NEBOSH International General Certificate

in Occupational Health and Safety

UNIT GC3: HEALTH AND SAFETY PRACTICAL APPLICATION

Student Name: Avvalesh kumar singh

Student Number: 00471166

Date of Submission: 22/02/19


APPENDIX 1
GC3 – The Health and Safety Practical Application

Candidate and course provider declarations:

For completion by the candidate:

I declare that the work submitted for this practical application assessment i.e. the completed observation sheets and
the report to management, is my own work. I recognise that contravention of this statement constitutes malpractice
and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy.

Name (Print) AVVALESH KUMAR SINGH

Signature _______________________________

Date

For completion by a course provider representative (e.g.internal practical assessor):

I declare that the work marked is identical to that received from the candidate. I recognise that contravention of this
statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH
Malpractice policy.

Name (Print) _______________________________

Signature _______________________________

Date _______________________________

For completion by the course provider’s internal practical assessor:

I declare that I have marked this work and am both qualified and approved by NEBOSH to do so. I recognise that
contravention of this statement constitutes malpractice and may result in my being subject to the penalties set out in
the NEBOSH Malpractice policy.

Name (Print) _______________________________

Signature _______________________________

Date _______________________________

NB: This declaration must be completed in full submitted and retained with the
candidate’s script. If this declaration is not submitted the candidate’s result may be
declared void.
APPENDIX 2
INTERNATIONAL GENERAL
CERTIFICATE Assessor’s marking sheet

GC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Date of practical application Name of assessor:

Course provider Course provider


number
733 name
Green World Group

Student number 00471166 Student name AVVALESH KUMAR SINGH

NEBOSH
Maximum
Assessor’s moderated
marks
Criteria available
marks awarded marks
(if different)

1 Completion of observation sheets

1.1 Range and outline of hazards and consequences 15

Identification of suitable control measures and


1.2 15
timescales

2 Report - Introduction and Executive Summary

Introduction providing an overview of the chosen


2.1 5
area

2.2 Executive summary 5

3 Report - Main findings of the inspection

3.1 Quality of interpretation of findings 15

Identification of possible breaches of international


3.2 5
standards

3.3 Persuasiveness / conciseness / technical content 10

4 Report - Conclusions and Recommendations

Clear and concise conclusions which are clearly


4.1 related to report findings and are effective in 15
convincing management to take action

Recommendations which present realistic actions to


4.2 15
improve health and safety in the chosen area

TOTAL MARKS 100

Grades:
Outcome: PASS (60% or more) REFER (less than 60%)

Date assessed ____ / ____ / ____

Assessor’s signature ______________________

Date received by course provider ____ / ____ / ____

Date received by NEBOSH


(if applicable) _____ / _____ / _____

Assessor’s additional comments on the practical application:

ASSESSED BY (name in block letters) ________________________________________________

The mark sheet must be retained by the Course Provider and sent to NEBOSH only if requested.

NEBOSH USE ONLY

NEBOSH Moderator’s comments:


APPENDIX 3

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number 1 of _____

Student name AVVALESH KUMAR SINGH _ Student number 00471166 _

Place inspected NUPPL thermal power project ____ Date of inspection 22 /__02_ / _19

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
1. Observed that some workers are Immediate Action 20 min
Resting near the generator *Keep cylinder in their proper place
room by using some cements
bags, there was also a small Midterm Action
cylinder kept in that place. *Provide temporary suitable rest area 1 WEEK
RISK:
Risk of explosion and fire due to Long term Action
cylinder in unauthorized area or *Provide permanent suitable rest area 1 MONTH
the oxygen using by workers in
that area are contaminated due
to dirty cement bags
Consequences:
Explosion, ill health,

2. Observed that, At zone F5 some


Immediate Action
workers are working in open 15 min
area , in direct sunlight, and may *Water and rehydration solution drinks
be temperature is also approx shall be provided to personnel.
39*C
*Take intervals during continuous work,
RISK:
rest in shade
Risk of Dehydration, skin-related
Midterm Action
diseases and even death may 1 WEEK
*Provide temporary shade in working
occur if exposed to hot
area
temperature for long periods. 1 MONTH
Consequences: Long term Action
Heat stress, dizziness and *Provide permanent shade in working
fatigue; Heat stroke; skin area
Burns and skin-related diseases.

