1
www.zamoda.my
LEGEND
1 1
1. Turn ‘ON’ incoming AUX. Voltage 415V 50Hz healthy (SESB). Refer voltmeter incoming
aux power supply No.1 & No.2 .
2. Ensure incomings Simulator Circuit Breaker 20A TPN No.1 & No.2 in
‘OFF’ Position
3 3
3. Incoming Neutral Knife switch Simulator No.1 & No. 2 ‘OFF’ position, knife switch
No.1 and No.2 in position up.
2
www.zamoda.my
4. Simulator No.1 speed reostat (ST1) &
No.2 speed reostat (ST2) set at 80% on
setting mode.
3
www.zamoda.my
START FOR SIMULATION SYNCHRONZING NO.1
4
www.zamoda.my
6
5
5. Turn Simulator No.1 neutral ON/OFF knife switch to ‘ON’ mode. IMPORTANT : Make
sure knife switch is at ON position before powering the bus.
5
www.zamoda.my
START FOR SIMULATION SYNCHRONZING NO.2 WITH SYNCH
2
5. Voltage & Frequency available:
Note : 4
To synchronize unit no.1 to unit no.2,
No.1 incoming.
6
www.zamoda.my
7. Adjust Simulator No.2 speed Rheostat (ST2)
clockwise until the pointer of synchroscope
following meter reach 12 o’clock ± 10% and the
8 10
7
www.zamoda.my
STOP SIMULATOR NO.2
Note :
4
Always make sure one of neutral
3 3
This to prevent the loss of neutral
8
www.zamoda.my
STOP SIMULATOR NO.1
COMPLETE SEQUENCE
9