0.815 4.34 113.05 96.94 0.637 0.486 3.53E+001 3.14E+001 1.48E+001 1.04E+002
GI 1

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 87
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: GLMNUK-BNYUWNGI 2

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GLMNUK-BNYUWNG Total 0.00 2.706 0.00 114.37 99.13 2.446 2.446 7.08E+000 1.23E+001 4.79E+000 2.07E+001
I2

Bus2 GLMNUK-BNYUWN 5.56 1.534 8.69 112.26 96.63 1.434 1.511 1.13E+001 2.24E+001 1.06E+001 3.27E+001
GI 2
GI BAYUWANGI GLMNUK-BNYUWN 5.38 1.177 7.44 112.90 97.34 1.012 0.949 1.82E+001 2.72E+001 4.91E+000 5.46E+001
GI 2

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 88
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: GLMNUK-BNYUWNGI 3

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GLMNUK-BNYUWNG Total 0.00 2.829 0.00 112.72 97.49 2.635 2.635 6.65E+000 1.19E+001 4.11E+000 1.87E+001
I3

GI GLMNUK GLMNUK-BNYUWN 2.21 2.342 3.69 111.99 96.25 2.241 2.331 6.62E+000 1.50E+001 5.21E+000 2.10E+001
GI 3
GI BAYUWANGI GLMNUK-BNYUWN 3.49 0.545 3.13 113.14 96.82 0.411 0.311 5.67E+001 4.20E+001 2.39E+000 1.62E+002
GI 3

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 89
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: GLMNUK-BNYUWNGI 4

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

GLMNUK-BNYUWNG Total 0.00 2.174 0.00 114.52 105.66 1.825 1.825 8.36E+000 1.56E+001 9.27E+000 2.87E+001
I4

GI GLMNUK GLMNUK-BNYUWN 25.04 1.631 33.45 108.44 96.63 1.316 1.208 1.18E+001 2.04E+001 1.70E+001 4.23E+001
GI 4
GI BAYUWANGI GLMNUK-BNYUWN 25.02 0.547 32.00 109.46 97.21 0.513 0.626 2.70E+001 6.50E+001 1.55E+001 8.66E+001
GI 4

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 90
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: Node GLMNK-CLBWNG

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Node Total 0.00 3.634 0.00 82.44 74.92 5.409 5.409 3.28E+000 1.01E+001 1.71E-001 2.78E+000
GLMNK-CLBWNG

GI GLMNUK Node 16.36 0.759 15.43 88.90 73.13 0.683 0.060 4.45E+001 2.43E+001 3.01E+001 2.49E+002
GLMNK-CLBWNG
GI CLKN BAWANG Node 1.39 3.126 3.79 81.91 74.62 4.927 5.349 1.80E+000 1.22E+001 1.71E-001 2.81E+000
GLMNK-CLBWNG

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 91
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Fault at bus: NUSA DUA-PSANGGARAN

Prefault voltage = 150.000 kV = 100.00 % of nominal bus kV ( 150.000 kV)


= 100.00 % of base kV ( 150.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

NUSA Total 0.00 2.218 0.00 78.67 76.38 3.383 3.383 1.81E+000 1.73E+001 1.84E-001 3.67E+000
DUA-PSANGGARAN

GIS PESANGGARAN NUSA 0.42 2.196 0.96 78.81 76.12 3.360 3.376 1.78E+000 1.74E+001 1.83E-001 3.68E+000
DUA-PSANGGARAN
GI NUSA DUA NUSA 0.09 0.023 0.10 78.69 76.39 0.023 0.007 6.62E+002 1.58E+003 2.71E+002 1.70E+003
DUA-PSANGGARAN

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 92
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Short-Circuit Summary Report