3. Observed that, At QR 4c some


workers are working at height, Immediate Action
*Stop working 15 min
in absence of guard rails , which
*Provide guard rails 1 hour
is a irresponsible behave they
may can fall if any slip or trip Midterm Action
1 WEEK
occur Provide proper training to workers
RISK:
Risk of falling person, falling of
object
APPENDIX 3

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number 2 of _____

Student name AVVALESH KUMAR SINGH _ Student number 00471166 _

Place inspected NUPPL thermal power project ____ Date of inspection 22 /__02_ / _19

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
Consequences:
Fracture, Fatal

4. Observed that, at the lobby of Immediate Action


Maintenance Department, *Using proper housekeeping in that area 15 min
There are some useless wires
thrown in access area, which Midterm Action
may be able to cause trip *Provide proper Trainings to 1 WEEK
hazard. housekeeping management
RISK:
Risk of trip hazard, Unsafe
access to work area
Consequences:
Fracture, head injury

5. Observed that, at the ESP area


Immediate Action
Concrete mixture vehicle driver 15 min
*Stop working
was stand under the boom 25 min
*Provide suitable PPE to the Driver
without safety helmet, Safety
goggle & reflective jacket. It may
Midterm Action
be cause Eye injury, head injury 1 WEEK
RISK: *Re induction & awareness training to be
Risk of head injury , eye strain, conduct for driver
death Long term Action
*Conduct proper Training programs for 1 MONTH
Consequences:
Fracture, Fatal, Eye strain, Head all Driver
injury *Disciplinary action

6. Observed that , at zone S6


Immediate Action
Deep open excavation has been
* Hard barriers, signs and warning lights 1 Day
found without Barricading at
shall be provided to prevent
CW pipe line area. Fall of
unauthorized Persons entering the site.
materials, person, animals
Midterm Action
Or vehicle may be happened.
* No materials shall be stored or moved 7 Days
RISK:
Near the excavation to prevent
Risk of fall of person, material,
accidental fall of materials.
animals, Or vehicles
*Provide proper awareness programs to 7 Days
the workers
Consequences:
APPENDIX 3

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number 3 of _____

Student name AVVALESH KUMAR SINGH _ Student number 00471166 _

Place inspected NUPPL thermal power project ____ Date of inspection 22 /__02_ / _19

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
Fatal, Fracture, Head injury Long term Action
Provide proper training on the excavation 1 MONTH
process
7. Observed that, at zone E12 Live Immediate Action
naked Power cable has been * Immediate inform to electrical 15 min
Found on the Wet Ground Department for disconnected the power.
Nearby cooling tower area. Fatal Midterm Action
accident (Person or animals) due *Take a corrective & preventive action
to electrocution. also for not occurred such type of 1 WEEK
RISK: incident in future at site.
Risk of electrocution Long term Action
Consequences: *Provide proper training to workers for 1 MONTH
Fatal , Muscle cramp, Nerve founding of Hazards
Damage, Skin burn
Immediate Action
8. Observed that, at transformer *Store in shaded areas and away from 1 Day
site Lots of transformer oil has Direct sunlight. Protect from extremes of
been kept found at Station temperature
transformer area without drip *Keep containers tightly closed and dry. 1 Day
tray, MSDS, Singe & fire *MSDS of Transformer oil shall be
extinguisher. Displayed & studied before storing the
RISK: material.
Skin burn, skin irritation, *Remove contaminated clothes 1 Day
inhalation, eye injury, Ingestion, Immediately. Wash affected area with
Industrial Hygiene, Soap & plenty of Water. If irritation
Spillage/Leakage may be occurs, obtain medical attention
happened. Midterm Action
Consequences: 1 WEEK
*Provide suitable trainings to the workers
Fire, Slip & trip,
ill health, skin burn, Eye injury

