Sie sind auf Seite 1von 4

Republic of the Philippines

Department of Education
Cordillera Administrative Region
Schools Division of Benguet
PAING ELEMENTARY SCHOOL
Paing, Baculongan Sur, Buguias, Benguet
ACTION PLAN FOR THE IMPLEMENTATION OF SCHOOL MAINTENACE WEEK (BRIGADA ESKWELA PROGRAM)
SY 2019-2020

School: PAING ELEMENTARY SCHOOL Division: BENGUET

DURING

BEFORE Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 AFTER

 Assigning  Repair of Toilet;  Cementing of  Lay-outing of  Planting of  Painting of  Finalization


committees to the replacement of drainage/canal garden different plants ceiling (sanipa) of unfinished Documentation
different areas of roofing  Repair of destroyed  Repair of in the school  Making/digging works
work in the  Cementing of chairs/desks destroyed garden of compost pit
school. drainage/canal  Removing of weeds chairs/desks  Fixing of potted 
 Float solicitation  Wiring of kindergarten in the school  Trimming of plants (lay
and invitation classroom surroundings. shrubs outing)
 Information  Re-painting of grade  Landscaping  Landscaping  Painting of stage
dissemination to 4-5 classrooms  Planting of
stakeholders  Cleaning of different plants in
classrooms the school garden

Prepared by: Noted: Approved by:

HELEN A. KIMKIMAN CRISTOBAL WAGSEY ROMEO C. DULNUAN


Coordinator PTA President Head Teacher III
Republic of the Philippines
Department of Education
Cordillera Administrative Region
Schools Division of Benguet
PAING ELEMENTARY SCHOOL
Paing, Baculongan Sur, Buguias, Benguet
ACTION PLAN FOR THE IMPLEMENTATION OF SCHOOL MAINTENACE WEEK (BRIGADA ESKWELA PROGRAM)
SY 2019-2020
School: PAING ELEMENTARY SCHOOL Division: BENGUET

ACTIVITIES DURING BRIGADA ESKWELA


Day 1 Day 2 Day 3 Day 4 Day 5 Day 6
May 20, 2019 (Monday) May 21, 2019 (Tuesday) May 22, 2019 May 23, 2019 May 24, 2019 May 25, 2019
(Wednesday) (Thursday) (Friday) (Saturday)
 Repair of Toilet; replacement of roofing  Continuation of undone  Continuation of  Continuation  Finalization  Documentation
 Replacement of gutter (old building) work on the first day undone work on of undone of unfinished
 Repair of grade 1-3 steel doors the second day work on the works
 Cementing of drainage/canal  Repair of destroyed third day
 Making/digging of compost pit chairs/desks  Fixing of potted
 Wiring of kindergarten classroom  Lay-outing of garden plants (lay  Cleaning of
 Re-painting of grade 4-5 classrooms (Landscaping) outing) classrooms
 Painting of ceiling (sanipa)  Planting of different  Painting  Re-structuring
 Removing of weeds in the school plants in the school (designing) of of classroom
surroundings. garden garden fence
 Trimming of shrubs  Painting of stage  Repair/
 Cleaning and painting of window grills replacement

Prepared by: Approved by:

HELEN A. KIMKIMAN ROMEO C. DULNUAN


School Brigada Eskwela Coordinator Head Teacher III
Republic of the Philippines
Department of Education
Cordillera Administrative Region
Schools Division of Benguet
PAING ELEMENTARY SCHOOL
Paing, Baculongan Sur, Buguias, Benguet
ACTION PLAN FOR THE IMPLEMENTATION OF SCHOOL MAINTENACE WEEK (BRIGADA ESKWELA PROGRAM)
SY 2019-2020
School: PAING ELEMENTARY SCHOOL Division: BENGUET

DURING
Day 1 Day 2 Day 3 Day 4 Day 5 Day 6
BEFORE May 20, 2019 May 21, 2019 May 22, 2019 May 23, 2019 May 24, 2019 May 25, 2019 AFTER
(Monday) (Tuesday) (Wednesday) (Thursday) (Friday) (Saturday)
 Assigning  Repair of Toilet;  Finalization of
committees to the replacement of  Repair of destroyed  Painting  Planting of  Wiring of unfinished Documentation
different areas of roofing chairs/desks (designing) of different plants kindergarten works
work in the  Replacement of gutter  Lay-outing of garden fence in the school classroom  Cleaning of
school. (old building) garden  Repair/ garden  Making/digging classrooms
 Float solicitation  Re-painting of grade (Landscaping) replacement of  Fixing of potted of compost pit  Re-structuring
and invitation 4-5 classrooms  Cleaning and broken windows plants (lay of classroom
 Information  Painting of ceiling painting of window  Cementing of outing)
dissemination to (sanipa) grills drainage/canal
stakeholders  Removing of weeds in  Repair of grade 1-3 
the school steel doors
surroundings.
 Trimming of shrubs

Prepared by: Noted: Approved by:

HELEN A. KIMKIMAN CRISTOBAL WAGSEY ROMEO C. DULNUAN


School Brigada Eskwela Coordinator PTA President Head Teacher III

Das könnte Ihnen auch gefallen