30 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

BSU BOO 11.00 1.040 -16.607 16.640 1.419 -13.267 13.343 15.641 1.095 15.679 -15.975 3.743 16.408

BUS AMLPURA 1 20.00 0.359 -1.873 1.907 0.425 -2.451 2.487 1.644 0.319 1.674 1.403 2.017 2.457

BUS AMLPURA 2 20.00 0.381 -1.983 2.020 0.455 -2.643 2.682 1.742 0.339 1.774 1.485 2.229 2.678

BUS ASARI 1 20.00 0.459 -2.888 2.924 0.478 -3.504 3.537 2.531 0.402 2.563 2.293 2.558 3.435

BUS ASARI 2 20.00 0.494 -3.159 3.197 0.510 -3.910 3.943 2.772 0.432 2.805 2.527 2.905 3.850

BUS BATURITI 1 20.00 0.485 -2.899 2.939 0.461 -3.344 3.376 2.538 0.423 2.573 2.331 2.344 3.306

BUS BATURITI 2 20.00 0.452 -2.784 2.820 0.427 -3.191 3.220 2.436 0.394 2.468 2.246 2.214 3.154

BUS CLBWNG PRMON 150.00 0.954 -2.838 2.994 0.844 -3.151 3.262 2.717 0.879 2.856 2.309 2.285 3.249

BUS GIANYAR 1 20.00 0.707 -6.398 6.437 0.784 -8.109 8.147 5.807 0.667 5.845 5.357 5.526 7.696

BUS GIANYAR 2 20.00 0.707 -6.398 6.437 0.784 -8.109 8.147 5.807 0.667 5.845 5.357 5.526 7.696

BUS GIS BANDARA 1 20.00 0.527 -6.979 6.999 0.582 -8.723 8.743 6.370 0.501 6.390 5.978 5.557 8.162

BUS GIS BANDARA 2 20.00 0.527 -6.979 6.999 0.582 -8.723 8.743 6.370 0.501 6.390 5.978 5.557 8.162

BUS GIS BNDRA NUSA DUA 150.00 0.244 -1.886 1.901 0.403 -2.508 2.540 1.820 0.259 1.838 -1.969 1.154 2.282

BUS GIS PSNGGRAN 1 20.00 0.451 -7.566 7.579 0.495 -9.326 9.339 6.940 0.430 6.953 6.560 5.669 8.671

BUS GIS PSNGGRAN 2 20.00 0.451 -7.566 7.579 0.495 -9.326 9.339 6.940 0.430 6.953 6.560 5.669 8.671

BUS GIS PSNGGRAN3 20.00 0.451 -7.566 7.579 0.495 -9.326 9.339 6.940 0.430 6.953 6.560 5.669 8.671

BUS GLMNK PMRON 150.00 0.936 -2.480 2.650 0.708 -2.457 2.557 2.339 0.851 2.489 2.038 1.869 2.765

BUS GLNUK 1 20.00 0.737 -5.312 5.363 0.578 -5.850 5.878 4.686 0.606 4.725 4.425 3.740 5.794

BUS GLNUK 2 20.00 0.405 -2.986 3.014 0.359 -3.150 3.170 2.613 0.341 2.635 2.438 1.974 3.137

BUS KAPAL 1 20.00 0.585 -7.102 7.127 0.626 -8.811 8.833 6.450 0.544 6.473 6.049 5.662 8.286

BUS KAPAL 2 20.00 0.585 -7.102 7.127 0.626 -8.811 8.833 6.450 0.544 6.473 6.049 5.662 8.286

BUS KAPAL 3 20.00 0.585 -7.102 7.127 0.626 -8.811 8.833 6.450 0.544 6.473 6.049 5.662 8.286

BUS KAPAL 4 20.00 0.585 -7.102 7.127 0.626 -8.811 8.833 6.450 0.544 6.473 6.049 5.662 8.286

BUS NEGAR 2 20.00 0.499 -3.131 3.170 0.516 -3.881 3.915 2.746 0.436 2.780 2.498 2.898 3.826

BUS NEGARA 1 20.00 0.499 -3.131 3.170 0.516 -3.881 3.915 2.746 0.436 2.780 2.498 2.898 3.826