9. GOOD PRACTICE: Observe that,


all the PPE used by workers are
kept in their proper place with
proper manner, also the
housekeeping seems very good
of that area. The light conditions
of that area was also very good
APPENDIX 3

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number 4 of _____

Student name AVVALESH KUMAR SINGH _ Student number 00471166 _

Place inspected NUPPL thermal power project ____ Date of inspection 22 /__02_ / _19

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
10. Observe that , at the zone S2 the
lighting system of access & Immediate Action
egress area are very bad due to *change the damaged bulbs 20 min
poor lighting .Few bulbs of that
area are damaged ,which is not
changed , it may can cause trip
or collapse Midterm Action
RISK: *Provide training to the workers about
Risk of collapse, trips lighting importance 1 WEEK
Consequences:
Head injury, Fracture, Eye injury

11. GOOD PRATICE: Observe that, at


the training room ,there was a
training going on, for the health
awareness programs .there are
two competent person provides
training to workers and all
workers are observing the facts
very peacefully

12. GOOD PRACTICE: Observe that ,


at the working site, there are a
emergency eye wash station is
placed , which is very helpful for
the workers in case of any
emergency for the eye, and also
the nearby area of eye wash
station are proper neat and
clean.

13. Observe that, at the zone A3, Immediate Action


Few workers are working their *stop working under the working at
job at ground level and at same height 15 min
time there are some work going *provide suitable place to the workers for
on, at the height, if any person doing their job 1 hour
or material fall from height then Midterm Action
the workers working on the *provide trainings and supervisions to
APPENDIX 3

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number 5 of _____

Student name AVVALESH KUMAR SINGH _ Student number 00471166 _

Place inspected NUPPL thermal power project ____ Date of inspection 22 /__02_ / _19

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
ground can harm by that. the workers for their growth of 1 WEEK
RISK: knowledge
Risk of falling person or object *Provide temporary working area to the
can cause the harm to the workers 1 WEEK
workers Long term Action
Consequences: *Provide permanent & suitable working
Head injury, fatal, fracture area to the workers 1 MONTH

14. Observe that, at working station Immediate Action


One workmen of M/S Fortuna *Stop working
Engineering has been found *provide suitable PPE for performing 15 min
Grinding work doing without their task 1 hour
face shield & ear plug at
Fabrication yard. Midterm Action
RISK: * *Grinding work awareness training to
Eye injury, cut injury, hearing be conducted to the workers 1 WEEK
capacity lost & screen burn may
be happened.
Consequences:
Permanent hearing loss,
Temporary hearing loss, cut
injury, Eye injury

15. Observe that , at the zone A9 Immediate Action


campus there are many objects *Arranging the all equipments and keep
or equipments are thrown in at their proper place 1 Day
irresponsible manner such as *housekeeping the area
ladders , wooden sticks, useless 1 Day
cables, polythene bags or Midterm Action
cement bags , which may can *Provide suitable places for arranging the
cause of slip, trip, cut injury or equipments 10 Days
cement bags in unauthorized *Provide proper training on the
area can be able to housekeeping management 10 Days
contaminated the oxygen of the
environment.
RISK:
Long term Action
Risk of Slip, trips, collapse or ill
*provide the proper training to all
health
APPENDIX 3

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number 6 of _____

Student name AVVALESH KUMAR SINGH _ Student number 00471166 _

Place inspected NUPPL thermal power project ____ Date of inspection 22 /__02_ / _19

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
Consequences: workers of the plant about maintaining 1 MONTH
Fracture , Head injury, Cut the housekeeping
injury, ill health

16. GOOD PRACTICE: Observe that,


at wash room, there was a
proper neat and clean
washroom provided to the
workers, and also hand wash is
present on their place. which is
very good for the health of the
workers ,this type of facility
increases the moral of the
workers by which the safety
culture is increased and workers
gets motivated

