BILL OF QUANTITY

CELL DIAMETRE
PIPE CULVERT
1 - 1000 mm

WING WALL (EACH SIDE)


UNIT
DIA. QTY LENGTH LENGTH TOTAL WEIGHT TOTAL
No. BAR MARK TYPE WEIGHT SHAPE LENGTH (mm)
(mm) (PCS) /PCS (m) (kg)
(kg/m)
A B C
1 B1 DB 16 1.578 1 1630 1 1630 1.63 2.57
2 B2 DB 16 1.578 1 1750 1 1750 1.75 2.76
3 B3 DB 12 0.888 1 2090 1 2090 2.09 1.86
4 B4 DB 12 0.888 1 2550 1 2550 2.55 2.26
5 B5 DB 12 0.888 1 3010 1 3010 3.01 2.67
9 B6 DB 12 0.888 1 3570 3 3570 10.71 9.51
10 B7 DB 12 0.888 1 1370 2 1370 2.74 2.43
11 H1 DB 12 0.888 1 1770 2 1770 3.54 3.14
12 H2 DB 12 0.888 1 1710 2 1710 3.42 3.04
13 L1 DB 12 0.888 2 400 300 13 700 9.10 8.08
14 L2 DB 16 1.578 2 720 600 2 1320 2.64 4.17
15 L3 DB 16 1.578 2 870 600 2 1470 2.94 4.64
16 L4 DB 16 1.578 2 1020 600 2 1620 3.24 5.11
17 L5 DB 16 1.578 2 1170 600 2 1770 3.54 5.59
18 L6 DB 16 1.578 2 1320 600 2 1920 3.84 6.06
19 L7 DB 16 1.578 2 1470 600 2 2070 4.14 6.53
20 L8 DB 16 1.578 2 1620 600 2 2220 4.44 7.01
24 L9 DB 16 1.578 2 500 320 5 820 4.10 6.47
25 U2 DB 16 1.578 3 1370 2170 2170 4 5710 22.84 36.04
27 W1 DB 12 0.888 1 1680 4 1680 6.72 5.97
28 W2 DB 12 0.888 1 975 6 975 5.85 5.19
29 W3 DB 12 0.888 1 1880 4 1880 7.52 6.68
SUB TOTAL WEIGHT (Kg) DB 12 51
SUB TOTAL WEIGHT (Kg) DB 16 87
TOTAL WEIGHT (Kg) 138
TOTAL CONCRETE (m3) 2.50
TOTAL LEAN CONCRETE (m3) 0.20

SUBSTRUTURE

REIN. WEIGHT CRUSHED STONE SAND


NAME QTY. CON. (m3)
No. (Kg) (m3) BEDDING
OF STRUCTURE OF STRUCTURE
DB12 DB16 15MPa 32MPa 150mm THK. 50mm THK.
1 WING WALL AND APRON 2 UNIT 102 174 0.40 5.00 1.38 1.70
SUB TOTAL 102 174 0.40 5.00 1.38 1.70
TOTAL 276 0.40 5.00 1.38 1.70

No. TOTAL METERIAL QTY.


1 REINFORCEMENT (Kg) 276
2 CONCRETE (m3) 5.00
3 LEAN CONCRETE (m3) 0.40
4 CRUSHED STONE (m3) 1.50
5 SAND BEDDING (m3) 2.00
INPUT

A= 0.8 800
B= 1.98 1980
C= 1.69 1690
D= 1.18 1180
E= 3.7 3700
F= 1.41 1410
a= 0.3 300
a1= 0.2 200
b1= 0.2 200

b2= 0.2 200

c= 0.4 400
c1= 0.41 410
H= 1.58 1580
G= 2.29 2290
T= 0.2 200
T-pipe= 0.09 90
QTY.PIPE 1 PCS
BOTTOM KEY AREA VOLUME QTY TOTAL VOLUME
SQM CUM PCS CUM
FRONT 0.06 0.222 1 0.222
BACK 0.082 0.11562 1 0.11562
SLAB
3.4049 0.68098 1 0.68098
LEAN. 50mm THK 3.4049 0.170245
STONE 150mm THK 3.4049 0.689492
WING
2.2161 0.44322 2 0.88644
SUR.CON.
1.955706 0.391141 1 0.391141
PIPE AREA 0.145194

2.296181
SAND BEDDING 0.079 x 14 = 1.659 m3

DIA. (mm) 1000 1500


SAND. AREA 0.079 0.107