BUS NUSA DUA 1 20.00 0.492 -7.271 7.287 0.541 -9.025 9.041 6.653 0.468 6.669 6.267 5.618 8.416

BUS NUSA DUA 2 20.00 0.492 -7.271 7.287 0.541 -9.025 9.041 6.653 0.468 6.669 6.267 5.618 8.416

BUS NUSA DUA 3 20.00 0.492 -7.271 7.287 0.541 -9.025 9.041 6.653 0.468 6.669 6.267 5.618 8.416

BUS PADNGSMBIAN 2 20.00 0.532 -6.227 6.250 0.598 -7.915 7.937 5.640 0.497 5.662 5.256 5.297 7.462

BUS PANYNGAN 2 20.00 1.189 -4.821 4.966 1.334 -6.298 6.438 4.253 1.053 4.381 3.565 5.326 6.409

BUS PDNGSMBIAN 1 20.00 0.532 -6.227 6.250 0.598 -7.915 7.937 5.640 0.497 5.662 5.256 5.297 7.462
Project:
ETAP Page: 93
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

30 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

BUS PEMARON 2 20.00 1.191 -8.564 8.646 1.032 -10.105 10.158 7.688 0.985 7.751 7.122 6.658 9.749

BUS PEMRON 1 20.00 1.191 -8.564 8.646 1.032 -10.105 10.158 7.688 0.985 7.751 7.122 6.658 9.749

BUS PKLOD GIS BANDARA 150.00 0.243 -1.855 1.871 0.409 -2.414 2.449 1.787 0.257 1.806 -1.953 1.067 2.225

BUS PLTDG 1 11.00 1.094 -17.500 17.534 1.692 -16.666 16.752 16.635 1.194 16.678 -17.019 5.541 17.899

BUS PLTDG 2 11.00 1.410 -22.890 22.933 2.754 -29.424 29.553 22.591 1.751 22.659 -22.819 13.154 26.339

BUS PLTG 4 11.00 1.253 -20.161 20.200 2.266 -23.739 23.847 19.584 1.476 19.640 -19.943 9.727 22.189

BUS PLTGD 3 11.00 1.253 -20.161 20.200 2.266 -23.739 23.847 19.584 1.476 19.640 -19.943 9.727 22.189

Bus PLTU 1 15.00 10.145 -53.496 54.450 11.236 -64.942 65.907 52.547 9.737 53.441 45.199 39.879 60.277

BUS PLTU 2 15.00 10.246 -54.158 55.119 11.522 -66.510 67.500 53.289 9.869 54.195 45.659 41.021 61.380

BUS PLTU 3 15.00 10.332 -54.716 55.683 11.758 -67.805 68.817 53.915 9.979 54.831 46.051 41.966 62.304

BUS SANUR 1 20.00 0.700 -6.576 6.613 0.772 -8.299 8.335 5.978 0.662 6.014 5.530 5.583 7.859

BUS SANUR 2 20.00 0.700 -6.576 6.613 0.772 -8.299 8.335 5.978 0.662 6.014 5.530 5.583 7.859

BUS SANUR 3 20.00 0.700 -6.576 6.613 0.772 -8.299 8.335 5.978 0.662 6.014 5.530 5.583 7.859

BUS SANUR 4 20.00 0.700 -6.576 6.613 0.772 -8.299 8.335 5.978 0.662 6.014 5.530 5.583 7.859

Bus1 150.00 1.376 -2.469 2.827 0.951 -2.457 2.634 2.327 1.264 2.648 1.981 2.267 3.011

Bus2 150.00 1.368 -2.467 2.821 0.947 -2.453 2.629 2.324 1.257 2.643 1.980 2.258 3.003

Bus38 20.00 0.546 -7.167 7.188 0.589 -8.889 8.909 6.524 0.511 6.544 6.132 5.643 8.333

Bus39 20.00 0.546 -7.167 7.188 0.589 -8.889 8.909 6.524 0.511 6.544 6.132 5.643 8.333

Bus40 20.00 0.546 -7.167 7.188 0.589 -8.889 8.909 6.524 0.511 6.544 6.132 5.643 8.333