17. Observe that, At zone A12, there


are a worker doing hot work of Immediate Action
welding at some height with the *Stop working 10 min
help of chairs and also not using *Provide suitable equipments for working 20 min
the safety goggles, which may on height
can cause incident of falling or *Provide suitable PPE , which is used in 20min
may be any ejected particles can their task
enter in their eyes by which eye
injury can happen.
RISK: Midterm Action
Risk of falling from height or eye *Provide suitable supervision about 1 WEEK
injury working on height or use of PPE
Consequences:
Fracture, Head injury, Eye injury

18. Observe that , At the zone S12,


there is a work on height is Immediate Action
carried out ,so scaffold is used *Stop doing unsafe act 5 min
for their working platform but it *Provide proper hand gloves for 20 min
seems that a worker are trying performing their task
to overreaching and his one
APPENDIX 3

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number 7 of _____

Student name AVVALESH KUMAR SINGH _ Student number 00471166 _

Place inspected NUPPL thermal power project ____ Date of inspection 22 /__02_ / _19

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
hand gloves are also missing Midterm Action
which may can cause fall of *provide proper supervision to the
person or any cut injury in their workers by giving details of unsafe act 1 WEEK
hand
RISK: Long term Action
Risk of falling of person by *Organized a proper training about 1 MONTH
overreaching or may be cut working on height
injury in the hand
Consequences:
Fatal, Fracture, head injury ,cut
injury

19. Observed that, At the Immediate Action


construction site ,there are two *Provide proper PPE to workers for 30 min
cement mixture machines are decreasing the noise level
used continuously and the noise
of the cement mixture are very Midterm Action
high ,which can cause the *Maintenances the cement mixture by 1 WEEK
hearing problems to workers which the noise level can decreased
,working near by the machine
RISK: Long term Action
Risk of hearing problems or *Provide training to the workers, how to 1 MONTH
maybe get stressed by this high work in noisy environment.
level of noise
Consequences:
Stress, Temporary hearing loss,
Permanent hearing loss

20. Observe that, at the vehicles


working station, there are no
Immediate Action
segregation pathways of 1 Days
*Provide Temporary barricading by
pedestrians’ or vehicles’. All are
segregating the pathways of pedestrians’
using the same path for moving
or vehicles
also having no singe at that site
RISK:
Midterm Action
Risk of person to collision with
*Provide Permanent barricading by
vehicles 7 Days
segregating the pathways
Consequences:
APPENDIX 3

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number 8 of _____

Student name AVVALESH KUMAR SINGH _ Student number 00471166 _

Place inspected NUPPL thermal power project ____ Date of inspection 22 /__02_ / _19

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
Fatal, fracture, injury *Provide suitable singe. 1 WEEK

21. Observe that , At zone D11,


there was some maintenance Immediate Action
work carried out on the height, *Stop working 15 min
but the workers working are *Provide fall arrester system 30 min
not using the fall arrester *tool box meeting 1 Day
system , they are using full body
harness or general PPE but fall Midterm Action
arrester is absent at the site *Provide proper supervision 1 WEEK
RISK:
Risk of falling person
Consequences:
Fatal ,Fracture, Injury

22. Observed that , at the zone


A6,there are two person Immediate Action
working the hot work of welding *Stop working 10 min
,and one empty fuel cane kept *Keep fuel cane on their proper place 30 min
near the wall where hot work *Toolbox meeting 1 Day
was carried out, which can
cause of explosion or fire Midterm Action
RISK: *Provide proper supervision 1 WEEK
Risk of fire & Explosion
Consequences: Long term Action
Fatal, injury *Provide training to the workers, how to 1 MONTH
carry hot works
23. Observed that, at the Disposal
area, there are metal container Immediate Action
box used for disposal purpose, *Stop using the damaged container 10 min
the condition of container are *Provide temporary containers for waste 1 hour
very bad , seems some parts of material
container are damaged by which
some waste material comes Midterm Action
outside, which may can pollute *Provide proper supervision 1 WEEK
the area and able to cause ill *Provide permanent containers for waste 1 WEEK
health material
RISK:
APPENDIX 3

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number 9 of _____

Student name AVVALESH KUMAR SINGH _ Student number 00471166 _

Place inspected NUPPL thermal power project ____ Date of inspection 22 /__02_ / _19

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
Risk of Health problems
Consequences: ill health

24. GOOD PRATICE: Observed that


, at 3rd floor of zone A12 ,some
works carried out, where the
bricks rails are not present but
the workers are using hard
barricading with barricading red
net, which save the persons or
object falling from height and also
motivate the workers for feeling
safe.