Bus70 20.00 1.189 -4.821 4.966 1.334 -6.298 6.438 4.253 1.053 4.381 3.565 5.326 6.409

GI AMLPURA 150.00 0.096 -0.365 0.377 0.057 -0.248 0.254 0.322 0.086 0.333 0.302 0.177 0.350

GI ASARI 150.00 0.206 -0.753 0.781 0.120 -0.517 0.531 0.667 0.184 0.692 0.625 0.373 0.728

GI BATURITI 150.00 0.371 -0.977 1.045 0.215 -0.708 0.740 0.869 0.334 0.931 0.796 0.597 0.995

GI BAYUWANGI 150.00 1.429 -2.382 2.778 0.964 -2.342 2.533 2.238 1.311 2.594 1.896 2.259 2.950

GI CLKN BAWANG 150.00 1.127 -3.501 3.678 1.510 -5.404 5.611 3.464 1.083 3.629 2.369 4.641 5.210

GI GIANYAR 150.00 0.294 -1.565 1.593 0.334 -1.639 1.672 1.477 0.301 1.508 1.307 1.007 1.650

GI GLMNUK 150.00 1.400 -2.523 2.886 0.989 -2.545 2.730 2.382 1.290 2.709 2.019 2.337 3.088

GI KAPAL 150.00 0.283 -1.928 1.949 0.338 -2.170 2.196 1.842 0.290 1.865 1.641 1.271 2.076

GI NEGARA 150.00 0.205 -0.740 0.768 0.118 -0.506 0.519 0.656 0.183 0.681 0.614 0.368 0.716

GI NUSA DUA 150.00 0.240 -2.030 2.045 0.399 -2.868 2.895 1.978 0.259 1.995 -2.092 1.472 2.558

GI PADANGSAMBIAN 150.00 0.207 -1.499 1.514 0.219 -1.482 1.498 1.409 0.208 1.424 1.293 0.824 1.533

GI PAYANGAN 150.00 0.357 -0.946 1.011 0.208 -0.683 0.714 0.841 0.322 0.901 0.771 0.576 0.962

GI PEMARON 150.00 0.954 -2.822 2.979 0.838 -3.111 3.221 2.699 0.879 2.839 2.297 2.260 3.222

GI PENSGGARAN 150.00 0.232 -2.215 2.227 0.365 -3.395 3.414 2.184 0.256 2.198 1.833 2.489 3.091
Project:
ETAP Page: 94
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

30 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

GI PKLOD 150.00 0.265 -1.967 1.985 0.342 -2.345 2.370 1.891 0.276 1.911 1.669 1.390 2.172

GI SANUR 150.00 0.303 -1.649 1.676 0.365 -1.802 1.838 1.564 0.314 1.595 1.368 1.113 1.764

GIS BANDARA 150.00 0.243 -1.864 1.880 0.408 -2.442 2.476 1.797 0.258 1.815 -1.958 1.092 2.242

GIS PESANGGARAN 150.00 0.232 -2.215 2.227 0.365 -3.395 3.415 2.184 0.256 2.198 1.833 2.490 3.092

GLMNUK-BNYUWNGI 1 150.00 1.374 -2.433 2.794 0.947 -2.399 2.579 2.290 1.262 2.614 1.945 2.236 2.964

GLMNUK-BNYUWNGI 2 150.00 1.348 -2.347 2.706 0.918 -2.267 2.446 2.201 1.235 2.524 1.869 2.148 2.847

GLMNUK-BNYUWNGI 3 150.00 1.382 -2.468 2.829 0.972 -2.449 2.635 2.325 1.271 2.650 1.967 2.270 3.003

GLMNUK-BNYUWNGI 4 150.00 1.027 -1.916 2.174 0.714 -1.679 1.825 1.770 0.928 1.998 1.497 1.584 2.179

Node GLMNK-CLBWNG 150.00 1.125 -3.456 3.634 1.466 -5.207 5.409 3.412 1.079 3.578 2.390 4.363 4.975