25. Observed that , At the side wall of


Zone A21 , there are some nets Immediate Action
thrown beside the corner of wall *Keep all the nets at their proper place 30 min
from outside and some ropes are
*Also keep ropes on their place 15 min
also thrown in that area , Which
may can cause trip hazard or the *Housekeeping of that area
nets using in work at height may
can damaged with direct sunlight Midterm Action
or rain *Provide proper supervision 1 WEEK
RISK: *Provide proper training on 1 WEEK
Risk of Trip hazard housekeeping
Consequences:
Trip, head injury, Fracture

26. Observe that, at storage area,


some workers are carrying load Immediate Action
by manually for arranging the *Provide suitable equipments for 30 min
goods or materials on their proper eliminating manual handling
place.
RISK: Midterm Action
Risk of musculoskeletal disorder *Provide proper supervision 1 WEEK
Consequences: *Provide training on proper lifting 1 WEEK
Stress, back pain ,neck pain, technique
musculoskeletal disorder
APPENDIX 3

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number 10 of _____

Student name AVVALESH KUMAR SINGH _ Student number 00471166 _

Place inspected NUPPL thermal power project ____ Date of inspection 22 /__02_ / _19

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions

27. Observe that, at work place a Immediate Action


worker using grinding machine, *Stop working 10 min
and the wire of the machine is *Change the wire of the machine 30 min
damaged, it is used with the
help of binding tape ,it may can Midterm Action
cause electric shock. *Provide proper supervision 1 WEEK
RISK: *Provide proper training on 1 WEEK
Risk of electric shock housekeeping
Consequences:
Fatal, muscle cramp, nerve
damaged
APPENDIX 3

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number 11 of _____

Student name AVVALESH KUMAR SINGH _ Student number 00471166 _

Place inspected NUPPL thermal power project ____ Date of inspection 22 /__02_ / _19

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
APPENDIX 3

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number 12 of _____

Student name AVVALESH KUMAR SINGH _ Student number 00471166 _

Place inspected NUPPL thermal power project ____ Date of inspection 22 /__02_ / _19

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
APPENDIX 4

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number 00471166

Location NUPPL Ghatampur thermal power project Date of review 22 /02 /19

Introduction including overview of area inspected and activities taking place

On 22/02/19 the 3*660 MW NUPPL Ghatampur thermal power project has been located
at vill- Lahurimau kasimpur, post- Samuhi, tahsil- Ghatampur, District- Kanpur nagar-
208001 has inspected at the time 10:00 AM to 11:30 AM to find out the health and
safety management system of the site. The purpose of this observation to identified the
hazard of the workplace activities.

The construction works were carried out at the site and approx 1100 workers are
working in one shift. Day and night both shifts are used for the carried out the works, the
digital attendance system are use to maintain the attendance of the workers and also a
register maintain by the guard for in and out system. The welfare facility of the worker’s
are very good such as neat and cleaned washroom first aid station almost every site,
the equipments used by the workers at construction site are Forklift, crane, grinding
machine, man lifting, welding machine, metal cutter

From that the major hazard have identified and made recommendations to avoid the
personal injury to the workers as well as property damage, because a minor problem
can create lots of hazard for the site, which is not cared by the workers. As per the
statement of the newspaper and the finding of the goggle, the net worth of company are
approx 1700 cr. And the company achieved standards are ISO 14001:2004

*Date of inspection - 22/02/19


*Time of inspection- 10:00 am to 11:30 am
*Area of inspection – construction site
Storage room
Excavation area
Work place all zones
Wash room
Maintenance department
APPENDIX 4

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number 00471166

Location NUPPL Ghatampur thermal power project Date of review 22 /02 /19

Executive Summary

NUPPL Ghatampur thermal power project at Lahurimau kasimpur, post- samuhi, tahsil-
ghatampur, district- Kanpur nagar-208001 has been inspected for the health and safety
measurement , it was found some good observation as well as some critical
observation, which should be improve as earlier as possible they were:-

It is observed that at ESP area the concrete mixture vehicle driver was stand under the
boom without safety helmet, Safety goggle & reflective jacket, it may be caused fatal ,
fracture, eye injury , head injury , that means the vehicles driver are not aware with the
health and safety responsibility. Management should provide proper training to the
vehicles driver to avoid such major problems; if it reoccurred then disciplinary action
must be taken.

It was observed that, at zone S6, deep open excavation has been found without any
barricading at CW pipe line area. These hazards are irresponsible performance of the
workers, it may cause fall of material, persons, animals or vehicles, which can create
the major accident like fatal, fracture, head injury. To control this irresponsibility activity,
provide the hard barriers, signs and warning light for the prevention from unauthorized
persons entering the site or provide proper training on excavation process by which they
can growth their awareness.

It was observed that, at the zone A6 , there are two person working the hot work of
welding and one empty fuel can kept near the wall, where hot work was carried out ,
which can cause of explosion of fire, To control this hazard , stop working and kept fuel
cane on their proper place , also proper supervision given to workers, how to deal with
hot work.

It was observed that, at the vehicle working station there are no separation pathways of
pedestrians’ or vehicles, All are using the same path for moving and also no any sign
board are using at the site, which can cause collapse of vehicles and pedestrians’, To
control this hazard, management should provide temporary barricading by segregating
pathways immediately as well as provide permanent barricading between the pathways
of pedestrians or vehicles.
APPENDIX 4

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number 00471166

Location NUPPL Ghatampur thermal power project Date of review 22 /02 /19

It was observed that, at the zone S12, there is a work on height is carried out, so
scaffold is used for their working platform but it seems that a worker are trying to
overreaching and his one hand gloves is also missing, which can cause fall of person or
any cut injury in their hand , To control this hazard management should provide the
proper training for how to work on height and provide the hand gloves for performing
their task safely.

The senior management or the director of the company is the accountability person of
the company, his responsibility to provide the safe workplace or safe environment to
carrying out the task safely. The workers faces many problems in their in their daily
activities for earning money for their family and accidents are not the cost paid to the
workers for their daily works. So the senior management take cares of his workers for
performing task in safe manner. If any accident occurs then there are many legal
problem faces by the management or also the money are wasted to fulfil the problems
of incidents, So all the hazard which is discussed above can cause of the major
problems for the management, which should be improved
APPENDIX 4

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number 00471166

Location NUPPL Ghatampur thermal power project Date of review 22 /02 /19
APPENDIX 4

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number 00471166

Location NUPPL Ghatampur thermal power project Date of review 22 /02 /19

Main Findings

1. Operating concrete mixture vehicle without using safety helmet, safety


goggles or reflective jacket.

At the time of operating the concrete mixture vehicles , the driver should must
wear the safety helmet , safety shoes , safety goggles , reflective jacket, all the
essential PPE which is used in that process, if it is not followed then any serious
or major accident can happen, at the time of observation the driver are not using
the safety helmet , safety goggles or reflective jacket, which is very
irresponsibility performance by the driver, which can cause serious accidents if
something falling on their head or some ejected particles enter in their eyes.