NUSA DUA-PSANGGARAN 150.00 0.231 -2.205 2.218 0.369 -3.363 3.383 2.173 0.254 2.188 1.815 2.446 3.045

All fault currents are symmetrical momentary (30 Cycle network) values in rms kA

* LLG fault current is the larger of the two faulted line currents
Project:
ETAP Page: 95
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Short-Circuit Summary Report

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

BSU BOO 11.000 0.02386 0.38092 0.38167 0.02515 0.31894 0.31993 0.10285 0.71995 0.72726

BUS AMLPURA 1 20.000 1.14082 5.94640 6.05484 1.13737 5.77961 5.89046 0.09988 1.99750 2.00000

BUS AMLPURA 2 20.000 1.07797 5.61515 5.71768 1.07452 5.44836 5.55331 0.03703 1.66625 1.66667

BUS ASARI 1 20.000 0.62042 3.89950 3.94855 0.60453 3.80772 3.85541 0.09988 1.99750 2.00000

BUS ASARI 2 20.000 0.55757 3.56825 3.61155 0.54168 3.47647 3.51842 0.03703 1.66625 1.66667

BUS BATURITI 1 20.000 0.64772 3.87479 3.92856 0.62948 3.79289 3.84477 0.12484 2.49688 2.50000

BUS BATURITI 2 20.000 0.65604 4.04125 4.09416 0.63780 3.95935 4.01039 0.13317 2.66334 2.66667

BUS CLBWNG PRMON 150.000 9.21442 27.41644 28.92346 6.95551 22.55996 23.60785 4.44345 26.95737 27.32113

BUS GIANYAR 1 20.000 0.19703 1.78304 1.79389 0.19358 1.61625 1.62780 0.01851 0.83313 0.83333

BUS GIANYAR 2 20.000 0.19703 1.78304 1.79389 0.19358 1.61625 1.62780 0.01851 0.83313 0.83333

BUS GIS BANDARA 1 20.000 0.12430 1.64514 1.64983 0.12109 1.47513 1.48009 0.01851 0.83313 0.83333

BUS GIS BANDARA 2 20.000 0.12430 1.64514 1.64983 0.12109 1.47513 1.48009 0.01851 0.83313 0.83333

BUS GIS BNDRA NUSA DUA 150.000 5.83962 45.17500 45.55087 5.65922 35.60988 36.05677 4.71425 20.19524 20.73817

BUS GIS PSNGGRAN 1 20.000 0.09059 1.52078 1.52348 0.08747 1.35023 1.35306 0.01851 0.83313 0.83333

BUS GIS PSNGGRAN 2 20.000 0.09059 1.52078 1.52348 0.08747 1.35023 1.35306 0.01851 0.83313 0.83333

BUS GIS PSNGGRAN3 20.000 0.09059 1.52078 1.52348 0.08747 1.35023 1.35306 0.01851 0.83313 0.83333

BUS GLMNK PMRON 150.000 11.54123 30.56891 32.67504 9.05932 26.05861 27.58844 7.52941 41.01820 41.70354

BUS GLNUK 1 20.000 0.29588 2.13276 2.15319 0.24684 2.06529 2.07999 0.03703 1.66625 1.66667

BUS GLNUK 2 20.000 0.51502 3.79667 3.83144 0.46598 3.72920 3.75820 0.25617 3.33016 3.34000

BUS KAPAL 1 20.000 0.13304 1.61481 1.62028 0.12639 1.46398 1.46942 0.01851 0.83313 0.83333

BUS KAPAL 2 20.000 0.13304 1.61481 1.62028 0.12639 1.46398 1.46942 0.01851 0.83313 0.83333

BUS KAPAL 3 20.000 0.13304 1.61481 1.62028 0.12639 1.46398 1.46942 0.01851 0.83313 0.83333

BUS KAPAL 4 20.000 0.13304 1.61481 1.62028 0.12639 1.46398 1.46942 0.01851 0.83313 0.83333

BUS NEGAR 2 20.000 0.57276 3.59688 3.64220 0.55580 3.50847 3.55222 0.03703 1.66625 1.66667

BUS NEGARA 1 20.000 0.57276 3.59688 3.64220 0.55580 3.50847 3.55222 0.03703 1.66625 1.66667

BUS NUSA DUA 1 20.000 0.10690 1.58093 1.58453 0.10374 1.41063 1.41444 0.01851 0.83313 0.83333

BUS NUSA DUA 2 20.000 0.10690 1.58093 1.58453 0.10374 1.41063 1.41444 0.01851 0.83313 0.83333

BUS NUSA DUA 3 20.000 0.10690 1.58093 1.58453 0.10374 1.41063 1.41444 0.01851 0.83313 0.83333

BUS PADNGSMBIAN 2 20.000 0.15731 1.84079 1.84750 0.15283 1.67795 1.68490 0.01851 0.83313 0.83333

BUS PANYNGAN 2 20.000 0.55691 2.25753 2.32521 0.53992 2.17350 2.23956 0.01851 0.83313 0.83333

BUS PDNGSMBIAN 1 20.000 0.15731 1.84079 1.84750 0.15283 1.67795 1.68490 0.01851 0.83313 0.83333

BUS PEMARON 2 20.000 0.18404 1.32276 1.33550 0.14380 1.23680 1.24513 0.01851 0.83313 0.83333

BUS PEMRON 1 20.000 0.18404 1.32276 1.33550 0.14380 1.23680 1.24513 0.01851 0.83313 0.83333

BUS PKLOD GIS BANDARA 150.000 5.99890 45.89216 46.28258 5.81777 36.33025 36.79312 5.92007 22.38491 23.15452

BUS PLTDG 1 11.000 0.02261 0.36150 0.36220 0.02460 0.29638 0.29740 0.06766 0.47365 0.47846
Project:
ETAP Page: 96
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

BUS PLTDG 2 11.000 0.01703 0.27640 0.27693 0.02049 0.20761 0.20862 0.02255 0.15788 0.15949

BUS PLTG 4 11.000 0.01950 0.31379 0.31440 0.02258 0.24470 0.24574 0.03383 0.23683 0.23923

BUS PLTGD 3 11.000 0.01950 0.31379 0.31440 0.02258 0.24470 0.24574 0.03383 0.23683 0.23923

Bus PLTU 1 15.000 0.02963 0.15627 0.15905 0.02150 0.11972 0.12163 0.01606 0.11245 0.11359

BUS PLTU 2 15.000 0.02921 0.15438 0.15712 0.02119 0.11777 0.11966 0.01530 0.10710 0.10819

BUS PLTU 3 15.000 0.02886 0.15283 0.15553 0.02093 0.11617 0.11805 0.01471 0.10298 0.10403

BUS SANUR 1 20.000 0.18477 1.73639 1.74619 0.18147 1.56886 1.57932 0.01851 0.83313 0.83333

BUS SANUR 2 20.000 0.18477 1.73639 1.74619 0.18147 1.56886 1.57932 0.01851 0.83313 0.83333

BUS SANUR 3 20.000 0.18477 1.73639 1.74619 0.18147 1.56886 1.57932 0.01851 0.83313 0.83333

BUS SANUR 4 20.000 0.18477 1.73639 1.74619 0.18147 1.56886 1.57932 0.01851 0.83313 0.83333

Bus1 150.000 14.90940 26.76314 30.63586 12.13473 23.00357 26.00800 8.57596 42.19838 43.06101

Bus2 150.000 14.88797 26.85018 30.70153 12.11620 23.07873 26.06589 8.59213 42.24994 43.11476

Bus38 20.000 0.12203 1.60184 1.60649 0.11651 1.44498 1.44967 0.01851 0.83313 0.83333

Bus39 20.000 0.12203 1.60184 1.60649 0.11651 1.44498 1.44967 0.01851 0.83313 0.83333