Recommendations:

a) It is recommended that provide the proper training to all drivers for the
awareness of health and safety responsibility- INR 30000

b) Higher some competent person for monitoring the work activities- INR 25000

Legal Requirements:

a) Employers have duties concerning the provision and use of personal


protective equipment at work.

b) The personal protective equipment regulations 2002 and the personal


protective equipment at work regulation 1992(as amended) give the main
requirement

2. Excavation has been found without any barricading at CW pipe line area.

All the deep open Excavation should be properly barricaded by hard barricading
System by which no any incidents such as fall of persons, materials, animals, or
vehicles occur, or also proper sign of excavation should be placed at their place,
by which any one can aware with the hazard, at the CW pipe line area it is found
APPENDIX 4

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number 00471166

Location NUPPL Ghatampur thermal power project Date of review 22 /02 /19

that excavation are without any barricading or sign, which can create the major
problems for the workers as well as the management.

Recommendations:

a) It is recommended that provide hard barricading from all side of the


excavation- INR 20000

b) Provide warning lights or proper sign board for alerting the high risk- INR
10000

c) Provide proper training to all the workers about the Excavation process- INR
20000

Legal Requirements:

a) It is legally important that all the Excavation are must be barricaded or proper
warning light or sign board are used at that place

b) When Excavation work is being carried out adjacent to an area where the
public or worker who isn’t usually engaged in the work may pass, an
employer must have ensure that the excavation is adequately guarded by a
fence , guardrail or covering sufficient to prevent a person from falling into the
excavation. OSHA [sec. 26.12(1)].

c) Excavation must be guarded by effective railings or barriers to prevent


workers from falling into excavation. OSHA [sec.410(1)].

3. Hot work was carried out in the workplace, where an empty fuel cane kept
inside the wall.

It is important that all the hot work of workplace will carry in safe way, all the
combustible material should be kept away from that area or those material which
is not able to keep away should be properly covered , at the zone A6, it is
APPENDIX 4

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number 00471166

Location NUPPL Ghatampur thermal power project Date of review 22 /02 /19

observed that there are two workers carried out hot works of welding, and one
empty cane kept near the wall, which can create fire or explosion.

Recommendations:

a) Provide training to the workers, how to deal with hot works- INR 10000

b) Provide suitable storage area to keep the fuel cane on the proper place- INR
30000

Legal Requiremens:

a) Flammable, combustible, or ignitable materials should be kept a minimum of


20 to 35 feet away from the hot work

b) It is important to have a permit signed to show that all phases of the work has
been inspected or approved. OSHA 1917.152

4. Not barricading between the pathways of pedestrians or vehicles.

It is important that pathways of pedestrians’ or vehicles should be segregated


with the hard barricading system by which not any incident of collapse occur
between the pedestrians or vehicles, proper sign board should be placed on their
position for alerting the person, At the vehicle working station, It is observed that
no any segregation of pathway found, pedestrians’ or vehicles both are using the
same pathway, which can create the collapse between them.

Recommendations:

a) It is recommended that provide hard barricading between the pathways of


pedestrians’ or vehicles- INR 50000

b) Provide suitable sign board at their place to alert the person- INR 20000

Legal Requiremens:
APPENDIX 4

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number 00471166

Location NUPPL Ghatampur thermal power project Date of review 22 /02 /19

a) It is legally important to provide the barricading between the pathways of


pedestrians or vehicles OHS-PROC-134

b) All the sign board must be on their place to alert the persons OHS-PROC-134

5. Overreaching at work on height.

The workers working at height should must be follow the safety rules of work on
height, all the equipment which is necessary to used in the process must be
correctly selected, and all personal protective equipments should be used by the
workers, and also work in safe manner, do not try to overreaching, which can
cause the fall incident, at zone S12 a worker working on height and try to
overreaching in their work, which can cause the major accident like fatal or
fracture.