Bus40 20.000 0.12203 1.60184 1.60649 0.11651 1.44498 1.44967 0.01851 0.83313 0.83333

Bus70 20.000 0.55691 2.25753 2.32521 0.53992 2.17350 2.23956 0.01851 0.83313 0.83333

GI AMLPURA 150.000 58.55322 222.12520 229.71300 58.35918 212.74340 220.60270 112.72200 560.81840 572.03460

GI ASARI 150.000 29.28043 106.98730 110.92180 28.38660 101.82460 105.70740 52.95150 267.68300 272.87000

GI BATURITI 150.000 29.41164 77.50763 82.90041 28.38581 72.90031 78.23177 44.38233 185.42970 190.66720

GI BAYUWANGI 150.000 16.04008 26.72959 31.17299 13.18848 23.16855 26.65929 9.80431 44.97363 46.02991

GI CLKN BAWANG 150.000 7.21343 22.41354 23.54571 5.11681 17.03728 17.78906 0.12658 5.14362 5.14517

GI GIANYAR 150.000 10.04151 53.43255 54.36790 9.84747 44.05083 45.13810 11.09541 54.73959 55.85276

GI GLMNUK 150.000 14.56043 26.24107 30.00999 11.80208 22.44560 25.35930 8.11214 40.00441 40.81862

GI KAPAL 150.000 6.44216 43.96967 44.43909 6.06787 35.48520 36.00026 5.72246 37.43872 37.87353

GI NEGARA 150.000 30.13495 108.59780 112.70140 29.18072 103.62470 107.65490 54.45043 274.82130 280.16350

GI NUSA DUA 150.000 4.97188 42.06360 42.35642 4.79388 32.48454 32.83636 2.60115 14.32719 14.56140

GI PADANGSAMBIAN 150.000 7.80702 56.68121 57.21633 7.55541 47.52145 48.11831 9.98260 67.38394 68.11937

GI PAYANGAN 150.000 30.28488 80.12268 85.65523 29.32919 75.39577 80.89948 46.09394 192.49690 197.93860

GI PEMARON 150.000 9.31060 27.54175 29.07293 7.04742 22.70671 23.77521 4.61438 27.62653 28.00924

GI PENSGGARAN 150.000 4.05416 38.68084 38.89272 3.87878 29.08712 29.34460 0.20996 7.88760 7.89039

GI PKLOD 150.000 5.82292 43.24026 43.63057 5.51201 34.41668 34.85527 4.48922 30.83187 31.15697

GI SANUR 150.000 9.35213 50.80855 51.66208 9.16637 41.38469 42.38768 9.52151 46.32784 47.29617

GIS BANDARA 150.000 5.95074 45.67550 46.06150 5.76983 36.11261 36.57064 5.55706 21.72437 22.42385

GIS PESANGGARAN 150.000 4.05414 38.68046 38.89234 3.87875 29.08679 29.34427 0.20675 7.88474 7.88745

GLMNUK-BNYUWNGI 1 150.000 15.23649 26.98985 30.99358 12.45799 23.26251 26.38836 9.31764 43.44511 44.43305

GLMNUK-BNYUWNGI 2 150.000 15.93523 27.74893 31.99898 13.14357 24.07655 27.43052 10.78268 46.62838 47.85887

GLMNUK-BNYUWNGI 3 150.000 14.95568 26.71598 30.61725 12.19036 22.95247 25.98886 9.24725 41.97632 42.98283
Project:
ETAP Page: 97
12.6.0H
Location: Date: 12-13-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: BUDI1 Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

GLMNUK-BNYUWNGI 4 150.000 18.81602 35.10440 39.82915 16.04260 31.37107 35.23505 20.86760 64.54873 67.83801

Node GLMNK-CLBWNG 150.000 7.37574 22.65762 23.82791 5.26020 17.31289 18.09436 0.38451 6.26000 6.27180

NUSA DUA-PSANGGARAN 150.000 4.07323 38.84031 39.05331 3.89763 29.24728 29.50584 0.41320 8.25780 8.26813