Recommendations:

a) It is recommended to management for providing the training to the workers about


work on height – INR 20000

b) Higher competent person for monitoring the activities – INR 20000

Legal Requiremens:

a) It is legally important to avoid overreaching at work on height. Act 1992(the HSE


act)

b) It is also legally important to monitor the unsafe act at work on height. Act
1992(the HSE act)
APPENDIX 4

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number 00471166

Location NUPPL Ghatampur thermal power project Date of review 22 /02 /19
APPENDIX 4

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number 00471166

Location NUPPL Ghatampur thermal power project Date of review 22 /02 /19

Conclusion

1. The safety inspection was carried out at 3*660 MW NUPPL Ghatampur thermal
power project has been located at vill- Lahurimau kasimpur, post- Samuhi, tahsil-
Ghatampur, District- Kanpur nagar-208001, the inspection shows some good
practice such as some works carried out, where the bricks rails are not present but
the workers are using hard barricading with barricading red net, which save the
persons or object falling from height and also motivate the workers for feeling safe
or eye wash station which is placed near the work station, which is very good for
the eye of the workers but there is also some critical observation found such as hot
work near the flammable fuel cane, pathways without segregating of the
pedestrians’ or vehicles, which can cause the major problems for the workers as
well as the management

There is some point based on the finding, which should be improved, it should be
considered or implemented with immediate effect:-

 Provide suitable and sufficient storage area for the storage of flammable
material
 Provide proper hard barricading between the pathways of pedestrians’ or
vehicles
 Provide warning lights or proper sign board for alerting the high risk
 Provide proper training to work on height
 Instruct the Japanese technique 5s approach for effective housekeeping
 Provide hard barricading system at the CW pipe line area, where open
excavation found.
 Higher some competent person for monitoring the activities
 Provide proper lightening in the access area of the maintenance
department
 Provide proper rest area for taking rest of the workers
APPENDIX 4

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number 00471166

Location NUPPL Ghatampur thermal power project Date of review 22 /02 /19

 Provide proper training on the hot work

All the recommendation which is indicating the poor safety culture ,it should be
improved immediately as soon as possible, The senior management or the director of
the company is the accountability person of the company, his responsibility to provide
the safe workplace or safe environment to carrying out the task safely. The workers
faces many problems in their in their daily activities for earning money for their family
and accidents are not the cost paid to the workers for their daily works. So the senior
management take cares of his workers for performing task in safe manner. If any
accident occurs then there are many legal problem faces by the management or also
the money are wasted to fulfil the problems of incidents, so all the hazard which is
discussed above can cause of the major problems for the management, which should
be improved
APPENDIX 4

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number 00471166

Location NUPPL Ghatampur thermal power project Date of review 22 /02 /19

Recommendations – include as a table in the following format:

Recommendation Likely resource implications Priority Target date

1. Unsafe act hazard The cost of the training- 2000


 Provide proper health INR. Number of people Medium 29/02/19
and safety involved are 15. Total cost of
awareness training training is 30000 INR
 Higher competent
person for monitoring The cost of higher a person is Medium 29/02/19
the work activities 25000 INR

2. Excavation found without


barricading
 hard barricading from The cost of barricading from High 23/02/19
all side of the all side 20000 INR
excavation
 Provide warning light The cost of warning light 5000 High 23/02/19
or proper sign board INR
 Provide proper The cost of sign board 5000 High 23/02/19
training to workers INR
about Excavation The cost of the training- 2000
INR. Number of people
involved are 10. Total cost of
training is 20000 INR Medium 29/02/19
APPENDIX 4

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number 00471166

Location NUPPL Ghatampur thermal power project Date of review 22 /02 /19

3. Hot work carried out near


the empty fuel cane
 Provide training to The cost of the training- 2000
the workers, how to INR. Number of people Medium 22/03/19
deal with hot works involved are 10. Total cost of
 Provide suitable training is 20000 INR
storage area for
flammable material The cost of storage area High 22/03/19
30000 INR
4. Not barricading between
the pathways of
pedestrians or vehicles. The cost of barricading 50000 High 29/02/19
 Provide hard INR
barricading between
the pathways of
pedestrians’ or
vehicles
 Provide suitable sign The cost of sign board 20000 High 29/02/19
board INR

5. Overreaching at work on
height.
 Provide proper The cost of the training- 2000 Medium 22/03/19
training to workers INR. Number of people
about work on height involved are 10. Total cost of
 Higher competent training is 20000 INR
person for monitoring
The cost of higher competent Medium 29/02/19
person 20000 INR